HomeMy WebLinkAbout08050106.1ProLo 9 is
4400 BUILDING RENOVATION
CONSTRUCTION ISSUE - MAY 612008
4400 West 96th Street
Indianapolis, Indiana 46268
DESIGN TEAM CONTACTS
ARCHITECT
AXIS ARCHITECTURE +INTERIORS
JOHN ALBRECHT
CHRIS HAGAN
618 EAST MARKET STREET
INDIANAPOLIS, INDIANA 46202
PH 317/ 264 8162, EXT. 21
FX 3171264 8165
PROJECT CONTACTS
OWNER
PROLOGI S
PAT SMITH
8755 HIGGINS RD, SUITE 700
CHICAGO, IL 60631
PH 773/ 380 3248
CITY OF CARNjL / CLAY TOWNSHIP
Deparment of Community Services - Building & Code Services
1 Civic Squarq - Cannel, IN 46032
PLAN A UTHENTICA TION CLATIFICATIONS AND AGREEMENT
As the authorized agent responsible for ottaining a permit or permits', I certify that these
plans are IDENTICAL to those released for,'construction by the State of Indiana
Department of Homeland Security, Divisic,n of Fire & Building Safety. I also understand
that if it is determi ed th these plans arty not identical a STOP WORK ORDER will be
a ui and h es referenced below.
u Signatu Printed Name
quired unde or 7, Section 10 Carmel City Code,
entitled "Buil Code" and Secti 29.4.2 and Section 29.4.3 Da
entitled "Administration ". Required by Carmel / Clay Township I -
Zoning Ordinance, Section 31.1 entitled "Violations and Penalties "I, SAPERMTT'SWORMMSTICKERS0an Authentication
'I
r
C DID #, 333 53�f
BUILDING INFORMATION
SQUARE FOOTAGE
RENOVATION
NEW CONSTRUCTION
CONST. TYPE
OCCUPANCY
APPLICABLE CODES
2000 INTERNATIONAL BUILDING CODE
2003 INDIANA BUILDING CODE
2003 INDIANA FIRE CODE
2003 INDIANA MECHANICAL CODE
2002 INDIANA ELECTRICAL CODE
1999 INDIANA PLUMBING CODE
74,334 SF
1,500 SF
0 SF
V -B
(FULLY SPRINKLERED)
B- OCCUPANCY
DRAWING INDEX
co
O
O
N
a
O
Im
O
N
N
O
00
0
N
0
O
LO
O
`\\\\\\\`��o�uuluuunR
ALL APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING JURISDICTION
systems. The drawings do not necessanly
3. THESE CONTRACT DOCUMENTS DO NOT ATTEMPT TO INSTRUCT THE
0.., �E
�`: No.
indicate or describe all work required /or
1. SHOULD THERE BE ANY QUESTIONS REGARDING THE CONTRACT DOCUMENTS
SPECIFICATIONS IN THAT THEY DO REQUIRE THAT ALL MANUFACTURED ITEMS,
fa#pedormance and completion of #;e
EXISTING CONDITIONS AND /OR DESIGN INTENT, THE CONTRACTOR SHALL BE
�* = STATE OF *`
'''
roquiromenhlscopeoniicat On he bass
oflhe general scope indxabd or described,
RESPONSIBLE FOR OBTAINING A CLARIFICATION FROM THE ARCHITECT PRIOR TO
THE CONTRACT DOCUMENTS ARE MORE STRINGENT. ANY MISCELLANEOUS ITEMS
the trade contractors shatl fumrsh oB items
BID SUBMITTAL AND PROCEDING WITH ANY WORK, OR RELATED WORK, IN
edlor 6e proper ezecu on and
comp comp kMion of dte work.
QUESTION.
