Loading...
HomeMy WebLinkAboutCoreslab Structures - $11,540Exhibit D Disbursement Instructions Mercantile Bank hereby is instructed to make a disbursement of Loan Proceeds from the Borrower Loan Account to (or for the account of) Borrower in: (a) the amount of the "Total Authorized Disbursement: line in the "Amount of Authorized Disbursement" column below; and (b) accordance with the terms and conditions of the Agreement, the other Loan Documents, and the Disbursement instructions, Purpose of Authorized Disbursement Amount of Authorized Disbursement Coreslab Structures Appl. #1 $ 576.00 Coreslab Structures Appl. #2 $ 9,810.00 Coreslab Structures Appl. #3 $ 1.154.00 Total Authorized Disbursement S11,540.00 AR terms used in these Disbursement Instructions without definition shall have the meanings ascribed thereto in that certain Loan Agreement (PAC Equipment), dated, as of August 31, 2009, by and between Lender and Village Financial, LLC. Dated: 2 j 20//? CITY OF CARMEL REDEVELOPMENT COMMISSION By Printed Lt s OLO1 Title 1 k Reacie^ IJ3 APPLICATION AND CERTIFICATION FOR PAYMENT ANA Document G702 To Owner or General Contractor: Project: Application No.: 1 Revised Signature Construction Cannel City Center Motor .application Date: 10/17/2012 720 3rd Avenue SW Court Stair Period To: 10/31/2012 Cannel, IN 46032 Mercantile's PAC Project No.: 12.022 From Contractor: Architect: Contract Date: 01/00/1900 Coreslab Structures (Indianapolis) Inc. Contract For: Precast Concrete 1030 S. Kitley Ave. Indianapolis, IN 46203 Co t ies to: Owner Architect- originals General Contractor SuhContractnr Q 0 0 0 CONTRACTOR'S APPLICATION FOR PAYMENT Contractor's Certificate for Payment Application is made for Payment, as shown below, in connection with the Contract. Continuation Sheet, AIA Document 0703 is attached. The undersigned Contractor certifies that to the hest of the Contractor's knowledge, information and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work forwhich previous Certificates for Payment tcere issued and pa}ments received front the Owner. and that current payment shown herein is now due. 1. Original Contract Sum $ 11,540.00 2. Net change by Change Orders $0.00 CONTRACTOR: Coreslab Structures (Indianapolis) Inc. 3. Contract Sum to Date (Line 1* 2) $ 11,540.00 4. Total Completed 8t. Stored $ 640.00 PA• (Column G on Detail Sheet) By: �e ll Date: 10/17/2012 5. Retainage a. 10% of Completed Work $ 64.00 -., _ — ; put. few" "' "' `" :' State of Indiana County of in tu ' '' " (Column D + E on Continuation) Subscribed and SW OM to before me on 1 E 7/2 12 i, ,i, ; /,,, ;. % ;,t p_. T;,. (; b. 10% of Stored Materials $ - if Notary Public: Yff? Q.. i, X1.-4- ,1 diVATE, OF " -,.' My Commission expires: `�f��f7 a �''�". �-y^ ,t,o =r`n ` a ..�.:--- __:- ..:..._. .......,,..._,.i (Column F on Continuation) Total Retainage Lines 5a + 5b $ 64.00 6. Total Earned Less Retainage (Line 4 Less Line 5's Total) $ 576 -00 Certificate for Payment 7. Less Previous Certificates for Payment In accordance with the Contract Documents, based on on -site observations and the data (Line 6 from prior Payment Request) $ - comprising the application, the Architect certifies to the Owner that to the best of the Architect's 8. Current Payment Due S 576.00 knowledge, information and belief the Work has progressed as indicated, the quality of the 8a. Current Completed including Retainage $ 640.00 Work is in accordance with the Contract Documents, and the Contractor is entitled to payment 8b. Retainage Being Held This Period $ 64.00 of the Amount Certified. 4-,trr ._..._- --- - -- Amount Certified S •�) ft O (Attach explanation if amount certified differs from the amount applied for. initial all figures 00 this 9. Balance to Finish including Retainage Being Held $ 10,964.00 (Line 3 less Line 6) ;l- plrentinn and on the Continuation ,S'heet that are changed to nor form to the amount certified) Change Order Summary Additions Deductions Total approved in previous months $0.00 $0.00 ,.• ---� r �, ARCHITECT: t t Total approved this month $0.00 $0.00 "., , A By: / ... Date: l !AA :..