HomeMy WebLinkAbout06040025.9CD
0
I
I
CD
I
C2
3
i
I1r)
,n
cD
a
I
Q0 cl�
cD
N
n-
,. �
i
I`
cD
T -
3 cn
7
CD
0
a� �
O O
_0 rl
0
o a
_0
0 0
I I
r\
L.l) In
cD �
in p
Q
Q)
X /
70
� U
is - /
Q a;
'71 �
C M) O
E t7
O N p
C
O �
to O
0 c�
C�
0 a
CD
C) co
U rq
Q� Ln
-C CO
o
Z M v
C)
0
V) Q
0 -.-� (n
>' 1n /
J J C�
-845- EROSION CONTROL NOTES
-- - -� -- = - - - -' •�, -, . - - -_ `' WPPP ARE INCLUDED AS
Al PLAN INDEX ITEMS RELATING TO THE S
�- -- ' NOTES ON THIS SHEET 2. CONSTRUCTION MATERIALS AND THEIR PACKAGING
J TEMPORARY CONSTRUCTION ENTRANCE
cp A. EROSION CONTROL MEASURES SHOWN ON THESE PLANS
(� � Q� � CD - ! 45.89 M.E.G. . A2 N/A SHALL BE IMPLEMENTED PRIOR TO AND DURING
F4-5-..3-21 M G R�
.E.
TJ
C
� :� �9 ' - �. .�,. ! -_„ _. •;,;. Y, � A3 THIS PROJECT INVOLVES THE CONSTRUCTION OF A FOUR LEVEL CONSTRUCTION IN THE PROPER SEQUENCING TO MINIMIZE
�_, _..) tc;t:.irx:.,::: -• . _..,..,,.. ,. -_ ..:.. .. crr..,._..._.., ..:. __.....«...... - _ :.,.., ",L:•::_ e:: = ':- �r -.._." .r �;`�:- ":_. "..:: � rte.-" r,'= "`TM`s. -.`�z -. .-- -
-- PARKING STRUCTURE, PARKING LOTS, ENTRANCE DRIVES, SOIL EROSION. EROSION CONTROLS SHALL BE INSPECTED
F -�
1 �;, / " (• `�� , �P4S - - _ 4 . 9
4-4-28 M.E.G. Ff NOfZTH SIDEWALKS, AND STORM SEWER. AND MAINTAINED AS DESCRIBED ELSEWHERE IN THESE
-- �� 4 M:E.G. PLANS. EXCESSIVE DUSTING OF SOIL ON THE SITE SHALL
- 3 7 A4 THE VICINITY MAP IS LOCATED ON SHEET C000, BE MINIMIZED BY REDUCING CONSTRUCTION TRAFFIC
- - - �- -T- 4 .- - 4� -
! 8�` 67• - ACROSS BARE SOIL DURING DRY AND /OR WINDY WEATHER,
I
-843 0 30 60 g0 A5 LEGAL DESCRIPTION PROVIDED ON SHEET C100. AND BY APPLYING WATER OR OTHER ACCEPTABLE DUST
45. W. 844 7b Wy 44 4 LATITUDE 39 55 45 N LONGITUDE 86 09 12 W ION OF
CONTROL MEASURES TO THE SOIL UPON COMPLETION
844 25 - - 844.40
43,90 CONSTRUCTION AND SUITABLE ESTABLISHMENT OF
- oa GRAPHIC SCALE IN FEE( A6 LOT BOUNDARIES ARE SHOWN ON THE PLAN PERMANENT VEGETATION, TEMPORARY EROSION CONTROL
'539_ $4q �.\ g 2 MEASURES SUCH AS SILT FENCE, CHECK DAMS, AND INLET
844,00 5 A7 HYDROLOGIC UNIT CODE: 05120201090050 PROTECTION DEVICES SHALL BE REMOVED IN A MANNER TO
=,
843.50 1 7
MINIMIZE ADDITIONAL LAND DISTURBANCE. ANY AREAS
- -- 84 �5 -" ,_, AS IDEM SECTION 401 WATER QUALITY CERTIFICATION DISTURBED BY THESE OPERATIONS SHALL BE PROPERLY
844.50 REVEGETATED.
845,35 844,25 -
l'i
844.85.45 % _ - - �g� ;; - !' , , - f O O O A9 STORM WATER WILL DISCHARGE INTO THE EXISTING DRAINAGE
_ 5 �_ _ 8 ,0 `? � SYSTEM FOR THE COMMERCIAL DEVELOPMENT, WHERE IT WILL BE B. LARGE WASTE MATERIALS CREATED BY CUTTING, SAWING,
- - - - - - J - R -B ROUTED THROUGH TWO DETENTION PONDS, AND OUTLET TO DRILLING, OR OTHER OPERATIONS SHALL BE PROPERLY
845:Oflr- 845.00 ' DISPOSED OF IN SUITABLE ONSITE WASTE CONTAINERS.
