Loading...
HomeMy WebLinkAbout06060001.25U 10' MIN 12" RLTREXX FILTER SOCK (WWW.FILTRExX CON) BERM STAKE (TYP.) 10' M!N. I _ SECTION LINE 10 MIL PLASTIC LINING TO EXTEND TO FlLTREXX FILTER SOCK LATH & RAGGING ON PLAN ALL SIDES STAKE TYP. 10 4_1 LASTIC JIVING TREXX FILTER 12 FlL socK SECTION -BERM NOTTS: 1 WASHOUT LOCATION SHOWN ON EROSION I ^ N CONTROL PLAT 2 DRY CONCRETE TO BE REMOVED FROM SITE PERIODICALLY AND DISPOSED OF BY APPROVED METHODS. 3. THE CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 3OFT. OF THE TFMP CONCRETE WASHOUT FACILITf. CONCRETE WASHOUT N TYPE BELOW GRADE 10 �UAL!t 3' 3/8" TREATED PLYWOOD 48"x24" PAINTED WHITE C/L SWALE CONCRETE BLACK LETTER 6" HEIGHT 1, 1/3 �_ STRAW BALES BURIED 3" WASHOUT 0.5" LAG SCREWS . POST 3"x3 %8' 3' 3' u u I CONCRETE WASHOUT SIGN MAINTENANCE: 1. INSPECT WEEKLY AND AFTER EACH STORM EVENT. M 2. IF FABRIC Is TORN OR DETERIORATED, REPLA CE SECTION IMMEDIATELY. 3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF THE f ENCE OR IS CAUSING FABRIC T O BULGE. R NCHED FABRIC. T E 4. TAKE CARE NOT 0 UNDE RMINE THE ENT 5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE AND SEDIMENT, BRING DISTURBED AREA TO GRADE AND STABILIZE IT. ,. 1 "X2" HARDWOOD CROSSBRACING 2 ., X2 "X36" HARDWOOD CATCH BASIN/ \ STAKES WITH POINTED END DRAINAGE \ - AT 5' O.C. STRUCTURE 1/2" X 2" X 24" WOOD LATH AT EACH STAKE OVER FABRIC 36" WIDE NONWOVEN POLYPROPYLENE FABRIC REFER TO SILT FENCE SECTION FOR EMBEDMENT DETAIL MAINTENANCE: 1. INSPECT WEEKLY AND AFTER EACH STORM EVENT, 2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY. 3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF THE FENCE OR IS CAUSING FABRIC TO BULGE. 4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC. 5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE AND SEDIMENT, BRINGING: DISTURBED AREA TO GRADE AND STABILIZE IT. SILT FENCE INLET PROTECTION DETAIL (NOT TO SCALE) l RUNOFF RU = R�NQFF GRAVELBAG CURB PROTECTION (FOR INLETS THAT ARE IN LOW POINTS) (NO &GALE) MAINTENANCE: 1. INSPECT WEEKLY AND AFTER EACH STORM EVENT. 2. GRAVEL BAGS ARE HALF FULL WITH ROCK LARGER THAN THE INLET GRATE AND PACKED CLOSE TOGETHER TO ELIMINATE GAPS. 3. IF BAG DETERIORATES OR IS DAMAGED, REBAG OLD BAG WITH CONTENTS INTO A NEW BAG. 4. REMOVE SEDIMENT WHEN HEIGHT REACHES THE TOP OF THE BAG. 5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE BAG AND SEDIMENT, BRINGING DISTURBED AREA TO GRADE AND STABILIZE IT- RIP-RAP I� Ili" I I 18" MIN SIDE RIP -RAP OUTLET EROSION CONTROL (NO SCALE) - #4 REBAR STAKE MAINTENANCE: 1. INSPECT STRAW BALE DAMS WEEKLY AND AFTER EACH STORM EVENT. 