HomeMy WebLinkAbout08040129.10PLUMBING DEMOLITION NOTES:
SYMBO
:
ABOVE FINISHED GRADE
AV
ACID /CHEMICAL VENT
(ALL SYMBOLS SHOWN MAY NOT APPEAR ON DRAWINGS)
ACID /CHEMICAL VENT THRU ROOF
AW
1. INFORMATION PERTAINING TO EXISTING PROJECT CONDITIONS,
ADB
ACID /CHEMICAL DILUTION BASIN
AWC
AUTOMATIC WASHER CONNECTION
SUCH AS PRESENT LOCATIONS OF ARCHITECTURAL AND
- --
COLD WATER PIPING
®
WATER MAIN /SERVICE VALVEBOX
STRUCTURAL BUILDING COMPONENTS, MECHANICAL AND
CA
COMPRESSED AIR
CB
CATCH BASIN
ELECTRICAL EQUIPMENT, PIPING, DUCTWORK, ROUGH -INS AND
- - --
HOT WATER PIPING
CHECK VALVE
FIRE HYDRANT
OTHER MISCELLANEOUS CONSTRUCTION APPEARS ON THE
CLVTR
CLEAR WATER VENT THRU ROOF
CLW
CLEAR WATER WASTE
DRAWINGS. WHILE SUCH INFORMATION HAS BEEN BASED ON
CLEAN OUT
COTG
CLEAN OUT TO GRADE
COND
AVAILABLE RECORDS AND COLLECTED WITH REASONABLE CARE,
- - ---
HOT WATER RETURN PIPING
CID
SOLENOID VALVE
THE ARCHITECT AND ENGINEER DOES NOT ASSUME ANY EXPRESSED
CUP SINK
CSS
CLINICAL SERVICE SINK
CSW
OR IMPLIED GUARANTEE THAT CONDITIONS SO INDICATED ARE
-NP-
NON- POTABLE WATER PIPING
®
MANHOLE OR CATCH BASIN
SHOWN ENTIRELY COMPLETE, CORRECT AND REPRESENTATIVE
DRINKING FOUNTAIN
DI
DEIONIZED WATER
DN
OF THOSE ACTUALLY EXISTING. ALL CONTRACTORS SHALL SATISFY
-TW-
TEMPERED WATER PIPING
-�-
METER
THEMSELVES AS TO ALL EXISTING JOB CONDITIONS PRIOR TO
DRAIN TILE CLEANOUT
DTR
DRAIN TILE RECEIVER
EEW
BIDDING, AND VERIFY ALL DIMENSIONS AT THE SITE.
EC
ELECTRICAL CONTRACTOR
EL
REDU
R REDU
TE R OR REDUCED
BACKFLOW PREVENLTE
ESEW
-S-
SOFT WATER PIPING
-'=�
PRESSURE BACKF PREVENTER
2. ALL EXISTING PLUMBING SHOWN HATCHED AND /OR
EWC
ELECTRIC WATER COOLER
EXIST.
EXISTING
DESIGNATED WITH AN "X' SHALL BE REMOVED. ALL
-H-
HARD WATER PIPING
FLOOR DRAIN
PRESSURE REDUCING VALVE
PLUMBING NOT INDICATED TO BE REMOVED SHALL
FH
FUME HOOD
HYD
FIRE HYDRANT
REMAIN.
-PW-
PURE WATER PIPING
GAS
SHUT -OFF VALVE
3. WHERE EXISTING PIPING IS TO BE REMOVED AT A
-DI -
DEIONIZED WATER
- -
BALANCING VALVE
SLAB ON GRADE, CAP EXISTING PIPING FLUSH OR
WATER MAIN
WS
WATER SOFTENER
WV
BELOW FLOOR LEVEL SO AS NOT TO INTERFERE
WITH NEW FLOOR FINISHES.
