HomeMy WebLinkAbout08050111.11wxwoplop
PLROMOawNIe
MCIM
wxw
Oclow
WHOM
...... ....... ........... . ---
- ---- ------
.................
------------------ -
..........
. . . . . . . . . . . . . . . . . . .
- - - - - - - - - - - - - - -
WE
I DEMOLITION NOTES I
1.) RTUS 1 & 2 REMOVE ALL DUCT BACK TO THE SUPPLY AND RETURN
PLENUM DROPS
2.) REMOVE ALL FD's, FSs AND PVC STUBBES AND CAP BELOW FLOORS
3.) REMOVE DUCT AND CAP CURB SEALED FROM WEATHER
4.) REMOVE STEEL DUCT DROPS CAP & SEAL CURB, MAKE WEATHER TITS
wxw,mwxw
wxr.
71DRADLIar
Ili
7-/777-/777-/777777-7777-/-/-A-----;''/77-7-/77-/777-/77M77 � 7',— I fl
Nil
I Nil
01/111111
1 FLOOR PLAN - DEMO WORK
"AMCON DESIGN%pd_k)go2.jpg
CV THE A�TE8T AND -PAUG-ON -COWAES,�ik AND EISUBSZIAAES,
ALL INFORMATION CONTAINED HEREIN IS OONFIDEN71AL ITS SUBMSSION AND
DISTRIBUTION TO OTrIER PARTIES 15 NOT TO BE CONSTRUED AS PUBLICATION
IN DEROGATION OF COMMON LAW COPYRIGHT, INMLECTUAL PROPERTY
RIGHTS OR 07HER RESERVED WITS.
ALL IWORMAIION CONTAINED HEREIN CONSTITUTES THE ORIGNAI. AND
UNIPUEILISHED WOW OF THE ARCHTECT, PETER VANTUM AND PARAGON
DESIGN SERVICES, L.L.C.
NO PART OR WHOLE OF THIS DESIGN, THESE DRAVANGS OR THE RESIXING
BUIILDING OR BUILDINGS, OR PORTIONS OF THE RESOLING BUILDING OR
BUILDINGS MAY CAI ;RnED,,=7ED, 1W ED, PUBLISHED
O&r
MODFIED OR WSE DI WAY THE SPECFIC
AND PRIOR WRITTEN CONSENT OF THE ARC141ECT, PETER WINTERS, AND
PARAGON DESIGN SERVICES, L.L.C.
@COPYRIGHT 2007 PETER VANTERS, ALA, INDIANAPOLIS
PRELIMINARY
NOT FOR
CONSTRUCTI01
OFD
.....................
...............
...............
.................
-- --------------
------------
... .. ... ..... ..
--------- ---- ---
------------------
LL...
0
--- ------ ------
-- - - -------------
;--/'7'7.7-/7 7,-1-7 7Tr7;r/?7;/-7 7,-1-7
.
.. ..........
----------- -
,11114
) #3
+D FS
LJ
wxwoplop
PLROMOawNIe
MCIM
wxw
Oclow
WHOM
...... ....... ........... . ---
- ---- ------
.................
------------------ -
..........
. . . . . . . . . . . . . . . . . . .
- - - - - - - - - - - - - - -
WE
I DEMOLITION NOTES I
1.) RTUS 1 & 2 REMOVE ALL DUCT BACK TO THE SUPPLY AND RETURN
PLENUM DROPS
2.) REMOVE ALL FD's, FSs AND PVC STUBBES AND CAP BELOW FLOORS
3.) REMOVE DUCT AND CAP CURB SEALED FROM WEATHER
4.) REMOVE STEEL DUCT DROPS CAP & SEAL CURB, MAKE WEATHER TITS
wxw,mwxw
wxr.
71DRADLIar
Ili
7-/777-/777-/777777-7777-/-/-A-----;''/77-7-/77-/777-/77M77 � 7',— I fl
Nil
I Nil
01/111111
1 FLOOR PLAN - DEMO WORK
"AMCON DESIGN%pd_k)go2.jpg
CV THE A�TE8T AND -PAUG-ON -COWAES,�ik AND EISUBSZIAAES,
ALL INFORMATION CONTAINED HEREIN IS OONFIDEN71AL ITS SUBMSSION AND
DISTRIBUTION TO OTrIER PARTIES 15 NOT TO BE CONSTRUED AS PUBLICATION
IN DEROGATION OF COMMON LAW COPYRIGHT, INMLECTUAL PROPERTY
RIGHTS OR 07HER RESERVED WITS.
ALL IWORMAIION CONTAINED HEREIN CONSTITUTES THE ORIGNAI. AND
UNIPUEILISHED WOW OF THE ARCHTECT, PETER VANTUM AND PARAGON
DESIGN SERVICES, L.L.C.
NO PART OR WHOLE OF THIS DESIGN, THESE DRAVANGS OR THE RESIXING
BUIILDING OR BUILDINGS, OR PORTIONS OF THE RESOLING BUILDING OR
BUILDINGS MAY CAI ;RnED,,=7ED, 1W ED, PUBLISHED
O&r
MODFIED OR WSE DI WAY THE SPECFIC
AND PRIOR WRITTEN CONSENT OF THE ARC141ECT, PETER WINTERS, AND
PARAGON DESIGN SERVICES, L.L.C.
@COPYRIGHT 2007 PETER VANTERS, ALA, INDIANAPOLIS
PRELIMINARY
NOT FOR
CONSTRUCTI01
PAPARAGON DE8lGN%pd—Wgo5 PW.Jpg
DATE, i,AA RCH 4., 20,(18
PRC)JECIF
17
REV:SIONS�
1.1.1.11.-- ...... . ..... -- -, ................ ..... ....................
MARK DA"ll",-
............... ff
..................... ............
----- - ----- - ------- . ..........
----------
............. . ....... .... ... . ...... ...................
..........
----------------- ------ - - - ---- - - ---- - - ------------
L 1� ----- ------- --
M 1 001
FLOOR PLAN
DEMOLITION WORK
- - ----- - ------
LL...
0
-- - - -------------
.
.. ..........
----------- -
PAPARAGON DE8lGN%pd—Wgo5 PW.Jpg
DATE, i,AA RCH 4., 20,(18
PRC)JECIF
17
REV:SIONS�
1.1.1.11.-- ...... . ..... -- -, ................ ..... ....................
MARK DA"ll",-
............... ff
..................... ............
----- - ----- - ------- . ..........
----------
............. . ....... .... ... . ...... ...................
..........
----------------- ------ - - - ---- - - ---- - - ------------
L 1� ----- ------- --
M 1 001
FLOOR PLAN
DEMOLITION WORK