A. ALL WORK SHALL BE WARRANTED SATISFACTORY, IN MATERIALS AND
WORKMANSHIP, FOR ONE (1) YEAR, OR FOR THE PERIOD OF WARRANTY
DRAWN by CRH
2, THESE CONTRACT DOCUMENTS ARE INTENDED TO DESCRIBE ONLY THE SCOPE
LONGER. THEREFORE, ONLY COMPETENT MECHANICS CAPABLE OF PRODUCING
CHECKED by DDW
AND APPEARANCE OF THE REAL PROPERTY IMPROVEMENTS, INCLUDING THE
COVER SHEET
DATE issued 0506.2008
PERFORMANCE AND LEVEL OF QUALITY EXPECTED OF ITS COMPONENTS. IT IS
ACCEPTANCE OF THE CONDITIONS AND SURFACE CONCERNED. IF ANY SUCH
REVISIONS
CONDITIONS ARE UNACCEPTABLE, THE GENERAL CONTRACTOR SHOULD BE
NOTIFIED AT ONCE AND NO WORK DONE UNTIL CONDITIONS ARE ACCEPTABLE.
5. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER, OR THEIR
SCALE AS NOTED
AUTHORIZED AGENT, TO DETERMINE ALL EXISTING MATERIALS TO BE SALVAGED
AND RETAINED BY THE OWNER. THE CONTRACTOR SHALL REMOVE SALVAGEABLE
SUOtl21n.`�a/ 01- -,
IIL L111M BCU�ijulLO
MATERIALS FROM THE SPACE AND STORE IN LOCATION AS DIRECTED BY THE
OWNER. ALL OTHER MATERIALS, RUBBISH AND DEBRIS SHALL BE REMOVED AND
PROMPTLY DISPOSED OF BY THE CONTRACTOR AT AN OFFSITE LOCATION. THE
CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ASSURE THAT ALL
PROPERTY IMPROVEMENTS (I.E., PARTITIONS, DOORS, FRAMES, CABINETS, CEILING
GRID, CEILING TILE AND THE ELECTRICAL AND MECHANICAL DEVICES, ETC.) WHICH
ARE TO REMAIN, ARE PROTECTED FROM DAMAGE OF ANY KIND.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING
WORK WHICH IS TO REMAIN, AND DETERMINING WHETHER OF NOT IT CAN BE
REPAIRED AND /OR RECONDITIONED TO MATCH AND BLEND WITH NEW
MATERIALS AND COMPONENTS. THE CONTRACTOR SHALL OBTAIN THE OWNER'S
APPROVAL OF THE SCOPE AND LIMIT OF SAID WORK PRIOR TO STARTING
CONSTRUCTION. NO CHANGE ORDERS SHALL BE ACCEPTED FOR COMPLETED
WORK THAT DOES NOT CONFORM TO THE STANDARDS ESTABLISHED AT THE TIME
OF BID ACCEPTANCE.
7. THE CONTRACTORS SHALL BE RESPONSIBLE FOR FAMILIARIZING THEMSELVES
WITH THE PROJECT SCOPE OF WORK, BUILDING STANDARDS, SCHEDULE AND
DEADLINES. THE CONTRACTOR SHALL FURTHER BE RESPONSIBLE FOR ADVISING THE
OWNER OF ALL LONG LEAD TIME ITEMS AFFECTING THE PROJECT SCHEDULE AND
SHALL, UPON REQUEST FROM THE OWNER, SUBMIT ORDER CONFIRMATIONS AND
DELIVERY DATES FOR SUCH LONG LEAD ITEMS TO THE OWNER.
8. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER ACCESS
TO THE SPACE AND THE ONGOING CONSTRUCTION WORK. DISRUPTIVE OR
POTENTIALLY HAZARDOUS CONSTRUCTION ACTIVITIES SHALL BE COORDINATED
TO OCCUR AFTER NORMAL OFFICE HOURS, SO AS TO MINIMIZE DISTURBANCE TO
BUILDING OCCUPANTS.
O
9. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER FOR
iiiiiiiiiiiiii■
H
DELIVERY TO THE SPACE OF ALL BUILDING MATERIALS, AND SHALL ARRANGE FOR
USAGE OF THE FREIGHT ELEVATOR (OR SUCH ELEVATOR DESIGNATED). IN DELMERY
OF BUILDING MATERIALS INVOLVES THE USE OF FACILITIES OTHER THAN THE
AVAILABLE ELEVATORS, THE CONTRACTOR SHALL COORDINATE SUCH ACTIVITIES IN
SUCH A MANNER WHICH POSES NO HAZARD TO ANY PERSONNEL WITHIN OR
AROUND THE BUILDING OR BUILDING SITE.