_ - - - - = -'TC X36 T2 ` STORM SEWER ALONG 96TH STREET.
& 845.50 ` EX -- THE SITE SHALL BE CHECKED AT THE END OF THE DAY,
`" ,a ►� 38 845.00 t \ L. Jf:1; --- A10 ALL LAKES AND WATER COURSES ON AND ADJACENT TO THE SITE AT A MINIMUM, AND ALL WASTE MATERIALS, INCLUDING
l -� ARE SHOWN AND LABELED ON THE PLAN. NO WETLANDS ARE THOSE BLOWN ACROSS OR OFF THE SITE BY WIND, SHALL
` ~ `� LOCATED ON THE SITE. BE PICKED UP AND DISPOSED OF IN SUITABLE
201 ,�39 f F` 1 - r- �-
�'" `
�___J CONTAINERS WHERE POSSIBLE, OPERATIONS SUCH A
qq �, _ A11 THE ULTIMATE RECEIVING WATER IS THE WHITE RIVER, SAWING THAT CREATE SMALL PARTICLES SHOULD BE
834,50 LEVEL 1 .-...
k PERFORMED IN ONE SPOT IN AN AREA PROTECTED FROM
_ I WIND, AND WASTE PARTICLES COLLECTED AND DISPOSED
835'.00 F•F•E•° 845.00 Al2 NONE. OF FREQUENTLY TO MINIMIZE WIND DISPERSAL, PACKAGING
TC 833.7 I I 834.50 - - -
E I { aka- A13 THERE ARE NO FLOOD PLAINS, FLOOD WAY FRINGES OR FLOOD USED TO TRANSPORT MATERIALS TO THE SITE FOR
BT 828.8; L-_ .._J = j T j WAYS ON THE SITE: CONSTRUCTION F THE FACILITY SHALL BE DISPOSED OF
4.5 I 0
1 W A14 - PROPERLY, WHETHER THE MATERIAL IS TAKEN OUT OF ITS
34,00 ❑
P
- ', � PRE CONSTRUCTION PEAK DISCHARGE: 4.57 CFS (10 -YEAR PACKAGE AND INCORPORATED INTO THE PROJECT
POST- CONSTRUCTION P€AK PISGHAR� €: 4:90 IFS (10 -YF�R} IMMEDIATELY STORED NSfTE FOR FUTURE USE.
MEDIATEL OR OR p
' 834.50 PACKAGED MATERIALS STORED ONSITE SHALL BE INSPECTED
REGULARLY AND ANY LOOSE PACKAGING SHALL BE
835.70 A15 ADJACENT LAND USES.
SUE -LEVEL
834, 20 7 REPAIRED OR DISPOSED OF PROPERLY.
? ; -.,.: �., L /REI /7 �1�IURIAZ NORTH: COMMERCIAL
C. ALL DEWATERING ACTIVITIES SHALL BE DONE IN
F F.E.= 834.50 rI SOUTH: COMMERCIAL
f1i
�x l,4 NA /IVSU Ra/VCE BIJI! L�/A/6) EAST: COMMERCIAL ACCORDANCE TO GOOD EROSION CONTROL PRACTICES.
i THESE PRACTICES SHOULD INCLUDE THE USE OF DIRT
8,�7- F.F.E. 838.45
`' 1 c 8.20 �+I E G.
1--' COMMERCIAL ERCIAL
TC 834.01 F r \ ut ° 3j BAGS SUCH AS DANDY DIRT BAGS. THE USE OF THESE
BTV 829.1 , L ! 835,00.'> L TYPES OF DEWATERING DEVICES WILL REMOVE LARGE
834.50 :i A16 CONSTRUCTION LIMITS ARE SHOWN IN THE PLAN VIEW.
834,50 " _ _ ... _.. ....
QUANTITIES OF SILT, SEDIMENT, AND DIRT AND PREVENT
A17 LANDSCAPED ISLANDS, THESE MATERIALS FROM ENTERING THE STORM SEWER
THE EXISTING PARKING LOT CONTAINS DSC S SYSTEM
3 IS BORDERED BY GRASS AND TREES.
L ,
D. IF THE USE OF LIME i5 USED TO STA$ILJZE THE SOIL OF
A18 SOILS INFORMATION:
Br - BROOKSTON SILTY CLAY LOAM THE SITE THEN ALL CONSTRUCTION EQUIPMENT USED
836.53
g 4 210 SHALL BE CLEANED OF ALL EXCESS MATERIAL WITH WATER
3) I I c i ` `3� - _. - -_ 834.87 A19 ALL PROPOSED STORM WATER SYSTEMS ARE SHOWN IN THE PLAN IN THE CONSTRUCTION STAGING AREA.
VIEW, DETAILED INFORMATION CAN BE FOUND ON C300.
