q ZERO GRADE q q q PRACTICE_ — JAN_ FEB. MAR. APR. —MAY— JUNE — JULY AUG.— SEPT. — OCT_NOV_ DEC.
PERMANENT A ////I / /// �/ I / ►
SEEDING
— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —
EROSION CONTROL BLANKET REQ'D. B ' C
TEMPORARY
NORTH AMERICAN GREEN SC150 OR EQUAL D -*///I
/ / /�►
- - - - - --
oil, BLANKET TO BE STAPLED IN PLACE SEEDING _0 0 15' -0" WITH STAPLES AT 2 PER SQUARE YARD. MULCHING
SC -150 -- EDGE OF BLANKET SHALL BE ---------------------------------
7' -0" BE ANCHORED IN A 6" DEEP
EDGE OF BLANKET SHALL BE X 6" WIDE TRENCH.
BE ANCHORED IN A 6" D A = KENTUCKY BLUEGRASS 40 %, TURF TYPE TALL FESCUE 40 %, ANNUAL RYEGRASS 20%
X 6" WIDE TRENCH. EEP 4:1 MAXIMUM SLOPE PLUS 2 TONS OF STRAW MULCH/ ACRE
PROPOSED DITCH
APPLY MIXTURE AT A RATE OF 2 LBS. PER 1000 SQ.FT.
VARIES B = SPRING OATS 3 BUSHEL PER ACRE
APRON LENGTH EDGE OF BLANKET SHALL BE ANCHORED IN A
12" DEEP X 6" WIDE TRENCH. C = WHEAT OR RYE 2 BUSHEL PER ACRE
APRON LENGTH D = ANNUAL RYEGRASS (1 LB. PER 1000 SO. FT.)
NOTE: ALL EROSION CONTROL BLANKETS SHALL BE INSTALLED
NO PER MANUFACTURER'S RECOMMENDATIONS BASED ON THE
OVERFALL NO PROPOSED TYPE AND USE. E = STRAW MULCH (90 LBS. PER 1000 SQ.FT.)
OVERFALL TYPICAL EROSION CONTROL BLANKET
T III - III - III = III - III - III -II II�II ���III � / I IRRIGATION NEEDED DURING JUNE, JULY, AND / OR SEPTEMBER.
NO SCALE
I-1 I I- III - III - 111 -1 I l-1 I-1 I I-1 ��LI �I I �I I �I �I I I FA 19I
- II�II�II�II III- II�II� -III III III= III -11F 111111 IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD
CI I I -I LI CI I f =1 I -I 1 -III I CI I LI t CI ���� 1 CI CI �I - III -I �I
71�Ib11 ll l E=
II�I IQ
EIIEI�II�II II�IIE 1- III - 111 -11r NOTE: ALL SEEDING SHALL HAVE 12 -12 -12 FERTILIZER APPLIED
FILTER
FABRIC FILTER 400 -600 LBS. PER ACRE OR AS SPECIFIED.
ROCK CHUTE FABRIC
NO SCALE SEEDING SCHEDULE
NO SCALE
VARIES* VARIES*
Y Y 2 "x2" POST (IYP.) 2"x2" POST (TYP.)
z z
a m
CONSTRUCT DIVERSIONARY DITCHES DITCH CHECKS REQUIRED
IF STOCKPILE RESTRICTS UPSTREAM EVERY 400' o o NON -WOVEN FILTER FABRIC NON -WOVEN FILTER FABRIC
DRAINAGE FLOW ATTACHED TO ALL SIDES ATTACHED TO ALL SIDES
ao 3 :1 SLOPE MAX. C11 INLET
~ 10:1 SLOPE MAX. 3:1 SLOPE MAX. 2 "x2" INTERIOR REINFORCEMENT 2"x2" INTERIOR REINFORCEMENT
l
N -3 :1 :>LOPE MAX. NORMAL POOL Nl
1 ELEVATION
zg 2 "x2" (TYP.)
