HomeMy WebLinkAbout06070020.1s
i
3
i
{
4�
r
PERENNIAL / GRASS SCHEDULE
KEY COMMON/80TANIC PLANT NAME SIZE SW.
COB
Change out bed
varies
2861
AR
Penniestum alopecurokles 'Hameln'
2 Gallons
3554
PA
Hameln Dwarf Fountain Grua
` �
22
RG
Rudbealta fulgido 'Golisturm'
1 Gallon
3973
:�
P
Black Eyed Susan
lk
14
TM
Economy Prairie & Annual Fescue
Varta
91.088
A
:;
5' Height
22
d'.V
, 1
,F
u-.
,k A\
A
'�
PLANT SCHEDULE
KEY COMMON /80TANK: PLANT NAME SIZE QTY.
AC
Abies Concolor
Douglas Fir
7' Height
t
AR
Acer rubrum 'Armstrong'
Armstrong Red Maple
2.5' CALIPER
24
LT
Uriodendron tulipifero
` �
22
Tultptres
Seeding Schedule
:�
P
Pk= Omorlko
Serbian Spruce
lk
14
TM
Taxus x media 'Runyan'
Runyon Yew
24' Spread
266
A
:;
5' Height
22
Mtaton Arbonitae
project at the locations shown on the landscape drawing.
UC
Q.
2.5 Caliper
8
CC
eercls Carwdensie
'roposed 31'
= ';!
JK
`
gree- Egress
Easem + t
81
�• -�
-
,q
Kalley Pfitzer Juniper
standards of 'American Standard for Nursery Stock' latest addition (1996). Provide only sound,
UH
Ulmus x hoilondlea "Urban'
2,5' Caliper
14
Urban Elm
PLANTING BED MULCH: 3 inches of Premium grade shredded hardwood mulch.
IV
Roo Virginica 'Henry's Gamey
24' Spread
94
�
-1; ,___
;�.
lk
�2r
WW
Salix babylonk a
2.5' Caliper
5
Weeping Willow
v' vv •.
PLANTING EXCAVATION: When conditions detrimental to plant growth are encountered, such
d'.V
, 1
,F
u-.
,k A\
A
'�
PLANT SCHEDULE
KEY COMMON /80TANK: PLANT NAME SIZE QTY.
AC
Abies Concolor
Douglas Fir
7' Height
15
AR
Acer rubrum 'Armstrong'
Armstrong Red Maple
2.5' CALIPER
24
LT
Uriodendron tulipifero
2.5' Caliper
pe
22
Tultptres
Seeding Schedule
PO
Pk= Omorlko
Serbian Spruce
7' Height
14
TM
Taxus x media 'Runyan'
Runyon Yew
24' Spread
266
Thu)a occidentalis 'Tschny
5' Height
22
Mtaton Arbonitae
project at the locations shown on the landscape drawing.
UC
Ulmus parvifolla
Chinese / Lacebork Elm
2.5 Caliper
8
CC
eercls Carwdensie
1.5' Caliper
13
JK
Juniperts Chinensis 'Kallays Compact'
24 Spread
81
u
Kalley Pfitzer Juniper
standards of 'American Standard for Nursery Stock' latest addition (1996). Provide only sound,
UH
Ulmus x hoilondlea "Urban'
2,5' Caliper
14
Urban Elm
PLANTING BED MULCH: 3 inches of Premium grade shredded hardwood mulch.
IV
Roo Virginica 'Henry's Gamey
24' Spread
94
Henry's Garnet Sweeteptro
-1; ,___
;�.
landscape operations shall be brought to Owner's attention prior to commencing excavation
oP 9 P 9
WW
Salix babylonk a
2.5' Caliper
5
Weeping Willow
v' vv •.
PLANTING EXCAVATION: When conditions detrimental to plant growth are encountered, such
EA
Euonymus akr4n 'Compacts'
3W Height
34
.• ,
Dwarf Burning Bush
-mob lttis
LL
Pkrtanus x ac:erifolia 'Ubsriy'
2.5' Caliper
23
Ubsrty London Planstres
` -f?r °`
-- w,_.w.. %', `•, fine texture at time of sodding. Contractor shall maintain sodded lawn for a period of 60 days
QM
Quer+cus macrocarpa
2.5' Caliper
22
Our Oak
year after date of substantial completion against defects including death and unsatisfactory
Taxodlum distichum
2,5' Caliper
0
Bald Cypress
Replace trees and shrubs which are in doubtful condition at end of warranty period.
BN
RiB eraBiirch
1.5' Caliper
0
,
1, 7
' ` _— - L-', , ---- _ _: --_ .� � -- - .. ' `� r , is ,� """- '"'S.,.ii •: L, '.J ..
