HomeMy WebLinkAbout06060001.13- =
9 4
C 8 � - I
Q)
u
-
•
4
U
000 0000'
MM00
U.
U
LEGEND
w
/ E,,
25 +00 E,'S fi3E" � � 84
a� ". t
� �
G� ❑
�---
--
- - -� -a !1�_�`�m
---___
- -�-
__
= RIGHT -01 -WAY LINE
= STORM `,EWER LINE
= SWALE �
�
a
U
�
l
c49
889.68 ��a 890.4
-
/
STM STR 740
CURB INLET
_
�- - -� -
-__ ___ HLVd 17VH --b p�
- - -�__�
�-/N
- -
__.
__
�-
= SANITARf SEWER LINE
• = SANITAR'r SEWER MANHOLE
= FLOW DIIIECTION
W
A rQ�
^ Z
TC= 893.93
889.16
- __ -_ __
--
J W3Sb SS300b -N
--fN
�J
F�
--- = EXIST. CONTOURS
g91
U' NV=
o
-
-- c
-'
N
3--57 ,C!_ _
-__ _
213QIflOHS 3NO1S ,�
�--I
o =STORM EtFEHIVE INLET
= STORM IULET
I-�
a
7
O
-- -- -
w v
W
- - - --
i� - -_-
-
1N�waS SS3,C0b -N N
--
� � �
CL
T C =TOP OF ASTING
INV. = INVERT
RCP = EINFOR, PIPE
m
Iii
z
-
-�
___ _
�
ED CONCRETE
�►/
0 3 z
N n 60d
�Vd Sf10210d >
V1393A �,
I
7 S 8 Ob
i
--
--_
- --
-
- - - -- -_ - --
_ - -
__ - - - --
O
p
ti
� � � � °r'
PVC = POLYVINrI_CHLORIDE SANITARY SEWER PIPE
M. H. = MANHOLE
STR STRUCTURE
1-� 0
�S!
o
J
N
CDL
..91. r
W �?
I
�� = -•_��
V
¢
L }]
°�
° i u
o W v L
m
D. &U.E. = DRAINAGI AND UTILITY EASEMENT
NT
R.D.E. = REGULATI D DRAIN EASEMENT
a
^a
1 7t
o
3NVI SS300HUO3
ON392i3W3
A W-Ju1S ADIHl „9
o
Q
3
a
B.S.L. = BUILDING SETBACY. LINE
V.W. = VARIABLE WIDTH
IIJJ
o n
o
p
PROP. = PROPOS[ D
ME = MATCH EXISTING
TYP. = TYPICAL
00
N
C,
°
®
�� b u
co
��
= SUBSURI ACE DRAIN AND SUMP LINE
x
_+
STM STR 731
W 886.0
889.0 0
STM STR 739
' °
�\ o.
�6,
�'
z a
iv - -
��
= WATER uNE
m = CONCRE E END SECTION
W
CES
yN��= g;7 -00
STM STIR
d -( ��'� W SOLID INLET
50
CES
INV= 884.00
STM STR 738
/ �;
��
^
;,
\
o
W
°'
i o
Y w
�w Zo
®
U
�-
o --
r0
-
{� =FLOOD ROUTE
000.D = PROPO`,ED GRADE
p
0 ^
TC =884
INV= 87t, s2
CES
��
°s `%
� z °
A`
0f
� °
°
w z ��t
srM sTR #700 =PROP. ',TORM STURCTURE NO.
U
�� ��
735
INV= 884.00 ��.
0
32' OF 12" RCP
o m
` n �o -o
�x�
- m
oo
n c z
�'���
V�
Q
r
o zo m
ma=r
o
u
-
SAN STIR #900 = PROP , ANITARY STURCTURE NO.
STM STR
CES
877.00
�
STM STR 737'
INLET
��
��
� s� � Jd-
�'
� \
I
F
w o wzo
rrr- �
w >_
� �
i
����.I
v✓ = EXIST. 1REELINE
Z
PQ
INV=
STM STk 736
BEEHIVE INLET
888.3 ,
BEEHIVE
TC- 887.00
INV= 883.84 ----
��
�� �� �n °
`'O� � \ �
15' D. &U.E
_
240' OF 15" RCP @ 2.15%
\ � �
W
, � � � �
0 = PROPO`�ED FIRE HYDRANT
� = PROPO',ED WATER LINE VALVE
Z,
tn
C)
O
0
- - - -- �
TC- 885.00
INV = 871.630' D. &U.E.