00. E. NUTRIENTS AND FERTILIZERS SHALL ONLY BE USED TO
ESTABLISH RAPID VEGETATION. WHEN THESE PRODUCTS
i _ A20 THERE IS NO OFF -SITE CONSTRUCTION ACTIVITY PLANNED WITH
THIS PROJECT. ARE UTILIZED, THE USER SHOULD PAY STRICT ATTENTION
83'4.25 - _
833.75 _ I I '•- " `- •_. ,,_. ,-
a I 9 6.22 -hTR - -� TO THE PRODUCTS RECOMMENDED USAGE.
I
+ ' • I 1 ! I = - 4. 2 ' 32 „ _ W1P - -1' --- r A21 THERE ARE NO SOIL STOCKPILES PLANNED FOR THIS PROJECT.
- - --�=
IF, ;::, I 614 SEE EROSION CONTROL INSTALLATION DETAIL,
} IP 1 _ k` WTR _-
(I Y + 834.50 `� .E 35.0 -- Q�"', �1 4 I I A22 EXISTING TOPOGRAPHY IS SHOWN ON SHEET C100,
202 `.. 834,5 B15 NOT APPLICABLE.
P A23 PROPOSED CONTOURS ARE PROVIDED IN THE PLAN VIEW (SHEET
CID
1 ``' C1 0 INDICATE DRAINAGE PATTERNS C1 EXPECTED POLLUTANTS WILL BE MINIMAL IN NATURE,
34.40 + 7,20 M.E.G. "� - -- -- f� _ - - _ 11) T POST- . OIL GREASE, ANTIFREEZE, GASOLINE, ETC.
- 3 T NT G EAS
M.E.G. I Bi POTENTIAL POLLUTANT SOURCES DURING CONSTRUCTION ACTIVITIES MAY OCCUR IN LIMITED AMOUNTS AS A RESULT OF THE MAJORITY
OF THIS PROJECT SITE BEING USED FOR EMPLOYEE PARKING.
-- - - INCLUDE CONCRETE WASTE WATER, TRASH FOSSIL FUELS, OIL,
_ L
634.5C I - - - - - - - - - - -' THE ONLY OTHER REASONABLY FORESEEN POLLUTION FROM THIS
1: t GREASE, PAINT. EXPOSURE OF THESE POLLUTANTS TO STORM SITE WILL BE LITTER AND TRASH DUMPED BY EMPLOYEES.
- WATER RUNOFF SHOULD BE MINIMIZED BY PERFORMING ACTIVITIES
34.50 SUCH AS EQUIPMENT STORAGE, REFUELING, MAINTENANCE AND
I., 834.80 ; 208 C2 ALL EROSION CONTROL MEASURES AS SHOWN ON THE PLAN VIEW
I �•'4 34,30 ' l _ - I ° PORT -A -LET PLACEMENT IN DESIGNED AREAS: W! BE STALLED BEFORE ANY DISTURBANCE OF TH PROJECT
IN E
834 ❑ 1 ',�{'�,- OCCURS. FINAL STABILIZATION OF THE SITE WILL BE
933. 18 L _ - _ _ _ - _ - 35:95 k1E,C. B2 CONSTRUCTION SEQUENCE IS PROVIDED ON THIS SHEET.
E'x 35.0 U ACCOMPLISHED USING PERMANENT SEEDING OF ALL OPEN AREAS
1 ts27.98 1- a rnn 834.5 '- - 36:03 M•EG� LANDSCAPING WITH MULCH WHERE APPLICABLE, AND PLACEMENT
35.5 M.E. r 83- THE APPROPRIATE EROSION CONTROL MEASURES ARE SHOWN
ED -'1 89 IN THE PLAN VIEW AND DETAIL SHEET C501. OF ASPHALT PAVEMENT.
i r - 8'3z BID WATER QUALITY WILL BE HANDLED THROUGH TWO SEPARATE C3 THE OWNER HAS A PRACTICE OF MAINTAINING ALL PARKING
AREAS ON A WEEKLY BASIS. THIS MAINTENANCE INCLUDES
_ -- - - - - -- - -I PASS NTHROUGHDTWO DETENTION PONDSLWHERE SEDIMENT AND
I • -14 r � � � � � r � FREQUENT SWEEPING OF ALL PAVED SURFACES AS WELL AS
i - - COLLECTION OF ANY LITTER DURING CART RETRIEVAL EFFORTS,
OTHER POLLUTANTS WILL SETTLE OUT. ALL GREEN SPACES WILL BE MAINTAINED WITH REGULAR MOWING
~ I I �Ir - - - _ - - - I I ` 611 SEE SEEDING SCHEDULE DETAIL THIS SHEET, DURING GROWING SEASONS, MINIMAL FERTILIZER APPLICATIONS
)� V ` WILL OCCUR TO THE GREEN SPACES.
r !I I I B12 SEE EROSION CONTROL INSTALLATION AND SEEDING SCHEDULE
C4 POST CONSTRUCTION STORM WATER QUALITY WILL BE
a� _= _ -._, _- - \� ` : �, 834 j ���' -' DETAILS, ACCOMPLISHED THROUGH TWO DETENTION PONDS.
