Loading...
HomeMy WebLinkAbout06050005.13APRON AT STABILIZATION q ZERO GRADE q q q PRACTICE_ — JAN_ FEB. MAR. APR. —MAY— JUNE — JULY AUG.— SEPT. — OCT_NOV_ DEC. PERMANENT A ////I / /// �/ I / ► SEEDING — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — EROSION CONTROL BLANKET REQ'D. B ' C TEMPORARY NORTH AMERICAN GREEN SC150 OR EQUAL D -*///I / / /�► - - - - - -- oil, BLANKET TO BE STAPLED IN PLACE SEEDING _0 0 15' -0" WITH STAPLES AT 2 PER SQUARE YARD. MULCHING SC -150 -- EDGE OF BLANKET SHALL BE --------------------------------- 7' -0" BE ANCHORED IN A 6" DEEP EDGE OF BLANKET SHALL BE X 6" WIDE TRENCH. BE ANCHORED IN A 6" D A = KENTUCKY BLUEGRASS 40 %, TURF TYPE TALL FESCUE 40 %, ANNUAL RYEGRASS 20% X 6" WIDE TRENCH. EEP 4:1 MAXIMUM SLOPE PLUS 2 TONS OF STRAW MULCH/ ACRE PROPOSED DITCH APPLY MIXTURE AT A RATE OF 2 LBS. PER 1000 SQ.FT. VARIES B = SPRING OATS 3 BUSHEL PER ACRE APRON LENGTH EDGE OF BLANKET SHALL BE ANCHORED IN A 12" DEEP X 6" WIDE TRENCH. C = WHEAT OR RYE 2 BUSHEL PER ACRE APRON LENGTH D = ANNUAL RYEGRASS (1 LB. PER 1000 SO. FT.) NOTE: ALL EROSION CONTROL BLANKETS SHALL BE INSTALLED NO PER MANUFACTURER'S RECOMMENDATIONS BASED ON THE OVERFALL NO PROPOSED TYPE AND USE. E = STRAW MULCH (90 LBS. PER 1000 SQ.FT.) OVERFALL TYPICAL EROSION CONTROL BLANKET T III - III - III = III - III - III -II II�II ���III � / I IRRIGATION NEEDED DURING JUNE, JULY, AND / OR SEPTEMBER. NO SCALE I-1 I I- III - III - 111 -1 I l-1 I-1 I I-1 ��LI �I I �I I �I �I I I FA 19I - II�II�II�II III- II�II� -III III III= III -11F 111111 IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD CI I I -I LI CI I f =1 I -I 1 -III I CI I LI t CI ���� 1 CI CI �I - III -I �I 71�Ib11 ll l E= II�I IQ EIIEI�II�II II�IIE 1- III - 111 -11r NOTE: ALL SEEDING SHALL HAVE 12 -12 -12 FERTILIZER APPLIED FILTER FABRIC FILTER 400 -600 LBS. PER ACRE OR AS SPECIFIED. ROCK CHUTE FABRIC NO SCALE SEEDING SCHEDULE NO SCALE VARIES* VARIES* Y Y 2 "x2" POST (IYP.) 2"x2" POST (TYP.) z z a m CONSTRUCT DIVERSIONARY DITCHES DITCH CHECKS REQUIRED IF STOCKPILE RESTRICTS UPSTREAM EVERY 400' o o NON -WOVEN FILTER FABRIC NON -WOVEN FILTER FABRIC DRAINAGE FLOW ATTACHED TO ALL SIDES ATTACHED TO ALL SIDES ao 3 :1 SLOPE MAX. C11 INLET ~ 10:1 SLOPE MAX. 3:1 SLOPE MAX. 2 "x2" INTERIOR REINFORCEMENT 2"x2" INTERIOR REINFORCEMENT l N -3 :1 :>LOPE MAX. NORMAL POOL Nl 1 ELEVATION zg 2 "x2" (TYP.) bi 10' SAFETY (n0- 10' SAFETY LEDGE AT A (n0 LEDGE AT A 10 :1 SLOPE LLI 10:1 SLOPE 3:1 SLOPE MAX. >< 3:1 SLOPE MAX. PLAN — PAVED AREAS PLAN — GRASS AREAS 2 "x2" INTERIOR REINFORCEMENT 2"x2" INTERIOR REINFORCEMENT NOTES: 