Loading...
HomeMy WebLinkAbout08050106.1ProLo 9 is 4400 BUILDING RENOVATION CONSTRUCTION ISSUE - MAY 612008 4400 West 96th Street Indianapolis, Indiana 46268 DESIGN TEAM CONTACTS ARCHITECT AXIS ARCHITECTURE +INTERIORS JOHN ALBRECHT CHRIS HAGAN 618 EAST MARKET STREET INDIANAPOLIS, INDIANA 46202 PH 317/ 264 8162, EXT. 21 FX 3171264 8165 PROJECT CONTACTS OWNER PROLOGI S PAT SMITH 8755 HIGGINS RD, SUITE 700 CHICAGO, IL 60631 PH 773/ 380 3248 CITY OF CARNjL / CLAY TOWNSHIP Deparment of Community Services - Building & Code Services 1 Civic Squarq - Cannel, IN 46032 PLAN A UTHENTICA TION CLATIFICATIONS AND AGREEMENT As the authorized agent responsible for ottaining a permit or permits', I certify that these plans are IDENTICAL to those released for,'construction by the State of Indiana Department of Homeland Security, Divisic,n of Fire & Building Safety. I also understand that if it is determi ed th these plans arty not identical a STOP WORK ORDER will be a ui and h es referenced below. u Signatu Printed Name quired unde or 7, Section 10 Carmel City Code, entitled "Buil Code" and Secti 29.4.2 and Section 29.4.3 Da entitled "Administration ". Required by Carmel / Clay Township I - Zoning Ordinance, Section 31.1 entitled "Violations and Penalties "I, SAPERMTT'SWORMMSTICKERS0an Authentication 'I r C DID #, 333 53�f BUILDING INFORMATION SQUARE FOOTAGE RENOVATION NEW CONSTRUCTION CONST. TYPE OCCUPANCY APPLICABLE CODES 2000 INTERNATIONAL BUILDING CODE 2003 INDIANA BUILDING CODE 2003 INDIANA FIRE CODE 2003 INDIANA MECHANICAL CODE 2002 INDIANA ELECTRICAL CODE 1999 INDIANA PLUMBING CODE 74,334 SF 1,500 SF 0 SF V -B (FULLY SPRINKLERED) B- OCCUPANCY DRAWING INDEX co O O N a O Im O N N O 00 0 N 0 O LO O `\\\\\\\`��o�uuluuunR ALL APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING JURISDICTION systems. The drawings do not necessanly 3. THESE CONTRACT DOCUMENTS DO NOT ATTEMPT TO INSTRUCT THE 0.., �E �`: No. indicate or describe all work required /or 1. SHOULD THERE BE ANY QUESTIONS REGARDING THE CONTRACT DOCUMENTS SPECIFICATIONS IN THAT THEY DO REQUIRE THAT ALL MANUFACTURED ITEMS, fa#pedormance and completion of #;e EXISTING CONDITIONS AND /OR DESIGN INTENT, THE CONTRACTOR SHALL BE �* = STATE OF *` ''' roquiromenhlscopeoniicat On he bass oflhe general scope indxabd or described, RESPONSIBLE FOR OBTAINING A CLARIFICATION FROM THE ARCHITECT PRIOR TO THE CONTRACT DOCUMENTS ARE MORE STRINGENT. ANY MISCELLANEOUS ITEMS the trade contractors shatl fumrsh oB items BID SUBMITTAL AND PROCEDING WITH ANY WORK, OR RELATED WORK, IN edlor 6e proper ezecu on and comp comp kMion of dte work. QUESTION. A. ALL WORK