INV 827.., - i 833
-- --
n - P N PLAN: IN OR
21 " RCP - 8 2 . - I 813 MATERIAL HANDLING AND ILL PREVENTIO LA DER TO
' LL _'.;.! - �--� r I C5 MAINTENANCE OF ALL STORM WATER POLLUTION PREVENTION
r _ _
�. „ - - - - - - - I- - - MINIMIZE THE RELEASE OF POTENTIAL POLLUTANTS DURING
MEASURES WILL BE THE RESPONSIBILITY OF THE PROJECT
l r CONSTRUCTION THE CONTRACTOR SHALL IMPLEMENT THIS MATERIAL OWNER, UTILIZING PROCEDURES OUTLINED ON THESE PLANS,
208 14 I I HANDLING AND SPILL PREVENTION PLAN, THE CONTRACTOR THE MAINTENANCE GUIDELINES CONSIST MOSTLY OF GOOD
207 1� SHALL REVIEW THIS PLAN WITH ALL SUBCONTRACTORS AND HOUSEKEEPING MEASURES. ANY GRASSED OR VEGETATED AREAS
� I 205 ''. - ,,t.,;:.� - - I
I REQUIRE THAT THEY IMPLEMENT THE PLAN AS WELL IF A SPILL THAT EXPERIENCE EROSION FROM RAINFALL EVENTS SHOULD BE
POND ;•�s" I J SHOULD OCCUR PLEASE CONTACT THE APPROPRIATE AUTHORITIES
REPAIRED AND REVEGETATED AS SOON AS POSSIBLE, TRASH OR
_ u BELOW: LITTER SHOULD BE PICKED UP AND PROPERLY DISPOSED TO
206
PREVENT IT FROM GETTING INTO THE STORM DRAINAGE SYSTEM
® -
EMERGENCY RESPONSE AND DOWNSTREAM WATERWAYS.
cp ❑ 911
�I
.S
1 1
t
o c 831.101 f_.... _....�
r, t
I. I 1
EROSION OF THE DETENTION POND BANKS SHOULD BE
1 I�` ,,�y�` - , � I -�\ INDIANA DEPARTMENT OF NATURAL RESOURCES
I �* : 833 :- II ADDRESSED AS SOON AS IT BECOMES VISIBLE BY FILLING THE
I
cal E .
BTV 82:.61 (_- _J ( 1 } 477 -8773
\ �.. _ __ .. _, . -_ . _ ,.. _ _... - S90'Qfl'QO "E - ER AREA WITH TA I A ESTABLISHING VEGETATION
- 8 2 ERODED w SUITABLE SOIL AND
IMMEDIATELY, PREFERABLY BY SODDING. THE SAME MEASURE
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
~ I st SHOULD BE USED FOR STEEP BANKS OF ANY BERMS OR
_ `� `: ' i � '� ., '.. ' -- _.835- �. _....., � ._ r.._ - _ J • _ ( ) 233-7745
1 SWALES. THE PONDS SHOULD ALSO BE MONITORED FOR
SOIL AND WATER
CAI !On! �qC %[J�l,.�4S�;t9C ;VT: IAl;F. � - - -. � �7- - -- - -- - _..... _ . _ - BE
?ir1i - - - -- _- - - - - -- �_ - - -- -- - - - - -- \ I HAMILTON 73-1406 HBOTT F �F T P POND SECEMENT SIHOULD NT
I HE 0 H
' SEDIMENT (LESS T 2 E DEEP), E ED
�, I REMOVED AND REPLACED ONSITE, AN ENGINEER SHOULD BE
J \ - ., je ._ 1 CONTACTED TO IDENTIFY THE SOURCE AND RECOMMEND REPAIRS.