2. REMOVE ANY SEDIMENT DEPOSITS PROMPTLY TAKING CARE NOT TO NTR UNDERMINE ENTRENCHED BALES. E 3. INSPECT WEEKLY FOR DETERIORATION OR DAMAGE BY CONSTRUCTION ACTIVITIES AND REPAIR IMMEDIATELY. 4. AFTER DRAINAGE AREA HAS BEEN STABILIZED, REMOVE BALES AND SECIMENT, BRING DISTURBED AREA TO GRADE AND STABILIZE IT. STRAW BALE PLACEMENT #1 FOR EROSION CONTROL (NO SCALE) ' 12" - #2 STONE FILTER FABRIC SMOOTH FOUNDATION UNDER FILTER CONSTRUCTION ENTRANCE (NO SCALE) MAINTENANCE: 1. INSPECT WEEKLY AND AFTER EACH STORM EVENT. 2. GRAVEL BAGS ARE HALF FULL WITH ROCK LARGE R THAN THE INLET GRATE AND PACKED CLOSE TOGETHER TO ELIMINATE GAPS. A OLD BAG WITH IF BAG DETERIORATES OR IS DAMAGED REB G 3 , CONTENTS INTO A NEW BAG. 4. REMOVE SEDIMENT WHEN HEIGHT REACHES THE TOP OF THE BAG. 5. AFTER DRAINAGE AREA IS STABIUZED, REMOVE BAG AND SEDIMENT, BRINGING DISTURBED AREA TO GRADE AND STABILIZE IT. STABILIZATION PRACTICE: JAN. FEB. MAR. APR MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. PERMANENT A • / / / /I / / / /'- • /I /+� D SEEDING DORMANT B II B SEEDING TEMPORARY C : D -� SEEDING E SODDING D MULCHING G LBS A - KENTUCKY BLUEGRASS 40 LBS /ACRE; CREEPING RED FESCU E 40 / ACRE , PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 20 LBS /ACRE. 8 = KENTUCKY BLUEGRASS 60 LBS /ACRE; CREEPING RED FESCUE 60 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE. C = SPRING OATS 3 BUSHEL /ACRE. D = WHEAT OR RYE 2 BUSHEL /ACRE. E = ANNUAL RYEGRASS 40 LBS /ACRE. (1 LB /1000 SQ. FT.) F =SOD G = STRAW MULCH 2 TONS /ACRE. */1/* IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER ** IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD. SEASONAL SOIL PROTECTION CHART POST 4" DIA. WOOD OR 1.33 LBS /FOOT STEEL 10' MAX. SPACING WIRE FENCE 14 GAGE (MIN) -6" MESH SPACING (MAX) FASTENED BY 1" WIRE STAPLES, TIE WIRES, OR HOG RINGS FILTER FABRIC ALONG LENGTH (NO JOINTS) STAPLE OR WIRE TO FENCE 4 "X4" TRENCH TO BE BACKFILLED AND COMPACTED DOWN - UPSLOPE SLOPE 2 SILT FENCE SECTION (NO SCALE) EROSION CONTROL NOTES 1. ALL DISTURBED AREAS SHALL BE SODDED GP SEEDED, EXCEPT BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR LOCATION OF LANDSCAPE BEDS 2. INSTALL SILT FENCE ALONG ALL PROPERTY B'IuNDARIES 2 "x2" STAKES SILT FENCE a, c; � DE � a END STAK E SHALL BE HIGHER G ER T HAN TOP OF PIPE EN_- SECTION MAINTENANCE. 1. INSPECT WEEKLY AND AFTER EACH STORM EVENT. 2. IF FABRIC IS TORN OR DEfE RI R Q. T E� REPLACE SECTION IMMEDIAT EL Y 3. REMOVE SEDIMENT WHEN HEIGHT PEACHES 1/3 OF THE HEIGHT OF THE FENCE OR IS CAUSING FABRIC TO BULGE. 4. TAKE CARE NOT TO UNDERMINE T "E ENTRENCHED FABRIC. 