� '� a �`-'� r; : - `s..r -:.:r" = .ter....__- ._....- - _._,� -_ ._ _- �._��.- r- __- __- �,, -�,_ f �.. ,�..- ...c+.. .�.,.,..<,... .,, -.u... �,- ,«,,K,m. ,�. �« .•F._ ,xi->s� � .�,...�,.., >7� ....
4. +
Vq
NOTE: DRAIMNG IS FOR LANDSCAPING ONLY
J]]i.LY
• SOIL BACKFILL TO BE 75%
TOPSOIL AND 25X PEAT (TAMPED)
• ALL STARS AND WIRE TO BE
REMOVED WITHIN 1 YEAR OF
PLAITING J
« �� 1 ;
r r r
a X711,. :. ►.
1.5X ROOTBALL -
DIAM. ALL AROUND
(--Q-C'ck (J-19-00
PRUNE BRANCHES AND FOLIAGE BY 1 /4TH
RETAIN NORMAL PLANT SHAPE. DO NOT
CUT EVERGREEN LEADER.
FOR ALL TREES 3' CALIPER AND LARGER
SUPPORT WiTH 3 (THREE) 10 GAUGE GALVANIZED
WIRES ENCLOSED IN CLEAR POLY TUBING AT
TRUNK AND SECURE TO 3 (THREE) 2-4-02-
VERTICALLY PLACED HARDWOOD STAKES AT GRADE
IF NEEDED OR REWIRED.
WRAP ENTIRE TRUNK TO HECK OF SECOND
BRANCH, TIE EVERY e.
3' MIN. MULCHED SAUCER.
TOPSOIL
FINISH GRADE
.i ®- F --CIIT NVD REMOVE BURLAP FROM TOP
1/3RD OF ROOT BALL.
PLANNING BACKFILL TOPSOIL •
SUB -GRADE - EXISTING SUBSOIL OR
COMPACTED BACKFILL
B Tree Planting Detail LOOSEN HARD SUB -GRADE
L -1 Scale: N,T.S.
PRUNE BRANCHES AND
FOLIAGE INTERNALLY BY 1/4
RETAINING NORMAL PLANT
SWIPE NEVER CUr OUT PLACE ROOT FLARE SLIGHTLY HIGHER THAN
EVERGREEN LEADER. FINISHED GRADE MOUND MULCH HEAVILY
OVER FLARE INSTALL FERTILIZER TABLETS
CUT AND REMOVE BURLAP + +� OR SPIKES 3' TO a BELOW SOIL
FROM TOP 1 /3RD OF BALI. 3" MIN. MULCH IN ALL
ALL ROOTBALLS REMOVED t �' PLANTING BEDS AND
FROM CONTAINERS SHALL SAUCERS.
BE SCARIFIED PRIOR TO
PLANTING. I 1 . _ I EARTH SAUCER
V MIN.
non s�namam ®man ►a€ PLANTING BACKFILL TOPSOIL •
• TOPSOIL AND 25X PEAT (TAMPED) EXISTING SUBSOIL OR
COMPACTED BACK ILL
Shrub Planting Detail MINIMUM 2X ROOiBNl
L -1 Scale: N.T.S.
Aquatic Plait Material
WIEKr ON
area
AUK R
® al"N 1FE SHACQm
•
V30MJW DA�F'3 MAY BE EXI M 5 DIMS
•• NCI8716E 810011 APR=1101 BY WX
FIGURE 5 -3
IitV�{, �y SEMW
M of gED 100E SOFT. ACID RF1NR✓<5
��%�
WNW � 3,5 � 2 BIN. 0001 8® 116-1- our ow
•
• NOT i MMLW WM 11MM B APRED,
Seeding Schedule
GRAPHIC SCALE L -1 Scele:N.T.S.
0
50 100 200 400
( IN FEET )
1 inch = 100 ft.
LANDSCAPE SPECIFICATIONS: These specifications cover the furnishing of labor, plants,
equipment, and materials to perform landscape operations in connection with this construction
project at the locations shown on the landscape drawing.
LANDSCAPE MATERIALS: FERTILIZER: Granular non— burning product composed of not less
,.
Lt
phosphoric acid, and 5X potash by weight or similarly approved composition.
=
PLANTING BACKFlLI_ SOIL:* Backflll plant pits with the following topsoil mixture: 1 part on —site
1.
topsoil, 1 part imported topsoil. 1 part compost and 1/2 pound plant specified fertilizer per cubic
yard.
u
PLANT MATERIALS: Provide trees and shrubs as Indicated. Comply with sizing and grading
standards of 'American Standard for Nursery Stock' latest addition (1996). Provide only sound,
healthy vigorous plants free from defects, disfiguring knots, sunscold injuries, frost cracks, plant
diseases, insects or any other form of disease or infestation. All plants shall have fully developed
form without voids or open spaces.
