Loading...
HomeMy WebLinkAbout06060001.361, 1 ar 0 ,J w n- .0 3 0 0 0 0 vi San M HH G.0.#34 T.C.- 872.39 E Inv -856.1 SW Inv -856.2 WATER AND SEWER UNDER CITY STREETS Bedding, Hounching, Initial Backfill Bedding, hounching, initial backfill materials, placement and compaction for water mains, water service laterals, sanitary mains and sanitary service laterals shall be in accordance with the standard practice of the utility that has jurisdiction over the installation. Final Backfill Final backfill for water mains, water service laterals, sanitary mains and sanitary service laterals under and within 5 —feet of pavement shall be B— Borrow for Structure Backfill meeting the material requirements of the INDOT and shall be compacted in 6 —inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6— inches of the excavation below the start of the aggregate subbase of the pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be compacted to not less than 95% Standard Proctor Density. If the standard practice of the utility that has jurisdiction over the installation has a more stringent final backfill requirement, the more stringent requirement shall govern. MINIMUM COVER FOR PIPE CROSSINGS OF CITY STREETS For installation of Storm Mains, Water Mains, Sanitary Mains, Water Service Laterals, Sanitary Sewer Laterals under City streets, regardless of the jurisdiction of the utility, the minimum cover from the top of the installed pavement to the top of the installed pipe shall be the pavement section practice of the utility that has jurisdiction over the installation has a more stringent cover requirement, the more stringent requirement shall govern. MATCH PREVIOUS SHEET `Ex. Sor 11H G.O.# i R =: r uH G.O.r_ T. C.- 882.08 ' :-89C.16 W Inv -869.8 13 9 E Inv -871.3 vE -89'3 BUCKEYE NOTE: NO WORK WITHIN 25 FEET OF BUCKEYE'S PIPE-INE, INCLUDING DEMOLITION AND CONSTRUCTION ACTIVITIES, SHALL BE CONDUCTED WITHOUT THE PRESENCE OF A BUCKEYE INSPECTOR BUCKEYE PIPELINE MR. ED GARZA BUS. 291 -3121 CELL 502 -2029 452-7 N. MERIDIAN ROAD HUNTINGTON, INDIANA 46750 MARATHON PIPELINE MR. DEREK SHEETS BUS. 291 -9460 CELL 432 -4356 10722 EAST C.R. 300 NORTH INDIANAPOLIS, INDIANA 46234 NOTE: NO VALVES WILL BE PERMITTED UNDER PAVEMENT. COMMON AREA 19A ffKi•N \u1 Zf = EXIST. FIRE HYDRANT • = EXIST. WATER METER .. = EXIST. WATER VALVE Z = EXIST. YARD SPIGOT n = EXIST. MONITOR WELL ® = EXIST. GAS METER va = EXIST. GAS VALVE o = EXIST. STORM INLET X = EXIST. ELECTRIC METER ■ = EXIST. POWER POLE ■ = EXIST. POWER POLE W /LIGHT ■ = EXIST. POWER POLE W /TRANSFORMER • = EXIST. LIGHT POLE = EXIST. GUY ANCHOR In = EXIST. TELEPHONE PEDESTAL O = EXIST. MANHOLE = EXIST. SANITARY SEWER LINE ao = EXIST. STORM SEWER LINE - -- = RIGHT -OF -WAY LINE = SWALE — — — — = PROPOSED SANITARY SEWER LINE = PROPOSED STORM SEWER LINE = PROPOSED MANHOLE Y = PROPOSED FIRE HYDRANT SCALE: 1 = 60 0 30 60 120 � � U O d O a z d � U 5 �w >o� how Qw, � LO =4 - w 0 0 0 .A �m D � U O � O Iz ID a�U r HC E1' MOLEY SA ✓� "DIG SAFELY" "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE KO�,, DIG 1- 800 - 382 -5544 CALL TOLL FREE PER INDIANA STATE LAW IC 8 -1 -26. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING V ORK. CITY OF CARMEL UTILITY PIPE INSTALLATION All work shall be in the best practices of the water utility industry and the American Water Works Association, and in accordance with all applicable federal, state, and local codes and regulations. Furthermore: 1) Any damage done to the City of Carmel Utility's system by the contractor of his affiliates shall immediately be repaired, to the satisfaction and direction of the City of Carmel Utility by the contractor at his own expense. 2) Should the contractor propose to depart from the specifications contained herein, he shall submit samples arid/or specifications of such alternatives to the City of Camel Utility before proceeding. 