Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Gibraltar - Motor Court Exterior Wall - $40,790
Regions Bank hereby is instructed to make a disbursement of Loan Proceeds from the Borrower Loan Account to (or for the account of) Borrower in: (a) the amount of the "Total Authorized Disbursement" line in the "Amount of Authorized Disbursement" column below; and (b) accordance with the terms and conditions of the Agreement, the other Loan Documents, and the Disbursement Instructions. Purpose of Authorized Disbursement Amount of Authorized Disbursement Amount to be paid by Carmel Theater Development Company as per the Motor Court Exterior Wall installment purchase contract Application 5(Gibraltar) June 2012 $ 27,100.00 Application 6(Gibraltar) August 2012 $ 13,690.00 Total Authorized Disbursement $ 40,790.00 , All terms used in these Disbursement Instructions without definition shall have the meanings ascribed thereto in that certain Loan Agreement (Equipment and Improvements), dated July 22, 2010, by and between Re ions Bank and Carmel Theater Development Company, LLC. Dated: `7 (p I. CITY OF CARMEL REDEVELOPMENT COMMISSION By: Les S. Olds Printed: Executive Director Title: It is acknowledged and agreed by the parties that CRC has reserved the right to require, as a condition of authorizing disbursement of Loan Proceeds from the Borrower Loan Account to (or for the account of) Borrower: (a) completion of a satisfactory inspection by CRC of the portions of the Equipment and/or the Improvements to which the disbursement relates; and (b) receipt of customary submittals. Motor Court Exterior Wall (Gibraltar Construction) October 2011 Application 1 Paid by Carmel Theater Development $ 39,645.00 November 2011 Application 2 Paid by Carmel Theater Development $ 99,005.00 January 2012 Application 3 Paid by Carmel Theater Development $ 16,542.50 April 2012 Application 4 Paid by Carmel Theater Development $ 4,417.50 June 2012 Application 5 Amount to be paid by Carmel Theater Development $ 27,100.00 August 2012 Application 6 Amount to be paid by Carmel Theater Development $ 13,690.00 ! AIA Document G732 TM - 2009 • RECT JUL 0 9 2012 Application and Certificate for Payment, Construction Manager as Adviser Edition TO OWNER: Carmel Theater Development Company PROJECT: Motor Court P112 Veneer APPLICATION NO: ,519: DISTRIBUTION TO: — 11711 North Pennsylvania Street,Suite 200 OWNER _ Carmel IN 46032 PERIOD TO CONSTRUCTION MANAGER 6/29/12 FROM Gibraltar Construction Corp VIA CONSTRUCTION CONTRACT DATE: 7/5/11 ARCHITECT CONTRACTOR: _ 2932 N.Webster Ave. MANAGER: PROJECT NOS: / / CONTRACTOR — Indianapolis,IN 46219 FIELD _ CONTRACT FOR: Motor Court P112 VIA ARCHITECT: Pedcor Design Group OTHER CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge,information and belief the Work covered by this Application for Payment has been completed in accordance with the • Application is made for payment,as shown below,in connection with the Contract. Contract Documents,that II mounts have been paid by the Contractor for Work for which previous AIA Document G703TM,Continuation Sheet,is attached. Certificates for Paymenti; er. issued and payments received from the Owner,and that current payment 1.ORIGINAL CONTRACT SUM $ 201,000.00 shown herein is now du. 2.NET CHANGES IN THE WORK $ 0.00 CONTRACTOR: Gi,r Ita onstruction Corp 3.CONTRACT SUM TO DATE(Line I±2) $ 201,000.00 By: II Date: ---_<---`1,09- 4.TOTAL COMPLETED AND STORED TO DATE(Column G on G703) $ 201,000.00 State of: /Jff 5.RETAINAGE: County of: /;f �:� BRIAN R. MCBRIDE a. %of Completed Work Subscribed an. �c/^ befog- ) ( �<^. Res of Hancock County (Column D+Eon G703f .': $ 13,690.00 me this / day of l ,GJ 7 My Comm. Ex;,. 11.29-2017 b. %of Stored Material Notary Public: - r• •D I P� Cci^!("!SSICf 011 611862 (Coleman F.017 G703) $ M Commission ex tires: _ —/� Total Retainage(Lines 5a+5h, Total in Column l on 6703) $ CERTIFICATE FOR PAYMENT . 