PLANTING BED MULCH: 3 inches of Premium grade shredded hardwood mulch.
`r
STEEL EDGING: Ryerson black steel edging 3/16'x4'.
PROJECT EXECUTION: SUBSURFACE UTILITIES: Contractor shall determine utility line
locations prior to commencing work. Any conflicts between utility locations, excavation and /or
-1; ,___
;�.
landscape operations shall be brought to Owner's attention prior to commencing excavation
oP 9 P 9
_..
and /or grading work. Contractor assumes responsibility for any utility damage resulting from
C
landscape operations. CONTRACTOR SHALL NOTIFY UTILITY LOCATE SERVICE (1.800.
382.5544) A MINIMUM OF TWO WORKING DAYS PRIM TO EXCAVATION.
v' vv •.
PLANTING EXCAVATION: When conditions detrimental to plant growth are encountered, such
.--G&-rubble fill, adverse drainage or obstructions. notify owner before planting. See planting
.,
details for planting, pruning and staking requirements.
.• ,
SODDED LAWN: Complete all other landscape plantings. mulching, fine grading and staking
-mob lttis
.Cks �•
...�a�
Spread topsoil over lawn areas to a depth of two pr p p Inches and cultivate soil to a depth of three
inches prior to sodding. Sod bed shall be in a firm but uncompacted condition with a relatively
` -f?r °`
-- w,_.w.. %', `•, fine texture at time of sodding. Contractor shall maintain sodded lawn for a period of 60 days
-
- beyond final acceptance by mowing and watering as required to maintain vigorous growth during
establishment period.
PROJECT WARRANTY: Contractor shall warrant trees, shrubs, and plants for a period of one
year after date of substantial completion against defects including death and unsatisfactory
,
1, 7
' ` _— - L-', , ---- _ _: --_ .� � -- - .. ' `� r , is ,� """- '"'S.,.ii •: L, '.J ..
� '� a �`-'� r; : - `s..r -:.:r" = .ter....__- ._....- - _._,� -_ ._ _- �._��.- r- __- __- �,, -�,_ f �.. ,�..- ...c+.. .�.,.,..<,... .,, -.u... �,- ,«,,K,m. ,�. �« .•F._ ,xi->s� � .�,...�,.., >7� ....
4. +
Vq
NOTE: DRAIMNG IS FOR LANDSCAPING ONLY
J]]i.LY
• SOIL BACKFILL TO BE 75%
TOPSOIL AND 25X PEAT (TAMPED)
• ALL STARS AND WIRE TO BE
REMOVED WITHIN 1 YEAR OF
PLAITING J
« �� 1 ;
r r r
a X711,. :. ►.
1.5X ROOTBALL -
DIAM. ALL AROUND
(--Q-C'ck (J-19-00
PRUNE BRANCHES AND FOLIAGE BY 1 /4TH
RETAIN NORMAL PLANT SHAPE. DO NOT
CUT EVERGREEN LEADER.
FOR ALL TREES 3' CALIPER AND LARGER
SUPPORT WiTH 3 (THREE) 10 GAUGE GALVANIZED
WIRES ENCLOSED IN CLEAR POLY TUBING AT
TRUNK AND SECURE TO 3 (THREE) 2-4-02-
VERTICALLY PLACED HARDWOOD STAKES AT GRADE
IF NEEDED OR REWIRED.
WRAP ENTIRE TRUNK TO HECK OF SECOND
BRANCH, TIE EVERY e.
3' MIN. MULCHED SAUCER.
TOPSOIL
FINISH GRADE
.i ®- F --CIIT NVD REMOVE BURLAP FROM TOP
1/3RD OF ROOT BALL.
PLANNING BACKFILL TOPSOIL •
SUB -GRADE - EXISTING SUBSOIL OR
COMPACTED BACKFILL
B Tree Planting Detail LOOSEN HARD SUB -GRADE
L -1 Scale: N,T.S.
PRUNE BRANCHES AND
FOLIAGE INTERNALLY BY 1/4
RETAINING NORMAL PLANT
SWIPE NEVER CUr OUT PLACE ROOT FLARE SLIGHTLY HIGHER THAN
EVERGREEN LEADER. FINISHED GRADE MOUND MULCH HEAVILY
OVER FLARE INSTALL FERTILIZER TABLETS
CUT AND REMOVE BURLAP + +� OR SPIKES 3' TO a BELOW SOIL
FROM TOP 1 /3RD OF BALI. 3" MIN. MULCH IN ALL
ALL ROOTBALLS REMOVED t �' PLANTING BEDS AND
FROM CONTAINERS SHALL SAUCERS.
