Loading...
HomeMy WebLinkAbout06030025 Landscape Plan Rcv. 6/19/2006NOTE: DRAWING IS FOR LANDSCAPING ONLY Q1 I. FOR ALL TREES 3" CALIPER AND LARGER 15 PER 24 or 22 TRUNK AND SECURE TO 3 (THREE) V&02 14 3d 266 IF NEEDED OR REQUIRED. 22 or 8 or 13 id 61 or 14 id 94 or 5 �t 34 or 23 or 22 or 0 or 0 SCALE * SOIL BACKFILL TO BE 75% TOPSOIL AND 25% PEAT (TAMPED) PRUNE ACHES AND FOLIAGE BY 1 /4TH 4 ALL STAKES AND V11RE TO BE RETAIN NOWAL PLANT SHAPE. DO NOT REMOVED WITHIN 1 YEAR OF CUT EVERGREEN LEADER. PLANTING ` FOR ALL TREES 3" CALIPER AND LARGER FOLIAGE INTERNALLY BY 1/4 ,,,-- — SUPPORT WTTH 3 (THREE) 10 GAUGE GALVANIZED RETAINING NORLK PLANT V1IRES ENCLOSED IN CLEAR POLY TUBING AT, SHAPE NEVER CUT OUT TRUNK AND SECURE TO 3 (THREE) V&02 PLACE ROOT FLARE VERTICALLY PLACED HAR17MM STAKES AT MADE SLIGHTLY HIGHER THAN IF NEEDED OR REQUIRED. EXISTING GRADE, WRAP ENTIRE TRUNK TO HEM OF SECOND FROM TOP 1/3M OF BALL. BRANCH, TIE EMERY V. 1.5X ROOTBA11 N 3" MIN. MULCHED SAUCER. DIAM. ALL AROUND TOPSOIL PLANTING. i r- FINISH GRADE Cllf AND REMOVE BURLAP FROM TOP t f3RD OF ROOT BALL _� �� PLANTING BACKFILL TOPSOIL SUB –GRADS EXISTING SUBSOIL OR COMPACTED BACKFILL Tree Planting Detail L H�D SUB-ORADE L -1 Scale: N.T.S. PRUNE RANCHES AND FOLIAGE INTERNALLY BY 1/4 RETAINING NORLK PLANT SHAPE NEVER CUT OUT PLACE ROOT FUME SLIGHTLY HIGHER THAN EVERGREEN LEADER. FINISHED GRADE. MOUND MULCH HEAVILY OVER FLARE. INSTALL FERTILIZER TABLETS CUT AND REIM BURLAP 40 A OR SPIKES 3" TO 4 BELOW SOIL FROM TOP 1/3M OF BALL. Y MIN. MULCH IN ALL �' �- � -� � FROM SHALL - PLANTING BEDS AND I�SAUCERS. GE SCARIFIED PRIOR TO PLANTING. i EARTH SAUCER kt t{QIE; �— PlAN111�G BACKFILL TOPSOIL • *TOPSOIL AND 25X PEAT (TAMPED) DUSi1NG SUBSOIL OR MPACTm BACKFILL Shrub Planting Detail UINIMUM 2X ROOTBALL L -1 State: N.T.S. zoo 400 L_ 'T ) .00 ft. Aquatic Fit Maims ChGoff on ME on A::= OEM= -M""VM31 G• h FIGURE 5 -3 :W,;.w E . rCFZ or- SM low MIT, =1X ,. M UW Ca M 3.5 LM 2EIL CMM SM 10 M 1-11;r DEEP - -i 10 1- Dap ` i M 1/47 OW Seeding �-� Scale: N.T.S. LANDSCAPE SPECIFICATIONS: These specifications cover the furnishing of labor, plants, equipment, and materials to perform landscape operations in connection with this construction pro fact at the locations shown on the landscape drawing. LANDSCAPE MATERIALS: FERTILIZER: Granular non - burning product composed of not less than 50% organic slow acting, guaranteed analysis professional fertilizer, 20% nitrogen, 10% phosphoric acid, and 5" potash by weight or similarly approved composition. PLANTING BACKFILL SOIL, Backfill plant pits with the following topsoil mixture: 1 P art on -site topsoil, 1 part imported topsoil, 1 part compost and 1/2 pound plant specified fertilizer per cubic yard. PLANT MATERIALS: Provide trees and shrubs as Indicated. Comply with sizing and grading standards of "American Standard for Nursery Stock" latest addition (1996). Provide only sound, healthy vigorous plants free from defects, disfiguring knots, sunscald injuries, frost cracks, plants diseases, insects or any other form of disease or infestation. All plants shall have fully developed form without voids or open spaces. PLANTING BED MULCH: 3 inches of Premium grade shredded hardwood mulch. STEEL EDGING: Ryerson black steel edging 3/16"x4". PROJECT EXECUTION: SUBSURFACE UTiUTiES: Contractor shall determine utility line locations prior to commencing work. Any conflicts between utility locations, excavation and /or landscape operations shall be brought to Owner's attention prior to commencing excavation and /or grading work. Contractor assumes responsibility for any utility damage resulting from 9 9 landscape operations. CONTRACTOR SHALL N011FY UTIUTY LOCATE SERVICE (1.800. 382.5544) A MINIMUM OF TWO WORKING DAYS PRIOR TO EXCAVATION. PLANTING EXCAVATION: Ten conditions detrimental to plant growth are encountered, such . .. .-as-rubble fill, adverse drainage or obstructions, notify owner before planting. See planting details for planting, pruning and staking requirements. SODDED LAVM: Complete all other. landscape plantings, mulching, fine grading and staking prior to sodding [own areas. Provide sodded lawn for all lawn areas utilizing Warren's Turf Type Tall Fescue Sod. Apply fertilizer at a rate of 4 pounds of actual nitrogen per 1,000 square feet. Spread topsoil over lawn areas to a depth of two inches and cultivate soil to a depth of three Inches prior to sodding. Sod bed shall be in a firm but uncompacted condition with a relatively fine texture at time of sodding. Contractor shall maintain sodded lawn for a period of 60 days beyond final acceptance by mowing and watering as required to maintain vigorous growth during establishment period. PROJECT WARRANTY: Contractor shall warrant trees, shrubs, and plants for a period of one year after date of substantial completion against defects including death and unsatisfactory growth, except for defects resulting from neglect by the Owners abuse or damage by others, or unusual phenomena or incidents which are beyond installer's control. Remove and replace trees, shrubs or other plants found to be dead or in unhealthy condition during warranty period. Replace trees and shrubs which are in doubtful condition at end of warranty period. No. Date Revision Landscape Plan Date March, 2006 1 5/31/06 New Pond & UF's Comments 2 6/05/06 UF'S Comments o Pearson Ford master Plan Job No. 2Q1.0 ENGINEERING, INC. s��e Clay Township Hamilton County Indiana 1 " =60' 13110 Promise Road Noblesville, IN 46060 Design By Drawn By Checked By Approved By Phone: (317) 841 -3141 Fax: (317) 841 -9951 AES VFH KEH AES Sheet No. C115