bi
10' SAFETY (n0- 10' SAFETY
LEDGE AT A (n0 LEDGE AT A
10 :1 SLOPE LLI 10:1 SLOPE
3:1 SLOPE MAX. >< 3:1 SLOPE MAX. PLAN — PAVED AREAS PLAN — GRASS AREAS
2 "x2" INTERIOR REINFORCEMENT 2"x2" INTERIOR REINFORCEMENT
NOTES:
1. STRIPPING OF TOPSOIL PRIOR TO EXCAVATION 2 "x2" POST (TYP.)
SANDBAGS NON -WOVEN FILTER FABRIC
SLOPE CHECK
OR FILLING IS REQUIRED. ENCIRCLING NON -WOVEN FILTER FABRIC ATTACHED TO ALL SIDES
2. LAKE TO BE CONSTRUCTED WITH A 4" THICK BOX ( TYP ) ATTACHED TO ALL SIDES
SILT FENCE CLAY LINER FROM ON SITE MATERIAL. � INLET INLET
LAKE SECTION = II�II „ I II�III
STOCKPILE MATERIAL DRAINAGE NO SCALE LAP FABRIC 0
OFFSITE PAVEMENT-/ MIN. 12' ONTO
PAVEMENT 2"x2" POST (TYP.)
ELEVATION — PAVED AREAS ELEVATION — GRASS AREAS
SEDIMENT TRAP
STONE OUTLET
(SEE DETAIL)
SIDE VIEW SHOWING INLET SIDE VIEW SHOWING INLET
(CONSTRUCTION SAME AS ABOVE) (CONSTRUCTION SAME AS ABOVE)
L I I l I I I
SLOPE CHECK SIDE VIEW — PAVED AREAS SIDE VIEW — GRASS AREAS
SILT FENCE
NOTES:
NON -WOVEN FILTER FABRIC ATTACHED TO ALL SIDES OF BOX.
SILT BOXES TO BE LOCATED AT EACH CATCH BASIN.
*DIMENSIONS OF BOX WILL VARY ACCORDING TO
THE SIZE OF INLET AND DEPTH OF BASE.
STOCKPILE EROSION CONTROL
NO SCALE SILT BOX DETAIL
NO SCALE
SLOPE CHECK DITCH CHECK JOINING FENCES
POST NON -WOVEN
FABRIC
POST _ FLOW
BACKFILL
GROUND -11 -II _III
LINE
3/4" BLACK RUBBER HOSE IIFEE III Ir=III I II L�11111�1�1 �� I
m
2 %2 %8" HARDWOOD REMOVE ANY BINDING I� III 1 111= EXISTING
2 PER TREE WITH #12 GALV. WRAP TRUNK 3" HARDWOOD AROUND PLANT STEM 11 SOIL
WIRE & 1/2- HOSE LOOP _ MULCH 6" X 6" TRENCH DITCH
TO FIRST BRANCH WHEN JOINING TWO OR MORE
BOTTOM OF
FILTER FABRIC
REMOVE BINDING AROUND CREATE 4" SAUCER SILT FENCES TIE THE TWO
3" SHREDDED 7x19 GALV. GUY WIRE EXTENDS INTO TRENCH EXISTING NOSTNYLON TOGETHER WITH
HARDWOOD MULCH TRUNK AFTER PLANTING REMOVE UPPER FINISH GRADE SILT FENCE DETAIL
AND STAKING 2" SHREDDED HARDWOOD MULCH 1/3 OF BURLAP NO SCALE
75 CREATE 4" SAUCER REMOVE BINDING FROM 111-1 it ;:: IIII�II�'
FINISH GRADE STEEL TEE FENCE POST 24" = 1L�1L� 1T11�11'
TRUNK AFTER PLANTING
AND STAKING TREE
- 11�11�11 �11�111= SOIL MIX: 3 PARTS -II a� Ilk
J I- III -III -I I L I EI TOPSOIL & 1 PART
Ir=1 IIE
g "C = II II SOIL MIX: 3 PARTS PEAT. II II -II' B & B OR CONTAINER
'I�II�II�II�II�II�II� I�IIF
O REMOVE UPPER -III III- TOPSOIL & 1 PARTI II II- SUBGRADE C- IIEII�II III- GROWN ROOT BALL
1/3 OF BURLAP =11 11 = III PEAT i i
11 III,` � '�. `.'' III I III �. o TWICE BALL DIA
EROSION CONTROL SCHEDULE
r
Q
0 3
_ Q
0 z
o - 6" STONE DEPTH
o (MIN) o EVERGREEN
II o v
o Z
O
n
FLOW w
GRADE @ 1% OR
1 11=1 f-1 �I I- III-
II= III - III - III -'
SUB DE
NOTE:
HARDWOOD STAKES SHALL
BE DRIVEN A MIN. OF 30"
