Loading...
HomeMy WebLinkAbout06060001.19�_'■ ® = ® M D ■ x -W s� V 0-15.0 4.0 HORIZONTAL SCALE- T A_ I Jc 2.0 L C L 1.0 A 10.0 • 1 860 LEGEND 87E 5 NP , I I � I � � 1855 ~ C � rs STORM SEWER LINE O � = SWALE I� I SANITARY SEWER LINE 850 O v • = SANITARY SEWER MANHOLE 0 = FLOW DIRECTION w 1:�� 1: 9 E NouS TO f REA4AIN lNV OUT —J0 NV lN; '854.67 SAN ST lNV /N;856 53(S ` N� 0 ' 50 wL0g21 1NV 7A/ 5p40 ,. OF r NOTES: THERE ARE TO BE NO WATER VALVES OR MANHOLES PLACED WITHIN THE PAVEMENT, CURBS OR SIDEWALKS. SAC ,TARY SEWER STRUCTURES ARE DESIGNATED AS "WLC ", INDICATING THE WOODS AT LIONS CREEK AS REQUESTED BY CTE ENGINEERS, INC. (CLAY TOWNSHIP REGIONAL WASTE DISTRICT CONSULTING ENGINEERING FIRM) o� CD + 6) c0 f " N CITY OF CARMEL STANDARD BACKFILL NOTES: STORM SEWERS Bedding, Haunching, Initial Backfill Bedding, haunching and initial backfill for all RCP installations shall be b— Borrow for Structure Backfill meeting the material requirements of the INDOT. Bedding shall be placed in the trench bottom such that after the pipe is installed to grade and line, there remains a 4 —inch minimum depth of material below the pipe barrel and a minimum of 3— inches below the bell. For pipe sizes 66— inches and larger, the minimum depth of material below the pipe barrel shad be 6— inches. Bedding, haunching and initial backfill shall be compacted in 6 —inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill shall be brought up evenly on both sides of the pipe for the full length of the pipe. Haunching shall extend to the springline of the pipe. The limit of initial backfill shall be 6— inches above the springline. Minimum trench width shall be the outside diameter of the pipe plus 18— inches. Final Backfill Final backfill for all RCP installations under and within 5 —feet of pavement shall be B— Borrow for Structure Backfill meeting the material requirements of the INDOT and shall be compacted in 6 —inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6— inches of the excavation below the start of the aggregate subbase of the pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be compacted to not less than 95% Standard Proctor Density. Final Backfill for all RCP installations greater than 5 —feet of pavement shall be clean fill material free of rocks larger than 6— inches in diameter, frozen lumps of soil, wood or other extraneous material, compacted in 12 —inch maximum lifts to not less than 90% Standard Proctor Density for the entire depth of the excavation. :■ U J CD 3: N O CD +03 �00 In ,#* ACCESS, ETC.) CITY OF CARMEL STANDARD BACKFILL NOTES: WATER AND SEWER UNDER CITY STREETS Bedding, Haunching, Initial Backfill Bedding, haunching, initial backfill materials, placement and compaction for water mains, water service laterals, sanitary mains and sanitary service laterals shall be in accordance with the standard practice of the utility that has jurisdiction over the installation. Final Backfill Final backfill for water mains, water service laterals, sanitary mains and sanitary service laterals under and within 5 —feet of pavement shall be B— Borrow for Structure Backfill meeting the material requirements of the INDOT and shall be compacted in 6 —inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6— inches of the excavation below the start of the aggregate subbase of the pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be compacted to not less than 95% Standard Proctor Density. If the standard