6.TOTAL EARNED LESS RETAINAGE $ 187,310.00 In accordance with the Contract Documents,based on evaluations of the Work and the data comprising (Line 4 minus Line 5 Total) this application,the Construction Manager and Architect certify to the Owner that to the best of their 7.LESS PREVIOUS CERTIFICATES FOR PAYMENT 159,610.00 knowledge,information and belief the Work has progressed as indicated,the quality of the Work is in (Line 6f from prior Certificate) accordance with the Contract Documents,and the Contractor is entitled to payment of the AMOUNT 8.CURRENT PAYMENT DUE 1$ 27,700.09 I. CERTIFIED. � 9.BALANCE TO FINISH,INCLUDING RETAINAGE d7 ,00 AMOUNT CERTIFIED $ , (Attach explanation if amount certified differs from the amount applied.Initia7�nl figures on this (Line 3 minus Line 6) $ 13,690.00 Application and on the Continuation Sheet that are changed to conform with the amount certified.) CONSTRUCTIO■ MANAG g ture Construction,LLC By �ar t-∎ Date: 7 �� /d, SUMMARY OF CHANGES IN THE WORK ADDITIONS DEDUCTIONS ARCHI C .(NOT t4ultil e rio e Contractors are responsible for performating portions of the f Total changes approved in previous months by Owner $ $ Project, the nwr ect' er tt n is not requn-ed) Total approved this month,including Construction Change By 1 Date: r7 Directives $ $ Th Certific . ,rot-ego 'able.T'`4/11R,,lT C •TIFIED is payab oni to the Contractor named TOTALS $ $ here . Issuance,pz yment and accepta e of ay are ,ut preju ice t any rights of the Owner NET CHANGES IN THE WORK $ or Cot actor ider this Contract. / CAUTION:You should sign an original AIA Contract Document,on which this text appears in RED.An original assures that changes wil no •nob-:•red. AIA Document G732T"—2009(formerly G702T"CMa—1992).Copyright©1992 and 2009 by The American Institute of Architects.All rights reserved.WARNING:This AlA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlA®Document,or any portion of it,may result in severe civil and criminal penalties,and'will be prosecuted to the maximum extent possible under the law.Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright @aia.org• • to Document G7321M — 2009 Instructions Application and Certificate for Payment, Construction Manager as Adviser Edition GENERAL INFORMATION Purpose.ALA Document G732-2009,Application and Certificate for Payment,Construction Manager as Adviser Edition,is to be used in conjunction with AIA Document G703Tm-1992,Continuation Sheet.These documents are designed to be used on a Project where a Construction Manager is employed as an adviser to the Owner,but not as a constructor. Procedures for their use are covered in ALA Document A232TM-2009,General Conditions of the Contract for Construction,Construction Manager as Adviser Edition. Related Documents.AIA Document G703-1992. Use of Current Documents. Prior to using any ALA Contract Document,users should consult www.aia.org or a local AIA component to verify the most recent edition. Reproductions.This document is a copyrighted work and may not be reproduced or excerpted from without the express written permission of the AIA.There is no implied permission to reproduce this document,nor does membership in The American Institute of Architects confer any further rights to reproduce this document.The ALA hereby grants the purchaser a limited license to reproduce a maximum of ten copies of a completed G732-2009,but only for use in connection with a particular project.The ALA will not permit reproduction outside of the limited license for reproduction granted above,except upon written request and receipt of written permission from the AIA. Rights to reproduce the document may vary for users of AIA software. Licensed AIA software users should consult the End User License Agreement(EULA).To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects' legal counsel,copyright @aia.org. USING G732-2009 After the Contractor has completed AIA Document