HomeMy WebLinkAbout06050011.8f\ �
TEMPORARY CONSTRUCTION ENT NCE
CID p co ; 45.89 M.E.G. i
i 45.32 M.E.G.
CO CO
1C 833.7
�Ex7
PLAN INDEX ITEMS RELATING TO THE SWPPP ARE INCLUDED AS
TYPES OF DEWATERING DEVICES WILL REMOVE LARGE
SITE. DUST SHALL BE KEPT TO A MINIMUM BY U L
SOUTH:
NOTES ON THIS SHEET 2,
BTM 828.8
c9,
18" RCP -
COMMERCIAL
4.5
34.00
AND SPECIFICATIONS INCLUDED HEREIN.
cFv,
N/A
A. EROSION CONTROL MEASURES SHOWN ON THESE PLANS
FEE= 83&45
.
P
� `-
OOP
x`
C 836:12
THIS PROJECT INVOLVES THE CONSTRUCTION OF A FOUR LEVEL
CONSTRUCTION IN THE PROPER SEQUENCING TO MINIMIZE
INSTALL STORM SEWERS.
m
\
SOIL EROSION. EROSION CONTROLS SHALL BE INSPECTED
C. ALL REUSABLE FLUID CONTAINERS, SUCH AS GASOLINE CANS,
835.70
834,20
SIDEWALKS, AND STORM SEWER,
AND MAINTAINED AS DESCRIBED ELSEWHERE IN THESE
DEVELOPING AREAS FROM THE DIVISION OF SOIL CONSERVATION.
6,
VIEW, DETAILED INFORMATION CAN BE FOUND ON C300,
PLANS, EXCESSIVE DUSTING OF SOIL ON THE SITE SHALL
-
-
v�
BE MINIMIZED BY REDUCING CONSTRUCTION TRAFFIC
I
o
A20
ACROSS BARE SOIL DURING DRY AND /OR WINDY WEATHER,
0 30 60
90 A5
LEGAL DESCRIPTION PROVIDED ON SHEET C100.
AND BY APPLYING WATER OR OTHER ACCEPTABLE DUST
THIS PROJECT.
TC 834.01 F X
_
CONTROL MEASURES TO THE SOIL. UPON COMPLETION OF
OR IN THE OPEN ON THE CONSTRUCTION SITE.
8,
TO THE PRODUCTS RECOMMENDED USAGE,
BTM 829.11
GRAPHIC SCALE IN FEET
A6
LOT BOUNDARIES ARE SHOWN ON THE PLAN
PERMANENT VEGETATION, TEMPORARY EROSION CONTROL
vi o
Q
B14 SEE EROSION CONTROL INSTALLATION DETAIL.
835..
834.50
A22
A7
HYDROLOGIC UNIT CODE: 05120201090050
PROTECTION DEVICES SHALL BE REMOVED IN A MANNER TO
_.- -
CURBS ARE COMPLETED AND GRADE ESTABLISHED.
615 NOT APPLICABLE.
MINIMIZE ADDITIONAL LAND DISTURBANCE. ANY AREAS
�S
A8
f\ �
TEMPORARY CONSTRUCTION ENT NCE
CID p co ; 45.89 M.E.G. i
i 45.32 M.E.G.
CO CO
1C 833.7
�Ex7
PLAN INDEX ITEMS RELATING TO THE SWPPP ARE INCLUDED AS
TYPES OF DEWATERING DEVICES WILL REMOVE LARGE
SITE. DUST SHALL BE KEPT TO A MINIMUM BY U L
SOUTH:
NOTES ON THIS SHEET 2,
BTM 828.8
L __1 �.
18" RCP -
COMMERCIAL
4.5
34.00
AND SPECIFICATIONS INCLUDED HEREIN.
A2
N/A
A. EROSION CONTROL MEASURES SHOWN ON THESE PLANS
FEE= 83&45
.
P
� `-
OOP
x`
C 836:12
THIS PROJECT INVOLVES THE CONSTRUCTION OF A FOUR LEVEL
CONSTRUCTION IN THE PROPER SEQUENCING TO MINIMIZE
INSTALL STORM SEWERS.
m
\
SOIL EROSION. EROSION CONTROLS SHALL BE INSPECTED
C. ALL REUSABLE FLUID CONTAINERS, SUCH AS GASOLINE CANS,
835.70
834,20
SIDEWALKS, AND STORM SEWER,
AND MAINTAINED AS DESCRIBED ELSEWHERE IN THESE
DEVELOPING AREAS FROM THE DIVISION OF SOIL CONSERVATION.
6,
VIEW, DETAILED INFORMATION CAN BE FOUND ON C300,
PLANS, EXCESSIVE DUSTING OF SOIL ON THE SITE SHALL
/WR
V
A4
v�
BE MINIMIZED BY REDUCING CONSTRUCTION TRAFFIC
837
o
A20
ACROSS BARE SOIL DURING DRY AND /OR WINDY WEATHER,
0 30 60
90 A5
LEGAL DESCRIPTION PROVIDED ON SHEET C100.
AND BY APPLYING WATER OR OTHER ACCEPTABLE DUST
THIS PROJECT.
TC 834.01 F X
_
CONTROL MEASURES TO THE SOIL. UPON COMPLETION OF
OR IN THE OPEN ON THE CONSTRUCTION SITE.
8,
TO THE PRODUCTS RECOMMENDED USAGE,
BTM 829.11
GRAPHIC SCALE IN FEET
A6
LOT BOUNDARIES ARE SHOWN ON THE PLAN
PERMANENT VEGETATION, TEMPORARY EROSION CONTROL
vi o
Q
B14 SEE EROSION CONTROL INSTALLATION DETAIL.
835..
834.50
A22
A7
HYDROLOGIC UNIT CODE: 05120201090050
PROTECTION DEVICES SHALL BE REMOVED IN A MANNER TO
_.- -
CURBS ARE COMPLETED AND GRADE ESTABLISHED.
615 NOT APPLICABLE.
MINIMIZE ADDITIONAL LAND DISTURBANCE. ANY AREAS
,.
A8
IDEM SECTION 401 WATER QUALITY CERTIFICATION
F8
- - - -
C 1 1 1) TO INDICATE DRAINAGE PATTERNS,
POST- DEVELOPMENT, OIL, GREASE, ANTIFREEZE, GASOLINE, ETC.
REVEGETATED.
0
A9
STORM WATER WILL DISCHARGE INTO THE EXISTING DRAINAGE
I
�
POTENTIAL POLLUTANT SOURCES DURING CONSTRUCTION ACTIVITIES
SYSTEM FOR THE COMMERCIAL DEVELOPMENT, WHERE IT WILL BE
B. LARGE WASTE MATERIALS CREATED BY CUTTING, SAWING,
1 1
ING
ROUTED THROUGH TWO DETENTION PONDS, AND OUTLET TO
DRILLING, OR OTHER OPERATIONS SHALL BE PROPERLY
2. IF SOIL pH IS UNSUITABLE FOR THE SPECIES TO BE SEEDED,
,
STORM SEWER ALONG 96TH STREET.
DISPOSED OF IN SUITABLE ONSITE WASTE CONTAINERS.
��U°
APPLY LIME ACCORDING TO TEST RECOMMENDATIONS.