10. ALL CONTRACTOR OR SUPPLIER REQUESTS FOR SUBSTITUTIONS OF SPECIFIED
ITEMS SHALL BE SUBMITTED IN WRITING, ACCOMPANIED BY THE ALTERNATIVE
Z
PRODUCT INFORMATION, TO THE ARCHITECT. ALL SUBTITUTIONS SHALL BE
O
SUBMITTED TO THE ARCHITECT, NOT LATER THAN FIVE (5) WORKING DAYS PRIOR
U j
TO BID OPENING DATE. SUBSTITUTIONS SHALL BE CONSIDERED ONLY IF THEY DO
NOT SACRIFICE QUALITY, APPEARANCE AND FUNCTION, UNDER NO
J
O
CIRCUMSTANCES WILL THE OWNER BE REQUIRED TO PROVE THAT A PRODUCT
0
PROPOSED FOR SUBSTITUTION IS OR IS NOT OF EQUAL QUALITY TO THE PRODUCT
SPECIFIED.
a
11. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR SCALE THE DRAWINGS
TO DETERMINE THE DIMENSIONS. SEE FLOOR PLAN FOR DIMENSION LOCATIONS.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF ALL
Q
SELECTED MATERIALS WHICH SHALL BE COMPLETE IN ALL RESPECTS PRIOR TO THE
FINAL ACCEPTANCE, UNLESS OTHERWISE NOTED.
13. THE CONTRACTOR SHALL PRESERVE ALL PRINTED INSTRUCTIONS AND
WARRANTIES THAT ARE PROVIDED WITH EQUIPMENT OR MATERIALS USED, AND
DELIVER PRINTED MATTER TO THE OWNER AT THE TIME OF SUBSTANTIAL
COMPLETION. THE CONTRACTOR SHALL INSTRUCT THE OWNER OR OWNER'S
Ica
REPRESENTATIVE IN THE PROPER USE OF THE EQUIPMENT FURNISHED IN THIER
TRADE.
14. GENERAL CONTRACTOR IS TO PROVIDE A THOROUGH CONSTRUCTION
CLEAN -UP AT CLOSE -OUT, INCLUDING VACUUMING AND CLEANING ALL
CARPETING.
w
V)
ce w
ad
3
O
to
m
N
LU
a
ti
w
Ln
O
�
N
z
OU
A000 COVER SHEET
A100 LIFE SAFETY AND LEASE AREA PLAN AND GENERAL NOTES
A101 FIRST FLOOR AREA B DEMOLITION AND ARCHITECTURAL PLANS
A102 FIRST FLOOR AREA B REFLECTED CEILING PLAN
A300 DETAILS
SYMBOL IDENTIFICATION
19— DETAIL NUMBER
SHEET NUMBER
ELEVATION NUMBER
A3.1 SHEET NUMBER
SECTION NUMBER
SHEET NUMBER
4.
1 WALL TYPE
5' -9" WALL HEIGHT i IF APPLICABLE i
CEILING TYPE
CEILING HEIGHT A.F. F.
DOOR ID NUMBER
o ( REFER TO DOOR SCHEDULE)
EXISTING DOOR TO REMAIN
( REFER TO DOOR SCHEDULE)
DEMOLITION NOTE
OPLAN NOTE /'KIT OF PARTS" NOTE
O WALL FINISH TAG
FXXIX TOILET ACCESSORY NOTE
NEW WALL CONSTRUCTION
:. EXISTING WALL CONSTRUCTION
— - - - — TO BE REMOVED
MASONRY CONTROLJOINT (ON ELEVATION)
618 East Market Street
Indianapolis, Indiana 46202
ph 317/264.8162 fx 317/264.8165
a x i s a r c In . c o m
Ir.1;NFDAI NnT1PC•
Scope Drawings
These drawings indicate the general scope of
the project in terms of architectural design
concept, the dimensions oithe building,
the majorarchitechrral elements and the
A. SCOPE CONTRACT DOCUMENTS
typeofstruc lural,nrochanrcalanderectricol
`\\\\\\\`��o�uuluuunR
ALL APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING JURISDICTION
systems. The drawings do not necessanly
3. THESE CONTRACT DOCUMENTS DO NOT ATTEMPT TO INSTRUCT THE
0.., �E
�`: No.