1.83%
--
_
30' D. &U.E.
7�=-= _ _ _ ' ���_
� --
_
�� �
15 D. &U.E.
I
�\
�
. � Q
857.3 = PROPO`,ED PAD GRADE
�
O
�
-- - -��
J _
- - - -- 30'
_---- - - - - 311' OF 12" RCP @ 2.00%
F 12" RCP 2.10% -�
890.4 ME
886.7 ME
�)
°'"
�•
��
w
c
M.F.P.G. = MINIMUM FLOOD PROTECTION GRADE
PAD; MINIMUM GRADE FOR ANY
-
-
6 ME
885.
10' L.S.E.
��
8 PVC S n
P
°o
�'. �� .
��
ST
STRUCTURE OPENING (DOOR, WINDOW
L, 11
WELL, UTSIDE BASEMENT STAIR
L.S.E.
--
8 "PVC San
_ --
20' Sewe Esmt. per Ins
oo
_
o �! '
�, A
ACCESS, ETC.)
�
EX. SAN MH G.O. #7
7. C. - 890.47
COM 1�sON
v \
�
O
o�
^
° ,n
�
� � ��
d
�n
-,
'� �
x
a �
r
_
LI n
°
EX.(W)INV- 876.8
EK(E)INV -876.9
��1 A 19A
A 1�+�
W ro
� J'n
�_��
n ��.
!"'��
�
~
o
� ��
_�
;�
s
c
-
-
PROP- (N)INV- 867.90
m o \
�c it ii
ao
�UHZ
n
_
V1
^ W 'I �I
'o
���OOC �•
LLj _ co loo (I
w
"
CITY OF CARMEL STANDARD BACKFILL NOTES:
W
Z?
( fy
STORM SEWERS
Bedding, Haunching, Initial Backfill
�I
n
I °I
�� I
Bedding, haunching and initial backfill for all RCP installations shall be
B- Borrow for Structure Backfill meeting the material requirements the
j
of
INDOT. Bedding shall be placed in the trench bottom such that after the
f
pipe s installed to grade and line, there remains a 4 -inch minimum
depth of material below the e barrel and a minimum of 3- inches
pipe
below the beli. For pipe sizes 66- inches and larger, the minimum depth
V
5.0
V
5.0
of material below the pipe barrel shall be 6- inches. Bedding, haunching
!
[T 5.o
E HORIZONTAL SCALE.'
E S
4 0 HORIZONTAL SCALE.'
R S
4.D HORIZONTAL SCALE.'
"
and initial backfill shall be compacted in 6 -inch maximum lifts to not
less than 95% Standard Proctor p Density for the entire depth of the
40
9 >,=
_R
50
R
C
T
3.0 ' „= 50
C
T
3.0
7 =50
material placed. The backfill shall be brought up evenly on both sides of
the pipe for the full length of the pipe. Haunching shall extend to the
'
T C 3 0
A=
A=
J
the The
�-
I L 5
2 0 °o N o ,f, a
I L 5
2.0 0
o
j
springline of pipe. limit of initial backfill shall be 6- inches above
the Minimum trench
:v
I 5 2.0 0o N
o ^ �
C
1.0
C
E`
1.0
springline. width shall be the outside diameter of the
18- inches.
! ~
S H 1.0
E
A
A
pipe plus
z
A
L 0.0
L
0 0
L
0.0
Final Backfill
°
1°
Final backfill for all RCP installations under and within 5 -feet of
z
¢
-
pavement shall be B- Borrow for Structure Backfill meeting the material
o
requirements of the INDOT and shall be compacted in 6 -inch maximum
lifts to not less than 95% Standard Proctor Density for the entire depth
of the material placed. The backfill for the top 6- inches of the
excavation below the start of the aggregate subbase of the pavement
H'
w
°
900
905
905
895
895
shall be No. 53 Stone meeting the material requirements of the INDOT
and shall be compacted to not less than 95% Standard Proctor Density.
