HomeMy WebLinkAbout06030014 Landscape Plan LP 101 Rcv. 10/19/2006 DOCS Apprv. 11/21/2006 EPLANDSCAPE SPECIFICATIONS: These specifications cover the furnishing of labor, plants,
equipment, and materials to perform landscape operations in connection with this construction
project at the locations shown on the landscape drawing.
LANDSCAPE MATERIALS: FERTILIZER: Granular non— burning product composed of not less
than 50% organic slow acting, guaranteed analysis professional fertilizer; 20% nitrogen, 10%
phosphoric acid, and 5% potash by weight or similarly approved composition.
PLANTING BACKFILL SOIL: Backfill plant pits with the following topsoil mixture: 1 part on —site
topsoil, 1 part imported topsoil, 1 part compost and 1/2 pound plant specified fertilizer per cubic
yard.
PLANT MATERIALS: Provide trees and shrubs as indicated. Comply with sizing and grading
standards of "American Standard for Nursery Stock ". Provide only sound, healthy vigorous
plants free from defects, disfiguring knots, sunscald injuries, frost cracks, plant diseases, insects
or any other form of disease or infestation. All plants shall have fully developed form without
voids or open spaces.
PLANTING BED MULCH: 3 inches of Premium grade shredded hardwood mulch.
PROJECT EXECUTION: SUBSURFACE UTILITIES: Contractor shall determine utility line
locations prior to commencing work. Any conflicts between utility locations, excavation and /or
landscape operations shall be brought to Owner's attention prior to commencing excavation
and /or grading work. Contractor assumes responsibility for any utility damage resulting from
landscape operations. CONTRACTOR SHALL NOTIFY UTILITY LOCATE SERVICE (1.800.
382.5544) A MINIMUM OF TWO WORKING DAYS PRIOR TO EXCAVATION.
PLANTING EXCAVATION: When conditions detrimental to plant growth are encountered, such
as rubble fill, adverse drainage or obstructions, notify owner before planting. See planting
details for planting, pruning and staking requirements.
SODDED LAWN: Complete all other landscape plantings, mulching, fine grading and staking
prior to sodding lawn areas. Provide sodded lawn for all lawn areas utilizing Warren's Turf Type
Tall Fescue Sod. Apply fertilizer at a rate of 4 pounds of actual nitrogen per 1,000 square feet.
Spread topsoil over lawn areas to a depth of two inches and cultivate soil to a depth of three
inches prior to sodding. Sod bed shall be in a firm but uncompacted condition with a relatively
fine texture at time of sodding. Contractor shall maintain sodded lawn for a period of 60 days
beyond final acceptance by mowing and watering as required to maintain vigorous growth during
establishment period.
PROJECT WARRANTY: Contractor shall warrant trees, shrubs, and plants for a period of one
year after date of substantial completion against defects including death and unsatisfactory
growth, except for defects resulting from neglect by the Owner, abuse or damage by others, or
unusual phenomena or incidents which are beyond installer's control. Remove and replace
trees, shrubs or other plants found to be dead or in unhealthy condition during warranty period.
Replace trees and shrubs which are in doubtful condition at end of warranty period.
PRUNE BRANCHES AND FOLIAGE
INTERNALLY BY NO MORE THAN
RETAINING NORMAL PLANT SHAPE,
NEVER CUT OUT EVERGREEN LEAI
CUT AND REMOVE BURLAP FROM
1 /3RD OF BALL. ALL ROOTBALLS
REMOVED FROM CONTAINERS SHA
SCARIFIED PRIOR TO PLANTINGINC
"Holey Mole ;" says,
"DON'T DIG BLIND"
Coll Monday through Friday -7 AM to 6 PM
1 -800- 382 -5544
PER INDIANA STATE LAW IS -69 -1991, IT IS
AGAINST THE LAW TO EXCAVATE iA nMUT
NOTIFYING THE UNDERGROUND LOCATION SERVICE rB
TWO (2) WORKING DAYS BEFORE COMMENCING WORK. i O
SUB —GF
Shrub Planting Detail
Not mScale
SHRUB SHALL BEAR RELATION
TO FINISHED GRADE AS IT BORE
TO PREVIOUS EXISTING GRADE
3" MIN. MULCH iN ALL 3" MiN. MULCHED
PLANTING BEDS AND HOLD
MULCH AWAY FROM STEM BY 1 ". 1/2 WIDTH OF RC
PLANTING SOIL BACKFILL,
SCARIFY SIDES AND BOTTOM OF
HOLE PRIOR TO PLANTING.
IIDTH OF ROOTBALL
FINISH GRAC
SUB —GRAC
F1,21
PRUNE DEAD AND DAMAGED BRANCHES, NO MORE
THAN 1 /4TH OF BRANCHES. PRUNE TO SHAPE AS
NECESSARY RETAINING NORMAL PLANT SHAPE. DO
NOT CUT EVERGREEN LEADER.
FOR ALL TREES 2.5" CALIPER AND LARGER
SUPPORT WITH 3 (THREE) 10 GUAGE GALVINIZED
WIRES ENCLOSED IN CLEAR POLY TUBING AT TRUNK
AND SECURE TO 3 (THREE) 2 "x2 "x72" VERTICALLY
PLACED HARDWOOD STAKES AT GRADE.
WRAP ENTIRE TRUNK TO HEIGHT OF SECOND
BRANCH, TIE EVERY 6 ".
ROOT FLARE SHELL BE LEVEL WITH FINISH GRADE.