1. STRIPPING OF TOPSOIL PRIOR TO EXCAVATION 2 "x2" POST (TYP.) SANDBAGS NON -WOVEN FILTER FABRIC SLOPE CHECK OR FILLING IS REQUIRED. ENCIRCLING NON -WOVEN FILTER FABRIC ATTACHED TO ALL SIDES 2. LAKE TO BE CONSTRUCTED WITH A 4" THICK BOX ( TYP ) ATTACHED TO ALL SIDES SILT FENCE CLAY LINER FROM ON SITE MATERIAL. � INLET INLET LAKE SECTION = II�II „ I II�III STOCKPILE MATERIAL DRAINAGE NO SCALE LAP FABRIC 0 OFFSITE PAVEMENT-/ MIN. 12' ONTO PAVEMENT 2"x2" POST (TYP.) ELEVATION — PAVED AREAS ELEVATION — GRASS AREAS SEDIMENT TRAP STONE OUTLET (SEE DETAIL) SIDE VIEW SHOWING INLET SIDE VIEW SHOWING INLET (CONSTRUCTION SAME AS ABOVE) (CONSTRUCTION SAME AS ABOVE) L I I l I I I SLOPE CHECK SIDE VIEW — PAVED AREAS SIDE VIEW — GRASS AREAS SILT FENCE NOTES: NON -WOVEN FILTER FABRIC ATTACHED TO ALL SIDES OF BOX. SILT BOXES TO BE LOCATED AT EACH CATCH BASIN. *DIMENSIONS OF BOX WILL VARY ACCORDING TO THE SIZE OF INLET AND DEPTH OF BASE. STOCKPILE EROSION CONTROL NO SCALE SILT BOX DETAIL NO SCALE SLOPE CHECK DITCH CHECK JOINING FENCES POST NON -WOVEN FABRIC POST _ FLOW BACKFILL GROUND -11 -II _III LINE 3/4" BLACK RUBBER HOSE IIFEE III Ir=III I II L�11111�1�1 �� I m 2 %2 %8" HARDWOOD REMOVE ANY BINDING I� III 1 111= EXISTING 2 PER TREE WITH #12 GALV. WRAP TRUNK 3" HARDWOOD AROUND PLANT STEM 11 SOIL WIRE & 1/2- HOSE LOOP _ MULCH 6" X 6" TRENCH DITCH TO FIRST BRANCH WHEN JOINING TWO OR MORE BOTTOM OF FILTER FABRIC REMOVE BINDING AROUND CREATE 4" SAUCER SILT FENCES TIE THE TWO 3" SHREDDED 7x19 GALV. GUY WIRE EXTENDS INTO TRENCH EXISTING NOSTNYLON TOGETHER WITH HARDWOOD MULCH TRUNK AFTER PLANTING REMOVE UPPER FINISH GRADE SILT FENCE DETAIL AND STAKING 2" SHREDDED HARDWOOD MULCH 1/3 OF BURLAP NO SCALE 75 CREATE 4" SAUCER REMOVE BINDING FROM 111-1 it ;:: IIII�II�' FINISH GRADE STEEL TEE FENCE POST 24" = 1L�1L� 1T11�11' TRUNK AFTER PLANTING AND STAKING TREE - 11�11�11 �11�111= SOIL MIX: 3 PARTS -II a� Ilk J I- III -III -I I L I EI TOPSOIL & 1 PART Ir=1 IIE g "C = II II SOIL MIX: 3 PARTS PEAT. II II -II' B & B OR CONTAINER 'I�II�II�II�II�II�II� I�IIF O REMOVE UPPER -III III- TOPSOIL & 1 PARTI II II- SUBGRADE C- IIEII�II III- GROWN ROOT BALL 1/3 OF BURLAP =11 11 = III PEAT i i 11 III,` � '�. `.'' III I III �. o TWICE BALL DIA EROSION CONTROL SCHEDULE r Q 0 3 _ Q 0 z o - 6" STONE DEPTH o (MIN) o EVERGREEN II o v o Z O n FLOW w GRADE @ 1% OR 1 11=1 f-1 �I I- III- II= III - III - III -' SUB DE NOTE: HARDWOOD STAKES SHALL BE DRIVEN A MIN. OF 30" INTO THE GROUND PLANTING DETAIL NO SCALE I I III III- II�II�_ �IIr 'I�II�I�II AMENDED PLANTING SOIL TREE PLANTING DETAIL NO SCALE - SCARIFY POT