indicate or describe all work required /or
1. SHOULD THERE BE ANY QUESTIONS REGARDING THE CONTRACT DOCUMENTS
SPECIFICATIONS IN THAT THEY DO REQUIRE THAT ALL MANUFACTURED ITEMS,
fa#pedormance and completion of #;e
EXISTING CONDITIONS AND /OR DESIGN INTENT, THE CONTRACTOR SHALL BE
�* = STATE OF *`
'''
roquiromenhlscopeoniicat On he bass
oflhe general scope indxabd or described,
RESPONSIBLE FOR OBTAINING A CLARIFICATION FROM THE ARCHITECT PRIOR TO
THE CONTRACT DOCUMENTS ARE MORE STRINGENT. ANY MISCELLANEOUS ITEMS
the trade contractors shatl fumrsh oB items
BID SUBMITTAL AND PROCEDING WITH ANY WORK, OR RELATED WORK, IN
edlor 6e proper ezecu on and
comp comp kMion of dte work.
QUESTION.
A. ALL WORK SHALL BE WARRANTED SATISFACTORY, IN MATERIALS AND
WORKMANSHIP, FOR ONE (1) YEAR, OR FOR THE PERIOD OF WARRANTY
DRAWN by CRH
2, THESE CONTRACT DOCUMENTS ARE INTENDED TO DESCRIBE ONLY THE SCOPE
LONGER. THEREFORE, ONLY COMPETENT MECHANICS CAPABLE OF PRODUCING
CHECKED by DDW
AND APPEARANCE OF THE REAL PROPERTY IMPROVEMENTS, INCLUDING THE
COVER SHEET
DATE issued 0506.2008
PERFORMANCE AND LEVEL OF QUALITY EXPECTED OF ITS COMPONENTS. IT IS
ACCEPTANCE OF THE CONDITIONS AND SURFACE CONCERNED. IF ANY SUCH
REVISIONS
INCUMBANT THAT UPON THE CONTRACTOR THAT ALL WORK COMPLETED AND
MATERIALS INSTALLED BE IN FULL COMPLIANCE, AS A MINIMUM STANDARD, WITH
`\\\\\\\`��o�uuluuunR
ALL APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING JURISDICTION
Fa•.;
3. THESE CONTRACT DOCUMENTS DO NOT ATTEMPT TO INSTRUCT THE
0.., �E
�`: No.
CONTRACTOR IN THE DETAILS OF HIS TRADE. THEY ARE PERFORMANCE
_ Q AR- 19400087 =:
SPECIFICATIONS IN THAT THEY DO REQUIRE THAT ALL MANUFACTURED ITEMS,
MATERIALS AND EQUIPMENT BE INSTALLED IN STRICT ACCORDANCE WITH THE
�* = STATE OF *`
'''
MANUFACTURER'S RECOMMENDED SPECIFICATIONS, EXCEPT IN THE CASE WHERE
'% "'•.,�/� �P,,.,'r`
"'•,,,D I A
THE CONTRACT DOCUMENTS ARE MORE STRINGENT. ANY MISCELLANEOUS ITEMS
:,���� q ,G� \\\\o 0
R,CH 11 TI�1\`\po�
OR MATERIALS NOT SPECIFICALLY NOTED, BUT REQUIRED FOR PROPER
INSTALLATION SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR(S).
A. ALL WORK SHALL BE WARRANTED SATISFACTORY, IN MATERIALS AND
WORKMANSHIP, FOR ONE (1) YEAR, OR FOR THE PERIOD OF WARRANTY
CUSTOMARY, OR STIPULATED FOR THE TRADE, CRAFT, OR PRODUCT, WHICHEVER IS
LONGER. THEREFORE, ONLY COMPETENT MECHANICS CAPABLE OF PRODUCING
GOOD WORKMANSHIP CUSTOMARY TO THE TRADE SHOULD BE USED.