THE SITE SHALL BE CHECKED AT THE END OF THE DAY,
5
A10
ALL LAKES AND WATER COURSES ON AND ADJACENT TO THE SITE
AT A MINIMUM, AND ALL WASTE MATERIALS, INCLUDING
ADD BINDER COURSE TO PAVEMENT AREAS.
Ln
ARE SHOWN AND LABELED ON THE PLAN, NO WETLANDS ARE
THOSE BLOWN ACROSS OR OFF THE SITE BY WIND, SHALL
LOCATED ON THE SITE.
BE PICKED UP AND DISPOSED OF IN SUITABLE
ANALYSIS, OR EQUIVALENT, FERTILIZER.
FF833.7
CONTAINERS. WHERE POSSIBLE, OPERATIONS SUCH AS
U
All
THE ULTIMATE RECEIVING WATER IS THE WHITE RIVER,
SAWING THAT CREATE SMALL PARTICLES SHOULD BE
W
LiJ
w
J
O
PERFORMED IN ONE SPOT IN AN AREA PROTECTED FROM
v
Al2
NONE,
WIND, AND WASTE PARTICLES COLLECTED AND DISPOSED
Z
IP
C
= I
202
THERE ARE NO FLOOD PLAINS, FLOOD WAY FRINGES OR FLOOD
USED TO TRANSPORT MATERIALS TO THE SITE FOR
WAYS ON THE SITE.
CONSTRUCTION OF THE FACILITY SHALL BE DISPOSED OF
�
F_
PROPERLY, WHETHER THE MATERIAL IS TAKEN OUT OF ITS
A14
PRE - CONSTRUCTION PEAK DISCHARGE: 4.57 CFS (10 -YEAR)
PACKAGE AND INCORPORATED INTO THE PROJECT
I
~
POST- CONSTRUCTION PEAK DISCHARGE: 4,90 CFS (10 -YEAR)
IMMEDIATELY OR STORED ONSITE FOR FUTURE USE.
I
PACKAGED MATERIALS STORED ONSITE SHALL BE INSPECTED
-
Q
A15
N90'00'00 "W -
803.67'
O O
EROSION CONTROL NOTES
-� --
- - Al
PLAN INDEX ITEMS RELATING TO THE SWPPP ARE INCLUDED AS
TYPES OF DEWATERING DEVICES WILL REMOVE LARGE
SITE. DUST SHALL BE KEPT TO A MINIMUM BY U L
SOUTH:
NOTES ON THIS SHEET 2,
CONSTRUCTION MATERIALS AND THEIR PACKAGING
1ND 14NA /NSURANCE HtNOING)
EAST:
COMMERCIAL
ACCORDANCE TO GOOD EROSION CONTROL PRACTICES.
AND SPECIFICATIONS INCLUDED HEREIN.
A2
N/A
A. EROSION CONTROL MEASURES SHOWN ON THESE PLANS
FEE= 83&45
.
SOILS INFORMATION:
� `-
OOP
x`
C 836:12
N90'00'00 "W -
803.67'
O O
EROSION CONTROL NOTES
-� --
- - Al
PLAN INDEX ITEMS RELATING TO THE SWPPP ARE INCLUDED AS
TYPES OF DEWATERING DEVICES WILL REMOVE LARGE
SITE. DUST SHALL BE KEPT TO A MINIMUM BY U L
SOUTH:
NOTES ON THIS SHEET 2,
CONSTRUCTION MATERIALS AND THEIR PACKAGING
1ND 14NA /NSURANCE HtNOING)
EAST:
COMMERCIAL
ACCORDANCE TO GOOD EROSION CONTROL PRACTICES.
AND SPECIFICATIONS INCLUDED HEREIN.
A2
N/A
A. EROSION CONTROL MEASURES SHOWN ON THESE PLANS
FEE= 83&45
A18
SOILS INFORMATION:
SHALL BE IMPLEMENTED PRIOR TO AND DURING
OOP
A3
THIS PROJECT INVOLVES THE CONSTRUCTION OF A FOUR LEVEL
CONSTRUCTION IN THE PROPER SEQUENCING TO MINIMIZE
INSTALL STORM SEWERS.
m
PARKING STRUCTURE, PARKING LOTS, ENTRANCE DRIVES,
SOIL EROSION. EROSION CONTROLS SHALL BE INSPECTED
C. ALL REUSABLE FLUID CONTAINERS, SUCH AS GASOLINE CANS,
SIDEWALKS, AND STORM SEWER,
AND MAINTAINED AS DESCRIBED ELSEWHERE IN THESE
DEVELOPING AREAS FROM THE DIVISION OF SOIL CONSERVATION.
6,
VIEW, DETAILED INFORMATION CAN BE FOUND ON C300,
PLANS, EXCESSIVE DUSTING OF SOIL ON THE SITE SHALL
/WR
V
A4
THE VICINITY MAP IS LOCATED ON SHEET C000.
BE MINIMIZED BY REDUCING CONSTRUCTION TRAFFIC
-
A20
ACROSS BARE SOIL DURING DRY AND /OR WINDY WEATHER,
0 30 60
90 A5
LEGAL DESCRIPTION PROVIDED ON SHEET C100.
AND BY APPLYING WATER OR OTHER ACCEPTABLE DUST
THIS PROJECT.
ARE UTILIZED, THE USER SHOULD PAY STRICT ATTENTION
LATITUDE 39'55'45 "N LONGITUDE 86'09'12 "W
CONTROL MEASURES TO THE SOIL. UPON COMPLETION OF
OR IN THE OPEN ON THE CONSTRUCTION SITE.
8,
TO THE PRODUCTS RECOMMENDED USAGE,
CONSTRUCTION AND SUITABLE ESTABLISHMENT OF
GRAPHIC SCALE IN FEET
A6
LOT BOUNDARIES ARE SHOWN ON THE PLAN
PERMANENT VEGETATION, TEMPORARY EROSION CONTROL
vi o
Q
B14 SEE EROSION CONTROL INSTALLATION DETAIL.
MEASURES SUCH AS SILT FENCE, CHECK DAMS, AND INLET
A22
A7
HYDROLOGIC UNIT CODE: 05120201090050
PROTECTION DEVICES SHALL BE REMOVED IN A MANNER TO
_.- -
CURBS ARE COMPLETED AND GRADE ESTABLISHED.
615 NOT APPLICABLE.
MINIMIZE ADDITIONAL LAND DISTURBANCE. ANY AREAS
A23
A8
IDEM SECTION 401 WATER QUALITY CERTIFICATION
DISTURBED BY THESE OPERATIONS SHALL BE PROPERLY
- - - -
C 1 1 1) TO INDICATE DRAINAGE PATTERNS,
POST- DEVELOPMENT, OIL, GREASE, ANTIFREEZE, GASOLINE, ETC.
REVEGETATED.
0
A9
STORM WATER WILL DISCHARGE INTO THE EXISTING DRAINAGE
B1
POTENTIAL POLLUTANT SOURCES DURING CONSTRUCTION ACTIVITIES
SYSTEM FOR THE COMMERCIAL DEVELOPMENT, WHERE IT WILL BE
B. LARGE WASTE MATERIALS CREATED BY CUTTING, SAWING,
1 1
INCLUDE CONCRETE WASTE WATER, TRASH, FOSSIL FUELS, OIL,
GREASE, PAINT. EXPOSURE OF THESE POLLUTANTS TO STORM
ROUTED THROUGH TWO DETENTION PONDS, AND OUTLET TO
DRILLING, OR OTHER OPERATIONS SHALL BE PROPERLY
2. IF SOIL pH IS UNSUITABLE FOR THE SPECIES TO BE SEEDED,
,
STORM SEWER ALONG 96TH STREET.