5. AFTER D RAINAGE AR EA IS S TABIL C REMOVE FENCE AND SEDIMENT, BRING DISTURBED AREA TO GRADE AND STABILIZE IT. RED END SECTI FLARED 0 N PROTECTION NC SCALE) ., � .ALE SECTION A - CONSTRUCTION PLAN ELEMENTS Al PLAN INDEX - SEE EROSION CONTROL PLAN A2 ll "x17" PLAT - (REDUCTION OF EROSION CONTROL PLAN TO BE SUBMITTED WITH FULL SIZE PLAN) A3 PROJECT NARRATIVE - THIS IS A PROPOSED RESIDENTIAL DEVELOPMENT ON APPROXIMATELY 59.097 ACRES. THE CONSTRUCTION SHALL CONSIST OF 32 LOTS, ASPHALT STREETS WITH 1 ENTRY DRIVE, ENCLOSED STORM SEWERS, AND GRAVITY SANITARY SEWERS. A4 VICINITY MAP - SEE UPPER RIGHT OF EROSION CONTROL PLAN SHEET C501. CONTROL PLAN A5 LEGAL DESCRIPTION SEE LOWER LEFT OF EROSION C SHEET C5C1. A6 LOCATION OF ALL LOTS AND PROPOSED SITE IMPROVEMENTS - LAT. 39'59'12", LONG: 86'14'13" A7 HYDROLOGIC UNIT CODE (14 DIGIT) 05120201120070 AB NOTATION OF ANY STATE OR FEDERAL WATER QUALITY PERMITS - NOT APPLICABLE A9 SPECIFIC POINTS WHERE STORMWATER DISCHARGE LEAVES SITE - POND OUTLET STRUCTURES DISCHARGE INTO LION CREEK ( SEE EROSION CONTROL PLAN) A10 LOCATION AND NAME OF WETLANDS, LAKES AND WATER COURSES ON AND ADJACENT TO SITE - LION CREEK 11 IDENTIFICATION FALL RECEIVING WATERS ION CREEK LITTLE A 0 CREEK/ LITTLE CREEK Al2 IDENTIFICATION OF POTENTIAL DISCHARGE TO GROUND WATER - NOT APPLICABLE A13 100 YEAR FLOODPLAINS, FLOODWAYS, AND FLOODWAY FRINGES - NOT APPLICABLE A14 PRE-CONSTRUCTION NSTRUCTION AND POST CONSTRUCT ION ESTIMATE OF PEAK E DISCHARGE (10 YEAR) LAKE SM - - W: Q10 P r e -0 ?. 0 00 cfs Q 10 ost-00 .000 cfs LAKE SM - - SW: Q 10 P r e =00 .000 c f s Q 10 P ost-00 .000 cfs -00 00 -00 000 - - - ......cfs LAKE SM S S: Q10pre cfs Q10post- - LAKE SM -S -SE: Q10pre = ? ?. ?? ?cfs QIOPost = ? ?. ?? ?cfs - LAKE SM -S -E: Q10pre = ? ?. ?? ?cfs Q1Opost = ? ?. ?? ?cfs LAKE S M - - N: Q 10 re =00 .000 cfs Q 1 O ost- 0 0 000 cfs - LAKE SM -N -E: Q10pre = ? ?. ?? ?cfs Q10post = ? ?. ?? ?cfs - LAKE SM -N -NE: Q10pre = ? ?. ?? ?cfs Q1Opost = ? ?. ?? ?cfs A15 ADJACENT LAND USE INCLUDING UPSTREAM WATERSHED - RESIDENTIAL Alb CONSTRUCTION LIMITS - AS SHOWN ON EROSION CONTROL PLAN A17 IDENTIFICATION OF EXISTING VEGETATIVE COVER - GRASS, WOODED AREA A18 SOILS MAP W/ SOIL DESCRIPTIONS AND LIMITATIONS - SEE EROSION CONTROL PLAN A19 LOCATIONS, SIZE & DIMENSIONS OF PROPOSED STORMWATER SYSTEMS - SEE SITE DEVELOPMENT PLAN A20 PLANS FOR OFF -SITE CONSTRUCTION ACTIVITIES - SEE OFFSITE SANITARY SEWER PLANS A21 LOCATIONS OF PROPOSED SOIL STOCKPILES AND /OR BORROW /DISPOSAL AREAS - ALL EARTH MOVEMENT AREAS TO BE PLACED IN FINAL LOCATION AT TIME OF INITIAL EXCAVATION. EARTHWORK PROGRAM TO BE ADJUSTED TO ELIMINATE STOCKPILE AREAS. A22 