SHALL BE WARRANTED SATISFACTORY, IN MATERIALS AND WORKMANSHIP, FOR ONE (1) YEAR, OR FOR THE PERIOD OF WARRANTY DRAWN by CRH 2, THESE CONTRACT DOCUMENTS ARE INTENDED TO DESCRIBE ONLY THE SCOPE LONGER. THEREFORE, ONLY COMPETENT MECHANICS CAPABLE OF PRODUCING CHECKED by DDW AND APPEARANCE OF THE REAL PROPERTY IMPROVEMENTS, INCLUDING THE COVER SHEET DATE issued 0506.2008 PERFORMANCE AND LEVEL OF QUALITY EXPECTED OF ITS COMPONENTS. IT IS ACCEPTANCE OF THE CONDITIONS AND SURFACE CONCERNED. IF ANY SUCH REVISIONS CONDITIONS ARE UNACCEPTABLE, THE GENERAL CONTRACTOR SHOULD BE NOTIFIED AT ONCE AND NO WORK DONE UNTIL CONDITIONS ARE ACCEPTABLE. 5. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER, OR THEIR SCALE AS NOTED AUTHORIZED AGENT, TO DETERMINE ALL EXISTING MATERIALS TO BE SALVAGED AND RETAINED BY THE OWNER. THE CONTRACTOR SHALL REMOVE SALVAGEABLE SUOtl21n.`�a/ 01- -, IIL L111M BCU�ijulLO MATERIALS FROM THE SPACE AND STORE IN LOCATION AS DIRECTED BY THE OWNER. ALL OTHER MATERIALS, RUBBISH AND DEBRIS SHALL BE REMOVED AND PROMPTLY DISPOSED OF BY THE CONTRACTOR AT AN OFFSITE LOCATION. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ASSURE THAT ALL PROPERTY IMPROVEMENTS (I.E., PARTITIONS, DOORS, FRAMES, CABINETS, CEILING GRID, CEILING TILE AND THE ELECTRICAL AND MECHANICAL DEVICES, ETC.) WHICH ARE TO REMAIN, ARE PROTECTED FROM DAMAGE OF ANY KIND. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING WORK WHICH IS TO REMAIN, AND DETERMINING WHETHER OF NOT IT CAN BE REPAIRED AND /OR RECONDITIONED TO MATCH AND BLEND WITH NEW MATERIALS AND COMPONENTS. THE CONTRACTOR SHALL OBTAIN THE OWNER'S APPROVAL OF THE SCOPE AND LIMIT OF SAID WORK PRIOR TO STARTING CONSTRUCTION. NO CHANGE ORDERS SHALL BE ACCEPTED FOR COMPLETED WORK THAT DOES NOT CONFORM TO THE STANDARDS ESTABLISHED AT THE TIME OF BID ACCEPTANCE. 7. THE CONTRACTORS SHALL BE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH THE PROJECT SCOPE OF WORK, BUILDING STANDARDS, SCHEDULE AND DEADLINES. THE CONTRACTOR SHALL FURTHER BE RESPONSIBLE FOR ADVISING THE OWNER OF ALL LONG LEAD TIME ITEMS AFFECTING THE PROJECT SCHEDULE AND SHALL, UPON REQUEST FROM THE OWNER, SUBMIT ORDER CONFIRMATIONS AND DELIVERY DATES FOR SUCH LONG LEAD ITEMS TO THE OWNER. 8. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER ACCESS TO THE SPACE AND THE ONGOING CONSTRUCTION WORK. DISRUPTIVE OR POTENTIALLY HAZARDOUS CONSTRUCTION ACTIVITIES SHALL BE COORDINATED TO OCCUR AFTER NORMAL OFFICE HOURS, SO AS TO MINIMIZE DISTURBANCE TO BUILDING OCCUPANTS. O 9. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER FOR iiiiiiiiiiiiii■ H DELIVERY TO THE SPACE OF ALL BUILDING MATERIALS, AND SHALL ARRANGE FOR USAGE OF THE FREIGHT ELEVATOR (OR SUCH ELEVATOR DESIGNATED). IN DELMERY OF BUILDING MATERIALS INVOLVES THE USE OF FACILITIES OTHER THAN THE AVAILABLE ELEVATORS, THE CONTRACTOR SHALL COORDINATE SUCH ACTIVITIES IN SUCH A MANNER WHICH POSES NO HAZARD TO ANY PERSONNEL WITHIN OR AROUND THE BUILDING OR BUILDING SITE. 10. ALL CONTRACTOR OR SUPPLIER REQUESTS FOR SUBSTITUTIONS OF SPECIFIED ITEMS SHALL BE SUBMITTED IN WRITING, ACCOMPANIED BY THE ALTERNATIVE Z PRODUCT INFORMATION, TO THE ARCHITECT. ALL SUBTITUTIONS SHALL BE O SUBMITTED TO THE ARCHITECT, NOT LATER THAN FIVE (5) WORKING DAYS PRIOR U j TO BID OPENING DATE. SUBSTITUTIONS SHALL BE CONSIDERED ONLY IF THEY DO NOT SACRIFICE QUALITY, APPEARANCE AND FUNCTION, UNDER NO J O CIRCUMSTANCES WILL THE OWNER BE REQUIRED TO PROVE THAT A PRODUCT 0 PROPOSED FOR SUBSTITUTION IS OR IS NOT OF EQUAL QUALITY TO THE PRODUCT SPECIFIED. a 11. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR SCALE THE DRAWINGS TO DETERMINE THE DIMENSIONS. SEE FLOOR PLAN FOR DIMENSION LOCATIONS. 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF ALL Q SELECTED MATERIALS WHICH SHALL BE COMPLETE IN ALL RESPECTS PRIOR TO THE FINAL ACCEPTANCE, UNLESS OTHERWISE NOTED. 13. THE CONTRACTOR SHALL PRESERVE ALL PRINTED INSTRUCTIONS AND WARRANTIES THAT ARE PROVIDED WITH EQUIPMENT OR MATERIALS USED, AND DELIVER PRINTED MATTER TO THE OWNER AT THE TIME OF SUBSTANTIAL COMPLETION. THE CONTRACTOR SHALL INSTRUCT THE OWNER OR OWNER'S Ica REPRESENTATIVE IN THE PROPER USE OF THE EQUIPMENT FURNISHED IN THIER TRADE. 14. GENERAL CONTRACTOR IS TO PROVIDE A THOROUGH CONSTRUCTION CLEAN -UP AT CLOSE -OUT, INCLUDING VACUUMING AND CLEANING ALL CARPETING. w V) ce w ad 3 O to m N LU a ti w Ln O � N z OU A000 COVER SHEET A100 LIFE SAFETY AND LEASE AREA PLAN AND GENERAL NOTES A101 FIRST FLOOR AREA B DEMOLITION AND ARCHITECTURAL PLANS A102 FIRST FLOOR AREA B REFLECTED CEILING PLAN A300 DETAILS SYMBOL IDENTIFICATION 19— DETAIL NUMBER SHEET NUMBER ELEVATION NUMBER A3.1 SHEET NUMBER SECTION NUMBER SHEET NUMBER 4. 1 WALL TYPE 5' -9" WALL HEIGHT i IF APPLICABLE i CEILING TYPE CEILING HEIGHT A.F. F. DOOR ID NUMBER o ( REFER TO DOOR SCHEDULE) EXISTING DOOR TO REMAIN ( REFER TO DOOR SCHEDULE) DEMOLITION NOTE OPLAN NOTE /'KIT OF PARTS" NOTE O WALL FINISH TAG FXXIX TOILET ACCESSORY NOTE NEW WALL CONSTRUCTION :. EXISTING WALL CONSTRUCTION — - - - — TO BE REMOVED MASONRY CONTROLJOINT (ON ELEVATION) 618 East Market Street Indianapolis, Indiana 46202 ph 317/264.8162 fx 317/264.8165 a x i s a r c In . c o m Ir.1;NFDAI NnT1PC• Scope Drawings These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions oithe building, the majorarchitechrral elements and the A. SCOPE CONTRACT DOCUMENTS typeofstruc lural,nrochanrcalanderectricol `\\\\\\\`��o�uuluuunR ALL APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING JURISDICTION systems. The drawings do not necessanly 3. THESE CONTRACT DOCUMENTS DO NOT ATTEMPT TO INSTRUCT THE 0.., �E �`: No. indicate or describe all work required /or 1. SHOULD THERE BE ANY QUESTIONS REGARDING THE CONTRACT DOCUMENTS SPECIFICATIONS IN THAT THEY DO REQUIRE THAT ALL MANUFACTURED ITEMS, fa#pedormance and completion of #;e EXISTING CONDITIONS AND /OR DESIGN INTENT, THE CONTRACTOR SHALL BE �* = STATE OF *` ''' roquiromenhlscopeoniicat On he bass oflhe general scope indxabd or described, RESPONSIBLE FOR OBTAINING A CLARIFICATION FROM THE ARCHITECT PRIOR TO THE CONTRACT DOCUMENTS ARE MORE STRINGENT. ANY MISCELLANEOUS ITEMS the trade contractors shatl fumrsh oB items BID SUBMITTAL AND PROCEDING WITH ANY WORK, OR RELATED WORK, IN edlor 6e proper ezecu on and comp comp kMion of dte work. QUESTION. A. ALL WORK SHALL BE WARRANTED SATISFACTORY, IN MATERIALS AND WORKMANSHIP, FOR ONE (1) YEAR, OR FOR THE PERIOD OF WARRANTY DRAWN by CRH 2, THESE CONTRACT DOCUMENTS ARE INTENDED TO DESCRIBE ONLY THE SCOPE LONGER. THEREFORE, ONLY COMPETENT MECHANICS CAPABLE OF PRODUCING CHECKED by DDW AND APPEARANCE OF THE REAL PROPERTY IMPROVEMENTS, INCLUDING THE COVER SHEET DATE issued 0506.2008 PERFORMANCE AND LEVEL OF QUALITY EXPECTED OF ITS COMPONENTS. IT IS ACCEPTANCE OF THE CONDITIONS AND SURFACE CONCERNED. IF ANY SUCH REVISIONS INCUMBANT THAT UPON THE CONTRACTOR THAT ALL WORK COMPLETED AND MATERIALS INSTALLED BE IN FULL COMPLIANCE, AS A MINIMUM STANDARD, WITH `\\\\\\\`��o�uuluuunR ALL APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING JURISDICTION Fa•.; 3. THESE CONTRACT DOCUMENTS DO NOT ATTEMPT TO INSTRUCT THE 0.., �E �`: No. CONTRACTOR IN THE DETAILS OF HIS TRADE. THEY ARE PERFORMANCE _ Q AR- 19400087 =: SPECIFICATIONS IN THAT THEY DO REQUIRE THAT ALL MANUFACTURED ITEMS, MATERIALS AND EQUIPMENT BE INSTALLED IN STRICT ACCORDANCE WITH THE �* = STATE OF *` ''' MANUFACTURER'S RECOMMENDED SPECIFICATIONS, EXCEPT IN THE CASE WHERE '% "'•.,�/� �P,,.,'r` "'•,,,D I A THE CONTRACT DOCUMENTS ARE MORE STRINGENT. ANY MISCELLANEOUS ITEMS :,���� q ,G� \\\\o 0 R,CH 11 TI�1\`\po� OR MATERIALS NOT SPECIFICALLY NOTED, BUT REQUIRED FOR PROPER INSTALLATION SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR(S). A. ALL WORK SHALL BE WARRANTED SATISFACTORY, IN MATERIALS AND WORKMANSHIP, FOR ONE (1) YEAR, OR FOR THE PERIOD OF WARRANTY CUSTOMARY, OR STIPULATED FOR THE