DISPOSED OF IN SUITABLE ONSITE WASTE CONTAINERS.
Z
APPLY LIME ACCORDING TO TEST RECOMMENDATIONS.
THE SITE SHALL BE CHECKED AT THE END OF THE DAY,
- -_
A10
ALL LAKES AND WATER COURSES ON AND ADJACENT TO THE SITE
AT A MINIMUM, AND ALL WASTE MATERIALS, INCLUDING
ADD BINDER COURSE TO PAVEMENT AREAS.
Ln
ARE SHOWN AND LABELED ON THE PLAN, NO WETLANDS ARE
THOSE BLOWN ACROSS OR OFF THE SITE BY WIND, SHALL
LOCATED ON THE SITE.
BE PICKED UP AND DISPOSED OF IN SUITABLE
ANALYSIS, OR EQUIVALENT, FERTILIZER.
CONTAINERS. WHERE POSSIBLE, OPERATIONS SUCH AS
U
All
THE ULTIMATE RECEIVING WATER IS THE WHITE RIVER,
SAWING THAT CREATE SMALL PARTICLES SHOULD BE
W
LiJ
w
J
O
PERFORMED IN ONE SPOT IN AN AREA PROTECTED FROM
v
Al2
NONE,
WIND, AND WASTE PARTICLES COLLECTED AND DISPOSED
Z
OF FREQUENTLY TO MINIMIZE WIND DISPERSAL. PACKAGING
Q
A13
THERE ARE NO FLOOD PLAINS, FLOOD WAY FRINGES OR FLOOD
USED TO TRANSPORT MATERIALS TO THE SITE FOR
WAYS ON THE SITE.
CONSTRUCTION OF THE FACILITY SHALL BE DISPOSED OF
�
F_
PROPERLY, WHETHER THE MATERIAL IS TAKEN OUT OF ITS
A14
PRE - CONSTRUCTION PEAK DISCHARGE: 4.57 CFS (10 -YEAR)
PACKAGE AND INCORPORATED INTO THE PROJECT
v♦
Z
~
POST- CONSTRUCTION PEAK DISCHARGE: 4,90 CFS (10 -YEAR)
IMMEDIATELY OR STORED ONSITE FOR FUTURE USE.
PACKAGED MATERIALS STORED ONSITE SHALL BE INSPECTED
-
Q
A15
ADJACENT LAND USES:
REGULARLY AND ANY LOOSE PACKAGING SHALL BE
Z
°
O
REPAIRED OR DISPOSED OF PROPERLY,
/BERTY MUTUAL
NORTH:
COMMERCIAL
TYPES OF DEWATERING DEVICES WILL REMOVE LARGE
SITE. DUST SHALL BE KEPT TO A MINIMUM BY U L
SOUTH:
COMMERCIAL
C. ALL DEWATERING ACTIVITIES SHALL BE DONE IN
1ND 14NA /NSURANCE HtNOING)
EAST:
COMMERCIAL
ACCORDANCE TO GOOD EROSION CONTROL PRACTICES.
AND SPECIFICATIONS INCLUDED HEREIN.
WEST:
COMMERCIAL
THESE PRACTICES SHOULD INCLUDE THE USE OF DIRT
FEE= 83&45
A18
SOILS INFORMATION:
BAGS SUCH AS DANDY DIRT BAGS, THE USE OF THESE
z
I - WT-
WTR -i- -
36.71 M,E,G,
1 C -
-- - _ - _ _ _ _ - - WATER RUNOFF SHOULD BE MINIMIZED BY PERFORMING ACTIVITIES
SUCH AS EQUIPMENT STORAGE, REFUELING, MAINTENANCE AND
834.80 834.50 �? I 2� C2 ALL EROSION CONTROL MEASURES AS SHOWN ON THE PLAN VIEW
co I 834 834.30 I t t i 6 PORT -A -LET PLACEMENT IN DESIGNED AREAS. WILL BE INSTALLED BEFORE ANY DISTURBANCE OF THE PROJECT
g3 0 OCCURS. FINAL STABILIZATION OF THE SITE WILL BE
I B2 CONSTRUCTION SEQUENCE IS PROVIDED ON THIS SHEET,
d- 833.18 _ f Ex� 4 835.0 _ -_ _ -� � d \ ACCOMPLISHED USING PERMANENT SEEDING OF ALL OPEN AREAS,
827.98 _ 34.5 36.03 M,EGI LANDSCAPING WITH MULCH WHERE APPLICABLE, AND PLACEMENT
- , 35.53 M.E.G. 83- THE APPROPRIATE EROSION CONTROL MEASURES ARE SHOWN OF ASPHALT PAVEMENT.
o 40.08 - - � / 69 IN THE PLAN VIEW AND DETAIL SHEET C501.
833 j \ / 1 C3 THE OWNER HAS A PRACTICE OF MAINTAINING ALL PARKING
_ B10 WATER QUALITY WILL BE HANDLED THROUGH TWO SEPARATE
\ _ - - - DETENTION PONDS, ALL STORMWATER LEAVING THE SITE WILL AREAS ON A WEEKLY BASIS. THIS MAINTENANCE INCLUDES
E� _ _ _ FREQUENT SWEEPING OF ALL PAVED SURFACES AS WELL AS
-- I - - - - PASS THROUGH TWO DETENTION PONDS WHERE SEDIMENT AND
OTHER POLLUTANTS WILL SETTLE OUT. COLLECTION OF ANY LITTER DURING CART RETRIEVAL EFFORTS,
M
ALL GREEN SPACES WILL BE MAINTAINED WITH REGULAR MOWING
DURING GROWING SEASONS, MINIMAL FERTILIZER APPLICATIONS
Bll SEE SEEDING SCHEDULE DETAIL THIS SHEET. WILL OCCUR TO THE GREEN SPACES,
812 SEE EROSION CONTROL INSTALLATION AND SEEDING SCHEDULE
J I I 834 q I I DETAILS, C4 POST CONSTRUCTION STORM WATER QUALITY WILL BE
834 :a� ACCOMPLISHED THROUGH TWO DETENTION PONDS.
INV 827.9 - -� - - _ _ - -�°*�. _,�, <.
