HomeMy WebLinkAbout06070008.36Mnl TF i I CITY OF CARMEL 2005 COVER AND BACKFILL POLICY 9/8/06 STORM SEWERS UNDER PAVEMENT, SIDEWALK, PAVED AREAS AND WITHIN RIGHT -OF -WAY BEDDING AND HAUNCHING BEDDING AND HAUNCHING FOR ALL REINFORCED CONCRETE PIPE INSTALLATIONS SHALL BE #8 STONE MEETING THE MATERIAL REQUIREMENTS OF THE INDOT. THE MATERIAL SHALL BE APPROVED BY THE CITY OF CARMEL DEPARTMENT OF ENGINEERING AT TIME OF INSTALLATION. BEDDING SHALL BE PLACED IN THE TRENCH BOTTOM SUCH THAT AFTER THE PIPE IS INSTALLED TO GRADE AND LINE, THERE REMAINS A 4 -INCH MINIMUM DEPTH OF MATERIAL BELOW THE PIPE BARREL AND A MINIMUM OF 3- INCHES BELOW THE BELL. FOR PIPE SIZES 66- INCHES AND LARGER, THE MINIMUM DEPTH OF MATERIAL BELOW THE PIPE BARREL SHALL BE 6- INCHES. BEDDING SHALL BE PLACED TO BE UNIFORM AS POSSIBLE, BUT SHALL BE LOOSELY PLACED UNCOMPACTED MATERIAL UNDER THE MIDDLE THIRD OF THE PIPE PRIOR TO PLACEMENT OF THE PIPE. IF THE UNDERLYING SOILS OF THE TRENCH BOTTOM ARE SOFT OR YIELDING, THE SOIL SHALL BE UNDERCUT TO SUCH A DEPTH THAT WHEN REPAIRED WITH #2 STONE IT WILL PRODUCE A UNIFORM AND STABLE FOUNDATION ALONG THE ENTIRE LENGTH OF THE PIPE. HAUNCHING SHALL BE COMPACTED IN 8 -INCH MAXIMUM LIFTS TO NOT LESS THAN 90% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED. THE BACKFILL SHALL BE BROUGHT UP EVENLY ON BOTH SIDES OF THE PIPE FOR THE FULL LENGTH OF THE PIPE, HAUNCHING SHALL EXTEND TO THE SPRINGLINE OF THE PIPE. MINIMUM TRENCH WIDTH SHALL BE THE OUTSIDE DIAMETER OF THE PIPE PLUS 18- INCHES. FINAL BACKFILL FINAL BACKFILL FOR ALL REINFORCED CONCRETE PIPE INSTALLATIONS UNDER AND WITHIN 5 -FEET OF PAVEMENT OR SIDEWALK OR OTHER PAVED AREAS AND FOR ALL INSTALLATIONS WITHIN CITY RIGHT -OF -WAY SHALL BE STRUCTURE FOR B BORROW O S BACKFILL MEETING THE MATERIAL REQUIREMENTS OF THE INDICT. THE MATERIAL SHALL BE APPROVED BY THE CITY OF CARMEL DEPARTMENT OF ENGINEERING AT TIME OF INSTALLATION. FINAL BACKFILL SHALL BE COMPACTED IN 6 -INCH MAXIMUM LIFTS TO NOT LESS THAN 95% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED- THE BACKFILL FOR THE TOP 6- INCHES OF THE EXCAVATION BELOW THE START OF THE AGGREGATE SUB -BASE OF THE PAVEMENT SHALL BE NO. 53 STONE MEETING THE MATERIAL REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED TO NOT LESS THAN 95% STANDARD PROCTOR DENSITY. FINAL BACKFILL FOR ALL REINFORCED CONCRETE PIPE INSTALLATIONS GREATER THAN 5 -FEET FROM PAVEMENT, SIDEWALK, OTHER PAVED AREAS OR THE LIMIT OF CITY RIGHT -OF -WAY SHALL BE CLEAN FILL MATERIAL FREE OF ROCKS LARGER THAN 6- INCHES IN DIAMETER, FROZEN LUMPS OF SOIL, WOOD OR OTHER EXTRANEOUS MATERIAL, COMPACTED IN 12 -INCH MAXIMUM LIFTS TO NOT LESS THAN 90% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE EXCAVATION. THE FINAL 6- INCHES OF THE EXCAVATION SHALL CONSIST OF TOPSOIL. WATER AND SEWER UNDER PAVEMENT, SIDEWALK, PAVED AREAS AND WITHIN RIGHT -OF -WAY BEDDING, HAUNCHING, INITIAL BACKFILL BEDDING, HAUNCHING AND INITIAL BACKFILL MATERIALS, PLACEMENT AND COMPACTION FOR WATER MAINS, WATER SERVICE LATERALS, SANITARY MAINS AND