Loading...
HomeMy WebLinkAbout06040025.15APRON AT STABILIZATION ---------------------------- A ZERO GRADE A A A PRACTICE: JAN. FEB. MAR, APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. PERMANENT A ////1 / /// 0/ 1 / ► SEEDING _ _ _ _ REALTY CORPORATION EROSION CONTROL BLANKET REQ'D. TEMPORARY B C 600 East 96th Street ______ -- ________ NORTH AMERICAN GREEN SC150 OR EQUAL SEEDING D —*///1 / / /� -� Suite 100 o BLANKET TO BE STAPLED IN PLACE -0 v° - - 15' -0" WITH STAPLES AT 2 PER SQUARE YARD. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Indianapolis IN 46240 ______ E Phone: (317 808 -6000 MULCHING Fax: (317 808-6797 SC -150 __- EDGE OF BLANKET SHALL BE - - - - - - - - - - - - - - - - - - - - - - -- - - - - -- 7' -0" BE ANCHORED IN A 6" DEEP EDGE OF BLANKET SHALL BE �� �— X 6" WIDE TRENCH. BE ANCHORED IN A 661 DE_/ 4;1 MAXIMUM SLOPE A = KENTUCKY BLUEGRASS 40 %, TURF TYPE TALL FESCUE 40 %, ANNUAL RYEGRASS 20% X 6" WIDE TRENCH. PLUS 2 TONS OF STRAW MULCH/ ACRE PROPOSED DITCH APPLY MIXTURE AT A RATE OF 2 LBS. PER 1000 SQ.FT.zl'' B = SPRING OATS 3 BUSHEL PER ACRE ti APRON LENGTH VARIES EDGE OF BLANKET SHALL BE ANCHORED IN A 12" DEEP X 6" WIDE TRENCH. C = WHEAT OR RYE 2 BUSHEL PER ACRE, APRON LENGTH NO NOTE: ALL EROSION CONTROL BLANKETS SHALL BE INSTALLED D = ANNUAL RYEGRASS (1 LB. PER 1000 SQ. FT,) OVERFALL PER MANUFACTURER'S RECOMMENDATIONS BASED ON THE E = STRAW MULCH 90 LBS. PER 1000 SQ.FT. NO PROPOSED TYPE AND USE. ( ) \ OVERFALL�" - IIHII -II 1 H7 TYPICAL EROSION CONTROL BLANKET �/ 1 /0 IRRIGATION NEEDED DURING JUNE, JULY, AND / OR SEPTEMBER. ' ar J TiJ/1nT DDT -Ti- i= NO SCALE g. r n\JLJJ� 1`1 III-III I I I LMM r ; ➢T �l . IIIIHII III -I 11� ='i' -_ II I =11 III -II I IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD 7140 Waldemar Drive FILTER NOTE: ALL SEEDING SHALL HAVE 12 -12 -12 FERTILIZER APPLIED Indianapolis, Indiana FABRIC FILTER 400 -600 LBS. PER ACRE OR AS SPECIFIED. FABRIC 46268 -4192 DANDY BAG 0 1 * ROCK CHUTE NO SCALE SEEDING SCHEDULE FAX: 31 .299. 1500 INSTALLATION AND MAINTENANCE GUIDELINES NO SCALE INSTALLATION: REMOVE THE GRATE FROM CATCH BASIN, IF USING OPTIONAL OIL ABSORBENTS; VARIES* VARIES* PLACE ABSORBENT PILLOW IN UNIT, STAND THE GRATE ON END, MOVE THE TOP LIFTING STRAPS y y P OUT OF THE WAY AND PLACE THE GRATE INTO THE DANDY BAG 0 1 SO THAT THE GRATE IS Z z 7'x2" DST (TYP.) 2 "x2" POST (TYP.) BELOW THE TOP STRAPS AND ABOVE THE LOWER STRAPS. HOLDING THE LIFTING DEVICES, INSERT a a THE GRATE INTO THE INLET. m m L� L, NON-WOVEN FILTER FABRIC NON -WOVEN FILTER FABRIC MAINTENANCE: REMOVE ALL ACCUMULATED SEDIMENT AND DEBRIS FROM VICINITY OF UNIT AFTER ° ATTACHED TO ALL SIDES ATTACHED TO ALL SIDES EACH STORM EVENT, AFTER