87 - 833 B13 MATERIAL HANDLING AND SPILL PREVENTION PLAN: IN ORDER TO
0 21 RCP - 832` - - _ C5 MAINTENANCE OF ALL STORM WATER POLLUTION PREVENTION
SPIN = - ,�(:- = 4. - - __ __ _ MINIMIZE THE RELEASE OF POTENTIAL POLLUTANTS DURING
G D <; j MEASURES WILL BE THE RESPONSIBILITY OF THE PROJECT
F CONSTRUCTION THE CONTRACTOR SHALL IMPLEMENT THIS MATERIAL
° 208 j I OWNER, UTILIZING PROCEDURES OUTLINED ON THESE PLANS,
HANDLING AND SPILL PREVENTION PLAN. THE CONTRACTOR
2.07 THE MAINTENANCE GUIDELINES CONSIST MOSTLY OF GOOD
m 205 b T. jl SHALL REVIEW THIS PLAN WITH ALL SUBCONTRACTORS AND HOUSEKEEPING MEASURES, ANY GRASSED OR VEGETATED AREAS
Ln o I \ � II REQUIRE THAT THEY IMPLEMENT THE PLAN AS WELL. IF A SPILL THAT EXPERIENCE EROSION FROM RAINFALL EVENTS SHOULD BE
co - POND`S 206 I n SHOULD OCCUR PLEASE CONTACT THE APPROPRIATE AUTHORITIES
i G BELOW: REPAIRED AND REVEGETATED AS SOON AS POSSIBLE, TRASH OR
,�1 - - LITTER SHOULD BE PICKED UP AND PROPERLY DISPOSED TO
PREVENT IT FROM GETTING INTO THE STORM DRAINAGE SYSTEM
EMERGENCY RESPONSE AND DOWNSTREAM WATERWAYS.
C 831.01 �E \ _� ; �.'•, ! _ INDIANA DEPARTMENT OF NATURAL RESOURCES EROSION OF THE DETENTION POND BANKS SHOULD BE
BTM 827.61 J `., I �� ADDRESSED AS SOON AS IT BECOMES VISIBLE BY FILLING THE
I 83� I ( (812) 477 -8773 ERODED AREA WITH SUITABLE SOIL AND ESTABLISHING VEGETATION
_ - S9o'0fl'oo" _ _ - _ I v I IMMEDIATELY, PREFERABLY BY SODDING. THE SAME MEASURE
\\ 1 83 1�4 93' T�- �I INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
I � � it SHOULD BE USED FOR STEEP BANKS OF ANY BERMS OR
(317) 233 -7745
SWALES, THE PONDS SHOULD ALSO BE MONITORED FOR
�. 836 ` I i SEDIMENT. IF THE BOTTOM OF THE POND RECEIVES SIGNIFICANT
Q -�L- "' r �' y ` - �' I �' I HAMILTON COUNTY SOIL AND WATER SEDIMENT (LESS THAN 2 FEET DEEP), THE SEDIMENT SHOULD BE
a CO MON F4,-IL'
4i 2/ >'IEASEMENT l -AKE 3 = - > � 37
Q) ( F- ) - - _ - _ _ - _- - - - - - - - --- - - - - - - - - - - - - - -- 1 (317) 773 -1406 REMOVED AND REPLACED ONSITE. AN ENGINEER SHOULD BE
NST ..� N0. 91- 18270
\ '° ,� 83E w ; CONTACTED TO IDENTIFY THE SOURCE AND RECOMMEND REPAIRS.
8 �83S - �� �� I CITY OF CARMEL - DEPT. OF ENGINEERING / STORMWATER
\ \ 0 4 I (317) 571 -2441 PAVEMENT AREAS SHOULD BE MONITORED FOR POLLUTANTS, ANY
I, o ( LARGE QUANTITIES OF FLUIDS SUCH AS OIL, ANTIFREEZE, BRAKE
°z I OWNER'S NAME: DUKE REALTY CORPORATION FLUID, ETC, FOUND ON THE PAVEMENT SHOULD BE REPORTED TO
\ r - - - - - - - - -� I I THE OWNER. THE OWNER SHOULD CLEAN THE POLLUTANTS AND
co _1 L- -- '���---- -�-�-- - - - - -- iii OWNER'S PHONE NUMBER: (317) 808 -6000
N90 *00'00"E I PREVENT THE SOURCE FROM ENTERING THE SITE IN THE FUTURE,
1. CONSTRUCTION EQUIPMENT FINALLY, PAVEMENTS SHOULD ALSO BE MONITORED FOR SEDIMENT
COMING FROM VEGETATIVE AREAS. IF POST CONSTRUCTION
3 GENERAL NOTES CONSTRUCTION SEQUENCE LEGEND FUELING, LUBRICATION, AND FLUIDS: ALL OPERATIONS IS OCCURRI ED
3 � STABILIZATION INVOLVING THE ADDITION OF FLUIDS TO EQUIPMENT SHOULD BE AS SOON AS POSSIBLE BY SEEDING, SODDING OR MULCHING,
_c� m PRACTICE: JAN, FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. DONE IN ONE LOCATION, AS DESIGNATED BY THE GENERAL
0 1, THE CONTRACTOR SHALL CONTROL WASTE, GARBAGE, DEBRIS, 1. SCHEDULE PRE - CONSTRUCTION MEETING WITH HAMILTON CONSTRUCTION LIMITS xrY CONTRACTOR, SO THAT SPILLS ARE LIMITED TO THAT SPECIFIC GENERAL NOTES
WASTEWATER, AND OTHER SUBSTANCES ON THE SITE IN SUCH A COUNTY SOIL AND WATER CONSERVATION DISTRICT PERMANENT q • / /// I / /// • •/ I / LOCATION WHICH WILL FACILITATE THE CLEANUP OF SPILLS. IF AN
WAY THAT THEY SHALL NOT BE TRANSPORTED FROM THE SITE BY
317 773 -2181. SEEDING OUTSIDE FUELING TANK IS PLANNED TO BE ON SITE IT SHALL BE 1 • THE CONTRACTOR SHALL CONTROL WASTE, GARBAGE DEBRIS
o THE ACTION OF WINDS, STORMWATER RUNOFF, OR OTHER ( ) SILT FENCE - X- X -X -X- DOUBLE WALLED AND STORED IN THIS DESIGNATED AREA, THIS WASTEWATER, AND OTHER SUBSTANCES ON THE SITE IN SUCH A
FORCES. PROPER DISPOSAL OR MANAGEMENT OF ALL WASTES 2 INSTALL MAINTENANCE, REFUELING AND CONCRETE WASH -OUT B C LOCATION IS AN AREA THAT WILL NOT ALLOW SPILLED FLUIDS TO WAY THAT THEY SHALL NOT BE TRANSPORTED FROM THE SITE BY
o AND UNUSED BUILDING MATERIALS, APPROPRIATE TO THE NATURE INLET PROTECTION �IP TEMPORARY p • / //I / / /•� THE ACTION OF WINDS, STORM WATER RUNOFF, OR OTHER
O OF THE WASTE OR MATERIAL, IS REQUIRED. FACILITIES AS SHOWN. SEEDING MIGRATE INTO SUBSURFACE SOILS, IN THE EVENT OF A SPILL,
2. PUBLIC OR PRIVATE ROADWAYS SHALL BE KEPT CLEARED OF 3, INSTALL PERIMETER SILT FENCE AND INLET PROTECTION AS THE FLUID SHALL IMMEDIATELY BE CLEANED UP BY REMOVING DISPOSAL OR MANAGEMENT OF ALL WASTES
L EROSION CONTROL BLANKET THE CONTAMINATED SOIL OR STONE WHICH SHALL BE DISPOSED AND UNUSED BUILDING MATERIALS, APPROPRIATE TO THE NATURE
0 o ACCUMULATED SEDIMENT. BULK CLEARING OF ACCUMULATED SHOWN FOR EXISTING STRUCTURES. E OF IN AN ACCEPTABLE MANNER, SPILLS ON HARD SURFACES OF THE WASTE OR MATERIAL, IS REQUIRED.