COVER SHEET
COMMENCING WORK BY A CONTRACTOR OR SUBCONTRACTOR CONSTITUTES
ACCEPTANCE OF THE CONDITIONS AND SURFACE CONCERNED. IF ANY SUCH
CONDITIONS ARE UNACCEPTABLE, THE GENERAL CONTRACTOR SHOULD BE
NOTIFIED AT ONCE AND NO WORK DONE UNTIL CONDITIONS ARE ACCEPTABLE.
5. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER, OR THEIR
SCALE AS NOTED
AUTHORIZED AGENT, TO DETERMINE ALL EXISTING MATERIALS TO BE SALVAGED
AND RETAINED BY THE OWNER. THE CONTRACTOR SHALL REMOVE SALVAGEABLE
SUOtl21n.`�a/ 01- -,
IIL L111M BCU�ijulLO
MATERIALS FROM THE SPACE AND STORE IN LOCATION AS DIRECTED BY THE
OWNER. ALL OTHER MATERIALS, RUBBISH AND DEBRIS SHALL BE REMOVED AND
PROMPTLY DISPOSED OF BY THE CONTRACTOR AT AN OFFSITE LOCATION. THE
CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ASSURE THAT ALL
PROPERTY IMPROVEMENTS (I.E., PARTITIONS, DOORS, FRAMES, CABINETS, CEILING
GRID, CEILING TILE AND THE ELECTRICAL AND MECHANICAL DEVICES, ETC.) WHICH
ARE TO REMAIN, ARE PROTECTED FROM DAMAGE OF ANY KIND.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING
WORK WHICH IS TO REMAIN, AND DETERMINING WHETHER OF NOT IT CAN BE
REPAIRED AND /OR RECONDITIONED TO MATCH AND BLEND WITH NEW
MATERIALS AND COMPONENTS. THE CONTRACTOR SHALL OBTAIN THE OWNER'S
APPROVAL OF THE SCOPE AND LIMIT OF SAID WORK PRIOR TO STARTING
CONSTRUCTION. NO CHANGE ORDERS SHALL BE ACCEPTED FOR COMPLETED
WORK THAT DOES NOT CONFORM TO THE STANDARDS ESTABLISHED AT THE TIME
OF BID ACCEPTANCE.
7. THE CONTRACTORS SHALL BE RESPONSIBLE FOR FAMILIARIZING THEMSELVES
WITH THE PROJECT SCOPE OF WORK, BUILDING STANDARDS, SCHEDULE AND
DEADLINES. THE CONTRACTOR SHALL FURTHER BE RESPONSIBLE FOR ADVISING THE
OWNER OF ALL LONG LEAD TIME ITEMS AFFECTING THE PROJECT SCHEDULE AND
SHALL, UPON REQUEST FROM THE OWNER, SUBMIT ORDER CONFIRMATIONS AND
DELIVERY DATES FOR SUCH LONG LEAD ITEMS TO THE OWNER.
8. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER ACCESS
TO THE SPACE AND THE ONGOING CONSTRUCTION WORK. DISRUPTIVE OR
POTENTIALLY HAZARDOUS CONSTRUCTION ACTIVITIES SHALL BE COORDINATED
TO OCCUR AFTER NORMAL OFFICE HOURS, SO AS TO MINIMIZE DISTURBANCE TO
BUILDING OCCUPANTS.
O
9. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER FOR
iiiiiiiiiiiiii■
H
DELIVERY TO THE SPACE OF ALL BUILDING MATERIALS, AND SHALL ARRANGE FOR
USAGE OF THE FREIGHT ELEVATOR (OR SUCH ELEVATOR DESIGNATED). IN DELMERY
OF BUILDING MATERIALS INVOLVES THE USE OF FACILITIES OTHER THAN THE
AVAILABLE ELEVATORS, THE CONTRACTOR SHALL COORDINATE SUCH ACTIVITIES IN
SUCH A MANNER WHICH POSES NO HAZARD TO ANY PERSONNEL WITHIN OR
AROUND THE BUILDING OR BUILDING SITE.