EXISTING SITE TOPOGRAPHY - SEE EROSION CONTROL PLAN AND EXISTING CONDITIONS PLAN A23 PROPOSED FINAL TOPOGRAPHY - SEE SPOT GRADES & FLOW ARROWS PROVIDED ON DEVELOPMENT PLAN & EROSION CONTROL PLAN E SECTION B - STORMWATER TI N PLAN - O POLLUTION PREVEN CONSTRUCTION PHASE B1 DESCRIPTION OF POTENTIAL POLLUTANT SOURCES - POTENTIAL POLLUTANTS FROM CONSTRUCTION ACTIVITY SUCH AS ASPHALT FROM PAVING; CONCRETE FROM CURBING, SIDEWALKS, AND DUMPTSTER PAD; OIL, GREASE, ANTIFREEZE, GASOLINE AND DIESEL FUEL FROM CONSTRUCTION EQUIPMENT; SOIL EROSION , FERTILIZER RTILIZER AND PESTICIDES FROM LANDSCAPING AND TRASH SHOULD BE PROPERLY ATTENDED TO TO REDUCE THE CONTAMINANTS FROM ENTERING THE STORM SYSTEM. TRASH SHOULD BE CLEANED UP TO REDUCE CLOGGING OF STORM SYSTEMS AND REDUCE POTENTIAL BACTERIA AND /OR OTHER BIOLOGICAL AGENTS FROM ENTERING IN THE STORM SYSTEM. B2 SEQUENCE DESCRIBING STORMWATER QUALITY MEASURE IMPLEMENTATION RELATIVE TO LAND DISTURBING ACTIVITIES - SEE CONSTRUCTION SEQUENCE ON THIS SHEET. B3 CONSTRUCTION ENTRANCE - SEE EROSION CONTROL P LAN AND N SEE DETAIL SHEET 41. H 64 SEDIMENT CONTROL PLAN FOR SHEET FL OW AREAS - SEE EROSION CONTROL PLAN B5 SEDIMENT CONTROL PLAN FOR CONCENTRATED FLOW AREAS - SEE EROSION CONTROL PLAN B6 STORM SEWER INLET PROTECTION MEASURE R LOCATIONS AND SPECS SEE EROSION CONTROL PLAN B7 RUNOFF CONTROL MEASURES - SEE EROSION CONTROL PLANS B8 STORM WATER OUTLET PROTECTION SPECS - SEE EROSION CONTROL PLAN B9 GRADE STABILIZATION STRUCTURE LOC ATIONS AND SPECS - SEE EROSION CONTROL PLAN N TION DETAILS - 1 CONSTRUCTION B 0 STO RMWATER DUALITY CO SEE EROSION CONTROL PLAN 811 TEMPORARY SURFACE STABILIZATION METHOD FOR EACH SEASON - SEE SEASONAL SOIL PROTECTION CHART 812 PERMANENT SURFACE STABILIZATIONS - SEE SEASONAL SOIL PROTECTION CHART B13 MATERIAL HANDLING AND SPILL PREVENTION PLAN - SEE OPERATION AND MAINTENANCE MANUAL FOR BEST MANAGED PRACTICES POS T CO NSTRUCTION WATER QUAILITY MEASURES AND SPILL PREVENTION. B14 MONITORING AND MAINTENANCE GUIDELINES FOR EACH STORMWATER QUALITY MEASURE - SEE STORMWATER QUALITY CONSTRUCTION DETAILS B15 EROSION & SEDIMENT CONTROL SPECS - SEE SHEET NUMBER C502 2 " -3" CLEAN STONE 1 2 " -3" CLEAN STONE _ - - 2:1 = 2:1 3' = _ 2:1- 2:1 3, 3 - FLOW 3' FLOW_ FILTER 7FAB I S FILTER /IEW) FABRIC - RIP RAP (DOWNSTREAM VIEW) 2 ACRES OR LESS OF DRAINAGE AREA 2 -10 ACRES OF DRAINAGE AREA SETTLEI.IEII_ GCMF _TL IL R'`rTECTEC - -ET� % -6" FnE -50ARC - - �' -- DESK . - -- - I - - I TEMPORARY DIVERSION SWALE SECTION (NO SCALE) a _ Ev0 n, -N TON OF BADE ROCK CHECK DAM (NO SCALE) :IJTLCI- PIN -PAP _ _ -E °E OR LES`_ PER INL'_ _ - EYIS ' .