a SEDIMENT SHALL NOT INCLUDE FLUSHING THE AREA WITH WATER. MULCHING SHALL BE SOAKED UP BY AN ACCEPTABLE MATERIAL SUCH AS
CLEARED SEDIMENT SHALL BE RETURNED TO THE POINT OF 4. STRIP AND ROUGH GRADE ENTIRE SITE. DISTURBED AREAS 12" THICK RIP RAP (SEE DETAIL) OIL DRY AND THE ABSORBENT MATERIAL DISPOSED OF IN A 2• PUBLIC OR PRIVATE ROADWAYS SHALL BE KEPT CLEARED OF
Q LIKELY ORIGIN OR OTHER SUITABLE LOCATION. PROPER MANNER. THE SPILL SHALL ALSO BE REPORTED
co ARE TO BE KEPT TO A MINIMUM. CONTRACTOR SHALL ACCUMULATED SEDIMENT. BULK CLEARING OF ACCUMULATED
CONTROL MUD ACCUMULATION ON ALL STREETS A = KENTUCKY BLUEGRASS 40 %, TURF TYPE TALL FESCUE 40 %, ANNUAL RYE GRASS 20% IMMEDIATELY TO THE CONTRACTOR'S SUPERINTENDENT. SEDIMENT SHALL NOT INCLUDE FLUSHING THE AREA WITH WATER.
3. THIS EROSION CONTROL PLAN SHALL BE IMPLEMENTED ON ALL PLUS 2 TONS OF STRAW MULCH ACRE
� � SURROUNDING PROJECT BY INSTALLING STONE SURFACE AT / CLEARED SEDIMENT SHALL BE RETURNED TO THE POINT OF
�O DISTURBED AREAS WITHIN THE CONSTRUCTION SITE, ALL
MEASURES INVOLVING EROSION CONTROL PRACTICES SHALL BE ALL LOCATIONS WHERE CONSTRUCTION TRAFFIC LEAVES THE
B, EQUIPMENT REPAIR, ESPECIALLY WHEN FLUIDS MUST BE LIKELY ORIGIN OR OTHER SUITABLE LOCATION.
TI IZING APPLY MIXTURE AT A RATE OF 2 IBS PER 1000 S FT
A16
CONSTRUCTION LIMITS ARE SHOWN IN THE PLAN VIEW,
TYPES OF DEWATERING DEVICES WILL REMOVE LARGE
SITE. DUST SHALL BE KEPT TO A MINIMUM BY U L
U
C = WHEAT OR RYE 2 BUSHEL PER ACRE
QUANTITIES OF SILT, SEDIMENT, AND DIRT AND PREVENT
A
A17
THE EXISTING PARKING LOT CONTAINS LANDSCAPED ISLANDS, AND
THESE MATERIALS FROM ENTERING THE STORM SEWER
AND SPECIFICATIONS INCLUDED HEREIN.
POSSIBLE. OTHERWISE, SUITABLE ON SITE CONTAINERS SHOULD BE
IS BORDERED BY GRASS AND TREES,
SYSTEM.
PLACED UNDER THE EQUIPMENT DURING REPAIR TO CATCH ANY
A18
SOILS INFORMATION:
D. IF THE USE OF LIME IS USED TO STABILIZE THE SOIL OF
�°
�Q
Br - BROOKSTON SILTY CLAY LOAM
THE SITE THEN ALL CONSTRUCTION EQUIPMENT USED
INSTALL STORM SEWERS.
m
WITH THE INDIANA HANDBOOK FOR EROSION CONTROL IN
DEVELOPING AREAS FROM THE DIVISION OF SOIL CONSERVATION.
SHALL BE CLEANED OF ALL EXCESS MATERIAL WITH WATER
C. ALL REUSABLE FLUID CONTAINERS, SUCH AS GASOLINE CANS,
A19
ALL PROPOSED STORM WATER SYSTEMS ARE SHOWN IN THE PLAN
IN THE CONSTRUCTION STAGING AREA,
DEVELOPING AREAS FROM THE DIVISION OF SOIL CONSERVATION.
6,
VIEW, DETAILED INFORMATION CAN BE FOUND ON C300,
a r� o
/WR
V
5, ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN
E. NUTRIENTS AND FERTILIZERS SHALL ONLY BE USED TO
�
A20
THERE IS NO OFF -SITE CONSTRUCTION ACTIVITY PLANNED WITH
ESTABLISH RAPID VEGETATION. WHEN THESE PRODUCTS
CO CD
CONTAINERS, AND THEIR PACKAGING, SHALL BE DISPOSED OF IN
HAMILTON COUNTY SOIL AND WATER INSPECTOR.
THIS PROJECT.
ARE UTILIZED, THE USER SHOULD PAY STRICT ATTENTION
-
OR IN THE OPEN ON THE CONSTRUCTION SITE.
8,
TO THE PRODUCTS RECOMMENDED USAGE,
--
_
�- A21
THERE ARE NO SOIL STOCKPILES PLANNED FOR THIS PROJECT,
z
_
vi o
Q
B14 SEE EROSION CONTROL INSTALLATION DETAIL.
9.
A22
EXISTING TOPOGRAPHY IS SHOWN ON SHEET C100.
-
_.- -
CURBS ARE COMPLETED AND GRADE ESTABLISHED.
615 NOT APPLICABLE.
G..
A23
PROPOSED CONTOURS ARE PROVIDED IN THE PLAN VIEW (SHEET
Cl EXPECTED POLLUTANTS WILL BE MINIMAL IN NATURE,
- -
- - - -
C 1 1 1) TO INDICATE DRAINAGE PATTERNS,
POST- DEVELOPMENT, OIL, GREASE, ANTIFREEZE, GASOLINE, ETC.
STONE PAVEMENT AREAS.
- \
MAY OCCUR IN LIMITED AMOUNTS AS A RESULT OF THE MAJORITY
B1
POTENTIAL POLLUTANT SOURCES DURING CONSTRUCTION ACTIVITIES
OF THIS PROJECT SITE BEING USED FOR EMPLOYEE PARKING.
ASSISTANCE AND ADDITIONAL SOILS INFORMATION)
1 1
INCLUDE CONCRETE WASTE WATER, TRASH, FOSSIL FUELS, OIL,
GREASE, PAINT. EXPOSURE OF THESE POLLUTANTS TO STORM
THE ONLY OTHER REASONABLY FORESEEN POLLUTION FROM THIS
SITE WILL BE LITTER AND TRASH DUMPED BY EMPLOYEES
-- - _ - _ _ _ _ - - WATER RUNOFF SHOULD BE MINIMIZED BY PERFORMING ACTIVITIES
SUCH AS EQUIPMENT STORAGE, REFUELING, MAINTENANCE AND
834.80 834.50 �? I 2� C2 ALL EROSION CONTROL MEASURES AS SHOWN ON THE PLAN VIEW
co I 834 834.30 I t t i 6 PORT -A -LET PLACEMENT IN DESIGNED AREAS. WILL BE INSTALLED BEFORE ANY DISTURBANCE OF THE PROJECT
g3 0 OCCURS. FINAL STABILIZATION OF THE SITE WILL BE
I B2 CONSTRUCTION SEQUENCE IS PROVIDED ON THIS SHEET,
d- 833.18 _ f Ex� 4 835.0 _ -_ _ -� � d \ ACCOMPLISHED USING PERMANENT SEEDING OF ALL OPEN AREAS,
827.98 _ 34.5 36.03 M,EGI LANDSCAPING WITH MULCH WHERE APPLICABLE, AND PLACEMENT
- , 35.53 M.E.G. 83- THE APPROPRIATE EROSION CONTROL MEASURES ARE SHOWN OF ASPHALT PAVEMENT.
o 40.08 - - � / 69 IN THE PLAN VIEW AND DETAIL SHEET C501.