//�
900
Final Backfill for all RCP installations greater than 5 -feet of pavement
be fill inches
���1111IIIIIII
P N
shall clean material free of rocks larger than 6- in
diameter, frozen lumps
F_
of soil, wood or other extraneous material,
.. �G1STfj;.. .S.
Q' O
compacted in 12 -inch maximum lifts to not less than 90% Standard
Proctor Density for the depth the
NQ.
to
'
GRANULAR
entire of excavation.
=
=
BACKFILL
• 8827
• -
895
895
900
C)
900
890
890
=
�0 .. STATE OF
-
CD
X000
+ - +
Nrb NCO
-
WATER AND STAN NOTES:
�iiz�ss�ONALI�'�G����\`
Iillll
O
+ 00
II II II II
Bedding, Haunching, Initial Backfill
Bedding, haunchin initial
�� �°
� N
890
895
�� �
895
885
�-
backfill materials, placement and compaction
g' g' p p
AaO H. WEIHE P
E 8827
890
C° EXISTING
r o -
- -
C/
II II
�� z
ti �n � 0 v�
PROPOSED
C-)
for water mains, water service laterals, sanitary mains and sanitary
service laterals shall be in accordance with the standard practice of the
o GRADE + �
QC� �r�w
_ _
,•.. , GRADE
(�
utility that has jurisdiction over the installation.
+00
000 0
0 � ~
_
II
..
�.
on o
PROPOSED
o
`n w
Final Backfill
Final backfill for water mains, water service laterals, sanitary mains and
II
U
PROPOSED
o z
cn cn w
885
890
n.
-_`
��_
o
o z
0
890
880
GRADE
880
sanitary service laterals under and within 5 -feet of pavement shall be
B- Borrow for Structure Backfill meeting he material requirements of the
885
(�
-
cn
GRADE
EXISTING J
0
+
N o
O
INDOT and shall be compacted in 5-inch maximum lifts to not less than
Loo h -
GRADE o v Li
°
r` o z
95% Standard Proctor Density for the entire depth of the material placed.
The backfill for the top 6- inches the below the
o z
=
8„ 0 �
II cnn
o O
o =
of excavation start of
�
CD
CD
� o
`n
o
°
WATER
N
�
w
+
o w
�
o
o
the aggregate subbase of the pavement shall be No. 53 Stone meeting
the material requirements of the INDOT and shall be compacted to not
less than 95% Standard Proctor Density. If the the
w
MAIN 0
240'
n
II n
standard practice of
Cpl 11 n
2 �QP%
00 o
00
II
880
885
1 @j
>
Of 1s„
RCP
@
885
875
o
� �
875
utility that has jurisdiction over the installation has a more stringent final
backfill requirement, the more stringent requirement shall govern.
q g q g
�-
W
880
Lnn c'n
- 12 -RCP
> Z
>
>
Ir E
2 ,s�
-
W
o
�
>
E
311 °
�
N
=
oo
N
EXIST ING
MINIMUM COVER FOR PIPE CROSSINGS OF CITY STREETS
N
8"
INV=
PVC
884.58
CD
_
GRADE
For installation of Storm Mains, Water Mains, Sanitary Mains, Water
Service Laterals, Sanitary Sewer Laterals City
r _
v
_ o
8' PVC
o
00
o
o
J
under streets, regardless of
the jurisdiction of the utility, the minimum cover from the top of the
0 0
INV = 877.02
°
875
880
II
88Q
$7o
c�
870
installed pavement to the top of the installed pipe shall be the pavement
875
I`
00
�
iz
section practice of the utility that has jurisdiction over the installation
�^
I-- � ,Nj
00
>
00
has a more stringent cover requirement, the more stringent requirement
v 1
s
h
shall govern.
II
a_
O
a
~'
N
870
875
875
865
Q0
865
z
_
o
y
865
870
870
860
860
Z
865
a o
o J_
z
860
865
865
855
855
Z
860
w �
r
O�
855
860
860
850
850
1855
r
o +oo
0+50 1+00
1+50 2 +00 2 +50 3 +00 3 +50
4 +00
3 +00 2 +50 2 +00
1+50 1+00
0 +50
0 +00
0 +00
0 +50 1+00
; : HEFT NO
I
I
C305
PROJECT NO
I W06 -0031
- =
9 4
C 8 � - I
Q)