practice of the utility that has jurisdiction over the installation has a more stringent final backfill requirement, the more stringent requirement shall govern. MINIMUM COVER FOR PIPE CROSSINGS OF CITY STREETS For installation of Storm Mains, Water Mains, Sanitary Mains, Water Service Laterals, Sanitary Sewer Laterals under City streets, regardless of the jurisdiction of the utility, the minimum cover from the top of the installed pavement to the top of the installed pipe shall be the pavement section practice of the utility that has jurisdiction over the installation has a more stringent cover requirement, the more stringent requirement shall govern. u7 C� 0 'n o CV ff-) 00 N 885 00 � II II W W /)I 1^� W U te • • , 1 8751 11 * 301111 8551 it reml ��0_ 0000 TBM 2: II ll CUT SQUARE 10 FEET EAST OF THE END OF IHE SOUTH CURB OF DOLAN WAY. ELEVATION = 907.86 T13M # 3 = CUT 835 - Q) 5 SQUARE 1.0 FEET NORTH OF THE SOUTH ENDOF THE EAST HEADWALL APPROX. 20 FEET NORTH OF THE ' OUTHWEST 1 CORNER OF SURVEYED PARCEL. ELEVATION: 890.24 830 1 830 9 +00 9 +50 10 +00 10 +50 11+00 11+50 12 +00 12 +50 13 +00 13 +50 14 +00 14 +50 15 +00 15 +50 16 +00 16 +50 17 +00 17 +50 18 +00 18 +50 19 +00 19 +50 20 +00 20 +50 21+00 21+50 22 +00 22 +50 23 +00 23 +50 24 +00 • .4 �0 00 C/1 U �o 0 000041 �44 Z t— t x M M 0000 V X a �A W a I Z as 0 H a� O V1 00 Q N j x Z W a rn W H ° �R z W0 � w a 5 Z�l kn L z� z�m z a o I� q z w u� -r 2. x z io 0 rim �I o ci N0. - =_ • 8827 • P STATE OF sS10NAL 'r��\\\\\�� ALLAN H. WEIHE P E. 8827 CT, ^'y `r l V LEGEND 87E 5 NP , I � I � = RIGHT -OF -WAY LINE STORM SEWER LINE O � = SWALE SANITARY SEWER LINE ` Z y • = SANITARY SEWER MANHOLE = FLOW DIRECTION = EXIST. CONTOURS 0 = STORM BEEHIVE INLET ❑ = STORM INLET T.C. = TOP OF CASTING INV. = INVERT RCP = REINFORCED CONCRETE PIPE PVC = POLYVINYLCHLORIDE SANITARY SEWER PIPE M. H. = MANHOLE STIR. = STRUCTURE II &U.E. = DRAINAGE AND UTILITY EASEMENT SAN STR R.D.E. = REGULATED DRAIN EASEMENT �C�882 0 p wLC975 R.S L. = BUILDING SETBACK LINE V OUT, 9 NV V.W. = VARIABLE WIDTH iN,85 9 g '7 PROP = PROPOSED ME = MATCH EXISTING T'P = TYPICAL — - — = SUBSURFACE DRAIN AND SUMP LINE r = WATER LINE � = CONCRETE END SECTION E:!-- = FLOOD ROUTE 000.0 = PROPOSED GRADE STM `IR #700 = PROP. STORM STURCTURE N0. SAN `JR #900 = PROP. SANITARY STURCTURE NO. EXIST. TREELINE PROPOSED FIRE HYDRANT 5 ar �o o � p (D = PROPOSED WATER LINE VALVE PROPOSED PAD GRADE M.I.P.& = MINIMUM FLOOD PROTECTION GRADE \ s OF PADS. MINIMUM GRADE FOR ANY \ STRUCTURE OPENING (DOOR, WINDOW o WELL, OUTSIDE BASEMENT STAIR CITY OF CARMEL STANDARD BACKFILL NOTES: STORM SEWERS Bedding, Haunching, Initial Backfill Bedding, haunching and initial backfill for all RCP installations shall be b— Borrow for Structure Backfill meeting the material requirements of the INDOT. Bedding shall be placed in the trench bottom such that after the pipe is installed to grade and line, there remains a 4 —inch minimum depth of material below the pipe barrel and a minimum of 3— inches below the bell. For pipe sizes 66— inches and larger, the minimum depth of material below the pipe barrel shad be 6— inches. Bedding, haunching and initial backfill shall be compacted in 6 —inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill shall be brought up evenly on both sides of the pipe for the full length of the pipe. Haunching shall extend to the springline of the pipe. The limit of initial backfill shall be 6— inches above