� the Totals $0.00 50.00 This `ertificate is ncit i igotiahle. The Amount Certified named he I st a/tce, payment and acceptance of payment is payable��6n(y to Contractor are tvitRiout prejudice to any rights of the Owner or Contractor under this Contract. Net Changes by Chanz Order AIA DOCUMENT G703 Project: Carmel City Center Motor Contract For: Precast Concrete A B C Application No.: 1 Revised Application Date: 10/17/2012 Period To: 10/31/2012 Project Number: 12.022 Contract Date: Item Description Orignal Contract Schedule Of Values D Previous Work Completed & Materials Stored E 1 F This Month Work Completed G H Materials Stored Total Completed & Materials Stored Percent Complete Balance to Finish Retainage Engineering Production Delivery Erection /Field Services Precast Stair Units 1,455.00 3,490.00 670.00 3,304.00 2,621.00 640.00 640.00 43.99"/o 0.00% 0.00% 0.00"% 0.00% 815.00 3,490.00 670.00 3,304.00 2,621.00 64.00 Subtotal 11,540.00 640,00 640.00 5.55% 10,900.00 64.00 Change Orders 0.00% 0.00 %io .............. 0.00% Subtotal GRAND TOTALS 11,540.00 640.00 0 640.00 5.55% 10,900.00 64.00 PARTIAL WAIVER OF LIEN (Payment to Follow) State of Indiana Marion County ss: WHEREAS The undersigned employed by Coreslab Structures (Indianapolis) Inc (Name of Declarer) has been heretofore Signature Construction To furnish certain material (Contractor) and labor to:wit: Precast Concrete Pieces (Work performed) for the project: Carmel city Center Motor Court Stair and located on Carmel, Indiana (Exact Legal description and street address, if any, of the land on which the improvement is situated or to which it may be removed) NOW, THEREFORE, KNOW YE, that the undersigned, upon the receipt of Payment application # 1 in the amount of ... Five Hundred Seventy-six dollars and no /cents Dollars ($ 576.00) It hereby and now waives and releases unto the said owner of said premises, any and all lien, right of lien or claim of whatsoever kind or character on the above described building and real estate, TO AND FOR SAID AMOUNT, on account of any and all labor, material or both, furnished for or Incorporated into said building by the undersigned, up to this date and further, he represents that no other person or party has any right to a lien on account of any work performed or material furnished by said company. THIS PARTIAL WAIVER OF LIEN has been given upon the promise to pay the amount as indicated on the attached statement or payment application. Coreslab Structures (Indianapolis) Inc. By: "71 J VP/GM (Name of Claimant firm) (Authorized Representative) (Title) STATE OF Indiana COUNTY OF Marion Before me, a Notary Public in and for said County and State, personally appeared Mpar 8 (kL( who acknowledged the execution of the foregoing PARTIAL Waiver of Lien, and who, having been duly sworn, stated that the representations therein ontained are true. Ss: Witness my hand and Notarial Seal this Signature Printed: My commission expires: County of Residence: 17m day of October 2012 Volere S. Hasseld 9117117 Hamilton CPA S dO" (AR Y P;441 if' 1 2. qs, t :: ! APPLICATION AND CERTIFICATION FOR PAYMENT AIA Document G702 To Owner or General Contractor: Project: Application No.: 2 Sigiantre Construction Carmel City Center Motor Application Date: 11/28/2012 720 3rd Avenue SW Court Stair Period To: 12/31/2012 Carmel, IN 46032 Mercantile's PAC Project No.: 12.022 From Contractor. Architect: Contract Date: 01/00/1900 Coreslab Structures (Indianapolis) Inc. Contract For: Precast Concrete 1030 S. Kiticy Ave. Copics to: Owner Architect- originals General Contractor SuhContractor 1 0 0 0 Indianapolis, IN 46203 CONTRACTOR'S APPLICATION FOR PAYMENT Contractor's Certificate for Payment Application is made for Payment, as shown below, in connection with the Contract. Continuation The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief Sheet, AIA Document G703 is attached. the Work covered by this .Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which pre. •ions Certificates for Payment were issued and payments received from the Owner, and that current pa;1ncnt shown herein is now due. 1. Original Contract Sum $ 1 1,540.00 2. Net change by Change Orders $0.00 CONTRACTOR: Coreslab Structures (Indianapolis) inc. 3. Contract Sum to Date (Line 1 ± 2) $ 11,540.00 4. Total Completed & Stored $ 11,540.00 (Column G on Detail Sheet) By: ef.(2vv- Date: 11/28/2012 5. Retainage a. 10% of Completed Work $ 1,154.00 State of Indiana County of RIP C•tcnJ (Column D + F on Continuation) Subscribed and sworn to before e on 1 28 012..::,___:... _ E b. 10% of Stored Materials $ - Notary Public: / i'J.