o n �� /��� _n I I CITY OF CARMEL - DEPT. OF ENGINEERING /STORMWATER
\ o 0 4 I (317) 571 -2441 PAVEMENT AREAS SHOULD BE MONITORED FOR POLLUTANTS. ANY
0 Ili o LARGE QUANTITIES OF FLUIDS SUCH AS OIL, ANTIFREEZE, BRAKE
r-, j _- _' ^� -„ �R� -,,�_ �_ .. _,� I Z I OWNERS NAME: DUKE REALTY CORPORATION FLUID, ETC. FOUND ON THE PAVEMENT SHOULD BE REPORTED TO
I I- `- _- ,�I I I OWNER'S PHONE NUMBER: (317) 808 -6000 THE OWNER. THE OWNER SHOULD CLEAN THE POLLUTANTS AND
\ I F - - - - N90-00'00 ^E - _ _ I I I PREVENT THE SOURCE FROM ENTERING THE SITE IN THE FUTURE,
199.99' I FINALLY, PAVEMENTS SHOULD ALSO BE MONITORED FOR SEDIMENT
COMING FROM VEGETATIVE AREAS: IF POST CONSTRUCTION
- - _ I I r I 1, CONSTRUCTION EQUIPMENT EROSION IS OCCURRING THE SOU
\ I I -
A. FUELING, LUBRICATION, AND FLUIDS: ALL OPERATIONS
GENERAL NOTES CONSTRUCTION SEQUENCE LEGEND SOURCE SHOULD 8E RE- STABILIZED
STA$ILIZA''ION INVOLVING THE ADDITfON OF FLUIDS TO EQUIPMENT HOU D AS SOON AS POSSIBLE BY SEEDIN
INLET PROTECTION
EROSION CONTROL BLANKET
12° THICK RIP RAP (SEE DETAIL)
FORCES. PROPER DISPOSAL OR MANAGEMENT OF ALL WASTES
UNUSED BUILDING MATERIALS, APPROPRIATE TO THE NATURE
PRACTICE: JAN. FEB, MAR, APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC.
S L BE G, SODDING OR MULCHING,
DONE IN ONE LOCATION, AS DESIGNATED BY THE GENERAL
1, THE CONTRACTOR SHALL CONTROL WASTE, GARBAGE, DEBRIS, 1.
SCHEDULE PRE - CONSTRUCTION MEETING WITH HAMILTON
CONSTRUCTION LIMITS �`wnM' '
CONTRACTOR, SO THAT SPILLS ARE LIMITED TO THAT SPECIFIC GENERAL NOTES
WASTEWATER, AND OTHER SUBSTANCES ON THE SITE IN SUCH A
COUNTY SOIL AND WATER CONSERVATION DISTRICT
PERMANENT A
LOCATION WHICH WILL FACILITATE THE CLEANUP OF SPILLS, IF AN
WAY THAT THEY SHALL NOT BE TRANSPORTED FROM THE SITE BY
(317)773 -2181.
SEEDING
FENCE
OUTSIDE FUELING TANK IS PLANNED TO BE ON SITE, IT SHALL BE 1 • THE CONTRACTOR SHALL CONTROL WASTE, GARBAGE, DEBRIS,
THE ACTION OF WINDS, STORMWATER RUNOFF, OR OTHER
SEDIMENT SHALL NOT INCLUDE FLUSHING THE AREA WITH WATER,
SILT - X- X- X - -X--
WASTEWATER AND OTHER
INLET PROTECTION
EROSION CONTROL BLANKET
12° THICK RIP RAP (SEE DETAIL)
FORCES. PROPER DISPOSAL OR MANAGEMENT OF ALL WASTES
UNUSED BUILDING MATERIALS, APPROPRIATE TO THE NATURE
2.
INSTALL MAINTENANCE, REFUELING AND CONCRETE WASH-OUT
_.:.._ ..
OF THE WASTE OR MATERIAL, IS REQUIRED:
it
FACILITIES AS SHOWN.
2,
PUBLIC OR PRIVATE ROADWAYS SHALL BE KEPT CLEARED OF
3,
INSTALL PERIMETER SILT FENCE AND INLET PROTECTION AS
n.
ACCUMULATED SEDIMENT. BULK CLEARING OF ACCUMULATED
LIKELY ORIGIN OR OTHER SUITABLE LOCATION,
SHOWN FOR EXISTING STRUCTURES.
REMOVED FROM THE EQUIPMENT OR THE POSSIBILITY OF FLUID
SEDIMENT SHALL NOT INCLUDE FLUSHING THE AREA WITH WATER,
B = SPRING OATS 3 BUSHEL PER ACRE
SPILLS IS HIGH, SHOULD ALWAYS BE DONE OFFSITE AT A FACILITY 3.
THIS EROSION R
CONTROL PLAN SHALL BE IMPLEMENTED ON ALL
CLEARED SEDIMENT SHALL BE RETURNED TO THE POINT OF
4,
STRIP AND ROUGH GRADE ENTIRE SITE. DISTURBED AREAS
C .
LIKELY ORIGIN OR OTHER SUITABLE LOCATION,
*
ARE TO BE KEPT TO A MINIMUM. CONTRACTOR SHALL
3,
THIS EROSION CONTROL PLAN SHALL BE IMPLEMENTED ON ALL
D = ANNUAL RYE GRASS (1 LB. PER 1000 SQ. FT.)
CONTROL MUD ACCUMULATION ON ALL STREETS
SURROUNDING PROJECT BY INSTALLING STONE SURFACE AT
EXPERIENCED IN EROSION CONTROL, AND FOLLOWING THE PLANS
DISTURBED AREAS WITHIN THE CONSTRUCTION SITE. ALL
MEASURES INVOLVING EROSION CONTROL PRACTICES SHALL BE
PLACED UNDER THE EQUIPMENT DURING REPAIR TO CATCH ANY
ALL LOCATIONS WHERE CONSTRUCTION TRAFFIC LEAVES THE
E = STRAW MULCH (90 LBS: PER 1000 SQ.FT.)