- ==-DE T, RLTE� _ SEE P.,='. r,= DEPTH (CPO TEMPORARY ROCK CHECK DAM W/SEDIMENT TRAP - (NO SCALE) f: Lk �_ d;,,_' TKF r.. -- iF, DAM' h,,11; 4TFC k? LAC - _ T, NA6T -�,4r _'GH T'E _41'. AND - - ro %, - � ,�.�� as NEE_ -_' MAINrh11. SE 1?Ef TABIL'= EkOS,L; __,;TANT NEECEL 7 SECTION C - STORMWATER POLLUTION PREVENTION PLAN - POST - CONSTRUCTION PHASE C1 DESCRIPTION OF POLLUTANTS AND THEIR SOURCES ASSOCIATED WITH THE PROPOSED LAND USE - POTENTIAL POLLUTANTS FROM POST- CONSTRUCTION ACTIVITY SUCH AS NUTRIENTS & PESTICIDES; SANDS AND SALTS FROM SNOW REMOVAL; OIL, GREASE, ANTIFREEZE, ETC. FROM VEHICLES INCLUDING HEAVY METAL FROM BRAKE PAD WEAR SHOULD BE PROPERLY ATTENDED TO TO REDUCE THE CONTAMINANTS FROM ENTERING THE STORM SYSTEM. TRASH SHOULD BE CLEANED UP TO REDUCE CLOGGING OF STORM SYSTEMS AND REDUCE POTENTIAL BACTERIA AND /OR OTHER BIOLOGICAL AGENTS FROM ENTERING IN THE STORM SYSTEM. C2 SEQUENCE DESCRIBING STORMWATER QUALITY MEASURE IMPLEMENTATION - AFTER FINAL GRADING OF PONDS & OUTLET STRUCTURES FINAL SEED POND BANKS WITH RECOMMENDED NATIVE SEED MIX. RIP -RAP TO BE INSTALLED AT TIME OF SWALE CONSTRUTION. C3 DESCRIPTION OF PROPOSED POST - CONSTRUCTION STORMWATER QUALITY MEASURES - DETENTION BASINS A T LOCATIONS; W RIP RAP INSTALLED T OUTLE LOC NS' OUTLET 0 WITH CONTROL STRUCTURE INSTALLED AT EXISTING LAKE OUTLET; GRASS SWALES, COMMON AREAS WITH TREES AND MINIMIZATION OF LAND DISTURBANCE. NATIVE PLANTINGS ON POND BANKS (SEE CHART ON SHEET C501). MOWING AND NUTRIENT APPLICATIONS TO BE KEPT AT A MINIMUM. C4 LOCATION, DIMENSIONS, SPECIFICATIONS, AND CONSTRUCTION DETAILS OF EACH STORM WATER QUALITY - MEASURE LAKE SM S W LOCA TED SOUTH OF LION AND ON CREEK A THE WEST PROPERTY LINE. - LAKE SM -S -SW LOCATED SOUTH OF LAKE SM -S -W AND ON R K THE WEST PROPERTY LINE. L E - LAKE LOCATED S D N THE SO A SOUTH PROPERTY SOUTH OF LION CREEK f 0 LINE. - LAKE SM -S -SE LOCATED SOUTH OF LION CREEK AND IN THE SOUTHEAST CORNER OF PROPERTY ALONG WEST ROAD. - LAKE SM -S -E LOCATED SOUTH OF LION CREEK AND NORTH OF LAKES SM -S -S & SM -S -SE - LAKE SM -N -N LOCATED NORTH OF LION CREEK AND THE NORTH CENTER OF THE PROPERTY. - LAKE SM -N -E LOCATED NORTH OF LION CREEK AND EAST OF LAKE SM -N -N. - LAKE SM -N -NE LOCATED NORTH OF LION CREEK AND IN THE NORTHEAST CORNER ALONG A W OF PROPERTY LO � ES T ROAD. C5 DESCRIPTION OF MAINTENANCE GUIDELINES FOR POST CONSTRUCTION STORMWATER QUALITY MEASURES - THE PONDS AND STORM SYSTEM TO BE MAINTAINED BY OWNER. ROUTINE INSPECTION AND MAINTENANCE AS REQUIRED. LOCAL VACTOR COMPANY TO REMOVE SEDIMENTS, OIL AND OTHER FLOATABLE POLLUTANTS WITH A VACTOR. DISPOSE OF ALL WASTE IN ACCORDANCE