10. ALL CONTRACTOR OR SUPPLIER REQUESTS FOR SUBSTITUTIONS OF SPECIFIED
ITEMS SHALL BE SUBMITTED IN WRITING, ACCOMPANIED BY THE ALTERNATIVE
Z
PRODUCT INFORMATION, TO THE ARCHITECT. ALL SUBTITUTIONS SHALL BE
O
SUBMITTED TO THE ARCHITECT, NOT LATER THAN FIVE (5) WORKING DAYS PRIOR
U j
TO BID OPENING DATE. SUBSTITUTIONS SHALL BE CONSIDERED ONLY IF THEY DO
NOT SACRIFICE QUALITY, APPEARANCE AND FUNCTION, UNDER NO
J
O
CIRCUMSTANCES WILL THE OWNER BE REQUIRED TO PROVE THAT A PRODUCT
0
PROPOSED FOR SUBSTITUTION IS OR IS NOT OF EQUAL QUALITY TO THE PRODUCT
SPECIFIED.
a
11. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR SCALE THE DRAWINGS
TO DETERMINE THE DIMENSIONS. SEE FLOOR PLAN FOR DIMENSION LOCATIONS.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF ALL
Q
SELECTED MATERIALS WHICH SHALL BE COMPLETE IN ALL RESPECTS PRIOR TO THE
FINAL ACCEPTANCE, UNLESS OTHERWISE NOTED.
13. THE CONTRACTOR SHALL PRESERVE ALL PRINTED INSTRUCTIONS AND
WARRANTIES THAT ARE PROVIDED WITH EQUIPMENT OR MATERIALS USED, AND
DELIVER PRINTED MATTER TO THE OWNER AT THE TIME OF SUBSTANTIAL
COMPLETION. THE CONTRACTOR SHALL INSTRUCT THE OWNER OR OWNER'S
Ica
REPRESENTATIVE IN THE PROPER USE OF THE EQUIPMENT FURNISHED IN THIER
TRADE.
14. GENERAL CONTRACTOR IS TO PROVIDE A THOROUGH CONSTRUCTION
CLEAN -UP AT CLOSE -OUT, INCLUDING VACUUMING AND CLEANING ALL
CARPETING.
W
Uj N
Z
O** J
F- 0
a
Wa
Z
0
O —
Z
15. LOCATION OF DUMPS TER MUST BE COORDINATED WITH AND APPROVED BY
OWNER.
`\\\\\\\`��o�uuluuunR
Fa•.;
0.., �E
�`: No.
B. DESIGN COMPLIANCE REVIEW
_ Q AR- 19400087 =:
1. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF CUSTOM FABRICATION
�* = STATE OF *`
'''
OR MANUFACTURE, AND PHYSICAL SMAPLES OF ALL FINISH MATERIALS SPECIFIED
'% "'•.,�/� �P,,.,'r`
"'•,,,D I A
TO THE ARCHITECT FOR REVIEW AND APPROVAL BY THE OWNER.
:,���� q ,G� \\\\o 0
R,CH 11 TI�1\`\po�
2. REVIEWED SHOP DRAWINGS AND SCHEDULES PREPARED BY OTHERS SHALL NOT
BE CONSTRUED TO BE PART OF THE CONTRACT DOCUMENTS, AS THE ARCHITECT
ASSUMES NO RESPONSIBILITY FOR DRAWINGS, SCHEDULES AND /OR
SPECIFICATIONS FOR WORK ON THE PROJECT PREPARED OR ACCOMPLISHED BY
OTHERS.
COVER SHEET
3. THE ARCHITECT WILL REVIEW THE DRAWINGS AND SMAPLES FOR CONFORMITY
WITH THE INFORMATION CONTAII`0,Q $N CONSTRUCTION DOCUMENTS,
AND RETURN THd( 4 "IIT 5,TO.T,W&gft4CTOR WITHIN FIVE (5) WORKING
DAYS OF RECEIPT, U. ,.AS:"IGi,�f` OTHERWii rP, &?V, .W;ED FW BY THE OWNER.
SCALE AS NOTED
'100 leo
-01 ou t) --
SUOtl21n.`�a/ 01- -,
IIL L111M BCU�ijulLO
9
AUUV °
N