TRADE, CRAFT, OR PRODUCT, WHICHEVER IS LONGER. THEREFORE, ONLY COMPETENT MECHANICS CAPABLE OF PRODUCING GOOD WORKMANSHIP CUSTOMARY TO THE TRADE SHOULD BE USED. COVER SHEET COMMENCING WORK BY A CONTRACTOR OR SUBCONTRACTOR CONSTITUTES ACCEPTANCE OF THE CONDITIONS AND SURFACE CONCERNED. IF ANY SUCH CONDITIONS ARE UNACCEPTABLE, THE GENERAL CONTRACTOR SHOULD BE NOTIFIED AT ONCE AND NO WORK DONE UNTIL CONDITIONS ARE ACCEPTABLE. 5. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER, OR THEIR SCALE AS NOTED AUTHORIZED AGENT, TO DETERMINE ALL EXISTING MATERIALS TO BE SALVAGED AND RETAINED BY THE OWNER. THE CONTRACTOR SHALL REMOVE SALVAGEABLE SUOtl21n.`�a/ 01- -, IIL L111M BCU�ijulLO MATERIALS FROM THE SPACE AND STORE IN LOCATION AS DIRECTED BY THE OWNER. ALL OTHER MATERIALS, RUBBISH AND DEBRIS SHALL BE REMOVED AND PROMPTLY DISPOSED OF BY THE CONTRACTOR AT AN OFFSITE LOCATION. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ASSURE THAT ALL PROPERTY IMPROVEMENTS (I.E., PARTITIONS, DOORS, FRAMES, CABINETS, CEILING GRID, CEILING TILE AND THE ELECTRICAL AND MECHANICAL DEVICES, ETC.) WHICH ARE TO REMAIN, ARE PROTECTED FROM DAMAGE OF ANY KIND. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING WORK WHICH IS TO REMAIN, AND DETERMINING WHETHER OF NOT IT CAN BE REPAIRED AND /OR RECONDITIONED TO MATCH AND BLEND WITH NEW MATERIALS AND COMPONENTS. THE CONTRACTOR SHALL OBTAIN THE OWNER'S APPROVAL OF THE SCOPE AND LIMIT OF SAID WORK PRIOR TO STARTING CONSTRUCTION. NO CHANGE ORDERS SHALL BE ACCEPTED FOR COMPLETED WORK THAT DOES NOT CONFORM TO THE STANDARDS ESTABLISHED AT THE TIME OF BID ACCEPTANCE. 7. THE CONTRACTORS SHALL BE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH THE PROJECT SCOPE OF WORK, BUILDING STANDARDS, SCHEDULE AND DEADLINES. THE CONTRACTOR SHALL FURTHER BE RESPONSIBLE FOR ADVISING THE OWNER OF ALL LONG LEAD TIME ITEMS AFFECTING THE PROJECT SCHEDULE AND SHALL, UPON REQUEST FROM THE OWNER, SUBMIT ORDER CONFIRMATIONS AND DELIVERY DATES FOR SUCH LONG LEAD ITEMS TO THE OWNER. 8. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER ACCESS TO THE SPACE AND THE ONGOING CONSTRUCTION WORK. DISRUPTIVE OR POTENTIALLY HAZARDOUS CONSTRUCTION ACTIVITIES SHALL BE COORDINATED TO OCCUR AFTER NORMAL OFFICE HOURS, SO AS TO MINIMIZE DISTURBANCE TO BUILDING OCCUPANTS. O 9. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER FOR iiiiiiiiiiiiii■ H DELIVERY TO THE SPACE OF ALL BUILDING MATERIALS, AND SHALL ARRANGE FOR USAGE OF THE FREIGHT ELEVATOR (OR SUCH ELEVATOR DESIGNATED). IN DELMERY OF BUILDING MATERIALS INVOLVES THE USE OF FACILITIES OTHER THAN THE AVAILABLE ELEVATORS, THE CONTRACTOR SHALL COORDINATE SUCH ACTIVITIES IN SUCH A MANNER WHICH POSES NO HAZARD TO ANY PERSONNEL WITHIN OR AROUND THE BUILDING OR BUILDING SITE. 10. ALL CONTRACTOR OR SUPPLIER REQUESTS FOR SUBSTITUTIONS OF SPECIFIED ITEMS SHALL BE SUBMITTED IN WRITING, ACCOMPANIED BY THE ALTERNATIVE Z PRODUCT INFORMATION, TO THE ARCHITECT. ALL SUBTITUTIONS SHALL BE O SUBMITTED TO THE ARCHITECT, NOT LATER THAN FIVE (5) WORKING DAYS PRIOR U j TO BID OPENING DATE. SUBSTITUTIONS SHALL BE CONSIDERED ONLY IF THEY DO NOT SACRIFICE QUALITY, APPEARANCE AND FUNCTION, UNDER NO J O CIRCUMSTANCES WILL THE OWNER BE REQUIRED TO PROVE THAT A PRODUCT 0 PROPOSED FOR SUBSTITUTION IS OR IS NOT OF EQUAL QUALITY TO THE PRODUCT SPECIFIED. a 11. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR SCALE THE DRAWINGS TO DETERMINE THE DIMENSIONS. SEE FLOOR PLAN FOR DIMENSION LOCATIONS. 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF ALL Q SELECTED MATERIALS WHICH SHALL BE COMPLETE IN ALL RESPECTS PRIOR TO THE FINAL ACCEPTANCE, UNLESS OTHERWISE NOTED. 13. THE CONTRACTOR SHALL PRESERVE ALL PRINTED INSTRUCTIONS AND WARRANTIES THAT ARE PROVIDED WITH EQUIPMENT OR MATERIALS USED, AND DELIVER PRINTED MATTER TO THE OWNER AT THE TIME OF SUBSTANTIAL COMPLETION. THE CONTRACTOR SHALL INSTRUCT THE OWNER OR OWNER'S Ica REPRESENTATIVE IN THE PROPER USE OF THE EQUIPMENT FURNISHED IN THIER TRADE. 14. GENERAL CONTRACTOR IS TO PROVIDE A THOROUGH CONSTRUCTION CLEAN -UP AT CLOSE -OUT, INCLUDING VACUUMING AND CLEANING ALL CARPETING. W Uj N Z O** J F- 0 a Wa Z 0 O — Z 15. LOCATION OF DUMPS TER MUST BE COORDINATED WITH AND APPROVED BY OWNER. `\\\\\\\`��o�uuluuunR Fa•.; 0.., �E �`: No. B. DESIGN COMPLIANCE REVIEW _ Q AR- 19400087 =: 1. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF CUSTOM FABRICATION �* = STATE OF *` ''' OR MANUFACTURE, AND PHYSICAL SMAPLES OF ALL FINISH MATERIALS SPECIFIED '% "'•.,�/� �P,,.,'r` "'•,,,D I A TO THE ARCHITECT FOR REVIEW AND APPROVAL BY THE OWNER. :,���� q ,G� \\\\o 0 R,CH 11 TI�1\`\po� 2. REVIEWED SHOP DRAWINGS AND SCHEDULES PREPARED BY OTHERS SHALL NOT BE CONSTRUED TO BE PART OF THE CONTRACT DOCUMENTS, AS THE ARCHITECT ASSUMES NO RESPONSIBILITY FOR DRAWINGS, SCHEDULES AND /OR SPECIFICATIONS FOR WORK ON THE PROJECT PREPARED OR ACCOMPLISHED BY OTHERS. COVER SHEET 3. THE ARCHITECT WILL REVIEW THE DRAWINGS AND SMAPLES FOR CONFORMITY WITH THE INFORMATION CONTAII`0,Q $N CONSTRUCTION DOCUMENTS, AND RETURN THd( 4 "IIT 5,TO.T,W&gft4CTOR WITHIN FIVE (5) WORKING DAYS OF RECEIPT, U. ,.AS:"IGi,�f` OTHERWii rP, &?V, .W;ED FW BY THE OWNER. SCALE AS NOTED '100 leo -01 ou t) -- SUOtl21n.`�a/ 01- -, IIL L111M BCU�ijulLO 9 AUUV ° N