INSTALLED UNDER THE GUIDANCE OF QUALIFIED PERSONNEL
SITE, DUST SHALL BE KEPT TO A MINIMUM BY UTILIZING
A PROPER MANNER. 4.
EXPERIENCED IN EROSION CONTROL, AND FOLLOWING THE P LANS
0/1 / • IRRIGATION NEEDED DURING JUNE, JULY, AND / OR SEPTEMBER.
SPRINKLING, C A LCIU M CHLORIDE, VEGETATIVE COVER, SPRAY
WITH THE INDIANA HANDBOOK FOR EROSION CONTROL IN
AND SPECIFICATIONS INCLUDED HEREIN,
C. ALL REUSABLE FLUID CONTAINERS, SUCH AS GASOLINE CANS,
ON ADHESIVES OR OTHER APPROVED METHODS.
4.
ALL EROSION CONTROL PRACTICES SHALL BE IN ACCORDANCE
5.
INSTALL STORM SEWERS.
LEAKS ARE FOUND, THE FLUID SHALL BE REMOVED FROM THE
WITH THE INDIANA HANDBOOK FOR EROSION CONTROL IN
CONTAINER IN A PROPER MANNER AND THE CONTAINER DISPOSED
DEVELOPING AREAS FROM THE DIVISION OF SOIL CONSERVATION.
6•
PLACE INLET PROTECTION AND OUTLET PROTECTION AS
5.
ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN
SHOWN FOR NEW STRUCTURES,
CONTAINERS, AND THEIR PACKAGING, SHALL BE DISPOSED OF IN
THE FIELD BY THE HAMILTON COUNTY SURVEYOR'S OFFICE OR
A PROPER MANNER AND SHALL NOT BE LEFT ON THE GROUND
"HOLEY MOLEr
HAMILTON COUNTY SOIL AND WATER INSPECTOR.
7.
FINE GRADE BUILDING PADS AND BEGIN FOUNDATIONS.
8.
SEED AND MULCH BUILDING PAD AND PARKING AREAS.
9.
SEED GREEN SPACE BEHIND CURBS IMMEDIATELY AFTER
CURBS ARE COMPLETED AND GRADE ESTABLISHED.
SEEDBED PREPARATION FOR PERMANENT SEEDING:
1. TEST SOIL TO DETERMIN pH AND NUTRIENT LEVELS. (CONTACT
10,
STONE PAVEMENT AREAS.
YOUR COUNTY SWCD OR COOPERATIVE EXTENSION OFFICE FOR
ASSISTANCE AND ADDITIONAL SOILS INFORMATION)
11,
CONTINUE BUILDING CONSTRUCTION; APPLY PERMANENT
2, IF SOIL pH IS UNSUITABLE FOR THE SPECIES TO BE SEEDED,
SEEDING.
APPLY LIME ACCORDING TO TEST RECOMMENDATIONS.
3. FERTILIZE AS RECOMMENDED BY THE SOIL TEST, IF TESTING WAS
NOT DONE, CONSIDER APPLYING 400 -600 LBS. /ACRE OF 12 -12 -12
12.
ADD BINDER COURSE TO PAVEMENT AREAS.
ANALYSIS, OR EQUIVALENT, FERTILIZER.
4, TILL THE SOIL TO OBTAIN A UNIFORM SEEDBED, WORKING THE
13,
INSTALL LANDSCAPING,
FERTILIZER AND LIME INTO THE SOIL 2 -4 INCHES DEEP WITH A DISC
OR RAKE OPERATED ACROSS THE SLOPE.
14.
COMPLETE BUILDING CONSTRUCTION.
15,
ADD SURFACE COURSE OF ASPHALT.
16.
INLET PROTECTION SHALL REMAIN IN PLACE UNTIL ALL AREAS
ARE STABILIZED.
INLET PROTECTION
EROSION CONTROL BLANKET
12° THICK RIP RAP (SEE DETAIL)
SOILS MAP
NO SCALE
TEMPORARY
SEEDING
MULCHING
B -- -� C DOUBLE WALLED AND STORED IN THIS DESIGNATED AREA. THIS
D -� LOCATION IS AN AREA THAT WILL NOT ALLOW SPILLED FLUIDS TO
MIGRATE INTQ 5059RFACE 59IL5, IN THE EVENT OF A SPILL,
THE FLUID SHALL IMMEDIATELY BE CLEANED UP BY REMOVING
E THE CONTAMINATED SOIL OR STONE WHICH SHALL BE DISPOSED
OF IN AN ACCEPTABLE MANNER, SPILLS ON HARD SURFACES
SHALL BE SOAKED UP BY AN ACCEPTABLE MATERIAL SUCH AS
SUBSTANCES ON THE SITE IN SUCH A
WAY THAT THEY SHALL NOT BE TRANSPORTED FROM THE SITE BY
THE ACTION OF WINDS, STORM WATER RUNOFF, OR OTHER
FORCES, PROPER DISPOSAL OR MANAGEMENT OF ALL WASTES
AND UNUSED BUILDING MATERIALS, APPROPRIATE TO THE NATURE
OF THE WASTE OR MATERIAL, IS REQUIRED.
er
4"
a
_.:.._ ..