the springline. Minimum trench width shall be the outside diameter of the pipe plus 18— inches. Final Backfill Final backfill for all RCP installations under and within 5 —feet of pavement shall be B— Borrow for Structure Backfill meeting the material requirements of the INDOT and shall be compacted in 6 —inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6— inches of the excavation below the start of the aggregate subbase of the pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be compacted to not less than 95% Standard Proctor Density. Final Backfill for all RCP installations greater than 5 —feet of pavement shall be clean fill material free of rocks larger than 6— inches in diameter, frozen lumps of soil, wood or other extraneous material, compacted in 12 —inch maximum lifts to not less than 90% Standard Proctor Density for the entire depth of the excavation. :■ U J CD 3: N O CD +03 �00 In ,#* ACCESS, ETC.) CITY OF CARMEL STANDARD BACKFILL NOTES: WATER AND SEWER UNDER CITY STREETS Bedding, Haunching, Initial Backfill Bedding, haunching, initial backfill materials, placement and compaction for water mains, water service laterals, sanitary mains and sanitary service laterals shall be in accordance with the standard practice of the utility that has jurisdiction over the installation. Final Backfill Final backfill for water mains, water service laterals, sanitary mains and sanitary service laterals under and within 5 —feet of pavement shall be B— Borrow for Structure Backfill meeting the material requirements of the INDOT and shall be compacted in 6 —inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6— inches of the excavation below the start of the aggregate subbase of the pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be compacted to not less than 95% Standard Proctor Density. If the standard practice of the utility that has jurisdiction over the installation has a more stringent final backfill requirement, the more stringent requirement shall govern. MINIMUM COVER FOR PIPE CROSSINGS OF CITY STREETS For installation of Storm Mains, Water Mains, Sanitary Mains, Water Service Laterals, Sanitary Sewer Laterals under City streets, regardless of the jurisdiction of the utility, the minimum cover from the top of the installed pavement to the top of the installed pipe shall be the pavement section practice of the utility that has jurisdiction over the installation has a more stringent cover requirement, the more stringent requirement shall govern. u7 C� 0 'n o CV ff-) 00 N 885 00 � II II W W /)I 1^� W U te • • , 1 8751 11 * 301111 8551 it reml ��0_ 0000 TBM 2: II ll CUT SQUARE 10 FEET EAST OF THE END OF IHE SOUTH CURB OF DOLAN WAY. ELEVATION = 907.86 T13M # 3 = CUT 835 - Q) 5 SQUARE 1.0 FEET NORTH OF THE SOUTH ENDOF THE EAST HEADWALL APPROX. 20 FEET NORTH OF THE ' OUTHWEST 1 CORNER OF SURVEYED PARCEL. ELEVATION: 890.24 830 1 830 9 +00 9 +50 10 +00 10 +50 11+00 11+50 12 +00 12 +50 13 +00 13 +50 14 +00 14 +50 15 +00 15 +50 16 +00 16 +50 17 +00 17 +50 18 +00 18 +50 19 +00 19 +50 20 +00 20 +50 21+00 21+50 22 +00 22 +50 23 +00 23 +50 24 +00 • .4 �0 00 C/1 U �o 0 000041 �44 Z t— t x M M 0000 V X a �A W a I Z as 0 H a� O V1 00 Q N j x Z W a rn W H ° �R z W0 � w a 5 Z�l kn L z� z�m z a o I� q z w u� -r 2. x z io 0 rim �I o ci N0. - =_ • 8827 • P STATE OF sS10NAL 'r��\\\\\�� ALLAN H. WEIHE P E. 8827 CT, ^'y `r l V a N c I � I � C~ O � Ia2 ` Z y o J, !SHEET NO I C403 PROJECT NO W06 -0031