-DIS-
DEIONIZED SUPPLY PIPING
-
CHECK VALVE
4. EXISTING PIPING SHALL BE REMOVED BACK TO
-DIR-
DEIONIZED RETURN PIPING
Q
WATER HAMMER ARRESTER
PIPING TO REMAIN. EXISTING PIPING SHALL NOT
BE ABANDONED IN PLACE UNLESS APPROVED BY
-RO-
REVERSE OSMOSIS SUPPLY PIPING
I
TEST CONNECTION
THE ENGINEER AND OWNER'S REPRESENTATIVE.
-ROR-
REVERSE OSMOSIS RETURN PIPING
CAPPED CONNECTION
5. REPAIR PIPE INSULATION ON EXISTING PIPING
WHERE DAMAGED BY DEMOLITION OR NEW WORK.
-WS-
WATER SERVICE LATERAL
UNION
6. DEMOLITION WORK SHALL BE COORDINATED WITH
-WM-
WATER MAIN
I�
THERMOMETER
PHASED CONSTRUCTION. PLUMBING FIXTURES LOCATED
OUTSIDE OF THE CURRENT CONSTRUCTION PHASE SHALL
-SS-
SANITARY WASTE IN GROUND
Q
PRESSURE GAUGE
REMAIN OPERATIONAL UNLESS APPROVED BY THE
OWNER'S REPRESENTATIVE.
- - - - -
SANITARY VENT PIPING IN GROUND
`0 0
ROOF DRAIN
7. REFER TO THE SPECIFICATIONS FOR CUTTING AND
PATCHING REQUIREMENTS.
-ST-
STORM WATER PIPING IN GROUND
O
OVERFLOW ROOF DRAIN
-DT-
DRAINTILE
®
FLOOR DRAIN
8. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
CUTTING AND PATCHING NECESSARY FOR THE WORK OF
THIS CONTRACT UNLESS SPECIFICALLY INDICATED OTHERWISE
SANITARY WASTE PIPING
Q
SITE DRAIN
WITHIN THE ARCHITECTURAL DRAWINGS OR SPECIFICATIONS.
- -
SANITARY VENT PIPING
®
TRENCH DRAIN
9. ALL EXISTING BRANCH WASTE PIPING SERVING NEW FIXTURES
-CL-
CLEARWATER WASTE PIPING
®
FLOOR SINK
SHALL BE RODDED AND FLUSHED BACK TO THE WASTE
STACK OR BUILDING DRAIN TO INSURE PROPER DRAINAGE.
-CL-
CLEARWATER VENT PIPING
CLEAN OUT
10. SEAL ALL EXISTING PIPE PENETRATIONS IN EXISTING
CONSTRUCTION WHERE PIPING IS REMOVED. SEALED
- —
STORM WATER CONDUCTOR PIPING
—O
FLOOR CLEAN OUT
PENETRATIONS SHALL MATCH RATING OF THE
CONSTRUCTION IN WHICH THEY OCCUR.
-OF-
OVERFLOW PIPING
-4-
HOSE BIBB
11. PLUMBING CONTRACTOR SHALL REMOVE, AND REINSTALL
-AW-
ACID /CHEMICAL WASTE PIPING
EQUIPMENT BY OTHERS. PLUMBING
OR REPLACE, EXISTING CEILINGS AS REQUIRED FOR
CONNECTION BY PLUMBING CONTRACTOR.
ACCESS TO PLUMBING SYSTEMS. THIS INCLUDES,
-AV-
ACID /CHEMICAL VENT PIPING
l9
CONNECT TO EXISTING PIPING
CEILINGS ON THE FLOORS BELOW THE PROJECT AREA
AND AREAS OUTSIDE THE PROJECT CONSTRUCTION LIMITS.
-GW-
GREASE WASTE
PIPING
XO
EXISTING TO BE REMOVED
12. WHERE EXISTING PIPING IS REMOVED, REMAINING
- G -
GAS PIPING
EXISTING PIPING
PIPING SHALL BE CAPPED BELOW FINISHED FLOORS,
WITHIN WALLS AND ABOVE SUSPENDED CEILINGS.