G703,Continuation Sheet,summary information should be transferred to AIA Document G732-2009,Application and Certificate for Payment,Construction Manager as Adviser Edition.The Contractor should sign G732,have it notarized and submit it,together with G703,to the Construction Manager and Architect.The Construction Manager and Architect should review G732 and G703 and,if they are acceptable,complete the Certificate for Payment on G732.The Construction Manager and Architect may certify a different amount than that applied for pursuant to Sections 9.5 and 9.6 of A232TM-2009.They should then initial all figures on G732 and G703 that have been changed to conform to the amount certified and attach an explanation.The completed G732 and G703 should be forwarded to the Owner. COMPLETING G703 Heading.This information should be completed to be consistent with similar information on AIA Document G732-2009,Application and Certificate for Payment,Construction Manager as Adviser Edition. Columns A,B and C.These columns should be completed by identifying the various portions of the Project and their scheduled value consistent with the schedule of values submitted at the commencement of the Project or as subsequently adjusted.The breakdown may be by sections of the Work or by Subcontractors and should remain consistent throughout the Project.Multiple pages should be used when required. Column C.Should be subtotaled at the bottom when more than one page is used and totaled on the last page. Initially,this total should equal the original Contract Sum.The total of;column C may be adjusted by Change Orders during the Project. Column D.Enter in this column the amount of completed'work'covered by the previous application(columns D&E from the previous application).Values from column F(Materials Presently Stored)from the previous application should not be entered in this column., Column E.Enter here the value of Work completed at the time of this application,including the value of materials incorporated into the project which were listed on the previous application under Materials Presently Stored(column F). !•' Column F. Enter here the value of Materials Presently Stored for which payment is sought.The total of the column must be ') recalculated at the end of each pay period.This value covers both materials newly stored for which payment is sought and/materials previously stored which are not yet incorporated into theVi-oject.'IVlere payment by the Owner for stored materials does not result.in a deduction from this column.Only as materials are incorporated into the Project is their value deducted from this column and,/ ' ' incorporated into column E(Work Completed-This Period),-". Column C. Enter here the total of columns D,E and F.Calcitlare the percentage completed by dividing column G by colurnn C. f Column H. Enter here the difference between column C7(Sche2laled Value)and column G(Total Completed and Stored to Date).' t' ;-t Column I.This column is normally used only for conti•"a`_ctS`wherevariable retainage is permitted on a line-item basis. It need nbt`be completed on projects where a constant retainage is wiihhdld from:the overall contract amount. • %A' Change Orders and Construction Change Directives;The amount of the original contract,adjusted by Change Orders and a'totnts authorized for Construction Change Directives as reflecfed1n;tine=2,is to be entered on line 3 of the G732 form. MAKING PAYMENT The Owner should make payment directly to the Contractoitliased On the amount certified by the Construction Manager and Architect on AIA Document G732-2009,Application and Certificate for.Pay`merit,Construction Manager as Adviser Edition.The completed form contains the name and address of the Contractor. Payment should not be made to any other party unless specifically indicated on G732. AIA Document G732TM—2009(formerly G702TMCMa—1992).Copyright©1992 and 2009 by The American Institute of Architects.All rights reserved. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA®Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright @aia.org. CONTINUATION SHEET Page 2 of 2 APPLICATION AND CERTIFICATE FOR PAYMENT,containing Contractor's signed Certification, is APPLICATION NO. : 5 attached. In tabulations below,amounts are stated to the nearest dollar. Use Column I on Contracts where APPLICATION DATE: 6/29/2012 variable retainage for line items may apply. PERIOD TO: 6/29/2012 ARCHITECT'S PROJECT NO. : A B C D I E F G H I WORK COMPLETED MATERIALS TOTAL ITEM FROM PREVIOUS PRESENTLY COMPLETED AND % BALANCE TO RETAINAGE NO. DESCRIPTION OF WORK SCHEDULED VALUE STORED(NOT IN STORED TO DATE FINISH APPLICATION THIS PERIOD ( (G/C) (C G) (IF VARIABLE RATE) (D+E) DORE) (D+E+F) Base Bid 1 Allowance $25,000.00 $25,000.00 $25,000.00 100% - 2 Mobilization $8,500.00 $8,500.00 $8,500.00 100% - 3 Submittals- Base Bid $13,550.00 $13,550.00 $13,550.00 100% - 4 Earth Moving $3,000.00 $2,000.00 $1,000.00 $3,000.00 100% - 5 Lawns and Grasses $1,100.00 $1,100.00 $1,100.00 100% - 6 Masonry $124,500.00 $124,500.00 $124,500.00 100% - 13,690.00 7 Electrical $18,850.00 $18,850.00 $18,850.00 100% - 8 Joint Sealants/Waterproofing $6,500.00 $5,900.00 .-$699 700 $6,500.00 100% - $201,000.00 $173,300.00 $299.00 $0.00 $201,000.00 100% $0.00 $13,690.00 ISA Form # 1-402 , i , 1 ;c1 # AFFIDAVIT AND WAIVER OF LIEN ❑ FINAL ® PARTIAL ® PAYMENT TO FOLLOW State of Indiana, County of Marion, SS Michael Smith being duly sworn state that he is the President of Gibraltar Construction Corp having contracted with the Owner to furnish certain materials and /or labor for a project known as Motor Court P112 Veneer and owned by Carmel Theater Development Company and does hereby further state on behalf of the aforementioned contractor: (PARTIAL WAIVER)that there is due from the Owner the sum of Twenty Seven Thousand Seven Hundred NO/100 Dollars ($27,700.00) ❑ receipt of which is hereby acknowledged; or ® the payment of which has been promised as the sole consideration of this Affidavit and Partial Waiver of Lien which is given solely with respect to said amount, and which waiver shall be effective only upon receipt of payment thereof by the undersigned; (FINAL WAIVER)that the final balance due from the Owner is the sum of Dollars () ❑ receipt of which is hereby acknowledged; or ❑ the payment of which has been promised as the sole consideration for this Affidavit and Final Waiver of Lien which shall become effective upon receipt of such payment. THERFORE, the undersigned waives and releases unto the Owner of said premises, any and all lien or claim whatsoever on the above-described property and improvements the on .ccount of LABOR or material or both, furnished by the undersigned thereto, subject to limitations of condition xpr-ssed herein, if any; and further certifies that no other party has any claim or right to a lien on account of any work I, rfo ed or material furnished to the undersigned for said project, and within the scope of this affidavit and waiver. Gibraltar Construction Corp By 1) Title President WITNESS MY HAND AND NOTORIAL SEAL, 7/,. .t of J u ly, 2012. f , (Notary Public) 0 x919 4..D ANA suecoNTRACroas ASSOCIATION INCORPORATED �.-"°.e BRIAN R. MCBRIDE UnauitwAtad PaWOdutimn Reotuh,ted !^ Rem IOW 2 Res. of Hancock County * . * My Comm. Exp. 11-29-2017 - o Pt Commission # 611862 ' Document X32 TM ® 2009 y tl jY ., vJ /,�: Application and Certificate for Payment, Construction Manager as Adviser Edition TO OWNER:Carmel Theater Development Company PROJECT: Motor Court P112 Veneer APPLICATION NO: 6 /.9 DISTRIBUTION TO 11711 North Pennsylvania Street,Suite 200 OWNER Carmel, IN 46032 PERIOD TO 8/22/12 CONSTRUCTION MANAGER FROM Gibraltar Construction Corp VIA CONSTRUCTION CONTRACT DATE: 7/5/11 ARCHITECT CONTRACTOR: 2932 N.Webster Ave. MANAGER: PROJECT NOS: CONTRACTOR Indianapolis,IN 46219 