WITH IDEM. SEE THE WOODS AT LIONS CREEK OPERATION AND MAINTENANCE MANUAL FOR BEST MANAGED PRACTICE(S) AND POST CONSTRUCTION WATER QUALITY MEASURES. SHALL CONSIST OF ASPHALT THE CONSTRUCTION S L ALT PAVEMENT WITH CONCRETE CURB AND GUTTER, ENCLOSED STORM SEWERS AND SWALES, EARTHEN PADS FOR FUTURE HOUSING AND PUBLIC UTILITIES. THE CONSTRUCTION SEQUENCING SHALL BE AS SHOWN ON THE TABLE BELOW. NOTE: BEFORE CO NSTRUCTION EVALUATE MARK, AND PROTECT IMPORTANT TREES AND ASSOCIATED ROOTING ZONES, UNIQUE AREAS (E.G. WETLANDS), TO BE PRESERVED IF APPLICABLE, AND VEGETATION SUITABLE FOR FILTER STRIPS, ESPECIALLY IN PERIMETER AREAS. CONSTRUCTION SEQUENCE: A. PRIOR TO CONSTRUCTION ON SITE THE FOLLOWING INFORMATION SHALL BE PROVIDED ON SITE: 1. SIGNAGE NOTIFYING AREA RESIDENTS OF CONSTRUCTION ACTIVITY. IGNAGE SHOWING LOCATION OF 2. S 'TIE LOCATION ENTRANCE. SAID SIGNS SHALL BE PLACED AT WES1 ROAD ENTRANCE. ADDITIONALLY, NOTIFICATION TO INDIANA DE PARTMENT OF ENVIRONMENTAL MANAGEMENT AND HAMILTON COUNTY SOIL &WATER DISTRICT SHALL BE PROVIDED TO INCLUDE NAME OF PERSON FOR CONTACT AND SITE CONSTRUCTION UPDATE REPORTS. A PRE - CONSTRUCTION MEETING IS TO BE ARRANGED AT SITE ANY CONSTRUCTION ACTIVITIE' PRIOR TO o. B. CONSTRUCTION ACCESS DRIVE - TOP SOIL STRIPPING & STONE PLACEMENT SHALL BE INSTALLED AS SHOWN ON PLANS AT ENTRANCE FROM WEST ROAD. CONCRETE WASHOUT AREA TO BE INSTALLED AND MARKED AS SHOWN. C. PERIMETER EROSION CONTROL - SILT FENCING TO BE INSTALLED ALONG PERIMETER OF N AS WELL AS THE BANK BOUNDARY LINES D L E S OF LION CREEK. TEMPORARY SWALE AND SILT BASINS TO BE PLACED ALONG BANKS OF CREEK AS SHOWN ON PLANS. BASINS TO BE BUILT PRIOR TO AND IN PLACE PRIOR TO ANY LAND DISTURBANCE ON TRACT. D. EARTHWORK - TOP SOIL FOR LOTS SHALL BE STRIPPED AND SPREAD IN AREAS REQUIRING FILL. TEMPORARY SEED IN G S H ALL TAKE PLACE T O DISTURBED AR EAS THAT REMAIN UNALTERED FOR MORE THAN 15 DAYS. MASS EARTHWORK SHALL BEGIN ON LAKES. DIRT FROM LAKE AREAS TO BE SPREAD IN AREAS WHICH REQUIRE FILL AS DESIGNATED ON SITE DEVELOPMENT PLAN. STREET IN TO B COMPLETED AS CONSTRI GRADING E 1CTION PROGRESSES. FINISH GRADING OF POND BANKS DISTURBED COMMON AREAS AND REAR YARDS TO BE SEEDED IMMEDIATELY. ALL EARTHWORK OVER PIPELINES SHALL BE DONE IN STRICT ACCORDANCE WITH MARATHON & BUCKEYE PIPELINE GUIDELINES. E. SANITARY SEWER - INSTALLATION OF GRAVITY SEWER SHALL BEGIN WITH "OFF-SITE" SEWER FROM CLAY TOWNSHIP REGIONAL INTERCEPTOR LOCATED WEST OF CONSTRUCTION SITE, AND CONTINUE WITH SANITARY SEWER ON SITE CONSTR T TEMPORARY A LITTON. DISTURBED AREAS 0 BE SEEDED S CONSTRUCTION IS COMPLETED. LATERALS TO EACH LOT TO BE PUT