INTO THE GROUND
PLANTING DETAIL
NO SCALE
I I
III
III- II�II�_ �IIr
'I�II�I�II
AMENDED PLANTING SOIL
TREE PLANTING DETAIL
NO SCALE
- SCARIFY POT
BOUND PLANTS
SHRUB PLANTING DETAIL
NO SCALE
INSPECT WEEKLY, AFTER STORM EVENTS, AND AFTER HEAVY USE;
All of your logo's entities (and
STONE ENTRANCE
RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL;
PRIOR TO CLEARING AND GRADING
AS SHOWN BELOW
TOPDRESS WITH CLEAN STONE AS NEEDED; REMOVE ALL MUD AND
\
0
SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS IMMEDIATELY
m(n
Z> Z
PLAN
INSPECT AFTER STORN EVENTS; REPAIR ANY AREAS OF DECOMPOSITION
ar
SILT FENCE
OR DAMAGE TO FENCE MATERIAL; REMOVE SEDIMENT AT DEPTH OF ONE
PRIOR TO CLEARING AND GRADING
HALF FENCE HEIGHT �T LOWEST POINT OR IF FABRIC BULGES; AVOID
N
NUT W/
UNDERMINING DURING CLEANOUT
EXISTING INLET PROTECTION
WEEKLY, AFTER STORN EVENTS, AND AS NEEDED
PRIOR TO CLEARING AND GRADING
LOCKING WELDED CAP
WEEKLY, AFTER STORK EVENTS, AND AS NEEDED
PRIOR TO CLEARING AND GRADING
U
INSPECT WEEKLY AND .AFTER EACH STORM EVENT; REMOVE SEDIMENT
WASHER
FROM CHANNEL AND I:EINFORCE RIDGE AS NEEDED; REPAIR OUTLET
W
50' 25'
DAMAGE IMMEDIATELY; REMOVE SEDIMENT FROM TRAPS WHEN 50% FULL;
ALONG WITH ROUGH GRADING
WHEN WORK AREA IS STABILIZED, REMOVE RIDGE, FILL CHANNEL, REMOVE
z
@ 1% 1 @ 2%
TEMPORARY SLOPE DPAINS, AND STABILIZE ALL DISTURBED AREAS
Q
INSPECT AFTER STORK EVENTS; REMOVE SEDIMENT AT ONE HALF DESIGN
�/♦
TEMPORARY SEDIMENT TRAP
DEPTH; REPLACE SPIL_WAY GRAVEL FACING IF CLOGGED; REPAIR EROSION
3/4" BLACK RUBBER HOSE
J
AND HOLES AS NEEDED; REPLACE DISPLACED RIPRAP
=
a
INSPECT PERIODICALL7 TO VERIFY ADEQUATE ESTABLISHMENT OF
WRAP TRUNK TO
ROUND
� STOP BOLTS HEAD
VEGETATIVE STANDS; PESEED AND MULCH AS NEEDED; INSPECT AFTER
o)
TEMPORARY SEEDING
STEEL TEE
FIRST BRANCH
0
WHEAT OR RYE SEEDINGS WITH 50 LBS /AC OF NITROGEN IN FEBRUARY
�
PROFILE
POST @ 10' O.C.
U
INSPECT PERIODICALLY AND AFTER STORM EVENTS UNTIL VEGETATIVE
STAND IS ESTABLISHED; ADD FERTILIZER AFTER GROWING SEASON PER
REMOVE BINDING FROM 7x9 GALV. GUY WIRE
PERMANENT SEEDING
SOIL TEST RECOMMENDATIONS; REPAIR DAMAGED, HARE, OR SPARSE
AFTER FINISH GRADING OF EACH AREA
AREAS BY FILLING, REPREPARING THE SEED BED, FERTILIZING, AND /OR
TRUNK AFTER PLANTING
0
SEEDING AND MULCHING
Drawing Number-
7///4j
NOTE:
INSPECT FOR AREAS OF EROSION BELOW THE BLANKET AFTER EACH
AND STAKING TREE 2" SHREDDED HARDWOOD MULCH
3" O.D. PIPE
'A
STORM EVENT; REPAIR AREAS OF EROSION BY REMOVING AFFECTED
AFTER FINISH GRADING
1. STONE SIZE SHALL CONFORM TO ASTM D48
PORTION OF BLANKET, ADD SOIL, RESEED, RELAY AND STAPLE BLANKET;
WITH SIMILAR
INSPECT PERIODICALLY AFTER VEGETATION IS ESTABLISHED
SIZE #1 (1 1/2" TO 3 1/2" DIA.).