833 j \ / 1 C3 THE OWNER HAS A PRACTICE OF MAINTAINING ALL PARKING
_ B10 WATER QUALITY WILL BE HANDLED THROUGH TWO SEPARATE
\ _ - - - DETENTION PONDS, ALL STORMWATER LEAVING THE SITE WILL AREAS ON A WEEKLY BASIS. THIS MAINTENANCE INCLUDES
E� _ _ _ FREQUENT SWEEPING OF ALL PAVED SURFACES AS WELL AS
-- I - - - - PASS THROUGH TWO DETENTION PONDS WHERE SEDIMENT AND
OTHER POLLUTANTS WILL SETTLE OUT. COLLECTION OF ANY LITTER DURING CART RETRIEVAL EFFORTS,
M
ALL GREEN SPACES WILL BE MAINTAINED WITH REGULAR MOWING
DURING GROWING SEASONS, MINIMAL FERTILIZER APPLICATIONS
Bll SEE SEEDING SCHEDULE DETAIL THIS SHEET. WILL OCCUR TO THE GREEN SPACES,
812 SEE EROSION CONTROL INSTALLATION AND SEEDING SCHEDULE
J I I 834 q I I DETAILS, C4 POST CONSTRUCTION STORM WATER QUALITY WILL BE
834 :a� ACCOMPLISHED THROUGH TWO DETENTION PONDS.
INV 827.9 - -� - - _ _ - -�°*�. _,�, <.
87 - 833 B13 MATERIAL HANDLING AND SPILL PREVENTION PLAN: IN ORDER TO
0 21 RCP - 832` - - _ C5 MAINTENANCE OF ALL STORM WATER POLLUTION PREVENTION
SPIN = - ,�(:- = 4. - - __ __ _ MINIMIZE THE RELEASE OF POTENTIAL POLLUTANTS DURING
G D <; j MEASURES WILL BE THE RESPONSIBILITY OF THE PROJECT
F CONSTRUCTION THE CONTRACTOR SHALL IMPLEMENT THIS MATERIAL
° 208 j I OWNER, UTILIZING PROCEDURES OUTLINED ON THESE PLANS,
HANDLING AND SPILL PREVENTION PLAN. THE CONTRACTOR
2.07 THE MAINTENANCE GUIDELINES CONSIST MOSTLY OF GOOD
m 205 b T. jl SHALL REVIEW THIS PLAN WITH ALL SUBCONTRACTORS AND HOUSEKEEPING MEASURES, ANY GRASSED OR VEGETATED AREAS
Ln o I \ � II REQUIRE THAT THEY IMPLEMENT THE PLAN AS WELL. IF A SPILL THAT EXPERIENCE EROSION FROM RAINFALL EVENTS SHOULD BE
co - POND`S 206 I n SHOULD OCCUR PLEASE CONTACT THE APPROPRIATE AUTHORITIES
i G BELOW: REPAIRED AND REVEGETATED AS SOON AS POSSIBLE, TRASH OR
,�1 - - LITTER SHOULD BE PICKED UP AND PROPERLY DISPOSED TO
PREVENT IT FROM GETTING INTO THE STORM DRAINAGE SYSTEM
EMERGENCY RESPONSE AND DOWNSTREAM WATERWAYS.
C 831.01 �E \ _� ; �.'•, ! _ INDIANA DEPARTMENT OF NATURAL RESOURCES EROSION OF THE DETENTION POND BANKS SHOULD BE
BTM 827.61 J `., I �� ADDRESSED AS SOON AS IT BECOMES VISIBLE BY FILLING THE
I 83� I ( (812) 477 -8773 ERODED AREA WITH SUITABLE SOIL AND ESTABLISHING VEGETATION
_ - S9o'0fl'oo" _ _ - _ I v I IMMEDIATELY, PREFERABLY BY SODDING. THE SAME MEASURE
\\ 1 83 1�4 93' T�- �I INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
I � � it SHOULD BE USED FOR STEEP BANKS OF ANY BERMS OR
(317) 233 -7745
SWALES, THE PONDS SHOULD ALSO BE MONITORED FOR
�. 836 ` I i SEDIMENT. IF THE BOTTOM OF THE POND RECEIVES SIGNIFICANT
Q -�L- "' r �' y ` - �' I �' I HAMILTON COUNTY SOIL AND WATER SEDIMENT (LESS THAN 2 FEET DEEP), THE SEDIMENT SHOULD BE
a CO MON F4,-IL'
4i 2/ >'IEASEMENT l -AKE 3 = - > � 37
Q) ( F- ) - - _ - _ _ - _- - - - - - - - --- - - - - - - - - - - - - - -- 1 (317) 773 -1406 REMOVED AND REPLACED ONSITE. AN ENGINEER SHOULD BE
NST ..� N0. 91- 18270
\ '° ,� 83E w ; CONTACTED TO IDENTIFY THE SOURCE AND RECOMMEND REPAIRS.
