Loading...
HomeMy WebLinkAboutMemo to KarL Haas/Theatre Equipment Material Info 8/12/2009Memo August 12, 2009 To: Karl Haas From: Mike Anderson Re: Theater Equipment/Material Info Karl: As requested please find the following: 1. CD (2 copies) with the equipment design specification information and the submittal information for all equipment. The design specifications:wi ll help definewarranties as they will not be available until the work is completed and approved. The submittal information provides the equipment manufacturer data. 2. With regard to schedule for installation, some of the equipment (JRClancy scope) will start this year but all work will not be completed until near the end of the project (i.e seating goes in after the wood flooring). 3. Included on the CD's are copies of the contractors schedule of values for the equipment/material (hi- lited) in case you need values. 4. There is also an equipment list on the CD for quick reference. Let me know if you need anything else. Cc: Matt Worthley - CRC R Crick s CONTINUATION PAGE (r m p, E . pr PROJECT: 2695 Carmel PAC Payment Application containing Contractor's signature is attached. Page / of #: DATE OF APPLICATION: PERIOD THRU: PROJECT #s: 3 07/15/2009 07/31/2009 2695 A 6 C D E F G H I ITEM # WORK DESCRIPTION COMPLETED WORK STORED MATERIALS (NOT IN D OR E) TOTAL COMPLETED AND STORED (D + E + F) /o COMP. (G / C) BALANCE TO COMPLETION (C -G) RETAINAGE (If Variable) SCHEDULED SCHEDULED AMOUNT AMOUNT PREVIOUS PERIODS AMOUNT THIS PERIOD 1 Bond 547,266.00 547,266.00 $0.00 50.00 $47,266.00 100% $0.00 2 Engineering /Project 5415,534.00 $41,553.40 516.621.36 $0.00 $58,174.76 14% 5357,359.24 Management/Mobilization 3 Master Control System 5238,100.00 50.00 $0.00 50.00 50.00 0% $238,100.00 4 Control System Electrical Work 533,750.00 50.00 50.00 $0.00 $0.00 0% 533,750.00 5 Control System Tum on and 568,900.00 50.00 50.00 50.00 $0.00 0% 568,900.00 Testing 6 CYC, FOH, Lighting Truss 51,356.800.00 50.00 50.00 50.00 50.00 0% $1',356,800.00 'Motorized Rigging 7 CYC, FOH, Lighting Truss 5514,200.00 50.00 $0.00 50.00 50.00 0% $514,200.00 Motorized Rigging Installation 8 Canopy Rigging and Cable Reels 51,301,000.00. 50.00 50.00 $0.00 50.00 0% 51,301,000.00 9 Canopy Rigging and Reel 5348,800.00 $0.00 50.00 $0.00 $0.00 0% 5348,800.00 Installation 10 Loudspeaker Motorized Rigging 5316.200.00 50.00 50.00 50.00 $0.00 0% $316,200.00 11 Loudspeaker Rigging Installation 555,800.00 50.00 50.00 $0.00 $0.00 0% 555,800.00 12 Variable Acoustic Curtains 5118,000.00 $0.00 50.00 50.00 $0.00 0% $118,000.00 13 Curtain Installation 517,700.00 $0.00 50.00 $0.00 $0.00 0% $17,700.00 14 Variable Acoustic Tracks /Blocking' 5426,000.00 50.00 $0.00 $0.00 50.00 0% 5426,000.00 & Actuators 15 Track & Actuator Installation 5131.745.00 50.00 50.00 50.00 50.00 0% $131,745.00 16 Extension Lift & Railings 5607,521.00 50.00 50.00 50.00 50.00 0% $607,521.00 SUB - TOTALS $5,997,316.00 588,819.40 $16,621.36 50.00 $105,440.76 2% $5,891,875.24 CONTINUATION PAGE FOR PAYMENT APPLICATION QSS, INC. DOCUMENT CONTINUATION PAGE Page /,of PROJECT: 2695 Carmel PAC Payment Application containing Contractor's signature is attached. APPLICATION #: DATE OF APPLICATION: PERIOD THRU: PROJECT #s: 3 07/15/2009 07/31/2009 2695 A B C D E F G H t ITEM # WORK DESCRIPTION SCHEDULED AMOUNT COMPLETED WORK STORED MATERIALS (NOT IN D OR E) TOTAL COMPLETED AND STORED (D+ E+ F) % COMP. (G / C) BALANCE TO COMPLETION (C -G) RETAINAGE (If Variable) AMOUNT PREVIOUS PERIODS AMOUNT THIS PERIOD 17 Lift Installation 590,000.00 $0.00 50.00 50.00 50.00 0% $90,000.00 18 Extension Lift Wagons 5111,300.00 $0.00 $0.00 $0.00 50.00 0% 5111,300.00 19 Extension Lift Wagon Installation 518,000.00 50.00 $0,00 $0.00 $0.00 0% $18,000.00 20 House Ma Lift & Railings 5248,000.00 $0.00 50.00 $0.00 $0.00 0% 5248,000.00 21 House Mix Lift Installation S60,000.00 50.00 50.00 50.00 50.00 0% 560,000.00 22 House Mix Lift Wagons 570,000.00 50.00 50.00 50.00 50.00 0% 570,000.00 23 House Mix Lift Wagon Installation 516,000.00 $0.00 50.00 50.00 $0.00 0% 516,000.00 24 Loudspeaker Wagon 535,384.00 50.00 50.00 $0.00 $0.00 0% 535,384.00 25 Loudspearker Wagon Installation $7,000.00 50.00 $0.00 $0.00 50.00 0% $7,000.00 26 Demountable Risers 545,000.00 S0.00 50.00 $0.00 50.00 0% 545,000.00 27 Demountable Riser Installation $4,800.00 50.00 $0.00 50.00 50.00 0% 54,600.00 28 Chorus Wagons 5189,000.00 50.00 $0.00 $0.00 $0.00 0% $189,000.00 29 Package 5170 Allowance 5200,000.00 50.00 $0.00 50.00 50.00 0% 5200,000.00 30 Package 5180 Allowance 5200.000.00 50.00 50.00 50.00 50.00 0% 5200,000.00 31 Package 5190 Allowance 55,000.00 50.00 50.00 $0.00 50.00 0% 55,000.00 32 CAD As- Builts 5170 & 5180 520,000.00 50.00 $0.00 50.00 $0.00 0% 520,000.00 Allowance SUB - TOTALS $7,316,800.00 588.819.40 $16,621.36 $0.00 5105,440.76 1% $7,211,359.24 CONTINUATION PAGE FOR PAYMENT APPLICATION OSS, INC DOCUMENT CONTINUATION PAGE PROJECT: 2695 Carmel PAC Payment Application containing Contractor's signature is attached. Page3of 3 APPLICATION #: DATE OF APPLICATION: PERIOD THRU: PROJECT #s: 3 07/15/2009 07/31/2009 2695 A B C D E F G H I ITEM # WORK DESCRIPTION SCHEDULED AMOUNT COMPLETED WORK STORED MATERIALS (NOT IN D OR E) TOTAL COMPLETED AND STORED (0 + E + F) % COMP. (G / C) BALANCE TO COMPLETION (C -G) RETAINAGE If Variable) AMOUNT PREVIOUS PERIODS AMOUNT THIS PERIOD 33 34 CAD As- Builts 5190 Allowance - _ail.. $5,000.00 .. , I!: t: t t $0.00 558.00 50.00 $0.00 50.00 50.00 50.00 50.00 0% 0% 55,000.00 5194,000.00 TOTALS 57,515,800.00 $88,819.40 $16,621.36 50.00 5105,440.76 1% $7,410,359.24 CONTINUATION PAGE FOR PAYMENT APPLICATION QSS, INC DOCUMENT CONTINUATION SHEET II Pc SCAM AIA DOCUMENT G703 AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT. containing Contractors signed certification is attached. In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. APPL1CA'1ION NO: APPLICATION DATE: PERIOD TO: ARCHITECT'S PROJECT NO: PAGE 1 OF t PAGES 1 05/19/09 05/19/09 A 8 C D E F G FI I ITEM NO. DESCRIPTION or WORK SCHEDUI.FD VALUE WORK COMPI.ETED MATERIALS PRESENTLY STORED (NOT IN D OR E) TOTAL COMPLETED AND STORED IODATE (D E -F) % (G - C) BALANCE TO FINISH (C - G) RETAINAGE (IF VARIABLE RATE) FROM PREVIOUS APPLICATION (D -- E) THIS PERIOD I Cable 5 86,750.00 S - S - S - S - 0.00% 5 86,750.00 $ - 2 Fabricated Steel 5 23,250.00 .5 - 5 - 5 - 5 - 0.00% $ 23,250.00 5 - 3 Racks, Cases. and Carts 5 21.420.00 $ - 5 - $ - $ - 0.00% S 21,420,00 5 - 4 Equipment Electronics 5 895,832.00 $ - 5 - 5 - $ - 0.00% $ 895,832.00 5 - 5 Equipment Hardware 5 57,011.00 5 - $ - 5 - $ - 0.00% $ 57,011.00 5 - 6 Labor 5 341,532.00 5 - 5 - $ - $ - 0.00% $ 341,532.00 $ - 7 Bond 5 49,675.00 5 - 5 49,675.00 $ - $ 49,675.00 100.00% $ - $ 4,967.50 8 Bid Package 6020 General Allowance $ 100,000.00 5 - $ - 5 - S - 0.00% $ 100,000.00 $ - 9 Allowance No. 3 - CAD AS BUILTS $ 5,000.00 $ - 5 - $ - S - 0.00% S 5,000.00 $ - 10 Software Allowance 5 1,500.00 5 - S - 5 - S - 0.00% 5 1,500.00 $ - GRAND TOTALS $ 1,581,970.00 $ - 5 49,675.00 5 - 5 49,675.00 3.14% $ 1,532,295.00 $ 4,967.50 AIA DOCUMENT G7CUS330 rTWitattadIrlEVaMtlatton olarbisodeteurnmat by squesting of the license a completed AIA Document 0401 - Certification of Document's Authenticity THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE. N W.. WASHINGTON. D.0 20006 -5232 G703 -1992 CONTINUATION SHEET See. AM DOCUMENT G703 C5eAr-rt.4:6-). PAGE OF PAGES AIA Document 0702. APPLICATION AND CERTIFICATION FOR PAYMENT. containing Contractor's signed certification is attached, In tabulations below, amounts arc stated to the nearest duller. Use Column I on Contracts where variable retainage for line items may apply. SECOA, Inc. APPLICATION NO: 2 APPLICATION DATE: 05/12/09 PERIOD TO: 05/31/09 SECOA'S PROJECT NO: 11786 -JRD Carmel Performing Arts Center A B C D E F G H I ITEM DESCRIPTION OF WORK SCHEDULED WORK COMPLETED MATERIALS TOTAL % BALANCE RETAINAGE NO. VALUE FROM PREVIOUS THIS PERIOD PRESENTLY COMPLETED (G +C) TO FINISH (IF VARIABLE APPLICATION STORED AND STORED (C - G) RATE) (D + E) (NOT IN TO DATE 0 OR E) (D +E -I F) 1 Performance & Payment Bond 8,350.00 8,350.00 8,350.00 I00% 835.00 2 Shop Drawings, Engineering, Samples, Coordination 75,000.00 75,000.00 75,000.00 l00% 7,500.00 0.00 3 Procurement ofCuston1 Fabric 59.000.00 59,000.00 0.00 4 Procurement of Custom End Panels 1 _ >7,000.00 127,000.00 0.00 5 Fixed Audience Seating - Materials 3fi4,346.00 364,346.00 0.00 6 Fixed Audience Seating - Labor 82,600.00 82,600.00 0.00 7 Demountable Seating - Materials 71,500.00 71,500.00 0.00 8 Demountable Seating - Labor 7,400.00 7,400.00 0.00 9 General Allowance 35,000.00 35,000.00 0.00 10 CAD Allowance 5,000.00 5,000.00 0.00 GRAND TOTALS 835.196.00 8,350.00 75,000.00 0.00 83,350.00 751,846.00 8,335.00 Users may obtain validation of this document by requesting of the license a completed AIA Document D401 - Certification of Document's Authenticity AIA DOCUMENT G703 - CONTINUATION SHEET FOR G702 • 1992 ECM ION • AIA • Q1992 THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVENUE. N.W. WASHINGTON, D.C. 20006.5232 G703 -1992 February 22, 2009 Project Schedule INDIANAPOLIS STAGE SALES & RENTAL, INC. 905 MASSACHUSETTS AVENUE INDIANAPOLIS, INDIANA 46202 317 - 635 -9430 — 317 - 635 -9433 www.indystage.com Predominately a supplier of equipment for other contractors to install Indianapolis Stage will schedule our work to coincide with the needs of those contractors as established by the Project Manager. Installation of fixtures will take place at the appropriate time during the project as established by the Project Manager. �� Schedule of Values Event Mobilization / Submittals Shipment of back - boxes & racks Shipment of electronic components Shipment of Fixtures . System energization Split -fin- ihsF01 General Allowance Training / Completion Total ‘Fk Schedule of Submittals Dimming and control devices for Performance Lighting System Fixtures Follow Spots •0 At u.1 S Value $45,000.00 64,500.00 197,500.00 —3.1.97008-138 -- 2,470 95,000.00 100,000.00 6,334.00 $818,334.00 Wages A copy of the Memorandum of Understanding between Indianapolis Stage and Local 30 of the International Alliance of Theatrical Stage Employees (IATSE) is attached. Management personnel wage rate is $47.50 per hour. Onsite Labor Hours Onsite labor hours for this project are projected to be 200 hours.