BOUND PLANTS SHRUB PLANTING DETAIL NO SCALE INSPECT WEEKLY, AFTER STORM EVENTS, AND AFTER HEAVY USE; All of your logo's entities (and STONE ENTRANCE RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL; PRIOR TO CLEARING AND GRADING AS SHOWN BELOW TOPDRESS WITH CLEAN STONE AS NEEDED; REMOVE ALL MUD AND \ 0 SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS IMMEDIATELY m(n Z> Z PLAN INSPECT AFTER STORN EVENTS; REPAIR ANY AREAS OF DECOMPOSITION ar SILT FENCE OR DAMAGE TO FENCE MATERIAL; REMOVE SEDIMENT AT DEPTH OF ONE PRIOR TO CLEARING AND GRADING HALF FENCE HEIGHT �T LOWEST POINT OR IF FABRIC BULGES; AVOID N NUT W/ UNDERMINING DURING CLEANOUT EXISTING INLET PROTECTION WEEKLY, AFTER STORN EVENTS, AND AS NEEDED PRIOR TO CLEARING AND GRADING LOCKING WELDED CAP WEEKLY, AFTER STORK EVENTS, AND AS NEEDED PRIOR TO CLEARING AND GRADING U INSPECT WEEKLY AND .AFTER EACH STORM EVENT; REMOVE SEDIMENT WASHER FROM CHANNEL AND I:EINFORCE RIDGE AS NEEDED; REPAIR OUTLET W 50' 25' DAMAGE IMMEDIATELY; REMOVE SEDIMENT FROM TRAPS WHEN 50% FULL; ALONG WITH ROUGH GRADING WHEN WORK AREA IS STABILIZED, REMOVE RIDGE, FILL CHANNEL, REMOVE z @ 1% 1 @ 2% TEMPORARY SLOPE DPAINS, AND STABILIZE ALL DISTURBED AREAS Q INSPECT AFTER STORK EVENTS; REMOVE SEDIMENT AT ONE HALF DESIGN �/♦ TEMPORARY SEDIMENT TRAP DEPTH; REPLACE SPIL_WAY GRAVEL FACING IF CLOGGED; REPAIR EROSION 3/4" BLACK RUBBER HOSE J AND HOLES AS NEEDED; REPLACE DISPLACED RIPRAP = a INSPECT PERIODICALL7 TO VERIFY ADEQUATE ESTABLISHMENT OF WRAP TRUNK TO ROUND � STOP BOLTS HEAD VEGETATIVE STANDS; PESEED AND MULCH AS NEEDED; INSPECT AFTER o) TEMPORARY SEEDING STEEL TEE FIRST BRANCH 0 WHEAT OR RYE SEEDINGS WITH 50 LBS /AC OF NITROGEN IN FEBRUARY � PROFILE POST @ 10' O.C. U INSPECT PERIODICALLY AND AFTER STORM EVENTS UNTIL VEGETATIVE STAND IS ESTABLISHED; ADD FERTILIZER AFTER GROWING SEASON PER REMOVE BINDING FROM 7x9 GALV. GUY WIRE PERMANENT SEEDING SOIL TEST RECOMMENDATIONS; REPAIR DAMAGED, HARE, OR SPARSE AFTER FINISH GRADING OF EACH AREA AREAS BY FILLING, REPREPARING THE SEED BED, FERTILIZING, AND /OR TRUNK AFTER PLANTING 0 SEEDING AND MULCHING Drawing Number- 7///4j NOTE: INSPECT FOR AREAS OF EROSION BELOW THE BLANKET AFTER EACH AND STAKING TREE 2" SHREDDED HARDWOOD MULCH 3" O.D. PIPE 'A STORM EVENT; REPAIR AREAS OF EROSION BY REMOVING AFFECTED AFTER FINISH GRADING 1. STONE SIZE SHALL CONFORM TO ASTM D48 PORTION OF BLANKET, ADD SOIL, RESEED, RELAY AND STAPLE BLANKET; WITH SIMILAR INSPECT PERIODICALLY AFTER VEGETATION IS ESTABLISHED SIZE #1 (1 1/2" TO 3 1/2" DIA.). INSPECT THE BALES AFTER EACH STORM EVENT; REMOVE SEDIMENT