Loading...
HomeMy WebLinkAbout08030103.1IL_ a r c i ICI ANN \ /iF-\A/ on' n 1 /0" a LEFT GABLE ELEVATION NOTE: THE INSTRUCTION MANUAL CONTAINS GENERAL GUIDELINES FOR INSTALLATION OF A FLORIAN GREENHOUSE UNIT. IT IS BASED ON A STANDARD, OUT -OF- THE -BOOK GREENHOUSE BEING INSTALLED ON A PREPARED SITE. FOR PROPER INSTALLATION, THIS MANUAL MUST BE USED IN CONJUNCTION WITH THE CUSTOMER- APPROVED DRAWINGS (CONTAINING SPECIFIC DETAILS) AND THE INCLUDED GREENHOUSE PACKING LIST WITH ATTACHED GLASS /METAL LAYOUT SHEETS. FLORIAN SOLAR PRODUCTS, L.L.G. ASSUMES NO RESPONSIBILITY FOR ANY INSTALLATION OR SITE PREPARATION, OR FOR ANY DISCREPANCIES BETWEEN THE CUSTOMER- APPROVED BLUEPRINTS AND THE INSTALLATION SITE. ANY SITE ADJUSTMENTS FOR THE GREENHOUSE TO FIT PROPERLY MUST BE MADE BEFORE INSTALLATION IS STARTED. PLEASE CHECK WITH LOCAL BUILDING CODES FOR REQUIREMENTS OF WALL CONSTRUCTION, HEADERS, ANCHORS, ETC. DURING INSTALLATION, SEALANT (NOT PROVIDED) MUST BE APPLIED AT ALL EXPOSED MATERIAL JOINTS INCLUDING, BUT NOT LIMITED TO, SILL ANCHOR HOLES, SILL UNDERSIDE AND ENDS, SILL AND HEAD MEMBER SPLICE JOINTS, DOOR HEADERS, BACK -TO -BACK RIDGES, ALL FLAT CAP /GLAZING JUNCTIONS, HORIZONTAL -TO- VERTICAL METAL JUNCTIONS, AND RUBBER JOINTS. RECOMMENDED SEALANT IS ONE -PART URETHANE OR SILICONE (GRADE 795 OR BETTER) CAULK. ONCE INSTALLATION IS COMPLETED, AND ALL SEALANT HAS PROPERLY DRIED (SEE SEALANT MFG'S RECOMMENDATIONS), THE ENTIRE GREENHOUSE MUST BE WATER TESTED WITH A HOSE AND NOZZLE. THE WATER SHOULD BE AIMED TO SIMULATE MODERATE -TO -HEAVY RAINS, AND SHOULD BE TESTED FROM THE BOTTOM OF THE GREENHOUSE UP TOWARDS THE TOP. IF THERE IS ANY WATER INFILTRATION, THE TEST CAN BE STOPPED, THE AREA REPAIRED, AND, AFTER THE SEALANT HAS PROPERLY DRIED, THE TESTING RESUMED. FOR INSTALLATION ASSISTANCE PLEASE CALL (678) 482 -8611. FOR QUESTIONS REGARDING MISSING /DAMAGED MATERIALS, PLEASE CALL YOUR SALESMAN. * *APPROVAL NOTE * *: BASED ON OUR INTERPRETATION OF THE PROJECT PLANS AND THE SPECIFICATIONS WHICH HAVE BEEN MADE AVAILABLE TO US, WE HAVE PREPARED THESE SHOP DRAWINGS TO ILLUSTRATE OUR UNDERSTANDING OF WHAT HAS BEEN ORDERED, AND WHAT WE INTEND TO FURNISH. BEFORE WE CAN ACTIVATE THIS ORDER FOR PRODUCTION, WE NEED THE APPROVAL OF: (1) THE ARCHTECT DESIGNER OF THE PROJECT, INDICATING THAT THESE DRAWINGS COMPLY WITH THE PLANS AND SATISFY ALL RELATED DESIGN SPECIFICATIONS, AND (2) THE CONTRACTOR OR SUCH OTHER PERSON RESPONSIBLE FOR THE SITE PREPARATION, INDICATING THAT WE CAN PROCEED TO MANUFACTURE THE MATERIALS RELYING ON THIER ASSURANCE THAT THE SITE HAS BEEN OR WILL BE PREPARED IN ACCORDANCE WITH ALL DIMENSIONS CONTAINED IN THESE