— `, ..1A . :' "= "- (Column F on Continuation) ��' My Commission expires: Cl/ h 1r7 � -? r:-h_ i,1- L:i:; f,,.:t, Total Retainage Lines 5a + 5b $ 1,154.00 - 6. 'Total Earned Less Retainage (Line 4 Less Line 5's Total) $ 10,386.00 Certificate for Payment 7. Less Previous Certificates for Payment In accordance with the Contract Doctmtenls, based on on -site observations and the data (Line 6 from prior Payment Request) $ 576.00 comprising the application, the Architect certifies to the Owner that to the best of the Architect's 8. Current Payment Due $ 9,810.00 knowledge, information and belief the Work has progressed as indicated, the quality of the 8a. Current Completed Including Retainage $ 10,900.00 Work is in accordance with the Contract Documents; and the Contractor is entitled to payment 8h. Retainage Being Held This Period $ 1,090.00 of the Amount Certified. ,n.` ---"'l" Amount Certified S - ( 9. Balance to Finish Including Retainage Being Held $ 1;154.00 (Attach explanation if amount certified di 'rs from the amou77r applied for= Inirrnl all, rgures on this (Line 3 less Line 6) Application and on the ('r17n,7Natial7 Shea; that are changed to ccnfonn to the amount certified.) Change Order Summary Additions Deductions Total approved in previous months $0.00 $0.00 ARCHITECT;`, 1:,; . t; , I.. l Total approved this month $0.00 $0.00 Date: 4 �r_ iI r R , ; t i(j 1� -'^"~h 'n t Totals $ 0.00 $0.00 7ihis Certificate is gotiehlc. The Amount Certified is payable only id the Contractor Net Changes by Change Order named herein. Issu ice, payment and acceptance of payment are without prejudice to any rights of the 0-WilZ"t or lontractor under this Contract. AIA DOCUMENT G703 Project: Carmel City Center Motor Contract For: Precast Concrete A Item Description Orignal Contract Engineering Production Delivery Erection /Field Services Precast Stair Units Schedule Of Values D Previous Work Completed & Materials Stored Application No.: Application Date: Period To: Protect Number: Contract Date: G 2 11/28/2012 12/31/2012 12.022 This Month Work Completed Materials Stored Total Completed & Materials Stored Percent Complete Balance to Finish Retainage 1,455.00 3,490.00 670.00 3,304.00 2,621.00 640.00 615.00 3,490.00 670.00 3,304.00 2,621.00 1 455.00 100.00% 3,490.00 100.00% .. ............................... 670.00 100.00% 3,304.00 100.00% 2,621.00 100.00% 145.50 349.00 67.00 330.40 262.10 Subtotal Change Orders 11,540.001 640.00 10,900.00 11,540,00 100.00% 1,154.00 2 f SubtotaI 0.00% 0.00% 0.00% GRAND TOTALS 11,540.00 640.00 10,900.00 11,540.00 100.00% 0.00 1,154.00 0 PARTIAL WAIVER OF LIEN (Payment to Follow) State of Indiana Marion County ss: WHEREAS The undersigned employed by Coreslab Structures (Indianapolis) Inc (Name of Declarer) has been heretofore Signature Construction To furnish certain material (Contractor) and labor to:wit: Precast Concrete Pieces (Work performed) for the project: Carmel city Center Motor Court Stair and located on Carmel, Indiana (Exact legal description and street address, if any, of the land on which the improvement is situated or to which it may be removed) NOW, THEREFORE, KNOW YE, that the undersigned, upon the receipt of Payment application # 2 in the amount of ... Nine Thousand Eight Hundred Ten dollars and no/ cents Dollars ($ 9,810.00) It hereby and now waives and releases unto the said owner of said premises, any and all lien, right of lien or claim of whatsoever kind or character on the above described building and real estate, TO AND FOR SAID AMOUNT, on account of any and all labor, material or both, furnished for or incorporated into said building by the undersigned, up to this date and further, he represents that no other person or party has any right to a lien on account of any work performed or material furnished by said company. THIS PARTIAL WAIVER OF LIEN has been given upon the promise to pay the amount as indicated on the attached statement or payment application. Coreslab Structures (Indianapolis) Inc. By: VP /GM (Name of Claimant firm) STATE OF Indiana ss: COUNTY OF Marion (Authorized Representative) (Title) Before me, a Notary Public in and for said County and State, personally appeared MATT S LL P who acknowledged the execution of the foregoing PARTIAL Waiver of Lien, and who, having been duly sworn, stated that the representations therein ontained are true. Witness my hand and Notarial Seal this Signature 28t day of November 2012 9,7 24, Volere S. Hasseld Printed: r 9117!17 i VOL E:=RE S. H.