Loading...
HomeMy WebLinkAbout06050011.9T 3 -- — 2 I, A-- ,G 3 4' X 0 I i I I I I � II �e 7—T x X —� ------- � - - - -- CL Q0 POND A5 PHY —O 0 0 �) AGE -R 5) PIG—P Q � V�MON FACILI%Y,EASFMENL: LAKE o 91-182701) cu � -C \ \ m LAK 0 �Ic r� L0 U U 3" SHREDDED 0 0 HARDWOOD MULCH U Q) CREATE 4" SAUCER 0 I- =11- 1 a IIIIIIIIIIIIII.1 L11 - j _ II illl a REMOVE UPPER =1 113 OF BURLAP -111 SUBGRADE - / �,� — — — — — — N90'00'0 803.6 GAL —A PLANT SCHEDULE vl� TREES SYMBOL QUANTITY BOTANICAL NAME COMMON NAME 31ZE ROOT NOTES ACE -R 6 ACER RUBRUM 'AUTUMN BLAZE' RED MAPLE 2 1/2" B/B AME -C 12 AMELANCHIER CANADENSIS SERVICEBERRY 8' B/B CLUMP PIC -P 11 PICEA PUNGENS BLUE SPRUCE 8' B/B SHRUBS PHY -0 45 PHYSOCARPUS OPULIFOLIUS 'MONLO' DIABLO PURPLE NINEBARK 24" CONT. PLANT 48" O.C. / L /L ( IN51ANA / VIB -D 104 VIBURNUM X DENTATUM ARROWWOOD VIBURNUM 24" B/B PLANT 48" O.C. F VIB -T 47 VIBURNUM X DENTATUM ARROWWOOD VIBURNUM 24" B/B PLANT 48" O.C. PERENNIALS, ORNAMENTAL GRASSES, AND GROUND COVERS — CAL -A 38 CALAMAGROSTIS A. 'KARL FOERSTER' FEATHER REED GRASS 2 GAL. CONT, PLANT 36" O.C. - - MIS -S 9 MISCANTHUS SINENSIS MAIDEN GRASS 2 GAL, CONT, PLANT 42" O.C. —L - - LAWN — — SEED SO. FT. ALL SEED AREAS TO BE HYDROMULCHED 4 VIf5_T PI(I -P ACE—P, P16 -P MULCH SHREDDED HARDWOOD CU, YDS. BARK MULCH GENERAL NOTE Quantity lists are supplied as a convenience, The Contractor shall verify all quantities. i s9o•oo'oo "E — — — _ � 184.x 5' LEVEL 'A' F5UFFERYARP (EXIS_�INO TREES USED FOR pUFFERYARD CREDIT) _ Ci — — — — — — — — — — — — L— L� — _ _ — � 190'00'00 "E 1799' I Io / \\. \\ 2 "x2 "x8" HARDWOOD STAKES 2 PER TREE WITH #12 GALV. WIRE & 1/2" HOSE LOOP REMOVE BINDING AROUND TRUNK AFTER PLANTING AND STAKING FINISH GRADE SOIL MIX: 3 PARTS TOPSOIL & 1 PART PEAT, NOTE: HARDWOOD STAKES SHALL BE DRIVEN A MIN, OF 30" INTO THE GROUND NOTES: 1. THE ROOT FLARE MUST BE PLANTED AT FINISH GRADE. 2, STAKES AND WIRES MUST BE REMOVED WITHIN ONE YEAR. 3. REMOVE BINDING AND TOP 1/3 OF BURLAP FROM ROOT BALL AFTER PLANTING AND STAKING TREE. a� EVERGREEN PLANTING DETAIL NO SCALE 3/4" BLACK RUBBER HOSE WRAP TRUNK TO FIRST BRANCH 7x19 GALV. GUY WIRE 2" SHREDDED HARDWOOD MULCH REMOVE BINDING FROM STEEL TEE FENCE POST 24" TRUNK AFTER PLANTING AND STAKING TREE II III - N III � ,,•i AMENDED PLANTING SOIL NOTES: 1, THE ROOT FLARE MUST BE PLANTED AT FINISH GRADE, 2. STAKES AND WIRES MUST BE REMOVED WITHIN ONE YEAR. 3. REMOVE BINDING AND TOP 1/3 OF BURLAP FROM ROOT BALL AFTER PLANTING AND STAKING TREE, TREE PLANTING DETAIL NO SCALE STABILIZATION PRACTICE: JAN. FEB, MAR, APR, MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC, PERMANENT q • / /// I / /// • •/ I / ► SEEDING TEMPORARY B C SEEDING D —*///1 1 E MULCHING A = KENTUCKY BLUEGRASS 40 %, TURF TYPE TALL FESCUE 40 %, ANNUAL RYE GRASS 20% PLUS 2 TONS OF STRAW MULCH/ ACRE APPLY MIXTURE AT A RATE OF 2 LBS. PER 1000 SQ.FT. B = SPRING OATS 3 BUSHEL PER ACRE C = WHEAT OR RYE 2 BUSHEL PER ACRE D = ANNUAL RYE GRASS (1 LB. PER 1000 SQ, FT.) E = STRAW MULCH (90 LBS. PER 1000 SQ.FT.) */1 / • IRRIGATION NEEDED DURING JUNE, JULY, AND / OR SEPTEMBER. • • IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD NOTE: ALL SEEDING SHALL HAVE 12 -12 -12 FERTILIZER APPLIED 400 -600 LBS, PER ACRE OR AS SPECIFIED. SEEDING SCHEDULE NO SCALE ALL PLANTING AREAS TO BE 0 A 3" DEPTH I�nhr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� I I II I II I II I I II I II I I I III -' -.11 =III -1 i�� III= Iii" - III =III 6" II11' SOIL MIX: 3 PARTS TOPSOIL & 1 PART11 B & B OR CONTAINER PEAT. �I II1I1 =1I 11I 1 =1111! 11I I� i SUBGRADE!II III II! -1TI GROWN ROOT BALL TWICE BALL DIA - SCARIFY POT BOUND PLANTS SHRUB PLANTING DETAIL NO SCALE -'4 Duke CONSTRUCTION 600 East 96th Street Suite 100 Indianapolis IN 46240 Phone: 317 808 -6000 Fax: 317 808 -6797 Mq WOOLPERT 7140 WALDEMAR DRIVE INDIANAPOLIS, IN 46268 PH- 317.299.7500 FX: 317.291 .5805 ari c 0 .0 n n N 0 W a a N t Q Z Q a Y o GC z a z �. O J J z Q a a a Q W ~a a � � z a U � H W w LLJ z a W Z V) -� m a Cl) Z (n a LLJ Z 0 a_ LO 0 z v Certified By: Drawing Number. C 4 0 0 X Of X Sheets Duke Realty Job Number. A/E Job Number: 65367