3) No work shall be performed under conditions which in the opinion of the City of Carmel Utilities would adversely affect the quality of the finished job. 4) The contractor shall conduct his work so as not to interfere with the present operation of the City of Carmel Utility's water /sanitary sewer system. If any work interference is encountered between the City of Carmel Utility and the contractor, the City of Carmel Utility will receive priority in scheduling. CITY OF CARMEL WATER UTILITY DEVELOPER INSTALLED WATER MAINS 1) Contractors shall call City of Carmel Utility for an on —site pre— construction meeting before work begins. Contractor mush have approved plans on —site and all materials to be used must be approved by a City of Carmel Utility inspector. 2) Contractor will allow inspection by City of Carmel Utility inspectors during the construction of the water maid extension and will honor the City of Carmel Utility's request for field changes in main extensions related to location, workmanship and materials as they relate to City of Carmel Utility standards and specifications. 3) The contractor will have water main extensions pressure tested per City of Carmel Utility specifications and witnessed by City of Carmel Utility's inspector. 4) The contractor will conduct the disinfection of water main extension, with direct supervision by a City of Carmel Utility operator. 5) Only after the water mian extension passes the City of Carmel Utility's laboratory testing, and two (2) sets of as —built plans have been turned in the City of Carmel Utility, will the water be turned on by the City of Carmel Utility. CITY OF CARMEL UTILITY STANDARD NOTES: 1) Absolutely no Kennedy fire hydrants or valves are allowed. 2) Only Tyler valve boxes are allowed. 3) Ductile iron pipe in lengths of 20 feet is the only length allowed. 4) Posi —caps or the equivalent are required on all water valve installations. 5) Tracer wire must be installed with all water main laid in Carmel. 6) Warning tape must be installed 12" to 18" above the water main. Note: 1) PVC pipe (6' in length) to be used to mark water service stub. 2) All bacteriological lab services to be billed to developer's contractor. GENERAL NOTES: 1) The contractor shall contact all applicable utilities and verify and and all fees associated with the installation of all utilities. 2) Provide thrust blocks for all water line bends and tees, including tab connection. 3) Contractor shall coordinate with water company for domestic and fire service. Connect to building domestic and fire line. Coordinate with plumbing drawings. 4) Coordinate location of electrical and telephone lines with local utilities. 5) Coordinate location and size of gas service connection and installation of service line and meter with gas company. 6) Coordinate locations and connections of building storm lines with mechanical /plumbing drawings. 7) Verify existing invert and location of sanitary sewer. Adjust inverts as required. Document any changes. 8) Maintain 10' horizontal and 18" vertical clearance between storm /sanitary sewer systems and domestic /fire line service. 9) Follow all local and state codes in reference to domestic /fire line installation and storm sewer /sanit(iry sewer installation. 10) Coordinate location of required conduits for light poles, telephone service and irrigation system. 1 1) Coordinate utility conduits with service providers. 12) Sanitary sewer laterals, water service, & electrical /telephone conduits shall be granular backfill for entire run. 13) There are to be no water valves or manholes plcaced within the pavement, curbs or sidewalks. NO 00 rA \0Co H U � 4A Z 00goI x ��d 00 V rM M 00 X w W V1 � �z W Z �a a Z ao a� M O A W W� W F r V� H � z W oz O QC .� o C] o Q G cn Q I ra w �I I i I I s I :f s� Z rn 0 z c° z >cn w x cD o N0. • 8827 • �0 ,. STATE OF �v /ON AL ALLAN H. WEIHE P.E. 8827 II w w a I � I � m O M� Al Z W� E-. o M a z c x Q ?HEET NO. C702 I PROJECT NO W06 -0031