-PD-
PUMP DISCHARGE PIPING
f /fi
EXISTING PIPING TO BE REMOVED
13. COORDINATE ALL SHUTDOWNS AND DISRUPTIONS WITH THE
HOT WATER TEMPERATURE MAINTENANCE
O
FIXTURE UNIT (WATER SUPPLY OR WASTE)
OWNER AND THE CONSTRUCTION MANAGER.
HEAT TRACE SYSTEM
FREEZE PROTECTION HEAT TRACE SYSTEM
FINISHED FLOOR ELEVATION
14. CONTRACTOR SHALL VISIT JOB SITE AND BECOME FAMILIAR
WITH EXISTING CONDITIONS PRIOR TO STARTING WORK.
-CA-
COMPRESSED AIR PIPING
O
FOOD SERVICE EQUIPMENT TAG
15. EXISTING BUILDING M.E.P. DRAWINGS WERE NOT AVAILABLE
-LA-
LABORATORY AIR PIPING
HOT WATER TEMPERATURE MAINTENANCE
DURING THE DESIGN PHASE. ALL DEMOLITION AND NEW WORK,
8S
H1
CIRCUIT NUMBER /START POINT DESIGNATION
INCLUDING UNDERGROUND PIPING, MUST BE FIELD VERIFIED.
-LV-
LABORATORY VACUUM PIPING
E
HOT WATER TEMPERATURE MAINTENANCE
16. SAWCUT AND PATCH EXISTING FLOORS AS REQUIRED FOR ALL
H1
CIRCUIT NUMBER /END POINT DESIGNATION
DEMOLITION AND NEW BELOW -FLOOR WORK. FIELD VERIFY ALL
EXISTING AND NEW PIPING INVERT ELEVATIONS.
17. FOR ALL NEW SHOWER VALVES, SET AND TEST FOR PROPER
TEMPERATURE AS REQUIRED BY ALL APPLICABLE CODES.
18. COORDINATE DEMOLITION AND NEW PLUMBING WORK WITH ALL
OTHER TRADES.
19. THERE IS NO STORM DRAINAGE WORK REQUIRED FOR THIS PROJECT.
ALL BUILDING STORM DRAINAGE IS PER GUTTERS AND DOWNSPOUTS.
20. INSTALL ALL SYSTEMS PER ALL APPLICABLE CODES AND REGULATIONS.
(ALL ABBRMTIONS SHOWN MAY NOT APPEAR ON DRAWPM)
AFF
ABOVE FINISHED FLOOR
AFG
ABOVE FINISHED GRADE
AV
ACID /CHEMICAL VENT
AVTR
ACID /CHEMICAL VENT THRU ROOF
AW
ACID /CHEMICAL WASTE
ADB
ACID /CHEMICAL DILUTION BASIN
AWC
AUTOMATIC WASHER CONNECTION
BFP
BACKFLOW PREVENTER
BT
BATH TUB
BVA
BALANCING VALVE
CA
COMPRESSED AIR
CB
CATCH BASIN
CC
CAPPED CONNECTION
CKVA
CHECK VALVE
CLV
CLEAR WATER VENT
CLVTR
CLEAR WATER VENT THRU ROOF
CLW
CLEAR WATER WASTE
CO
CLEAN OUT
COTG
CLEAN OUT TO GRADE
COND
CONDUCTOR
CONN
CONNECTION
CID
CIRCULATING PUMP
CS
CUP SINK
CSS
CLINICAL SERVICE SINK
CSW
COLD SOFT WATER
CHW
COLD HARD WATER
CW
COLD WATER
DF
DRINKING FOUNTAIN
DI
DEIONIZED WATER
DN
DOWN
DR
DRAIN
DT
DRAIN TILE
DTCO
DRAIN TILE CLEANOUT
DTR
DRAIN TILE RECEIVER
EEW
EMERGENCY EYE WASH
EC
ELECTRICAL CONTRACTOR
EL
ELEVATION
ESEW
EMERGENCY SHOWER -EYE WASH
ES
EMERGENCY SHOWER
ET
EXPANSION TANK
EWC
ELECTRIC WATER COOLER
EXIST.
