Loading...
HomeMy WebLinkAbout06060001.8s v - � o 1 P(^1_PMn RIGHT -OF -WAY LINE STORM SEWER LINE — -- = SWALE = SANITARY SEWER LINE • p t 1 N = FLOW DIRECTION EXIST. CONTOURS o = STORM BEEHIVE INLET ❑ = STORM INLET T.C. = TOP OF CASTING INV. , a = REINFORCED CONCRETE PIPE 22 = POLNINYLCHLORIDE SANITARY SEWER PIPE M.H. = MANHOLE STR. = STRUCTURE D. &U.E. 10 R.D.E. ur i 0��� B.S.L. 895 0 V.W. r PROP. = PROPOSED ME = MATCH EXISTING TYP. = TYPICAL — = SUBSURFACE DRAIN AND SUMP LINE G.. 40 B.S.L. w m `° \ {� = FLOOD ROUTE 20 D. &U.E. = PROPOSED GRADE I \ 23 = PROP. SANITARY STURCTURE NO. z � 895.4 8 j = PROPOSED FIRE HYDRANT = PROPOSED WATER LINE VALVE 857.3 .0 M. F.P.G. = MINIMUM FLOOD PROTECTION GRADE OF PADS. MINIMUM GRADE FOR ANY STRUCTURE OPENING (DOOR, WINDOW /j \ \ 89, 0 ACCESS, ETC.) z ly, 894.6 � ur 39 2 \ 3 891 —� 893.8 r, �� y ME Rg NCY NE / 6 �, o app V�4 _ 8g3• o �, 4g � /C 889 P% � 8 •2 � 893 S NCY LA ' ; �- _ g 25 8 pg74 26 \ +00 � C PC ',6+ 496 NE F$Mj s Wq/k 890 .tc4 891.84 4l 5 D 8g j 891.3 �— �2� ur / 890 340' B.S.L. O 18 — 2 0 / 894.0 ' 19 o ag9.0 889.0 l ^_ J 1 ° gg9.0 CIRCULAR P.CIJL AR D = 60 °57'07 D Da = 38 °1 `'�� Da = 38 °11'50" CD = °. 19 --1 L = 88.21 E �0 HORIZONTAL SCALE.- R 4.c L = 150.00 159.57 R = L = 74.54 RC' 1„ =50 = Ln 1� _ I A 5 2.0 0 O �, PI Sta C4 +� .�� O N r °57.07 "L PI �. _ �� +8 .-1 CE 1.0 = 60 = 28`27' "H A PC Sta 23 +46.16 PC t - 4 ._ L D0 PT Sta = 25 +05.74 PT St 4- =.'''6 I S1 THE T(' 910 910 I 905 i O 7 M 9051 C6 N II II tLLJ 900 900 N VPI STA = 27 +00.00 11 U VPI EL 894.00 f WCURVE LEN = 100.00 895 895 i � 890 r —f -- I I i I I 890 i - 0 12" O RCP + Ln ° cv INV. .52 N M 1885 N C II 885 I I I cc~n w cn w � 1 880 U ' U ' 880 875 I i 875 I 870 I � ! 870 i I 711 00 J � 0.1 — ' C 865 rr OF � a r:, o C 0 07 x, � a- 0 03 ,� c" -0 ,o ;p � � 865 24 +50 25 +00 25 +50 26 +00 26 +50 27 +00 27 +50 28 +00 28 +50 1 P(^1_PMn RIGHT -OF -WAY LINE STORM SEWER LINE — -- = SWALE = SANITARY SEWER LINE • = SANITARY SEWER MANHOLE = FLOW DIRECTION EXIST. CONTOURS o = STORM BEEHIVE INLET ❑ = STORM INLET T.C. = TOP OF CASTING INV. = INVERT RCP = REINFORCED CONCRETE PIPE PVC = POLNINYLCHLORIDE SANITARY SEWER PIPE M.H. = MANHOLE STR. = STRUCTURE D. &U.E. = DRAINAGE AND UTILITY EASEMENT R.D.E. = REGULATED DRAIN EASEMENT B.S.L. = BUILDING SETBACK LINE V.W. = VARIABLE WIDTH PROP. = PROPOSED ME = MATCH EXISTING TYP. = TYPICAL — = SUBSURFACE DRAIN AND SUMP LINE G.. = WATER LINE w m = CONCRETE END SECTION {� = FLOOD ROUTE = PROPOSED GRADE STM STR #700 = PROP. STORM STURCTURE NO. SAN STR #900 = PROP. SANITARY STURCTURE NO. = EXIST. TREELINE = PROPOSED FIRE HYDRANT = PROPOSED WATER LINE VALVE 857.3 = PROPOSED PAD GRADE M. F.P.G. = MINIMUM FLOOD PROTECTION GRADE OF PADS. MINIMUM GRADE FOR ANY STRUCTURE OPENING (DOOR, WINDOW WELL, OUTSIDE BASEMENT STAIR ACCESS, ETC.) MINIMUM COVER FOR PIPE CROSSINGS OF CITY STREETS For installation of Storm Mains, Water Mains, Sanitary Mains, Water Service Laterals, Sanitary Sewer Laterals under City streets, regardless of the jurisdiction of the utility, the minimum cover from the top of the installed pavement to the top of the installed pipe shall be the pavement section thickness (all bituminous and aggregate material above the subgrade) plus 1' -0 ". If the standard practice of the utility that has jurisdiction over the installation has a more stringent cover requirement, the more stringent requirement shall govern. CITY OF CARMEL STANDARD BACKFILL NOTES: STORM SEWERS Bedding, Haunching, Initial Backfill Bedding, haunching and initial backfill for all RCP installations shall be B- Borrow for Structure Backfill meeting the material requirements of the INDOT. Bedding shall be placed in the trench bottom such that after the pipe is installed to grade and line, there remains