C,A r�
it
IMMEDIATELY TO THE CONTRACTOR'S SUPERINTENDENT,
SEDIMENT SHALL NOT INCLUDE FLUSHING THE AREA WITH WATER,
PLUS 2 TONS OF STRAW MULCH/ ACRE
A
NCR$ 'Ridge.VM6l 0
n.
Fire
LIKELY ORIGIN OR OTHER SUITABLE LOCATION,
APPLY MIXTURE AT A RATE OF 2 LBS, PER 1000 SQ.FT.
REMOVED FROM THE EQUIPMENT OR THE POSSIBILITY OF FLUID
B = SPRING OATS 3 BUSHEL PER ACRE
SPILLS IS HIGH, SHOULD ALWAYS BE DONE OFFSITE AT A FACILITY 3.
THIS EROSION R
CONTROL PLAN SHALL BE IMPLEMENTED ON ALL
In
DISTURBED AREAS WITHIN THE CONSTRUCTION SITE. ALL
C .
SPILLS, WHEN EQUIPMENT MUST BE REPAIRED ONSITE, IT
*
,.•. •. r .i ar^C�
SHOULD BE MOVED TO THE MAINTENANCE AND FUELING AREA IF
C.
,
SOILS MAP
NO SCALE
TEMPORARY
SEEDING
MULCHING
B -- -� C DOUBLE WALLED AND STORED IN THIS DESIGNATED AREA. THIS
D -� LOCATION IS AN AREA THAT WILL NOT ALLOW SPILLED FLUIDS TO
MIGRATE INTQ 5059RFACE 59IL5, IN THE EVENT OF A SPILL,
THE FLUID SHALL IMMEDIATELY BE CLEANED UP BY REMOVING
E THE CONTAMINATED SOIL OR STONE WHICH SHALL BE DISPOSED
OF IN AN ACCEPTABLE MANNER, SPILLS ON HARD SURFACES
SHALL BE SOAKED UP BY AN ACCEPTABLE MATERIAL SUCH AS
SUBSTANCES ON THE SITE IN SUCH A
WAY THAT THEY SHALL NOT BE TRANSPORTED FROM THE SITE BY
THE ACTION OF WINDS, STORM WATER RUNOFF, OR OTHER
FORCES, PROPER DISPOSAL OR MANAGEMENT OF ALL WASTES
AND UNUSED BUILDING MATERIALS, APPROPRIATE TO THE NATURE
OF THE WASTE OR MATERIAL, IS REQUIRED.
SEEDING SCHEDULE
NO SCALE
ALL AREAS THAT ARE LEFT
UNDISTURBED FOR 15 DAYS SHALL
RECEIVE SEED AND MULCH,
DONT
DIG
BLIND
1- 800 - 382 -5544
CALL TOLL FREE
Duke
CONSTRUCTION
600 East 96th Street
Suite 100
Indianapolis IN 46240
Phone: 317 808 -6000
Fax: (317 ) 808 -6797
■ ■I
:1
WOOLPERT
7140 WALDEMAR DRIVF
INDIANAPOLIS, IN 46268
PH: 317.299.7500
FX: 317.291.5805
frl
c
0
N
cr
M O
04 �' Q �',
n N
0
in
U
/W
V
a
c1c
a N J a
z
Q O
CL o Z
C1C z W
CL (jj O
irk
CI; z Z
d. o 0
0
W w
o CL
LL! Q V) p�
_c LLJ
QD H-
♦♦� C7) a
z U7
LLJ
Q
Z ° O cc
z
Certified By:
Drawing Number:
C301
X Of X Sheets
Duke Realty Job Number.
A/E Job Number:
65367
I
OIL DRY AND THE ABSORBENT MATERIAL DISPOSED OF IN A Z.