IN PLACE AS MAIN LINE 15 AS -BUILT INFORMATION I ENGINEERING P CONSTRUCTED. S TO BE PROVIDED TO CTE ENG NEER NG N U 0 F EVERY THIRD MANHOLE COMPLETION 0 SET. F STORM SEWER - CURB INLETS YARD INLETS, STORM PIPES &STREET UNDERDRAINS SHALL BE CONSTRUCTED AS WARRANTS. LAKE CO NTROL STRUCTURES TO BE INSTALLED WITH CONSTRUCTION OF INDIVIDUAL LAKES. PROTECTION TO BE PUT IN PLACE AS NOTED IN "C" ABOVE. SILT FENCING PUT IN PLACE AROUND YARD INLETS PER DETAIL. GRAVELBAG CURB PROTECTION PLACEMENT AT STREET INLET LOCATIONS. SWALES TO BE SEEDED AND MULCHED BEFORE STREET CURBS ARE STARTED AND PIPES INSTALLED. G. UTILITIES - COORDINATION WITH UTILITIES FOR WATER MAINS, GAS LINES, TELEPHONE, CABLE N AND ELECTRIC LINES TO TAKE PLACE AS WORK PROGRESSES. PROPER GRADING AND SEEDING TO BE INSTALLED UPON COMPLETION OF INSTALLED UTILITIES. H. PAVEMENT - LIME STABILIZATION INSTALLATION OF CONCRETE CURBS AND ASPHALT LAYERS TO BE PUT IN PLACE. EROSION CONTROL STRUCTURES SUCH AS SILT FENCE AND GRAVELBAGS SHALL BE ADJUSTED TO ORIGINAL LOCATIONS AND REPAIRED IF NEEDED. TEMPORARY SEEDING TO BE PUT IN PLACE ALONG BACK OF CURB IN ACCORDANCE WITH STATED PLANTING CHART. I. FINISH GRADING - FINISH GRADES WITH SEEDING REQUIREMENTS TO BE COMPLETED, AND EROSION CONTROL BLANKETS AROUND LAKE AREAS AS SHOWN ON PLANS. RIP -RAP TO BE INSTALLED AND /OR INSPECTED IF PREVIOUSLY PUT IN REQUIRED LOCATIONS. PERMANENT SEEDING TO BE PLACED IN ACCORDANCE WITH EROSION CONTROL PLAN AS SHOWN. J. CLEANUP - CONTRACTOR SHALL REMOVI ALL EXCESS MATERIALS, REGRADE AND STABILIZE ALL AREAS OF DISTURBANCE BY UTILITY INSTALLATION. RESEED AREAS ALONG CURBS IF REQUIRED. CONCRETE WASHOUT AREA TO BE COMPLETELY CLEARED AND CLEANED OF ANY UNWANTED MATERIALS; WASHOUT SIGN TO BE REMOVED. ALL INLETS AND END SECTIONS TO BE CHECKED AND CLEANED OF ALL OBSTRUCTIONS WHICH WOULD HINDER STORM FLOWAGE. K. FINAL LANDSCAPING - INSTALL AND FINISH LANDSCAPING IN AREAS OF COMPLETED CONSTRUCTION. L INDIVIDUAL BUILDING CONSTRUCTION - REFERENCE DETAIL SHOWN ON THIS SHEET FOR EROSION CONTROL PRACTICE PLAN AND ANY SPECIFICATIONS DURING CONSTRUCTION OF TYPICAL SINGLE FAMILY DWELLING UNDER CONSTRUCTION. M. PERMANENT SEED ALL AREAS OF DISTURBANCE. y� HOLEY MOLEY SAYS "DIG SAFELY" "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1- 800 -382 -5544 CALL TOLL FREE PER INDIANA STATE TAW IC 8 -1 -26, IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. EROSION CONTROL PLAN PLAN NOTES F- S F S F- EROSION CONTROL SPNCEFICATIONS \JlT :� c -agrec as ar attempt {o prevent any and all sed,nent :ham - notruction site by way of erosion If erosion of sedme�t PS _ is 'ob,ng pace, the