FIELD CONTRACT FOR:Motor Court P112 VIA ARCHITECT: Pedcor Design Group OTHER CONTRACTOR'S APPLICATION FOR PAYMENT The unelersign ed C onti actoi eeltitle that to the best of the Conti autos knowledge.e intmmation and belief the AWork covered h this Application for P 1yment ha,been completed in accordance with the Application is made lot payment as shown helo\ in connection with the Contact. Contract Document, that amounts Have been paid by the Contractor lot Wol k for which piev ions ALA Document G703'" Continuation Sheet, i,attached. ( criilicalc, for Pav/i nt w r e issued and payments recewcd from the Ovyner.;nut that eau i ent payment 1.ORIGINAL CONTRACT SUM S 201,000.00 shown herein is n00 I iue. 2.NET CHANGES IN THE WORK 5 0.00 CONTRACTOR: t• oral 91r Construction Corp 3.CONTRACT SUM TO DATE(Line l±2) 5 201,000.00 By: J ! Date: ^�42''r? 4.TOTAL COMPLETED AND STORED TO DATE(Column C on 6)707) 5 201,000.00 State of: 4'" % �'-` P° 5.RETAINAGE: County of %f,, O ,� k6 01- BRIAN R. MCBRIDE �// des, of Hancock County a. ',,of Completed Work Subscribcc "XI swell ,o he ci' 4 v, 1V �' (Cn/enter D +Eon( 70 3) 5 0.00 me this � � clay oh LJ / �� My Comm, Exp. 11-29-2017 b. `'oa.: Commission #611862 of Stored Material Nutary Public: (Col,,,,,,I on 07(6) S N�ly Commission expires: l /'' '''T/!"7 Total Retainage(LW( -I-S/t, or Total in Column heir(770;) S CERTIFICATE FOR PAYMENT 6.TOTAL EARNED LESS RETAINAGE 5 201,000.00 In accordance with the Contract Documents based on evaluation;ntthe Work and the data comprising (Line-/miners Line S Total) this application,the Construction Manager and Architect certify to the Owner that to the best oftheir 7.LESS PREVIOUS CERTIFICATES FOR PAYMENT 187,310.00 knowledge. information and belief the Work has progressed as indicated,the(palmy of the Work is in (Line 5lirmt prier Cerli/icale) accordance with the Contract Documents,and the Contractor i,entitled to payment of the AMOUNT 8.CURRENT PAYMENT DUE `') 13 CERTIFIED. ,690.00 9.BALANCE TO FINISH,INCLUDING RETAINAGE AMOUNT CERTIFIED S f3690 (.'Itloch e.rplonotion Ifcrnrorntt eerti/iecl Ui//i�r'.■nom tire- um■ tmt upplicd lnitiol al!/i,rrnc:c on this (Line i minutia Line(,) 5 0.00 .°I/O/cation and on the Continnation Sheet 11701 ore ch(ntyrecl to conform elide the ontotrnr ecru/ir5.) CONSTRUCTION MANAC,lhature onstruction, LLC �I Dv: '�� Date r /" SUMMARY OF CI-IANCI S IN TI-II \WORK ADDITIONS DEDUCT IONS ARCHITECT: Vir c rune(.'tern, tot:t on'is'apotrnihlr'/)rrprrlirrimam_poi lion.e 01 117, !'ro c c 1 the c t.a( crtiliccrlion is not rcr tr rc r/.i ..Coral change,approved in previous months by Owner 5 S 1' � \� / Total approved this month. including Construction Change B',:�i Date: C Directives S S This 'ertilieallis not net.,_ le.The v Ol I'T CF?TIFIED is pay ible t Ily to the Contractor named TO I Al_S S S het,in. titan e,pis'mull and ace I.tnec e IV\t re will nit prejudice to am inn of the Ors ocr V NF CI-IANC■ES IN SHE WORK ti or Conu'actor tinder thi,Centric . 8/2#7— AIA Document G732' –2009(formerly G702T"CMa–1992).Copyright v 1992 and 20091 /The American Instiiute of Architects. All rights reserved. Purchasers are permitted to reproduce ten(10)copies of this document when completed-To report copyright violations of All\Lonlract Documents,e-mail The American institute of Architects'legal counsel,copyright5t)s a.org CONTINUATION SHEET Page 2 of 2 APPLICATION AND CERTIFICATE FOR PAYMENT, containing Contractor's signed Certification, is APPLICATION NO. : 6 attached. In tabulations below,amounts are stated to the nearest dollar. Use Column I on Contracts where APPLICATION DATE: 8/22/2012 variable retainage for line items may apply. PERIOD TO: 8/31/2012 ARCHITECTS PROJECT NO. : A B C D I E F G H 1 WORK COMPLETED MATERIALS TOTAL ITEM FROM PREVIOUS BALANCE TO DESCRIPTION OF WORK SCHEDULED VALUE PRESENTLY COMPLETED AND % FINISH RETAINAGE NO. APPLICATION THIS PERIOD STORED(NOT IN STORED TO