PUBLIC OR PRIVATE ROADWAYS SHALL BE KEPT CLEARED OF
PROPER MANNER. THE SPILL SHALL ALSO BE REPORTED
ACCUMULATED SEDIMENT. BULK CLEARING OF ACCUMULATED
A = KENTUCKY BLUEGRASS 40%, TURF TYPE TALL FESCUE 407., ANNUAL RYE GRASS 20%
IMMEDIATELY TO THE CONTRACTOR'S SUPERINTENDENT,
SEDIMENT SHALL NOT INCLUDE FLUSHING THE AREA WITH WATER,
PLUS 2 TONS OF STRAW MULCH/ ACRE
CLEARED SEDIMENT SHALL BE RETURNED TO THE POINT OF
B. EQUIPMENT REPAIR, ESPECIALLY WHEN FLUIDS MUST BE
LIKELY ORIGIN OR OTHER SUITABLE LOCATION,
APPLY MIXTURE AT A RATE OF 2 LBS, PER 1000 SQ.FT.
REMOVED FROM THE EQUIPMENT OR THE POSSIBILITY OF FLUID
B = SPRING OATS 3 BUSHEL PER ACRE
SPILLS IS HIGH, SHOULD ALWAYS BE DONE OFFSITE AT A FACILITY 3.
THIS EROSION R
CONTROL PLAN SHALL BE IMPLEMENTED ON ALL
THAT IS MORE SUITABLE THAN A CONSTRUCTION SITE TO HANDLE
DISTURBED AREAS WITHIN THE CONSTRUCTION SITE. ALL
C =WHEAT OR RYE 2 BUSHEL PER ACRE
SPILLS, WHEN EQUIPMENT MUST BE REPAIRED ONSITE, IT
MEASURES INVOLVING EROSION CONTROL PRACTICES SHALL BE
SHOULD BE MOVED TO THE MAINTENANCE AND FUELING AREA IF
INSTALLED UNDER THE GUIDANCE OF QUALIFIED PERSONNEL
D = ANNUAL RYE GRASS (1 LB. PER 1000 SQ. FT.)
POSSIBLE. OTHERWISE, SUITABLE ON SITE CONTAINERS SHOULD BE
EXPERIENCED IN EROSION CONTROL, AND FOLLOWING THE PLANS
PLACED UNDER THE EQUIPMENT DURING REPAIR TO CATCH ANY
AND SPECIFICATIONS INCLUDED HEREIN.
E = STRAW MULCH (90 LBS: PER 1000 SQ.FT.)
SPILLED FLUIDS AND THESE FLUIDS SHOULD BE DISPOSED OF IN
A PROPER MANNER. 4.
ALL EROSION CONTROL PRACTICES SHALL BE IN ACCORDANCE
0/1 / • IRRIGATION NEEDED DURING JUNE, JULY, AND / OR SEPTEMBER.
WITH THE INDIANA HANDBOOK FOR EROSION CONTROL IN
C. ALL REUSABLE FLUID CONTAINERS, SUCH AS GASOLINE CANS,
DEVELOPING AREAS FROM THE DIVISION OF SOIL CONSERVATION.
• IRRIGATION NEEDED FOR Z TO 3 WEEKS AFTER APPLYING SOD
SHALL BE INSPECTED FOR LEAKS EACH TIME THEY ARE USED. IF
LEAKS ARE FOUND, THE FLUID SHALL BE REMOVED FROM THE
CONTAINER IN A PROPER MANNER AND THE CONTAINER DISPOSED
NOTE: ALL SEEDING SHALL HAVE 12 -12 -12 FERTILIZER APPLIED
OF IN AN ACCEPTABLE MANNER, EMPTY DISPOSABLE CONTAINERS,
400 -600 LBS, PER ACRE OR AS SPECIFIED.
SUCH AS GREASE TUBES AND LUBRICATING OIL AND BRAKE FLUID
CONTAINERS, AND THEIR PACKAGING, SHALL BE DISPOSED OF IN
A PROPER MANNER AND SHALL NOT BE LEFT ON THE GROUND
"HOLEY MOLEr
nR IN THE nPFN ON THE (-.nNSTRIIrTIr)N CITF
SEEDING SCHEDULE
NO SCALE
ALL AREAS THAT ARE LEFT
UNDISTURBED FOR 15 DAYS SHALL
RECEIVE SEED AND MULCH,
DONT
DIG
BLIND
1- 800 - 382 -5544
CALL TOLL FREE
Duke
CONSTRUCTION
600 East 96th Street
Suite 100
Indianapolis IN 46240
Phone: 317 808 -6000
Fax: (317 ) 808 -6797
■ ■I
:1
WOOLPERT
7140 WALDEMAR DRIVF
INDIANAPOLIS, IN 46268
PH: 317.299.7500
FX: 317.291.5805
frl
c
0
N
cr
M O
04 �' Q �',
n N
0
in
U
/W
V
a
c1c
a N J a
z
Q O
CL o Z
C1C z W
CL (jj O
irk
CI; z Z
d. o 0
0
W w
o CL
LL! Q V) p�
_c LLJ
QD H-
♦♦� C7) a
z U7
LLJ
Q
Z ° O cc
z
Certified By:
Drawing Number:
C301
X Of X Sheets
Duke Realty Job Number.
A/E Job Number:
65367
I