BE SCARIFIED PRIOR TO
PLANTING. I 1 . _ I EARTH SAUCER
V MIN.
non s�namam ®man ►a€ PLANTING BACKFILL TOPSOIL •
• TOPSOIL AND 25X PEAT (TAMPED) EXISTING SUBSOIL OR
COMPACTED BACK ILL
Shrub Planting Detail MINIMUM 2X ROOiBNl
L -1 Scale: N.T.S.
Aquatic Plait Material
WIEKr ON
area
AUK R
0
® al"N 1FE SHACQm
•
V30MJW DA�F'3 MAY BE EXI M 5 DIMS
•• NCI8716E 810011 APR=1101 BY WX
FIGURE 5 -3
IitV�{, �y SEMW
M of gED 100E SOFT. ACID RF1NR✓<5
��%�
WNW � 3,5 � 2 BIN. 0001 8® 116-1- our ow
•
• NOT i MMLW WM 11MM B APRED,
Seeding Schedule
GRAPHIC SCALE L -1 Scele:N.T.S.
0
50 100 200 400
( IN FEET )
1 inch = 100 ft.
LANDSCAPE SPECIFICATIONS: These specifications cover the furnishing of labor, plants,
equipment, and materials to perform landscape operations in connection with this construction
project at the locations shown on the landscape drawing.
LANDSCAPE MATERIALS: FERTILIZER: Granular non— burning product composed of not less
than 50X organic slow acting, guaranteed analysis professional fertilizer, 20X nitrogen. 1OX
Lt
phosphoric acid, and 5X potash by weight or similarly approved composition.
=
PLANTING BACKFlLI_ SOIL:* Backflll plant pits with the following topsoil mixture: 1 part on —site
1.
topsoil, 1 part imported topsoil. 1 part compost and 1/2 pound plant specified fertilizer per cubic
yard.
u
PLANT MATERIALS: Provide trees and shrubs as Indicated. Comply with sizing and grading
standards of 'American Standard for Nursery Stock' latest addition (1996). Provide only sound,
healthy vigorous plants free from defects, disfiguring knots, sunscold injuries, frost cracks, plant
diseases, insects or any other form of disease or infestation. All plants shall have fully developed
form without voids or open spaces.
PLANTING BED MULCH: 3 inches of Premium grade shredded hardwood mulch.
`r
STEEL EDGING: Ryerson black steel edging 3/16'x4'.
PROJECT EXECUTION: SUBSURFACE UTILITIES: Contractor shall determine utility line
locations prior to commencing work. Any conflicts between utility locations, excavation and /or
-1; ,___
;�.
landscape operations shall be brought to Owner's attention prior to commencing excavation
oP 9 P 9
_..
and /or grading work. Contractor assumes responsibility for any utility damage resulting from
landscape operations. CONTRACTOR SHALL NOTIFY UTILITY LOCATE SERVICE (1.800.
382.5544) A MINIMUM OF TWO WORKING DAYS PRIM TO EXCAVATION.
v' vv •.
PLANTING EXCAVATION: When conditions detrimental to plant growth are encountered, such
.--G&-rubble fill, adverse drainage or obstructions. notify owner before planting. See planting
.,
details for planting, pruning and staking requirements.
.• ,
SODDED LAWN: Complete all other landscape plantings. mulching, fine grading and staking
prior to sodding lawn areas. Provide sodded lawn for all a '
P 9 lawn areas utilizing Warren s Turf Type
Tall Fescue Sod. Apply fertilizer at a rate of 4 pounds of actual nitrogen per 1.000 square feet.
Spread topsoil over lawn areas to a depth of two pr p p Inches and cultivate soil to a depth of three
inches prior to sodding. Sod bed shall be in a firm but uncompacted condition with a relatively
` -f?r °`
-- w,_.w.. %', `•, fine texture at time of sodding. Contractor shall maintain sodded lawn for a period of 60 days
-
- beyond final acceptance by mowing and watering as required to maintain vigorous growth during
establishment period.
PROJECT WARRANTY: Contractor shall warrant trees, shrubs, and plants for a period of one
year after date of substantial completion against defects including death and unsatisfactory
growth. except for defects resulting from neglect by the Owner, abuse or damage by others. or
unusual phenomena or incidents which are beyond Installer's control. Remove and replace
trees, shrubs or other plants found to be dead or in unhealthy condition during warranty period.
Replace trees and shrubs which are in doubtful condition at end of warranty period.
0