DATE (G/C) (IF VARIABLE RATE) (D+E) DORE) (D+E+F) (C G) Base Bid 1 Allowance $25,000.00 $25,000.00 $25,000.00 100% - 2 Mobilization $8,500.00 $8,500.00 $8,500.00 100% - 3 Submittals- Base Bid $13,550.00 $13,550.00 $13,550.00 100% - 4 Earth Moving $3,000.00 $3,000.00 $3,000.00 100% - 5 Lawns and Grasses $1,100.00 $1,100.00 $1,100.00 100% - 6 Masonry $124,500.00 $124,500.00 $124,500.00 100% - 7 Electrical $18,850.00 $18,850.00 $18,850.00 100% - 8 Joint Sealants/Waterproofing $6,500.00 $6,500.00 $6,500.00 100% - $201,000.00 $201,000.00 $0.00 $0.00 $201,000.00 100% $0.00 $0.00 ISA Form # 1-402 , y Buz- I AFFIDAVIT AND WAIVER OF LIEN `'. :III I ® FINAL ❑ PARTIAL ® PAYMENT TO FOLLOW State of Indiana, County of Marion, SS Michael Smith being duly sworn state that he is the President of Gibraltar Construction Corp having contracted with the Owner to furnish certain materials and/or labor for a project known as Motor Court P112 Veneer and owned by Carmel Theater Development Company and does hereby further state on behalf of the aforementioned contractor: (PARTIAL WAIVER)that there is due from the Owner the sum of Dollars ($.00) ❑ receipt of which is hereby acknowledged; or ❑ the payment of which has been promised as the sole consideration of this Affidavit and Partial Waiver of Lien which is given solely with respect to said amount, and which waiver shall be effective only upon receipt of payment thereof by the undersigned; (FINAL WAIVER)that the final balance due from the Owner is the sum of Thirteen Thousand Six Hundred Ninety and No/100 Dollars ($13,690.00) ❑ receipt of which is hereby acknowledged; or N the payment of which has been promised as the sole consideration for this Affidavit and Final Waiver of Lien which shall become effective upon receipt of such payment. THERFORE, the undersigned waives and releases unto the Owner of said premises, any and all lien or claim whatsoever on the above-described property and improvements therein account of LABOR or material or both, furnished by the undersigned thereto, subject to limitations of condition. ex p ressed herein, if any; and further certifies that no other party has any claim or right to a lien on account of any wo ''perf rmed or material furnished to the undersigned for said project, and within the scope of this affidavit and waiver. It Gibraltar Construction Corp By ,' Title President 'if 'WITNESS MY HAND AND NOTORIAL SEAL, i o,August, 2012. i (Notary Public) c 1979 4HpRANA SUBCONTRACTORS ASSOCIATsON INCORPORATED 4,4,¢Y Rue BRIAN R. MCBRIDE ��,�,„o,;, Rrp+oav,c,ron �pR/IllllYEl Z° `� Res. of Hancock Courrty Rev , , * * My Comm, E . 11-29-2017 D 1 P� Commission # 611 Bfi2 Gibraltar Construction Corp Check: 155 2932 N. Webster Ave. Date: 9/11/2012 Indianapolis, IN 46219 Vendor: GIBR1 Prior Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid See Transmittal Sheet for check detail. 125,455.00 125,455.00 0.00 0.00 125,455.00 155 9/11/2012 ********125,455.00 THE SUM OF ONE HUNDRED TWENTY FIVE THOUSAND FOUR HUNDRED FIFTY FIVE DOLLARS AND NO CENTS************ Gibraltar Construction Corp 2932 N. Webster Ave. Indianapolis, IN 46219 Gibraltar Construction Corp Check: 155 2932 N. Webster Ave. Date: 9/11/2012 Indianapolis, IN 46219 Vendor: GIBR1 Prior Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid See Transmittal Sheet for check detail. 125,455.00 125,455.00 0.00 0.00 125,455.00 ' - Transmittal Sheet Page 1 Carmel Redevelopment Comm Gibraltar Construction Corp Check: 155 2932 N. Webster Ave. Date: 9/11/2012 Indianapolis, IN 46219 Vendor: GIBR1 Prior Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid 5a 27,100.00 27,100.00 0.00 0.00 27,100.00 App 5 on P112 Veneer 5B 56,565.00 56,565.00 0.00 0.00 56,565.00 Application 5B for Masonry Ven 6a 13,690.00 13,690.00 0.00 0.00 13,690.00 App 6a on p112 veneer 6B 28,100.00 28,100.00 0.00 0.00 28,100.00 Retainage on P112 Veneer 125,455.00 125,455.00 0.00 0.00 125,455.00