Loading...
HomeMy WebLinkAbout08040129.10PLUMBING DEMOLITION NOTES: SYMBO : ABOVE FINISHED GRADE AV ACID /CHEMICAL VENT (ALL SYMBOLS SHOWN MAY NOT APPEAR ON DRAWINGS) ACID /CHEMICAL VENT THRU ROOF AW 1. INFORMATION PERTAINING TO EXISTING PROJECT CONDITIONS, ADB ACID /CHEMICAL DILUTION BASIN AWC AUTOMATIC WASHER CONNECTION SUCH AS PRESENT LOCATIONS OF ARCHITECTURAL AND - -- COLD WATER PIPING ® WATER MAIN /SERVICE VALVEBOX STRUCTURAL BUILDING COMPONENTS, MECHANICAL AND CA COMPRESSED AIR CB CATCH BASIN ELECTRICAL EQUIPMENT, PIPING, DUCTWORK, ROUGH -INS AND - - -- HOT WATER PIPING CHECK VALVE FIRE HYDRANT OTHER MISCELLANEOUS CONSTRUCTION APPEARS ON THE CLVTR CLEAR WATER VENT THRU ROOF CLW CLEAR WATER WASTE DRAWINGS. WHILE SUCH INFORMATION HAS BEEN BASED ON CLEAN OUT COTG CLEAN OUT TO GRADE COND AVAILABLE RECORDS AND COLLECTED WITH REASONABLE CARE, - - --- HOT WATER RETURN PIPING CID SOLENOID VALVE THE ARCHITECT AND ENGINEER DOES NOT ASSUME ANY EXPRESSED CUP SINK CSS CLINICAL SERVICE SINK CSW OR IMPLIED GUARANTEE THAT CONDITIONS SO INDICATED ARE -NP- NON- POTABLE WATER PIPING ® MANHOLE OR CATCH BASIN SHOWN ENTIRELY COMPLETE, CORRECT AND REPRESENTATIVE DRINKING FOUNTAIN DI DEIONIZED WATER DN OF THOSE ACTUALLY EXISTING. ALL CONTRACTORS SHALL SATISFY -TW- TEMPERED WATER PIPING -�- METER THEMSELVES AS TO ALL EXISTING JOB CONDITIONS PRIOR TO DRAIN TILE CLEANOUT DTR DRAIN TILE RECEIVER EEW BIDDING, AND VERIFY ALL DIMENSIONS AT THE SITE. EC ELECTRICAL CONTRACTOR EL REDU R REDU TE R OR REDUCED BACKFLOW PREVENLTE ESEW -S- SOFT WATER PIPING -'=� PRESSURE BACKF PREVENTER 2. ALL EXISTING PLUMBING SHOWN HATCHED AND /OR EWC ELECTRIC WATER COOLER EXIST. EXISTING DESIGNATED WITH AN "X' SHALL BE REMOVED. ALL -H- HARD WATER PIPING FLOOR DRAIN PRESSURE REDUCING VALVE PLUMBING NOT INDICATED TO BE REMOVED SHALL FH FUME HOOD HYD FIRE HYDRANT REMAIN. -PW- PURE WATER PIPING GAS SHUT -OFF VALVE 3. WHERE EXISTING PIPING IS TO BE REMOVED AT A -DI - DEIONIZED WATER - - BALANCING VALVE SLAB ON GRADE, CAP EXISTING PIPING FLUSH OR WATER MAIN WS WATER SOFTENER WV BELOW FLOOR LEVEL SO AS NOT TO INTERFERE WITH NEW FLOOR FINISHES. -DIS- DEIONIZED SUPPLY PIPING - CHECK VALVE 4. EXISTING PIPING SHALL BE REMOVED BACK TO -DIR- DEIONIZED RETURN PIPING Q WATER HAMMER ARRESTER PIPING TO REMAIN. EXISTING PIPING SHALL NOT BE ABANDONED IN PLACE UNLESS APPROVED BY -RO- REVERSE OSMOSIS SUPPLY PIPING I TEST CONNECTION THE ENGINEER AND OWNER'S REPRESENTATIVE. -ROR- REVERSE OSMOSIS RETURN PIPING CAPPED CONNECTION 5. REPAIR PIPE INSULATION ON EXISTING PIPING WHERE DAMAGED BY DEMOLITION OR NEW WORK. -WS- WATER SERVICE LATERAL UNION 6. DEMOLITION WORK SHALL BE COORDINATED WITH -WM- WATER MAIN I� THERMOMETER PHASED CONSTRUCTION. PLUMBING FIXTURES LOCATED OUTSIDE OF THE CURRENT CONSTRUCTION PHASE SHALL -SS- SANITARY WASTE IN GROUND Q PRESSURE GAUGE REMAIN OPERATIONAL UNLESS APPROVED BY THE OWNER'S REPRESENTATIVE. - - - - - SANITARY VENT PIPING IN GROUND `0 0 ROOF DRAIN 7. REFER TO THE SPECIFICATIONS FOR CUTTING AND PATCHING REQUIREMENTS. -ST- STORM WATER PIPING IN GROUND O OVERFLOW ROOF DRAIN -DT- DRAINTILE ® FLOOR DRAIN 8. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING NECESSARY FOR THE WORK OF THIS CONTRACT UNLESS SPECIFICALLY INDICATED OTHERWISE SANITARY WASTE PIPING Q SITE DRAIN WITHIN THE ARCHITECTURAL DRAWINGS OR SPECIFICATIONS. - - SANITARY VENT PIPING ® TRENCH DRAIN 9. ALL EXISTING BRANCH WASTE PIPING SERVING NEW FIXTURES -CL- CLEARWATER WASTE PIPING ® FLOOR SINK SHALL BE RODDED AND FLUSHED BACK TO THE WASTE STACK OR BUILDING DRAIN TO INSURE PROPER DRAINAGE. -CL- CLEARWATER VENT PIPING CLEAN OUT 10. SEAL ALL EXISTING PIPE PENETRATIONS IN EXISTING CONSTRUCTION WHERE PIPING IS REMOVED. SEALED - — STORM WATER CONDUCTOR PIPING —O FLOOR CLEAN OUT PENETRATIONS SHALL MATCH RATING OF THE CONSTRUCTION IN WHICH THEY OCCUR. -OF- OVERFLOW PIPING -4- HOSE BIBB 11. PLUMBING CONTRACTOR SHALL REMOVE, AND REINSTALL -AW- ACID /CHEMICAL WASTE PIPING EQUIPMENT BY OTHERS. PLUMBING OR REPLACE, EXISTING CEILINGS AS REQUIRED FOR CONNECTION BY PLUMBING CONTRACTOR. ACCESS TO PLUMBING SYSTEMS. THIS INCLUDES, -AV- ACID /CHEMICAL VENT PIPING l9 CONNECT TO EXISTING PIPING CEILINGS ON THE FLOORS BELOW THE PROJECT AREA AND AREAS OUTSIDE THE PROJECT CONSTRUCTION LIMITS. -GW- GREASE WASTE PIPING XO EXISTING TO BE REMOVED 12. WHERE EXISTING PIPING IS REMOVED, REMAINING - G - GAS PIPING EXISTING PIPING PIPING SHALL BE CAPPED BELOW FINISHED FLOORS, WITHIN WALLS AND ABOVE SUSPENDED CEILINGS. -PD- PUMP DISCHARGE PIPING f /fi EXISTING PIPING TO BE REMOVED 13. COORDINATE ALL SHUTDOWNS AND DISRUPTIONS WITH THE HOT WATER TEMPERATURE MAINTENANCE O FIXTURE UNIT (WATER SUPPLY OR WASTE) OWNER AND THE CONSTRUCTION MANAGER. HEAT TRACE SYSTEM FREEZE PROTECTION HEAT TRACE SYSTEM FINISHED FLOOR ELEVATION 14. CONTRACTOR SHALL VISIT JOB SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS PRIOR TO STARTING WORK. -CA- COMPRESSED AIR PIPING O FOOD SERVICE EQUIPMENT TAG 15. EXISTING BUILDING M.E.P. DRAWINGS WERE NOT AVAILABLE -LA- LABORATORY AIR PIPING HOT WATER TEMPERATURE MAINTENANCE DURING THE DESIGN PHASE. ALL DEMOLITION AND NEW WORK, 8S H1 CIRCUIT NUMBER /START POINT DESIGNATION INCLUDING UNDERGROUND PIPING, MUST BE FIELD VERIFIED. -LV- LABORATORY VACUUM PIPING E HOT WATER TEMPERATURE MAINTENANCE 16. SAWCUT AND PATCH EXISTING FLOORS AS REQUIRED FOR ALL H1 CIRCUIT NUMBER /END POINT DESIGNATION DEMOLITION AND NEW BELOW -FLOOR WORK. FIELD VERIFY ALL EXISTING AND NEW PIPING INVERT ELEVATIONS. 17. FOR ALL NEW SHOWER VALVES, SET AND TEST FOR PROPER TEMPERATURE AS REQUIRED BY ALL APPLICABLE CODES. 18. COORDINATE DEMOLITION AND NEW PLUMBING WORK WITH ALL OTHER TRADES. 19. THERE IS NO STORM DRAINAGE WORK REQUIRED FOR THIS PROJECT. ALL BUILDING STORM DRAINAGE IS PER GUTTERS AND DOWNSPOUTS. 