8 �83S - �� �� I CITY OF CARMEL - DEPT. OF ENGINEERING / STORMWATER
\ \ 0 4 I (317) 571 -2441 PAVEMENT AREAS SHOULD BE MONITORED FOR POLLUTANTS, ANY
I, o ( LARGE QUANTITIES OF FLUIDS SUCH AS OIL, ANTIFREEZE, BRAKE
°z I OWNER'S NAME: DUKE REALTY CORPORATION FLUID, ETC, FOUND ON THE PAVEMENT SHOULD BE REPORTED TO
\ r - - - - - - - - -� I I THE OWNER. THE OWNER SHOULD CLEAN THE POLLUTANTS AND
co _1 L- -- '���---- -�-�-- - - - - -- iii OWNER'S PHONE NUMBER: (317) 808 -6000
N90 *00'00"E I PREVENT THE SOURCE FROM ENTERING THE SITE IN THE FUTURE,
1. CONSTRUCTION EQUIPMENT FINALLY, PAVEMENTS SHOULD ALSO BE MONITORED FOR SEDIMENT
COMING FROM VEGETATIVE AREAS. IF POST CONSTRUCTION
3 GENERAL NOTES CONSTRUCTION SEQUENCE LEGEND FUELING, LUBRICATION, AND FLUIDS: ALL OPERATIONS IS OCCURRI ED
3 � STABILIZATION INVOLVING THE ADDITION OF FLUIDS TO EQUIPMENT SHOULD BE AS SOON AS POSSIBLE BY SEEDING, SODDING OR MULCHING,
_c� m PRACTICE: JAN, FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. DONE IN ONE LOCATION, AS DESIGNATED BY THE GENERAL
0 1, THE CONTRACTOR SHALL CONTROL WASTE, GARBAGE, DEBRIS, 1. SCHEDULE PRE - CONSTRUCTION MEETING WITH HAMILTON CONSTRUCTION LIMITS xrY CONTRACTOR, SO THAT SPILLS ARE LIMITED TO THAT SPECIFIC GENERAL NOTES
WASTEWATER, AND OTHER SUBSTANCES ON THE SITE IN SUCH A COUNTY SOIL AND WATER CONSERVATION DISTRICT PERMANENT q • / /// I / /// • •/ I / LOCATION WHICH WILL FACILITATE THE CLEANUP OF SPILLS. IF AN
WAY THAT THEY SHALL NOT BE TRANSPORTED FROM THE SITE BY
317 773 -2181. SEEDING OUTSIDE FUELING TANK IS PLANNED TO BE ON SITE IT SHALL BE 1 • THE CONTRACTOR SHALL CONTROL WASTE, GARBAGE DEBRIS
o THE ACTION OF WINDS, STORMWATER RUNOFF, OR OTHER ( ) SILT FENCE - X- X -X -X- DOUBLE WALLED AND STORED IN THIS DESIGNATED AREA, THIS WASTEWATER, AND OTHER SUBSTANCES ON THE SITE IN SUCH A
FORCES. PROPER DISPOSAL OR MANAGEMENT OF ALL WASTES 2 INSTALL MAINTENANCE, REFUELING AND CONCRETE WASH -OUT B C LOCATION IS AN AREA THAT WILL NOT ALLOW SPILLED FLUIDS TO WAY THAT THEY SHALL NOT BE TRANSPORTED FROM THE SITE BY
o AND UNUSED BUILDING MATERIALS, APPROPRIATE TO THE NATURE INLET PROTECTION �IP TEMPORARY p • / //I / / /•� THE ACTION OF WINDS, STORM WATER RUNOFF, OR OTHER
O OF THE WASTE OR MATERIAL, IS REQUIRED. FACILITIES AS SHOWN. SEEDING MIGRATE INTO SUBSURFACE SOILS, IN THE EVENT OF A SPILL,
2. PUBLIC OR PRIVATE ROADWAYS SHALL BE KEPT CLEARED OF 3, INSTALL PERIMETER SILT FENCE AND INLET PROTECTION AS THE FLUID SHALL IMMEDIATELY BE CLEANED UP BY REMOVING DISPOSAL OR MANAGEMENT OF ALL WASTES
L EROSION CONTROL BLANKET THE CONTAMINATED SOIL OR STONE WHICH SHALL BE DISPOSED AND UNUSED BUILDING MATERIALS, APPROPRIATE TO THE NATURE
0 o ACCUMULATED SEDIMENT. BULK CLEARING OF ACCUMULATED SHOWN FOR EXISTING STRUCTURES. E OF IN AN ACCEPTABLE MANNER, SPILLS ON HARD SURFACES OF THE WASTE OR MATERIAL, IS REQUIRED.
a SEDIMENT SHALL NOT INCLUDE FLUSHING THE AREA WITH WATER. MULCHING SHALL BE SOAKED UP BY AN ACCEPTABLE MATERIAL SUCH AS
CLEARED SEDIMENT SHALL BE RETURNED TO THE POINT OF 4. STRIP AND ROUGH GRADE ENTIRE SITE. DISTURBED AREAS 12" THICK RIP RAP (SEE DETAIL) OIL DRY AND THE ABSORBENT MATERIAL DISPOSED OF IN A 2• PUBLIC OR PRIVATE ROADWAYS SHALL BE KEPT CLEARED OF
Q LIKELY ORIGIN OR OTHER SUITABLE LOCATION. PROPER MANNER. THE SPILL SHALL ALSO BE REPORTED
co ARE TO BE KEPT TO A MINIMUM. CONTRACTOR SHALL ACCUMULATED SEDIMENT. BULK CLEARING OF ACCUMULATED
CONTROL MUD ACCUMULATION ON ALL STREETS A = KENTUCKY BLUEGRASS 40 %, TURF TYPE TALL FESCUE 40 %, ANNUAL RYE GRASS 20% IMMEDIATELY TO THE CONTRACTOR'S SUPERINTENDENT. SEDIMENT SHALL NOT INCLUDE FLUSHING THE AREA WITH WATER.
3. THIS EROSION CONTROL PLAN SHALL BE IMPLEMENTED ON ALL PLUS 2 TONS OF STRAW MULCH ACRE
� � SURROUNDING PROJECT BY INSTALLING STONE SURFACE AT / CLEARED SEDIMENT SHALL BE RETURNED TO THE POINT OF
�O DISTURBED AREAS WITHIN THE CONSTRUCTION SITE, ALL
MEASURES INVOLVING EROSION CONTROL PRACTICES SHALL BE ALL LOCATIONS WHERE CONSTRUCTION TRAFFIC LEAVES THE
B, EQUIPMENT REPAIR, ESPECIALLY WHEN FLUIDS MUST BE LIKELY ORIGIN OR OTHER SUITABLE LOCATION.
TI IZING APPLY MIXTURE AT A RATE OF 2 IBS PER 1000 S FT
67mA-
or
` Br
INSTALLED UNDER THE GUIDANCE OF QUALIFIED PERSONNEL
c,A
SITE. DUST SHALL BE KEPT TO A MINIMUM BY U L
U
C = WHEAT OR RYE 2 BUSHEL PER ACRE
EXPERIENCED IN EROSION CONTROL, AND FOLLOWING THE PLANS
A
SPRINKLING, CALCIUM CHLORIDE, VEGETATIVE COVER, SPRAY
x
a ^A
AND SPECIFICATIONS INCLUDED HEREIN.
POSSIBLE. OTHERWISE, SUITABLE ON SITE CONTAINERS SHOULD BE
ON ADHESIVES OR OTHER APPROVED METHODS.
PLACED UNDER THE EQUIPMENT DURING REPAIR TO CATCH ANY
AND SPECIFICATIONS INCLUDED HEREIN.
`
C,A
�°
�Q
4, ALL EROSION CONTROL PRACTICES SHALL BE IN ACCORDANCE
5.
INSTALL STORM SEWERS.
m
WITH THE INDIANA HANDBOOK FOR EROSION CONTROL IN
DEVELOPING AREAS FROM THE DIVISION OF SOIL CONSERVATION.
WITH THE INDIANA HANDBOOK FOR EROSION CONTROL IN
C. ALL REUSABLE FLUID CONTAINERS, SUCH AS GASOLINE CANS,
a �
SHALL BE INSPECTED FOR LEAKS EACH TIME THEY ARE USED, IF
DEVELOPING AREAS FROM THE DIVISION OF SOIL CONSERVATION.
6,
PLACE INLET PROTECTION AND OUTLET PROTECTION AS
a r� o
/WR
V
5, ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN
SHOWN FOR NEW STRUCTURES.
�
THE FIELD BY THE HAMILTON COUNTY SURVEYOR'S OFFICE OR
SUCH AS GREASE TUBES AND LUBRICATING OIL AND BRAKE FLUID
CO CD
CONTAINERS, AND THEIR PACKAGING, SHALL BE DISPOSED OF IN
HAMILTON COUNTY SOIL AND WATER INSPECTOR.
7
FINE GRADE BUILDING PADS AND BEGIN FOUNDATIONS.
O N
OR IN THE OPEN ON THE CONSTRUCTION SITE.
8,
SEED AND MULCH BUILDING PAD AND PARKING AREAS.
z
vi o
Q
O
9.
SEED GREEN SPACE BEHIND CURBS IMMEDIATELY AFTER
N N
-
_Z
CURBS ARE COMPLETED AND GRADE ESTABLISHED.
o
G..