EACH STORM EVENT AND AT REGULAR INTERVALS, LOOK INTO THE a 3:1 SLOPE MAX. o O � INLET INLET DANDY BAG ®II, IF THE CONTAINMENT AREA IS MORE THAN 1/3 FULL OF SEDIMENT, THE UNIT / 10:1 SLOPE MAX. 3:1 SLOPE MAX. MUST BE EMPTIED. TO EMPTY UNIT, LIFT THE UNIT OUT OF THE INLET USING THE LIFTING STRAPS NORMAL POOL 2 "x2" INTERIOR REINFORCEMENT 2 "x2" INTERIOR REINFORCEMENT AND REMOVE THE GRATE. IF USING OPTIONAL OIL ABSORBENTS; REPLACE ABSORBENT WHEN NEAR �� V� 3:1 SLOPE MAX. ELEVATION SATURATION, o 0 2 "x2" (TYP,) GRATE X I o Wg �0�00 o 10' SAFETY 10' SAFETY LIFT STRAPS �r LEDGE AT A LEDGE AT A 10:1 SLOPE 10:1 SLOPE � wz 3:1 SLOPE MAX. >a 3:1 SLOPE MAX, PLAN - PAVED AREAS PLAN - GRASS AREAS DANDY BAG ® II 12' 2 "x2" INTERIOR REINFORCEMENT 2 "x2" INTERIOR REINFORCEMENT NOTES: o CURB INLET 1. STRIPPING OF TOPSOIL PRIOR TO EXCAVATION 2 "x2" POST (TYP.) GRAVEL FILTER* o o WIRE MESH OR FILLING IS REQUIRED. ENCIRCLING ATOTACHOEDENOFI ALL RSIDES BRIO 2. LAKE TO BE CONSTRUCTED WITH A 4" THICK NON -WOVEN FILTER FABRIC -DANDY BAG 0 1 SEDIMENT o o BOX (TYP.) INLET BOX TO ALL SIDES INLET C CLAY LINER FROM ON SITE MATERIAL. c `'"DEN LAKE SECTION RUNOFF � -STANDARD FABRIC IS AN o O O \ ^ NO SCALE MIN. FABRIC � � N � ORANGE WOVEN MONOFILAMENT� O, , iu� PAVEMENT o PAVEMENT 2 "x2" POST (TYP.) W DUMPING STRAP ALLOWS FOR FILTERED ELEVATION - PAVED AREAS ELEVATION - GRASS AREAS J Q EASY Q REMOVAL OF CONTENTS WATER r c ca Y \ cl) SIDE VIEW SHOWING INLET SIDE VIEW SHOWING INLET Z G (CONSTRUCTION SAME AS ABOVE) ( CONSTRUCTION SAME AS ABOVE) THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS, GRAVEL CURB INLET SEDIMENT FILTER SIDE VIEW - PAVED AREAS SIDE VIEW - GRASS AREAS NO SCALE NOTES: *DANDY BAG II OR APPROVED EQUAL NON -WOVEN FILTER FABRIC ATTACHED TO ALL SIDES OF BOX SILT BOXES TO BE LOCATED AT EACH CATCH BASIN. 0-1 3 *DIMENSIONS T THE SIZE OFOINLEEOTXAND LDEPTTH OF ACCORDING TO INLET PROTECTION � NO SCALE X SILT BOX DETAIL NO SCALE N U < SLOPE CHECK DITCH CHECK JOINING FENCES W Q Q �� POST NON -WOVEN FABRIC POST CUg A FLOW BACKFILL Y/ Q . ? GROUND - -T� cn z � RT��` LINE Q cn X OP 3/4" BLACK RUBBER HOSE TT1�1� - �I -T= �^ Z ter' ,^ 11= 1 =11 EXISTING = II�II�II�III- W REMOVE ANY BINDING -II � N F 2 "x2 "x8" HARDWOOD STAKES � � AROUND PLANT STEM 2 PER TREE WITH #12 GALV. WRAP TRUNK � SOIL II WIRE & 112" HOSE LOOP TO FIRST BRANCH 3" HARDWOOD NON -WOVEN BOTTOM OF MULCH WHEN JOINING TWO OR MORE FLARE ROOT SHALL BE FILTER FABRIC 6" X 6" TRENCH DITCH SILT FENCES TIE THE TWO L) 3" SHREDDED REMOVE BINDING AROUND 7x19 GALV. GUY WIRE AT GROUND LEVEL EXTENDS INTO TRENCH END POSTS TOGETHER WITH � N TRUNK AFTER PLANTING t REMOVE UPPER FINISH GRADE EXISTING NYLON CORDS. uj O E HARDWOOD MULCH