� S.S: ; �1 � My commission expires: NOTARY ra ;iti, y Hamilton ( gF= •til County of Residence: r STATE OF ° ,art,;., ■- APPLICATION AND CERTIFICATION FOR PAYMENT AIA Document G702 _._. _ To Owner or General Contractor: Project: Application No.: C3 Retainage_. Signature Construction Carmel City Center Motor Application Date: 1 1/28/2012 720 3rd Avenue SW Court Stair Period To: 12/31/2012 Carmel, IN 46032 Mercantile's PAC Project No.: 12.022 From Contractor: Architect: Contract Date: 01/00/1900 Coreslab Structures (Indianapolis) Inc. RECEIVED JAN 2 5e act For: Precast Concrete u 1030 S. Kitley Ave. Indianapolis, iN 46203 Copies to: Owner Architect - originals General Contractor SubContractor I 0 0 0 CONTRACTOR'S APPLICATION FOR PAYMENT Contractor's Certificate for Payment Application is made for Payment, as shown below, in connection with the Contract. Continuation The undersigned Contractor certifies that to the hest of the Contractor's knowledge, information and belief Sheet, AIA Document G703 is attached. the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have hcen paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. 1. Original Contract Sum , 5 1 1,540.00 2. Net change by Change Orders 50.00 CONTRACTOR: Coreslab Structures (Indianapolis) Inc. 3. Contract Sum to Date (Line 1 ± 2) 5 11,54000 4. Total Completed & Stored $ 11,540.00 (Column G on Detail Sheet) / / Date: 11/28/2012 By: , +. - `�� �� 5. Retainage State of Indiana County of 1'hA 1,01ti Subscribed and sworn to before me on: l /2012 Notary Public: /ifti.h.t 4-Z-1 - ; � ' ^� :,-,..,-,::;',--D CPA uift, gl11l �� tyt�9.q-�� My Commission expires: r ,` �( ;rr' *r•;:, • , ` ' "' Total from Retainage Column on Detail Sheet. 5'° ...: 1 6. Total Earned Less Rctainage (Line 4 Less Line 5's Total) $ 11,540.00 Certificate for Payment � — - -• 7. Less Previous Certificates for Payment In accordance with the Contract Documents; based on on -site observations and the data (Line 6 from prior Payment Request) 5 10,386.00 comprising the application, the Architect certifies to the Owner that to the best of the Architect's 8. Current Payment Due S 1,154.00 knowledge, information and belief the Work has progressed as indicated, the quality of the 8a. Current Completed Including Retainage 5 - Work is in accordance with the Contract Documents, and the Contractor is entitled to payment 8h. Retainage Being Held This Period 5 (1,154.00) of'the Amount Certified. ,l } \ ■ __-_ ----- Amount Certified 5 i s ti 9. Balance to Finish Including Retainage Being Held $ - (Attach e.vplananan if amount certified d fcrs`finnr the applied for. Initial all frgrors on this (Line 3 less Line 6) .mrowu Application and on the Continuation Sheet that are changed to conform to the amount certified) Change Order Summary Additions Deductions Total approved in previous months 50.00 50.00 ARCHITECT: }\ Total approved this month 50.00 50.00 By: 1("------ ''; r. IA Ui \ Date: A Ii Totals 50.00 $0.00 This Certifice. te. is not n iahlc. The Amount Certified is payable drily to ontractor Net Changes by Change Order named herein 'scan payment and acceptance of payment are vvithbui pr judice to any rights of the Owner or Contractor under this Contract. AIA DOCUMENT G703 Project: Carmel City Center Motor Contract For: Precast Concrete Application No.: 3 Retainage Application Date: 11/28/2012 Period To: 12/31/2012 Project Number: 12 -022 Contract Date: D E F G Item Previous Work Description Schedule Of Values Completed & Materials Stored This Month Work Completed Materials Stored Total Completed & Materials Stored Percent Complete Balance to Finish Retainage Orignal Contract Engineering 1,455.00 1,455.00 Production 3,490.00 3,490.00 Delivery 670.00 670.00 Erection /Field Services 3,304 00 3,304.00 Precast Stair Units 2,621.00 2,621.00 1,455 00 100.00% 3,490.00 100.00% 670.00 100.00% 3,304.00 100.00% 2,621.00 100.00% Subtotal 11,540.00 11,540.00 Change Orders Subtotal 11, 540.00 100.00% 0.00% 0.00% 0.00% GRAND TOTALS 11,540.00 11,540.00 11,540.00 100.00% 0.00 0.00