20. INSTALL ALL SYSTEMS PER ALL APPLICABLE CODES AND REGULATIONS. (ALL ABBRMTIONS SHOWN MAY NOT APPEAR ON DRAWPM) AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE AV ACID /CHEMICAL VENT AVTR ACID /CHEMICAL VENT THRU ROOF AW ACID /CHEMICAL WASTE ADB ACID /CHEMICAL DILUTION BASIN AWC AUTOMATIC WASHER CONNECTION BFP BACKFLOW PREVENTER BT BATH TUB BVA BALANCING VALVE CA COMPRESSED AIR CB CATCH BASIN CC CAPPED CONNECTION CKVA CHECK VALVE CLV CLEAR WATER VENT CLVTR CLEAR WATER VENT THRU ROOF CLW CLEAR WATER WASTE CO CLEAN OUT COTG CLEAN OUT TO GRADE COND CONDUCTOR CONN CONNECTION CID CIRCULATING PUMP CS CUP SINK CSS CLINICAL SERVICE SINK CSW COLD SOFT WATER CHW COLD HARD WATER CW COLD WATER DF DRINKING FOUNTAIN DI DEIONIZED WATER DN DOWN DR DRAIN DT DRAIN TILE DTCO DRAIN TILE CLEANOUT DTR DRAIN TILE RECEIVER EEW EMERGENCY EYE WASH EC ELECTRICAL CONTRACTOR EL ELEVATION ESEW EMERGENCY SHOWER -EYE WASH ES EMERGENCY SHOWER ET EXPANSION TANK EWC ELECTRIC WATER COOLER EXIST. EXISTING FCO FLOOR CLEAN OUT FD FLOOR DRAIN FFEL FINISHED FLOOR ELEVATION FH FUME HOOD HYD FIRE HYDRANT FS FLOOR SINK G GAS GCB GARAGE CATCH BASIN GT GREASE TRAP GW GREASE WASTE PLUMBING SHEET INDEX No. TITLE P -1 NOTES, SYMBOLS AND ABBREVIATIONS P -2 FOUNDATION PLANS P -3 FIRST FLOOR PLANS P -4 ENLARGED PLANS P -5 ISOMETRICS P -6 DETAILS AND SCHEDULES HB HOSE BIBB HW HOT WATER HWR HOT WATER RETURN IE INVERT ELEVATION LA LAB AIR LV LAB VACUUM L /LAV LAVATORY LS LAB SINK LT LAUNDRY TRAY MB MOP BASIN MC MECHANICAL CONTRACTOR MH MANHOLE NC NORMALLY CLOSED NP NON - POTABLE OF OVERFLOW SD SITE DRAIN PC PLUMBING CONTRACTOR PD PUMP DISCHARGE PG PRESSURE GAUGE PRVA PRESSURE REDUCING VALVE PW PURE WATER RIO ROUGH -IN ONLY RD ROOF DRAIN RPBFP REDUCED PRESSURE 'Q BACKFLOW PREVENTER RO REVERSE OSMOSIS S /SK SINK SAN SANITARY SE SEWAGE EJECTOR SH SHOWER SP SUMP PUMP SS SERVICE SINK ST STORAGE TANK SVA SOLENOID VALVE TC TEST CONNECTION TO TRENCH DRAIN T&P VA TEMPERATURE & PRESSURE Z WQ�^ RELIEF VALVE TIP TRAP PRIMER TW TEMPERED WATER U /URI URINAL UNIXC UNEXCAVATED V VENT VA VALVE VTR VENT THRU ROOF W WASTE WC WATER CLOSET WC /L COMBINATION WATER CLOSET LAVATORY WCO WALL CLEAN OUT WH WATER HEATER WHA WATER HAMMER ARRESTER WM WATER MAIN WS WATER SOFTENER WV WET VENT tR ��'� 9G 87 �p �►� STATE ►t� % O t:0 110 O DU & HATEAU 10101 Innovation Dnve - Suite 200, Milwaukee, WI 53226 Phone: 414.778.17001 Fax: 414.778.2360 / r- d @ringdu.com THIS BAR IS 1"I ONG. IF IT MEASURES ANYTHING OTHER THAN 1" ADJUST SCALE ACCORDINGLY R &D Project No.: 207159 4/14/2006 1:53 IM Sushi , M" E= y]�O'7Job��i 70'1159�idwg�Uiplbg �j7159P -Itlwg ►t� O t:0 110 A W CO z V 1 O W U0 Q� I Cq �1 F O Liz 0 Cq V1 cil E � � a Q co O O m tO O z Drawn: R &D Approved: R &D 4/11/08 REVISED PER 1 STATE REVIEW date comments REVISIONS Job: 2134 -802 Date: 02 -08 -08 J 'Q W O � W Z17�' O 0 0 L-L-I LJ_J ('000 x Q .-. Q 04 ~ to W ~ Z Q Z --.4-0 W Q LLJ Z LO L(� U– Z o Qz U > -0 Oz w _J I >_V) L� > CD W U_J I w Z z0�Lo �UJ — zar- , QS` Z WQ�^ Z _ 1LZnr_ 00 Z zo n U Q U) ? W W O Z 0 H Sheet P�i