EXISTING
FCO
FLOOR CLEAN OUT
FD
FLOOR DRAIN
FFEL
FINISHED FLOOR ELEVATION
FH
FUME HOOD
HYD
FIRE HYDRANT
FS
FLOOR SINK
G
GAS
GCB
GARAGE CATCH BASIN
GT
GREASE TRAP
GW
GREASE WASTE
PLUMBING SHEET INDEX
No.
TITLE
P -1
NOTES, SYMBOLS AND ABBREVIATIONS
P -2
FOUNDATION PLANS
P -3
FIRST FLOOR PLANS
P -4
ENLARGED PLANS
P -5
ISOMETRICS
P -6
DETAILS AND SCHEDULES
HB
HOSE BIBB
HW
HOT WATER
HWR
HOT WATER RETURN
IE
INVERT ELEVATION
LA
LAB AIR
LV
LAB VACUUM
L /LAV
LAVATORY
LS
LAB SINK
LT
LAUNDRY TRAY
MB
MOP BASIN
MC
MECHANICAL CONTRACTOR
MH
MANHOLE
NC
NORMALLY CLOSED
NP
NON - POTABLE
OF
OVERFLOW
SD
SITE DRAIN
PC
PLUMBING CONTRACTOR
PD
PUMP DISCHARGE
PG
PRESSURE GAUGE
PRVA
PRESSURE REDUCING VALVE
PW
PURE WATER
RIO
ROUGH -IN ONLY
RD
ROOF DRAIN
RPBFP
REDUCED PRESSURE
'Q
BACKFLOW PREVENTER
RO
REVERSE OSMOSIS
S /SK
SINK
SAN
SANITARY
SE
SEWAGE EJECTOR
SH
SHOWER
SP
SUMP PUMP
SS
SERVICE SINK
ST
STORAGE TANK
SVA
SOLENOID VALVE
TC
TEST CONNECTION
TO
TRENCH DRAIN
T&P VA
TEMPERATURE & PRESSURE
Z WQ�^
RELIEF VALVE
TIP
TRAP PRIMER
TW
TEMPERED WATER
U /URI
URINAL
UNIXC
UNEXCAVATED
V
VENT
VA
VALVE
VTR
VENT THRU ROOF
W
WASTE
WC
WATER CLOSET
WC /L
COMBINATION WATER
CLOSET LAVATORY
WCO
WALL CLEAN OUT
WH
WATER HEATER
WHA
WATER HAMMER ARRESTER
WM
WATER MAIN
WS
WATER SOFTENER
WV
WET VENT
tR ��'� 9G 87
�p �►� STATE
►t�
%
O
t:0
110
O
DU &
HATEAU
10101 Innovation Dnve - Suite 200, Milwaukee, WI 53226
Phone: 414.778.17001 Fax: 414.778.2360 / r- d @ringdu.com
THIS BAR IS 1"I ONG. IF IT MEASURES
ANYTHING OTHER THAN 1" ADJUST
SCALE ACCORDINGLY
R &D Project No.: 207159
4/14/2006 1:53 IM Sushi , M"
E= y]�O'7Job��i 70'1159�idwg�Uiplbg �j7159P -Itlwg
►t�
O
t:0
110
A
W
CO z
V 1
O
W U0
Q� I
Cq
�1 F O
Liz
0 Cq
V1 cil E
� � a
Q
co
O
O
m
tO
O
z
Drawn: R &D
Approved: R &D
4/11/08
REVISED PER
1
STATE REVIEW
date
comments
REVISIONS
Job: 2134 -802
Date: 02 -08 -08
J
'Q
W
O
� W
Z17�' O
0
0
L-L-I LJ_J ('000 x
Q .-.
Q
04
~ to
W
~ Z
Q
Z --.4-0
W Q
LLJ Z LO
L(�
U–
Z o
Qz
U > -0
Oz
w _J I
>_V) L�
> CD
W
U_J
I
w Z z0�Lo
�UJ
— zar- ,
QS`
Z WQ�^
Z
_ 1LZnr_
00
Z zo n
U
Q U) ?
W
W
O
Z
0
H
Sheet
P�i