INSPECT THE BALES AFTER EACH STORM EVENT; REMOVE SEDIMENT
COLOR FINISH
DEPOSITS TO PROVIDE STORAGE FOR THE NEXT STORM BEING CAREFUL
AFTER FINISH GRADING
2. PERIODIC 2" STONE TOP DRESSING & WASHING
NOT TO DAMAGE OR UNDERCUT THE BALES; REPLACE DAMAGED OR
DETERIORATED BALES IMMEDIATELY
AS REQUESTED BY COUNTY /CITY.
INSPECT FABRIC BARRIER AFTER STORM EVENTS AND MAKE NEEDED
STEEL 4E FENCE
2
°
REPAIRS IMMEDIATELY; REMOVE SEDIMENT FROM THE POOL AREA WHILE
AFTER EACH INLET IS PLACED
ICONC.
POST
OR
KEEP SOD MOIST UNTIL FULLY ROOTED; WATER All) NEEDED
AFTER FINISHED GRADING AROUND FINISHED UNITS
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF STRAW BALES
II
REMOVAL OF INLET PROTECTION
PAVER SLOPE TO DRAIN
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF SILT FENCE
TEMPORARY CONSTRUCTION
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
N
FINISH 1/4" SLOPE PER FOOT
ENTRANCE DETAIL
NO SCALE
SNOW FENCE ALONG
DRIP LINE OF TREE
(FENCE TYPE TO BE
SUBMITTED FOR REVIEW)
AMENDED PLANTING SOIL
CLASS "A" CONCRETE
FOR TREE PLANTING #5
TREE PROTECTION DETAIL
12"
NO SCALE
TREE PLANTING DETAIL ON SLOPE
STOP SIGN DETAIL
NO SCALE
NO SCALE
EROSION CONTROL SCHEDULE
EROSION CONTROL MEASURE
MAINTENANCE
INSTALLATION SEQUENCE
for revisions- Your logo may be
INSPECT WEEKLY, AFTER STORM EVENTS, AND AFTER HEAVY USE;
All of your logo's entities (and
STONE ENTRANCE
RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL;
PRIOR TO CLEARING AND GRADING
logo's entities. Erase this text.
TOPDRESS WITH CLEAN STONE AS NEEDED; REMOVE ALL MUD AND
\
0
SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS IMMEDIATELY
m(n
Z> Z
Of
J U
H
INSPECT AFTER STORN EVENTS; REPAIR ANY AREAS OF DECOMPOSITION
ar
SILT FENCE
OR DAMAGE TO FENCE MATERIAL; REMOVE SEDIMENT AT DEPTH OF ONE
PRIOR TO CLEARING AND GRADING
HALF FENCE HEIGHT �T LOWEST POINT OR IF FABRIC BULGES; AVOID
N
C3
UNDERMINING DURING CLEANOUT
EXISTING INLET PROTECTION
WEEKLY, AFTER STORN EVENTS, AND AS NEEDED
PRIOR TO CLEARING AND GRADING
TREE PROTECTION
WEEKLY, AFTER STORK EVENTS, AND AS NEEDED
PRIOR TO CLEARING AND GRADING
U
INSPECT WEEKLY AND .AFTER EACH STORM EVENT; REMOVE SEDIMENT
FROM CHANNEL AND I:EINFORCE RIDGE AS NEEDED; REPAIR OUTLET
W
TEMPORARY DIVERSIONS
DAMAGE IMMEDIATELY; REMOVE SEDIMENT FROM TRAPS WHEN 50% FULL;
ALONG WITH ROUGH GRADING
WHEN WORK AREA IS STABILIZED, REMOVE RIDGE, FILL CHANNEL, REMOVE
z
TEMPORARY SLOPE DPAINS, AND STABILIZE ALL DISTURBED AREAS
Q
INSPECT AFTER STORK EVENTS; REMOVE SEDIMENT AT ONE HALF DESIGN
�/♦
TEMPORARY SEDIMENT TRAP
DEPTH; REPLACE SPIL_WAY GRAVEL FACING IF CLOGGED; REPAIR EROSION
DURING CLEARING AND PRIOR TO GRADING
J
