Loading...
HomeMy WebLinkAbout08030101.1Q I c0 i Q 12 8� ■ FRONT ELEVATION SCALE 1/4" s I'-0" REAR ELEVATION W-g-M 1/4" - I' -0" 11 f� Q S�cc AWAI NM PAR' 6" GUTTER BOARD Cps CROUM IXil FRIEZE 2X4 ON DC4 CAP GROWN HEAD PC 4' SIDE TRIM 4" BOTTOM TRIM IX4 TRIM ON SMOOTH PANEL - — - - T Q>! PANELED COLUMN 6' RAIL POST WOOD RAIL WOOD DECK LATTICE 7 b" GUTTER BOARD 8" FRIEZE MD. b" TRIM BOARDS - 10" BAND BOARD' =J M Lam' MIMI REAR ELEVATION "COMPLETE'' SCALE= 1/4'- I' -0" ROOF FRAMING PER IRC 2003 4 INDIANA STATE AMENDMENTS, SECTION 802, PURLIN BRACING PER SECTION 802.5,1 4 FIGURE 802,5.1 ROOF TRUSS SYSTEM PER IRC 2003 4 INDIANA AMENDMENTS SECTION 502.11 NOTE: VENTILATE ROOF TO I /30OT14 OF INSULATED OILING AREA TYPICAL TRUSS ROOF: SHINGLES AS SPECIFIED 1/I6" ROOFING SHEATHING w/ 'H' CLIPS 2x8 BLOCKING AT PEAK PRE- ENGNEERED TRUSSES a 24" o,o, 2x4 TRUSS BRACING R40 BATT INSULATION 4 6 roll POLY Y.B. 5/8" CEILING BOARD TAPED 4 SANDED TYPICAL 2X4 SIDING EXTERIOR FIBER CEMENT SMOOTH SIDING 1/16 " WALL SHEATHING 2x4 STUDS • 16" o,c. R13 BATT INSULATION 6 MIL POLY :'.8. 1/2" DRYWALL TAPED AND SANDED U� ISING d lil dl t4o 1 e5� LL TYPICAL SILL ASSEMBLY: \ V2" DIA, X 18" ANCHOR BOLT • 48" o,c. 12' MIN. FROM EA. CORNER 2x4 PRESSURE TREATED SILL PLATE 114" 6LL GASKET ALL PER IRC 2003 4 INDIANA AMENDMENTS SEC 403.1.6 2' RIGID FOAM TO BE USED PER IRC 2003 W/ STATE AMENDMENTS 8" CONCRETE BLOCK OR POURED CONCRETE WALL AND STEEL REBAR AS REQ'D PER IRC 2003 SEC 4OLI.1 4 INDIANA STATE AMENDMENTS 4" MIN. PEA FI! L OVER 6 MIL POLY VAPOR BARRIER VENTILATION AS REQUIRED TYPICAL SECTION SCALE: 1/2" = I' -0" ilk 1. Exterior Colors and materials, �a 2. Landscaping plan (must be submitted 60 days after construction start.) C� N �p l � � GRADE O Q IV �E Z � � M C4 16" WIDE x 8" DEEP CONCRETE FOOTING e/w 2 - RUNS 45 REBAR, PER IRC 2003 4 INDIANA AMENDMENTS SEC 403 We 3$ � ,/ 01! 0 DATE: 02 -22-08 DRAWN BY: J.HOLLEY SCALE: AS SHOWN REVISIONS: 02 -22 -08: FINAL PLANS 03-06 -08: REVISIONS PER A.R.B. JU 3 LLpp J Qf E9 -" C o - Q qj mq �m�► 0 00 00 _ • ry 41 V T 0 Qm m • S 3 Q) T } m V Q N 0 0 4 Q� = V D V a c D Opt m 4 0 m n $ Ln s 0 °u m m o� mom��m .�...1 WIT 00 M "C _ ocs E6 C3 �QU 2:X 00 I M I.j 01! 0 DATE: 02 -22-08 DRAWN BY: J.HOLLEY SCALE: AS SHOWN REVISIONS: 02 -22 -08: FINAL PLANS 03-06 -08: REVISIONS PER A.R.B. UI I 00 00 _ • ry 41 � _ 01! 0 SWEET 1 DATE: 02 -22-08 DRAWN BY: J.HOLLEY SCALE: AS SHOWN REVISIONS: 02 -22 -08: FINAL PLANS 03-06 -08: REVISIONS PER A.R.B. SWEET 1