SEEDBED PREPARATION FOR PERMANENT SEEDING:
o
Z
E N
1. TEST SOIL TO DETERMIN pH AND NUTRIENT LEVELS. (CONTACT
10.
STONE PAVEMENT AREAS.
- \
YOUR COUNTY SWCD OR COOPERATIVE EXTENSION OFFICE FOR
(L
U)
O
ASSISTANCE AND ADDITIONAL SOILS INFORMATION)
1 1
CONTINUE BUILDING CONSTRUCTION; APPLY PERMANENT
a
2. IF SOIL pH IS UNSUITABLE FOR THE SPECIES TO BE SEEDED,
,
SEEDING.
-1
Z
APPLY LIME ACCORDING TO TEST RECOMMENDATIONS.
Q
C� o
3. FERTILIZE AS RECOMMENDED BY THE SOIL TEST. IF TESTING WAS
12.
ADD BINDER COURSE TO PAVEMENT AREAS.
Ln
NOT DONE, CONSIDER APPLYING 400 -600 LBSJACRE OF 12 -12 -12
q) _c �
ANALYSIS, OR EQUIVALENT, FERTILIZER.
cn
U
4 TILL THE SOIL TO OBTAIN A UNIFORM SEEDBED WORKING THE
13
INSTALL LANDSCAPING,
67mA-
or
` Br
THIS EROSION CONTROL PLAN SHALL BE IMPLEMENTED ON ALL
c,A
r #
DISTURBED AREAS WITHIN THE CONSTRUCTION SITE. ALL
C = WHEAT OR RYE 2 BUSHEL PER ACRE
SPILLS. WHEN EQUIPMENT MUST BE REPAIRED ONSITE, IT
A
Nortv'Ridg* ��1ayti
SHOULD BE MOVED TO THE MAINTENANCE AND FUELING AREA IF
a ^A
D = ANNUAL RYE GRASS (1 LB. PER 1000 SO. FT.)
POSSIBLE. OTHERWISE, SUITABLE ON SITE CONTAINERS SHOULD BE
EXPERIENCED IN EROSION CONTROL, AND FOLLOWING THE PLANS
PLACED UNDER THE EQUIPMENT DURING REPAIR TO CATCH ANY
AND SPECIFICATIONS INCLUDED HEREIN.
`
C,A
C +A
�Q
J-•J
ij
`A"� " �M�Fa?
H\ GYP a' _
OrA• ' Hr 'Mt1S
Q
REMOVED FROM THE EQUIPMENT OR THE POSSIBILITY OF FLUID
SPILLS IS HIGH, SHOULD ALWAYS BE DONE OFFSITE AT A FACILITY 3•
THIS EROSION CONTROL PLAN SHALL BE IMPLEMENTED ON ALL
B = SPRING OATS 3 BUSHEL PER ACRE
THAT IS MORE SUITABLE THAN A CONSTRUCTION SITE TO HANDLE
DISTURBED AREAS WITHIN THE CONSTRUCTION SITE. ALL
C = WHEAT OR RYE 2 BUSHEL PER ACRE
SPILLS. WHEN EQUIPMENT MUST BE REPAIRED ONSITE, IT
MEASURES INVOLVING EROSION CONTROL PRACTICES SHALL BE
SHOULD BE MOVED TO THE MAINTENANCE AND FUELING AREA IF
INSTALLED UNDER THE GUIDANCE OF QUALIFIED PERSONNEL
D = ANNUAL RYE GRASS (1 LB. PER 1000 SO. FT.)
POSSIBLE. OTHERWISE, SUITABLE ON SITE CONTAINERS SHOULD BE
EXPERIENCED IN EROSION CONTROL, AND FOLLOWING THE PLANS
PLACED UNDER THE EQUIPMENT DURING REPAIR TO CATCH ANY
AND SPECIFICATIONS INCLUDED HEREIN.
E = STRAW MULCH (90 LBS, PER 1000 SQ,FT,)
SPILLED FLUIDS AND THESE FLUIDS SHOULD BE DISPOSED OF IN
O
N
�Q
A PROPER MANNER_ 4.
ALL EROSION CONTROL PRACTICES SHALL BE IN ACCORDANCE
0/1 / • IRRIGATION NEEDED DURING JUNE, JULY, AND OR SEPTEMBER.
/
c
WITH THE INDIANA HANDBOOK FOR EROSION CONTROL IN
DEVELOPING AREAS FROM THE DIVISION OF SOIL CONSERVATION.
C. ALL REUSABLE FLUID CONTAINERS, SUCH AS GASOLINE CANS,
U
SHALL BE INSPECTED FOR LEAKS EACH TIME THEY ARE USED, IF
• • IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD
LEAKS ARE FOUND, THE FLUID SHALL BE REMOVED FROM THE
/WR
V
CONTAINER IN A PROPER MANNER AND THE CONTAINER DISPOSED
NOTE: ALL SEEDING SHALL HAVE 12 -12 -12 FERTILIZER APPLIED
OF IN AN ACCEPTABLE MANNER. EMPTY DISPOSABLE CONTAINERS,
400 -600 LBS, PER ACRE OR AS SPECIFIED,
SUCH AS GREASE TUBES AND LUBRICATING OIL AND BRAKE FLUID
0
CONTAINERS, AND THEIR PACKAGING, SHALL BE DISPOSED OF IN
Q
A PROPER MANNER AND SHALL NOT BE LEFT ON THE GROUND
HOLEY MOLEr
OR IN THE OPEN ON THE CONSTRUCTION SITE.
SEEDING SCHEDULE
NO SCALE
U OR
FERTILIZER OPERATED LIME ACROSS THE
THESOIL
SLOPE4 INCHES DEEP WITH A DISC ALL AREAS THAT ARE LEFT
Z m 14• COMPLETE BUILDING CONSTRUCTION. SOILS MAP
_o -0 ' o
0 Q UNDISTURBED FOR DAYS SHALL
> m 15. ADD SURFACE COURSE OF ASPHALT. NO SCALE
RECEIVE SEED AND MULCH.
0 16. INLET PROTECTION SHALL REMAIN IN PLACE UNTIL ALL AREAS
0 cn ARE STABILIZED.
_1 J Ci
DONT
DIG
BLIND
1- 800 - 382 -5544
CALL TOLL FREE
q
•
Duke
CONSTRUCTION
600 East 96th Street
Suite 100
Indianapolis IN 46240
Phone: 317 808 -6000
Fax: 317 808 -6797
WOOLPERT
7140 WALDEMAR DRIVE
INDIANAPOLIS, IN 46268
PH: 317.299.7500
FX: 317.291 .5805
bi
c
o:
m
ch
u
O
N
�Q
�'
-
r
10
c
U
/WR
V
0
Q
Q
N
J
a
z
O
Q
O
z
-
_Z
G..
Y
o
Z
0
a
>
(L
U)
O
J
a
�-
0
-1
Z
<
Q
Q
Z
a
Q
_O
0
U
�
>.
W
LiJ
w
J
O
�
v
�
a
Z
Q
W
_M
�
F_
v♦
Z
~
-
Q
Q
w
Z
°
O
Q
V/
Z
v
Certified By:
Drawing Number:
C301
X
Of X Sheets
Duke Realty Job Number:
A/E Job Number:
65367