AND HOLES AS NEEDED; REPLACE DISPLACED RIPRAP
=
a
INSPECT PERIODICALL7 TO VERIFY ADEQUATE ESTABLISHMENT OF
VEGETATIVE STANDS; PESEED AND MULCH AS NEEDED; INSPECT AFTER
o)
TEMPORARY SEEDING
STORM EVENTS AND REPAIR EROSION DAMAGE; TOPDRESS FALL SEEDED
AFTER ROUGH GRADING
0
WHEAT OR RYE SEEDINGS WITH 50 LBS /AC OF NITROGEN IN FEBRUARY
�
OR MARCH IF NITROGEN DEFICIENCY IS APPARENT; WATER AS NEEDED
U
INSPECT PERIODICALLY AND AFTER STORM EVENTS UNTIL VEGETATIVE
STAND IS ESTABLISHED; ADD FERTILIZER AFTER GROWING SEASON PER
W
PERMANENT SEEDING
SOIL TEST RECOMMENDATIONS; REPAIR DAMAGED, HARE, OR SPARSE
AFTER FINISH GRADING OF EACH AREA
AREAS BY FILLING, REPREPARING THE SEED BED, FERTILIZING, AND /OR
IF- p� STATE OF i
IND1AN4 .• � ��.
0
SEEDING AND MULCHING
Drawing Number-
7///4j
C702
INSPECT FOR AREAS OF EROSION BELOW THE BLANKET AFTER EACH
Duke Realty Job Number.
EROSION CONTROL BLANKET
STORM EVENT; REPAIR AREAS OF EROSION BY REMOVING AFFECTED
AFTER FINISH GRADING
PORTION OF BLANKET, ADD SOIL, RESEED, RELAY AND STAPLE BLANKET;
INSPECT PERIODICALLY AFTER VEGETATION IS ESTABLISHED
INSPECT THE BALES AFTER EACH STORM EVENT; REMOVE SEDIMENT
STRAW BALES
DEPOSITS TO PROVIDE STORAGE FOR THE NEXT STORM BEING CAREFUL
AFTER FINISH GRADING
NOT TO DAMAGE OR UNDERCUT THE BALES; REPLACE DAMAGED OR
DETERIORATED BALES IMMEDIATELY
INSPECT FABRIC BARRIER AFTER STORM EVENTS AND MAKE NEEDED
INLET PROTECTION
REPAIRS IMMEDIATELY; REMOVE SEDIMENT FROM THE POOL AREA WHILE
AFTER EACH INLET IS PLACED
AVOIDING DAMAGING OR UNDERCUTTING THE FABRIC
SEED, SOD & LANDSCAPE
AROUND UNITS FINISHED
KEEP SOD MOIST UNTIL FULLY ROOTED; WATER All) NEEDED
AFTER FINISHED GRADING AROUND FINISHED UNITS
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF STRAW BALES
N/A
REMOVAL OF INLET PROTECTION
N/A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF SILT FENCE
N/A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
ue
REALTY CORPORATION
600 East 96th Street
Sure 100
Indianapolis IN 46240
Phone: �33 17 808 -6000
Fax: 1 7 808 -6797
Adjust the vertical position of
the green bar below this text to
center your firm's logo inside of
this area, leaving enough room
for revisions- Your logo may be
be rotated 90' cow, if needed.
All of your logo's entities (and
the logo's insertion, if a block)
are to be on layer "AELOGO "-
Any colors may be used by the
logo's entities. Erase this text.
0
0
\
0
a Cn
z
m(n
Z> Z
Of
J U
H
•) Q
m
ar
7(444M
N
C3
J
C
i 0
U
H
W
U)
W
W
z
Q
�/♦
/A
o
z
J
o
=
a
Z
o)
W
0
�
U
Q
CL
W
1iHlH / ///
Certifie�\��� • K( jFS;o,4���,
�� Q�. ��G \STERF�.,• �F�.,
�� 19011
IF- p� STATE OF i
IND1AN4 .• � ��.
0
/NAIL „��``',,,,
Drawing Number-
7///4j
C702
17 Of 17 Sheets