REMOVE SOIL AS NECESSARY FROM TOP OF
ROOTBALL TO EXPOSE ROOT FLARE.
TOPSOIL
CUT AND REMOVE BURLAP FROM TOP 1 /3RD OF
ROOT BALL.
PLANTING SOIL BACKFILL, SCARIFY SIDES AND
BOTTOM OF HOLE PRIOR TO PLANTING.
LOOSEN HARD SUB —GRADE
K'C"� Tree Planting Detail
P -10 Not toScale XAS SPECIFIED IN XX WOODY'S WAREHOUSE
TREE /SHRUB SCHEDULE SCHEDULE xX NURSERY - 1.25" CALIPER
rw Landscape Master Plan
P10 Scale: 1"= 40'-0"
KEY BOTANICAL NAME SIZE @ PLANTING
AG
Amelanchier grandifloria 'Autumn Brilliance'
6 , Clump
Autumn Brilliance Serviceberry
1 Gallon
AR
Acer rubrum 'October Glory'
2.5" Caliper
P
CZ
October Glory Red Maple
AS
Acer soccharum 'Green Mountain'
2.5" Caliper
HO
Green Mountain Sugar Maple
BK
Buxus x koreana 'Green Velvet'
18 „ Height
LM
Green Velvet Boxwood
1 Gallon
CC
Crataegus crus —galli 'Inermis'
1.5” Caliper
p
MS
Thornless Cockspur Hawthorn
° CL c
GT
Gleditsia triacanthos 'Skycole'
2.5" Caliper
p
PH
Skycole Honeylocust
CU
IV
Itea virginica 'Henry's Garnet'
Henry 's Garnet Sweetspire
18 " Spread
JC
Juniperus chinensis 'Sea Green'
24 " Spread
Sea Green Juniper
MC
Malus 'Centurion'
Centurion Crabapple
1.5" Caliper
p
MP
Myrica pennsylvanica
Northern Bayberry
24 " Height
NS
Nyssa sylvatica
Black Gum
1.25" Caliper
P
PA
Picea abies
Norway Spruce
6 , Height
PO
Platanus x a. Metzam
Sycamore Metzam London Plane Tree
"
2.5 Caliper
PS
Pinus strobus
Eastern White Pine
6 , Height
QR
Quercus rubrum
Red Oak
2.5" Caliper
P
TM
Taxus x media 'Runyan'
Runyan Yew
18" Spread
P
UA
Ulmus americana 'Valley Forge'
1.25" Caliper
P
Vallye Forge Elm
r
Cl)
Vi
Viburnum Juddii
Judd's Viburnum
24" Height
PERENNIAL /GRASS SCHEDULE
KEY BOTANICAL NAME SIZE @ PLANTING
CA
Calamagrostis a 'Kart Foerster'
Karl Foerster Feather Reed Grass
1 Gallon
COB
Spring /Summer /Fall
Annuals
CZ
Coreopsis v 'Zagreb"
Zagreb Coreopsis
1 Gallon
HO
Hosta sieboldiana 'Eiegans'
Blue Giant Hosta
1 Gallon
LM
Uriope m 'Big Blue'
1 Gallon
>
Big Blue Lilytuft
W
MS
Miscanthus s 'Silberfeder'
° CL c
Silver Feather Grass
1 Gallon
PH
Pennisetum alopecuroides 'Hameln'
CU
Hameln Dwarf Fountain Gross
1 Gallon
RF
Rudbeckia fulgida
1 Gallon
Black —eyed Susan
SN
Salvia n 'Mainacht'
May Night Salvia
1 Gallon
Sedum 'Autumn Joy'
--
SS
Autumn Joy Sedum
1 Gallon
I
I
I
I
*PHASE I(A)
. i
0 O PHASE 11
FOLLOWING I
-- - -- IJ T ='tu�ut�:t;xt:��i'- ,
*PHASE I(B)
Y:y
I Ing I
o Landscape. Installation Phasing Plan
P -10 in = 150'-0•
NORTH *PHASE I(A) AND I(B) TO BE INSTALLED BY END OF CONSTRUCTION PROGRAM
REM
,`•GERTIFj f� .•• �i� ,
No. °►
80860005 ,
y :• STATE OF C 7
2O �.•• /NDI ANP .= �lv
,OE AR�
Professional Seal
Project # Date
461006 la174
Lp. 101
V
>
W
° CL c
cc
CU
Z o
W
U
U
--
mg(D
U)
.�-.•
CU
CU
-�
CU
_
J
s- c-
CU �
U)
QD
-6-,
CU
Cn
r
Cl)
L
U
o
rT�
Designed By
MJH
C:
QD
w
MJH
Revisions
G U W
C U
o g oo
aa)
- �
m�L
U
a
�FnE
o
�
rn
N
�
3 am
O C to
c
235 0
C13 3
v
Z
o
I
N
O
,.._,
o o
(D 2_ C:
U)°,0_
W
L
0 0-
-a E Ca
Ln
ma)
ca
Cif
T �.
.,_.r
ch o
C�
c
ci
m
o
��E
Sri
.o
a,
CM
.N
>D
Qv
Project # Date
461006 la174
Lp. 101
CU
W
mcu i
U
--
U)
.�-.•
CU
CU
-�
CU
_
J
s- c-
CU �
QD
-6-,
CU
Cn
r
Cl)
L
U
Designed By
MJH
Drawn By
MJH
Revisions
W74
Project # Date
461006 la174
Lp. 101