COLOR FINISH DEPOSITS TO PROVIDE STORAGE FOR THE NEXT STORM BEING CAREFUL AFTER FINISH GRADING 2. PERIODIC 2" STONE TOP DRESSING & WASHING NOT TO DAMAGE OR UNDERCUT THE BALES; REPLACE DAMAGED OR DETERIORATED BALES IMMEDIATELY AS REQUESTED BY COUNTY /CITY. INSPECT FABRIC BARRIER AFTER STORM EVENTS AND MAKE NEEDED STEEL 4E FENCE 2 ° REPAIRS IMMEDIATELY; REMOVE SEDIMENT FROM THE POOL AREA WHILE AFTER EACH INLET IS PLACED ICONC. POST OR KEEP SOD MOIST UNTIL FULLY ROOTED; WATER All) NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF STRAW BALES II REMOVAL OF INLET PROTECTION PAVER SLOPE TO DRAIN AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF SILT FENCE TEMPORARY CONSTRUCTION AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED N FINISH 1/4" SLOPE PER FOOT ENTRANCE DETAIL NO SCALE SNOW FENCE ALONG DRIP LINE OF TREE (FENCE TYPE TO BE SUBMITTED FOR REVIEW) AMENDED PLANTING SOIL CLASS "A" CONCRETE FOR TREE PLANTING #5 TREE PROTECTION DETAIL 12" NO SCALE TREE PLANTING DETAIL ON SLOPE STOP SIGN DETAIL NO SCALE NO SCALE EROSION CONTROL SCHEDULE EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE for revisions- Your logo may be INSPECT WEEKLY, AFTER STORM EVENTS, AND AFTER HEAVY USE; All of your logo's entities (and STONE ENTRANCE RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL; PRIOR TO CLEARING AND GRADING logo's entities. Erase this text. TOPDRESS WITH CLEAN STONE AS NEEDED; REMOVE ALL MUD AND \ 0 SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS IMMEDIATELY m(n Z> Z Of J U H INSPECT AFTER STORN EVENTS; REPAIR ANY AREAS OF DECOMPOSITION ar SILT FENCE OR DAMAGE TO FENCE MATERIAL; REMOVE SEDIMENT AT DEPTH OF ONE PRIOR TO CLEARING AND GRADING HALF FENCE HEIGHT �T LOWEST POINT OR IF FABRIC BULGES; AVOID N C3 UNDERMINING DURING CLEANOUT EXISTING INLET PROTECTION WEEKLY, AFTER STORN EVENTS, AND AS NEEDED PRIOR TO CLEARING AND GRADING TREE PROTECTION WEEKLY, AFTER STORK EVENTS, AND AS NEEDED PRIOR TO CLEARING AND GRADING U INSPECT WEEKLY AND .AFTER EACH STORM EVENT; REMOVE SEDIMENT FROM CHANNEL AND I:EINFORCE RIDGE AS NEEDED; REPAIR OUTLET W TEMPORARY DIVERSIONS DAMAGE IMMEDIATELY; REMOVE SEDIMENT FROM TRAPS WHEN 50% FULL; ALONG WITH ROUGH GRADING WHEN WORK AREA IS STABILIZED, REMOVE RIDGE, FILL CHANNEL, REMOVE z TEMPORARY SLOPE DPAINS, AND STABILIZE ALL DISTURBED AREAS Q INSPECT AFTER STORK EVENTS; REMOVE SEDIMENT AT ONE HALF DESIGN �/♦ TEMPORARY SEDIMENT TRAP DEPTH; REPLACE SPIL_WAY GRAVEL FACING IF CLOGGED; REPAIR EROSION DURING CLEARING AND PRIOR TO GRADING J AND HOLES AS NEEDED; REPLACE DISPLACED RIPRAP = a INSPECT PERIODICALL7 