owner shall take preventative actwn t \ T-, vngreer snall Le consulted in the event this hoppers r / TcEE ) P - = - _-d s to be a lied to an graded area that wid remcu / _ I 57TCT1'icE � �g FF Y 9 -T, �icE � l _ a - e.tended p,nod at time ana s to be applied immediately to areas that na,e - - - - "mshed anode '� ^q �egeto *.Tan on the site whenever and wherever pc�sia,e PS . en' _o1'unng mec =ures are to be implemented prior t, the - -h, area they are intended fo serwc. r -t -o, n,easares proposed are t,, be properly mmntD,nrd t_ - _r e'r -_trve nos PS .; i, „ :.,rs during Dei-ember, January, February dormant seedina "II 1 - used. PS PS is 1 -, ..rarhe;, beep lawns watered with sprinklers or other apprcred c- Env areas nDt germinating or damaged at intervals as ma, __ - - -H• I Iq to seasonal condition ono; r,r construction aet�,d" Wa• -r _ ___. Di,_, l;, -L-PE` Cn necessary weeoing unlit full stand of grass has been _ :J.rG - _1.iFLE -r'. cctc and m ..o aintenance of the erosion nfrol is the s.-1- cintractor and /or owner n ce :',e :ontractor's and /or owner's responsibility to -nimre ,>, on -site construction activities) from being deposited ova L c, n, receivina streams /ditches in strict compliance wtn construction activity stormwater runoff contr:l It LL V7 - w V T = �t 7 e _antra, tar's ar owners respons,bility to obtain any DTTrcva;s m fPe authority and to submit a complete Notice If Intent - C•frr- o` 'Water Management, Indiana Department e,f Dr,ir�nmenti, art P$ < e, ar pr to any construction octivrty h�, �; „ _aRasE P _j� G' ,L° ue1ksU etone ynsttuJion entrance(s) to site T'on- �,G t/7 .e the contra.ac.'s ana,st owners responsbwty to on -nl - _ _ o�m :. as for each b'. The builder may implement o ditf�rem car as cng as it meet or exceeds Rule 5 regalat,ans PS v_ PS PS - INDIVIDUAL LOT EROSION - CONTROL PLAN PLAN _ - E : LEGEND ��-�, - - - ► - FIIIISH -FADE /WATER FLOW tam _TTEP .PD t,1E - - PPOPETY LINE]DRAINAGE SWALE �TE, PEPMANENr SEEDING RAP /GRAVEL DP.IVE /EXIT PAD _ J __IFB IIILET PROTECTION (SEE DETAIL) SAMPLE EROSION /SEDIMENT CONTROL PRACTICE PLAN ® SILT FEN,-.E Box AROUND FOR A TYPICAL ONE/TWO FAMILY DWELL_ ING BEEHIVE NLE;S (SEE DE`AIL) UNDER CONSTRUCTION - _ - ,�;.T EEIIi=E • ,-y No 00 � C; U �p M C4 P4 z 00 00 V�,�,,� taro Men000 U U O �z W 4 a a I rA a 0 a> V O V1 00 Q W W a W O U V a z O p� O o z o �- m z - - ° c- w ¢ ., < 'r z w G C c. i J_ CD w z � 0 J.I Z z o c o IFL'I Q 1ST4 EO 411 NO. = _ 8827 .. STATE OF N011 7 SS/ONAL` I'C�\\\\��. ALLAN H. WEIHE P E. 8827 e 1 0 �n 0 v 1 � z O � a M r c �-I z W� O� z N � i O SHFFT NO. C503 PROJECT NO. W06 -0031 Q