Loading...
HomeMy WebLinkAboutDodd Technologies - $11,526.20 Regions Bank hereby is instructed to make a disbursement of Loan Proceeds from the Borrower Loan Account to (or for the account of) Borrower in: (a) the amount of the "Total Authorized Disbursement" line in the "Amount of Authorized Disbursement" column below; and (b) accordance with the terms and conditions of the Agreement, the other Loan Documents, and the Disbursement Instructions. Purpose of Authorized Disbursement Amount of Authorized Disbursement Amount to be paid by Carmel Theater Development Company as per the Lifts, Lighting and Rigging Equipment installment purchase contract Invoice 10834(Dodd Technologies) November 2011 $ 11,526.20 Total Authorized Disbursement $ 11,526.20 All terms used in these Disbursement Instructions without definition shall have the meanings ascribed thereto in that certain Loan Agreement (Equipment and Improvements), dated July 22, 2010, by and between Regions Bank and Carmel Theater Development Company, LLC. Dated: it /28/1 CITY OF CARMEL REDEVELOPMENT COMMISSION By: Les S. Olds Printed: Executive Director Title: It is acknowledged and agreed by the parties that CRC has reserved the right to require, as a condition of authorizing disbursement of Loan Proceeds from the Borrower Loan Account to (or for the account of) Borrower: (a) completion of a satisfactory inspection by CRC of the portions of the Equipment and/or the Improvements to which the disbursement relates; and (b) receipt of customary submittals. r` _ i 4t1' �y/ } . , "� T..... g6®s, .Inc. FULL SERVICE EVENT, MEETING, AND ENTERTAINMENT PRODUCTION' www.Doddtechnologie'a.com • Carmel Theater•Developnient ATTN:Jeff'Sporieder 11711 N Pennsylvania St,Ste 200 Carmel,,IN: 46032 Date Invoice#' • 11/7/2011 10834, i 'P.O. No Terms Project Contact Name 476776 Net 30 Palladium Quantity Description Rate Amount - Final Deliveries for PO Number above:except Custom Pieces not yet designed Y� 1 •Delivery6/E13/11 _ . _ ;• 1 RResccue.Systems Orange.3"•Sealed Bearing Rescue ` 103:20. . 103:20'• y - • 1',,#4.Double Pulley,Wood Blockl:for 1/2" Diameter : 0:00, 0 ).00. • ` . !Rope-Replacement for Wrong Block-N/C • 1 ;600'Spool.518"'-diameterSterling'Super Static'Nylon• 810'60'' _ = 810:00 ; , Rope 4 1 ndy Case`+Elite Pro-Storage Trunk : 635:00 ': 2,540;00 't Delivery-8/10/11 I 48::6'Square X 18" Length•Steel Pipe'twith ;4" Steel Tabs ' 152:60+ 7,296100 , Welded Right Angles•4,3/4":Apart and_Centered ' on Top..=of=Each „ , 1 21 '4 Diameter X 24 Length, Schedule,40 Round Steel 37.00: 777:00 • 'Pipe 12;-4"Dlameter,X.36" Length`Schedule`40.Round Steel , 0 00 • 0:00 ' , 'Pipe-N/C , , t ;Backordered.,and Waiting,on Final:Design Criteria: (1.)Custom Capstan Winch Motor Stand&(4): E ;Custom.Grid.Stands ti I Total $11,526:20: Execution. impact.Value. ' 720'W. Pioneer Trace,Suite 200,.Pendleton,IN 46064•(0)765.221:5010`•.(F.),765:221.5011 •wvrw.doddtechnologies:com