TO VERIFY ADEQUATE ESTABLISHMENT OF VEGETATIVE STANDS; PESEED AND MULCH AS NEEDED; INSPECT AFTER o) TEMPORARY SEEDING STORM EVENTS AND REPAIR EROSION DAMAGE; TOPDRESS FALL SEEDED AFTER ROUGH GRADING 0 WHEAT OR RYE SEEDINGS WITH 50 LBS /AC OF NITROGEN IN FEBRUARY � OR MARCH IF NITROGEN DEFICIENCY IS APPARENT; WATER AS NEEDED U INSPECT PERIODICALLY AND AFTER STORM EVENTS UNTIL VEGETATIVE STAND IS ESTABLISHED; ADD FERTILIZER AFTER GROWING SEASON PER W PERMANENT SEEDING SOIL TEST RECOMMENDATIONS; REPAIR DAMAGED, HARE, OR SPARSE AFTER FINISH GRADING OF EACH AREA AREAS BY FILLING, REPREPARING THE SEED BED, FERTILIZING, AND /OR IF- p� STATE OF i IND1AN4 .• � ��. 0 SEEDING AND MULCHING Drawing Number- 7///4j C702 INSPECT FOR AREAS OF EROSION BELOW THE BLANKET AFTER EACH Duke Realty Job Number. EROSION CONTROL BLANKET STORM EVENT; REPAIR AREAS OF EROSION BY REMOVING AFFECTED AFTER FINISH GRADING PORTION OF BLANKET, ADD SOIL, RESEED, RELAY AND STAPLE BLANKET; INSPECT PERIODICALLY AFTER VEGETATION IS ESTABLISHED INSPECT THE BALES AFTER EACH STORM EVENT; REMOVE SEDIMENT STRAW BALES DEPOSITS TO PROVIDE STORAGE FOR THE NEXT STORM BEING CAREFUL AFTER FINISH GRADING NOT TO DAMAGE OR UNDERCUT THE BALES; REPLACE DAMAGED OR DETERIORATED BALES IMMEDIATELY INSPECT FABRIC BARRIER AFTER STORM EVENTS AND MAKE NEEDED INLET PROTECTION REPAIRS IMMEDIATELY; REMOVE SEDIMENT FROM THE POOL AREA WHILE AFTER EACH INLET IS PLACED AVOIDING DAMAGING OR UNDERCUTTING THE FABRIC SEED, SOD & LANDSCAPE AROUND UNITS FINISHED KEEP SOD MOIST UNTIL FULLY ROOTED; WATER All) NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF STRAW BALES N/A REMOVAL OF INLET PROTECTION N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF SILT FENCE N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED ue REALTY CORPORATION 600 East 96th Street Sure 100 Indianapolis IN 46240 Phone: �33 17 808 -6000 Fax: 1 7 808 -6797 Adjust the vertical position of the green bar below this text to center your firm's logo inside of this area, leaving enough room for revisions- Your logo may be be rotated 90' cow, if needed. All of your logo's entities (and the logo's insertion, if a block) are to be on layer "AELOGO "- Any colors may be used by the logo's entities. Erase this text. 0 0 \ 0 a Cn z m(n Z> Z Of J U H •) Q m ar 7(444M N C3 J C i 0 U H W U) W W z Q �/♦ /A o z J o = a Z o) W 0 � U Q CL W 1iHlH / /// Certifie�\��� • K( jFS;o,4���, �� Q�. ��G \STERF�.,• �F�., �� 19011 IF- p� STATE OF i IND1AN4 .• � ��. 0 /NAIL „��``',,,, Drawing Number- 7///4j C702 17 Of 17 Sheets Duke Realty Job Number. A/E Job Number: 58661.01