AND STAKING 2" SHREDDED HARDWOOD MULCH 1/30F BURLAP SILT FENCE DETAIL Q All �II�I ": III-11 NO SCALE Q0 75 CREATE 4" SAUCER FLARE ROOT SHALL BE REMOVE BINDING FROM 111 11 111=11 III- CD ctf - - AT GROUND LEVEL STEEL TEE FENCE POST 24 "� TRUNK AFTER PLANTING 1T1= iii= AND STAKING TREE _ - O Q SOIL MIX: 3 PARTS 6•, �. Tr O O 1 III= III =11 `J- IIIJI FINISH GRADE TOPSOIL & 1 PART i - - _ _:'' B & B OR CONTAINER 11 =T�11 « III; .IN.: O U L Q� �' III -III- � PEAT. _ REMOVE UPPER ;; ., SOIL MIX: 3 PARTS I- III -I III -I III II III- SUBGRADE -m _ GROWN ROOT BALL X � ti� �. 1/3 OF BURLAP _ -11 '�F:::= .;:!`_` 1� TOPSOIL & 1 PART - � � PEAT. iTT= Ti o ° O -T IEI -I III C = TE TWICE BALL DIA O g - I_ I I =1 I �I I ��1 I �� ,� -I I I I i-I I�, .�- I I f � I1 =i N - - SCARIFY POT 0 _ - `i 1� eourvD PLANrs EROSION CONTROL SCHEDULE he SUBGRADE NOTE: l�lm =T II a HARDWOOD STAKES SHALL � r EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE O ° o BE DRIVEN A MIN. OF 30" SHRUB PLANTING DETAIL Q N (D p z Q INTO THE GROUND NO SCALE INSPECT WEEKLY, AFTER STORM EVENTS, AND AFTER HEAVY USE; O p (6" STONE DEPTH o AMENDED PLANTING SOIL p (MIN) o EVERGREEN PLANTING DETAIL �. STONE ENTRANCE TOPDRESSPWIDTH AS CLEAN STONE OR DRAINAGE EEDEDA REMOVE ALLCMUD CONTROL; PRIOR TO CLEARING AND GRADING N II � a ° M a ° NO SCALE SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS IMMEDIATELY ° it r TREE PLANTING DETAIL INSPECT AFTER STORM EVENTS; REPAIR ANY AREAS OF DECOMPOSITION O n N FLOW NO SCALE OR DAMAGE TO FENCE MATERIAL; REMOVE SEDIMENT AT DEPTH OF ONE � w !`'�_�,,; SILT FENCE HALF FENCE HEIGHT AT LOWEST POINT OR IF FABRIC BULGES; AVOID PRIOR TO CLEARING AND GRADING N Upµ - a UNDERMINING DURING CLEANOUT U EXISTING INLET PROTECTION WEEKLY, AFTER STORM EVENTS, AND AS NEEDED PRIOR TO CLEARING AND GRADING C 3 TREE PROTECTION WEEKLY, AFTER STORM EVENTS, AND AS NEEDED PRIOR TO CLEARING AND GRADING GRADE 0 1% OR INSPECT WEEKLY AND AFTER EACH STORM EVENT; REMOVE SEDIMENT AS SHOWN BELOW FROM CHANNEL AND REINFORCE RIDGE AS NEEDED; REPAIR OUTLET Q ( TEMPORARY DIVERSIONS DAMAGE IMMEDIATELY; REMOVE SEDIMENT FROM TRAPS WHEN 50% FULL; ALONG WITH ROUGH GRADING WHEN WORK AREA IS STABILIZED, REMOVE RIDGE, FILL CHANNEL, REMOVE N TEMPORARY SLOPE DRAINS, AND STABILIZE ALL DISTURBED AREAS NUT W/ I Ln LOCKING WELDED CAP INSPECT AFTER STORM EVENTS; REMOVE SEDIMENT AT ONE HALF DESIGN CID 50' 25' WASHER TEMPORARY SEDIMENT TRAP DEPTH; REPLACE SPILLWAY GRAVEL FACING IF CLOGGED; REPAIR EROSION DURING CLEARING AND PRIOR TO GRADING 0 1% 0 2% AND HOLES AS NEEDED; REPLACE DISPLACED RIPRAP N 3/4" BLACK RUBBER HOSE INSPECT PERIODICALLY TO VERIFY ADEQUATE ESTABLISHMENT OF Certified By: 1n (n VEGETATIVE STANDS; RESEED AND