SHOP DRAWINGS. PLEASE TAKE THIS APPROVAL PROCESS SERIOUSLY, AND REVIEW CAREFULLY FOR ACCURACY AND NOTE ANY EXCEPTION, OMISSIONS, AND OR CHANGES REQUIRED. ONCE THESE DRAWINGS HAVE BEEN APPROVED, THEY WILL SERVE AS THE BASIS FOR MANUFACTURING AND THE RESULTING FULFILLMENT OF OUR CONTRACTUAL OBLIGATIONS. UNDERSTOOD AND APPROVED: (1) AS TO DESIGN SPECIFICATIONS: (2) AS TO SITE PREPARATION: DATE: - -� DATE:— CHECK ONE OF THE FOLLOWING: NO EXCEPTIONS TAKEN APPROVED AS NOTED REVISE & RESUBMIT FRONT ELEVATION CUSTOM GENEVA MODEL #CSES- SG24BHP CLEAR SPAN 8 - STANDARD PANELS (B -TO -B) 2 - FULL GABLE ENDS (B -TO -B) 1 - 8 -BAY MOTORIZED RIDGE VENT W /THERMOSTAT & SCREENS 2 - 29 3/4 "W X 31 "H SINGLE VENTING AWNING WINDOWS W /SCREENS (GP) 1 - 60" X 80" SLIDING PATIO DOOR 1 - 20" EXHAUST FAN W/ INTAKE LOUVER & THERMOSTAT 1 - 8 BAY CRESTING W/ FINIALS 00 0 i r, a r DRAWN /CHK'D REVISIONS AND APPROVAL I I REV I DESCRIPTION I DATE I APPROVED 1n'_0 i /.?" 11' -9 1/2" GREENHOUSE POSITION OF RIDGE VENT MOTOR, REAR ELEVATION 23' -7" OVERALL L 11' -9 1/2" GREENHOUSE 3x2x1/8" ANGLE COLLAR `TIE (2 PER BAR) GREENHO USE SPECIFICATIONS ROOF GLASS: SB -60 MC 2x4xl /8" ALUMINUM SAFETY OVER SB -60 2x4x1/8" ALUMINUM MC LOW -E TEMPERED SAFETY OVER CLEAR SUPPORT TUBE (TYP. 7) SAFETY SUPPORT TUBE (TYP. 7) WALL GLASS: SB -60 MC LOW -E TEMPERED SAFETY OVER CLEAR / TEMPERED SAFETY (7/8" O.A. THICKNESS) FINISH: 2x6x1/8" ALUMINUM TO \ 2x6x1/8" ALUMINUM BAKED -ON ENAMEL GASKETS: GLAZING GASKETS TO BE E.P.D.M. RUBBER SUPPORT TUBE (TYP. 7) \ SUPPORT TUBE (TYP. 7) � \ 12 / \ 8 1/4 �- -- - -- - -- -- / \ r` n U r r` 2x4x 1 /8" &UIVINUM I r, SUPPORT TLBES ON ALL GABLE VERITCALS TYP 9) I 8 6 I i i y0 be llv�,�,�,� ^t Ott So y; i✓ x c0 cD 20" INTAKE LOUVER W/ N INSULATED PANELBOARD N GREENHO USE SPECIFICATIONS ROOF GLASS: SB -60 MC LOW -E TEMPERED SAFETY OVER SB -60 MC LOW -E TEMPERED SAFETY OVER CLEAR TEMPERED SAFETY [TRIPLE PANE]( 7/8" O.A. THICKNESS) WALL GLASS: SB -60 MC LOW -E TEMPERED SAFETY OVER CLEAR TEMPERED SAFETY (7/8" O.A. THICKNESS) FINISH: FRAME FINISH TO BE BRONZE BAKED -ON ENAMEL GASKETS: GLAZING GASKETS TO BE E.P.D.M. RUBBER 23' -9" BASEWALL RIGHT GABLE ELEVATION �- i k (� u C>� ©2007 FLORIAN SOLAR PRODUCTS, L.L.C. Solariums 549 AVIATION BLVD. ® Greenhouses GEORGETOWN, S.C. 29440 Solar Products, L.L.C. Conservatories TEL. ( 800) 356 -7426 ( 520 -4605 IMPROVE YOUR OUTLOOK FAX 843) DRAWN /CHK'D: SGP CUSTOMER: END USER: dh DR. ZACHARY I. DR. ZACHARY I. ISSUED 5/18/07 HODES HODES 637 BRYN MAWR DR 637 BRYN MAWR DR INDIANAPOLIS, IN INDIANAPOLIS, IN CODE IDENT NO 9092 -3617 1 46260 -4735 46260 -4735 DWG NO SP -3617 SCALE, 3/8" = 1' -0" I SHEET 1 OF 2