a 4 -inch minimum depth of material below the pipe barrel and a minimum of 3- inches below the bell. For pipe sizes 66- inches and larger, the minimum depth of material below the pipe barrel shall be 6- inches. Bedding, haunching and initial backfill shall be compacted in 6 -inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill shall be brought up evenly on both sides of the pipe for the full length of the pipe. Haunching shall extend to the springline of the pipe. The limit of initial backfill shall be 6- inches above the springline. Minimum trench width shall be the outside diameter of the pipe plus 18- inches. Final Backfill Final backfill for all RCP installations under and within 5 -feet of pa -ement shall be B- Borrow for Structure Backfill meeting the material requirements of the INDOT and shall be compacted in 6 -inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6- inches of the excavation below the start of the aggregate subbase of the pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be compacted to not less than 95% Standard Proctor Density. Final Backfill for all RCP installations greater than 5 -feet of pavement shall be clean fill material free of rocks larger than 6-inches in diameter, frozen lumps of soil, wood or other extraneous material, compacted in 12 -inch maximum lifts to not less than 90% Standard Proctor Density for the entire depth of the excavation. CITY OF CARMEL_STANDARD BACKFILL NOTES WATER AND SEWER UNDER CITY STREETS Bedding, Haunching, Initial Backfill Bedding, haunching, initial backfill materials, placement and compaction for water mains, water service laterals, sanitary mains and sanitary service laterals shall be in accordance with the standard practice of the utility that has jurisdiction over the installation. Final Backfill Final backfill for water mains, water service laterals, sanitary mains and sanitary service laterals under and within 5 -feet of pavement shall be B- Borrow for Structure Backfill meeting the material requirements of the INDOT and shall be compacted in 6 -inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6 -inches of the excavation below the start of the aggregate subbase of the pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be compacted to not less than 95% Standard Proctor Density. If the standard practice of the utility that has jurisdiction over the installation has a more stringent final backfill requirement, the more stringent requirement shall govern. MINIMUM COVER FOR PIPE CROSSINGS OF CITY STREETS For installation of Storm Mains, Water Mains, Sanitary Mains, Water Service Laterals, Sanitary Sewer Laterals under City streets, regardless of the jurisdiction of the utility, the minimum cover from the top of the installed pavement to the top of the installed pipe shall be the pavement section. practice of the utility that has J urisdiction over the installation has a more stringent cover requirement, the more stringent requirement shall govern. HORIZONTAL SCALE - 1"=50' O O O O N � r- O �U1V11IFJL AREAB � Lx Tll��, ��r,.� =T�or1 ,,, ° UIPEu:�L L, _ 33' LF � = 38,' I I t'0' y r `- 4 .., G C Fl U z U� w z' w' W x •-� %0 00 X00` ITITV) 00 00 4T o M M 00 i ww O 00 W� W� r H aQ W 0� Z O V'1 o� J H W U �i a U W� �z A4s 1 � ao W� ay z xa W V W U x �1 w f. a N • W ''''�, Q. L tiF N0. ' • 8827 • STATE OF O�� .. A A!DIANP sS/ONAL 1F'0�`�``� ALLAN H. YIEIHE P E 8827 W W C/I O ti N `-4 V O O SHEET NO I I w� .w i Iwo I - z it NO I z Z z S � rw, C203 PROJECT NO W06 -0031 I- �r V) C) UD C o cO r. d G.. Cam'. C x G _ O x �1 w f. a N • W ''''�, Q. L tiF N0. ' • 8827 • STATE OF O�� .. A A!DIANP sS/ONAL 1F'0�`�``� ALLAN H. YIEIHE P E 8827 W W C/I O ti N `-4 V O O SHEET NO I I w� .w i Iwo I - z it NO I z Z z S � rw, C203 PROJECT NO W06 -0031 I-