MULCH AS NEEDED; INSPECT AFTER WRAP TRUNK TO STOP ROUND HEAD TEMPORARY SEEDING STORM EVENTS AND REPAIR EROSION DAMAGE; TOPDRESS FALL SEEDED AFTER ROUGH GRADING STEEL ® . EEO' DC FIRST BRANCH M f BOLTS WHEAT OR RYE SEEDINGS WITH 50 LBS /AC OF NITROGEN IN FEBRUARY POST PROFILE . -- OR MARCH IF NITROGEN DEFICIENCY IS APPARENT; WATER AS NEEDED N Q U REMOVE BINDING FROM 7x9 GALV. GUY WIRE INSPECT PERIODICALLY AND AFTER STORM EVENTS UNTIL VEGETATIVE NOTE: TRUNK AFTER PLANTING STAND IS ESTABLISHED; ADD FERTILIZER AFTER GROWING SEASON PER (15 O IN 1. STONE SIZE SHALL CONFORM TO ASTM D48 lie -U AND STAKING TREE 2" SHREDDED HARDWOOD MULCH 3" O.D. PIPE PERMANENT SEEDING SOIL TEST RECOMMENDATIONS; REPAIR DAMAGED, BARE, OR SPARSE AFTER FINISH GRADING OF EACH AREA SIZE #1 (1 1/2" TO 3 1/2" DIA.). WITH A SIMILAR AREAS BY FILLING, REPREPARING THE SEED BED, FERTILIZING, AND /OR - - -- - -- - - -- , -• O � 2. PERIODIC 2" STONE TOP DRESSING & WASHING COLOR FINISH SEEDING AND MULCHING U AS REQUESTED BY COUNTY /CITI STEEL TEE FENCE _, °'fV I N POST 24" CONC. OR INSPECT FOR AREAS OF EROSION BELOW THE BLANKET AFTER EACH y ' ° PAVER SLOPE TO DRAIN EROSION CONTROL BLANKET STORM EVENT; REPAIR AREAS OF EROSION BY REMOVING AFFECTED AFTER FINISH GRADING PORTION OF BLANKET, ADD SOIL, RESEED, RELAY AND STAPLE BLANKET;'`1;�L -`� %� E Cp 3: TEMPORARY CONSTRUCTION N FINISH 1/4" SLOPE PER FOOT NSPECT PERIODICALLY AFTER VEGETATION IS ESTABLISHED o -0 ENTRANCE DETAIL y �9 O N O NO SCALE F INSPECT THE BALES AFTER EACH STORM EVENT; REMOVE SEDIMENT r7 O SNOW FENCE ALONG DEPOSITS TO PROVIDE STORAGE FOR THE NEXT STORM BEING CAREFUL .. Drawing Number: X O DRIP LINE OF TREE m STRAW BALES NOT TO DAMAGE OR UNDERCUT THE BALES; REPLACE DAMAGED OR AFTER FINISH GRADING 9 (FENCE TYPE TO BE DETERIORATED BALES IMMEDIATELY SUBMITTED FOR REVIEW) AMENDED PLANTING SOIL FOR TREE PLANTING #5 INSPECT FABRIC BARRIER AFTER STORM EVENTS AND MAKE NEEDED 0 C7 CLASS 'A" CONCRETE N TREE PROTECTION DETAIL 12" INLET PROTECTION REPAIRS IMMEDIATELY; REMOVE SEDIMENT FROM THE POOL AREA WHILE AFTER EACH INLET IS PLACED O NO SCALE AVOIDING DAMAGING OR UNDERCUTTING THE FABRIC SEED, SOD & LANDSCAPE KEEP SOD MOIST UNTIL FULLY ROOTED; WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS 13 Of 13 Sheets Ln TREE PLANTING DETAIL ON SLOPE AROUND UNITS FINISHED °J Q0 NO SCALE STOP SIGN DETAIL NO SCALE REMOVAL OF STRAW BALES N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED Dube Realty Job Number Z v REMOVAL OF INLET PROTECTION N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED p V1/V1/3 01- 0 01 R / REMOVAL OF SILT FENCE N A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED p O I- > Un O A/E Job Number: 0 i .. 65493 J J C