Loading...
HomeMy WebLinkAboutEngrg Dept Review Letter 3®�I IM!f u `� .� April 5, 2013 TAMFs BRYINARD, MAYOR Mr. George Lukas Landwater Group, Inc. 1414 Franklin Street Columbus, IN 47201 RE: McDonald's Restaurant 750 East Carmel Drive remodel - Project Review ##3 Dear Mr. Lukas: The City received your construction plans on April 3, 2013 in response to the City's comment letter dated March 21, 2013. We offer the following additional comments: CONSTRUCTION DRAWING REVIEW COMMENTS 1. Previous Comment 4 of a letter dated August 30, 2012 and Comment 1 of a letter dated March 21, 2013. Please omit Sheet C6.0p, Landscape Plan; and Sheet C7.0p, Site Lighting Plan, from construction sets to be submitted for review by this department. The Department of Engineering does not have approval authority over landscape plans or site lighting plans. The Department repeats this comment. In addition, please omit Sheet C6.1, Landscape Details. Please delete these sheets from the Title Sheet. 2. Previous Comment 16 of a letter dated August 30, 2012 and Comment 5 of a letter dated March 21. Please indicate a 50 -foot half right -of- -way along Carmel Drive consistent with the Thoroughfare Plan. Thank you for indicating the 50 -foot half right -of -way on the site plan. Please indicate this right -of -way on all sheets. This right -of -way is required to be dedicated with this project in order to satisfy the requirements of the Thoroughfare Plan. Please submit the appropriate dedication documents. 3. Previous Comment 18 of a letter dated August 30, 2012 and Comment 6 of a letter dated March 21, 2013. City standard Commercial Drive entrances shall be provided. Please indicate on the plans and provide the City standard Commercial Driveway and Depressed Curb details. Thank you for including the City standard Commercial Driveway and Depressed Curb details. Depressed curb was not indicated on any of the site plan sheets however. Please include the depressed curb on the Site Development Plan and Grading & Drainage Plan, at a minimum. 4. Previous Comment 23 of a letter dated August 30, 2012 and Previous Comment 8 of a letter dated March 21, 2013. All proposed ADA ramps within the public right -of -way shall meet the INDOT specifications for ADA ramps. Please provide the INDOT standard details. The City requires INDOT standard ADA ramps within the right -of -way. Please include the applicable INDOT standard ADA ramp detail. 5. Please move the sign at the southwest corner of the project outside the proposed 50 -foot half right -of -way. If you have questions, please contact me at 571 -2441. Sincerely, a ary Du F P. Assistan City Engineer DFP-�RTMENT oi' F vc,i �hratl c; ONF C MC S(,n-.v E. CARMH.. IN 46032 OFFIci 317.571.2.441 FAN 3I7,571.2-439 EMAIL ungiriuvru1g1f9c rim-1 m.rgoc Mr. George Lukas March 21, 201; RE: McDonald's Restaurant 750 East Carmel Drive remodel- Project Review #2 Page 2 of 2 Department of Engineering cc: Angelina Conn, Department of Community Services John Duffy, Cannel Utilities Paul Pace, Carmel Utilities Paul Arnone, Cannel Utilities Greg Hoyes, Hamilton County Surveyor's Office Greg llko, Crossroad Engineers, PC issvrappsluser dalalzAshared0evelopment Revie%�,sIPROJREV l 31 MCDONALD 'SRES'FAURAN'IREMODELREV#3