SANITARY SERVICE LATERALS SHALL BE IN ACCORDANCE WITH THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION. FINAL BACKFILL FINAL BACKFILL FOR WATER MAINS. WATER SERVICE LATERALS, SANITARY MAINS AND SANITARY SERVICE LATERALS UNDER AND WITHIN 5 -FEET OF PAVEMENT OR SIDEWALK OR OTHER PAVED AREAS AND FOR ALL INSTALLATIONS WITHIN CITY RIGHT -OF -WAY SHALL BE B- BORROW FOR STRUCTURE BACKFILL MEETING THE MATERIAL REQUIREMENTS OF THE INDOT. THE MATERIAL SHALL BE APPROVED BY THE CITY OF CARMEL DEPARTMENT OF ENGINEERING AT TIME OF INSTALLATION. FINAL BACKFILL SHALL BE COMPACTED IN 6 -INCH MAXIMUM LIFTS TO NOT LESS THAN 953 STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED, THE BACKFILL FOR THE TOP 6- INCHES OF THE EXCAVATION BELOW THE START OF THE AGGREGATE SUB -BASE OF THE PAVEMENT SHALL BE NO. 53 STONE MEETING THE MATERIAL REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED TO NOT LESS THAN 95% STANDARD PROCTOR DENSITY. IF THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION HAS A MORE STRINGENT FINAL BACKFILL REQUIREMENT, THE MORE STRINGENT REQUIREMENT SHALL GOVERN. MINIMUM COVER FOR PIPE CROSSINGS WITHIN CITY RIGHT -OF -WAY FOR INSTALLATION OF STORM MAINS, WATER MAINS, SANITARY MAINS, WATER SERVICE LATERALS, SANITARY SERVICE LATERALS UNDER CITY STREETS, REGARDLESS OF THE JURISDICTION OF THE UTILITY, THE MINIMUM COVER FROM THE TOP OF THE INSTALLED PAVEMENT TO THE TOP OF THE INSTALLED PIPE SHALL BE THE PAVEMENT SECTION THICKNESS (ALL BITUMINOUS AND AGGREGATE MATERIAL ABOVE THE SUBGRADE) PLUS 1 -D ", BUT UNDER NO CIRCUMSTANCES SHALL THE COVER ALONG ANY PART OF THE PIPE FROM THE FINAL PAVEMENT ELEVATION TO THE TOP OF THE PIPE BE LESS THAN 2.5 -FEET. IF THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION HAS A MORE STRINGENT COVER REQUIREMENT, THE MORE STRINGENT REQUIREMENT SHALL GOVERN. COVER HEIGHTS FOR REINFORCED CONCRETE PIPE STORM SEWER THAT ARE LESS THAN THOSE REQUIRED WILL BE EVALUATED ON A CASE BY CASE CONDITION AND APPROVED ONLY WITH WRITTEN PERMISSION BY THE CITY ENGINEER. SOIL EROSION CONTROL SUMMARY CONTRACTOR SHALL INSTALL SEDIMENT TRAPS AND CONTRUCTION EROSION CONTROL DEVICES AS SHOWN. 2. MASS GRADE THE SITE (SIDES OF SWALES, AND MOUNDS TO BE SODDED OR SEEDED AND MULCHED IMMEDIATELY UPON COMPLETION). TEMPORARY SEEDING SHALL BE RECOMMENDED FOR ALL SWALES AND DISTURBED AREAS THAT CANNOT BE FINAL SEEDED WITHIN A TIME PERIOD THAT WILL PREVENT SOIL EROSION, FOR TEMPORARY SEEDING THE CONTRACTOR SHALL UTILIZE A FAST GROWING SEED OF EITHER OATS, ANNUAL RYEGRASS, WHEAT OR RYE DEPENDING UPON TIME OF YEAR. DISTURBED AREAS SHOULD BE KEPT TO A MINIMUM AT ALL TIMES. 3. CONTRACTOR SHALL CONTROL MUD ACCUMULATION ON ALL STREETS SURROUNDING THE PROJECT BY INSTALLING STONE SURFACE AT ALL LOCATIONS WHERE CONSTRUCTION TRAFFIC LEAVES THE SITE. DUST SHALL BE KEPT TO A MINIMUM BY UTILIZING SPRINKLING, CALCIUM CHLORIDE, VEGETATIVE COVER, SPRAY ON ADDITIVES OR OTHER APPROVED METHODS. CLEANING OF STREET SHALL BE REQUIRED AS DIRECTED BY LOCAL AUTHORITIES, OWNER, ARCHITECT, OR ENGINEER. 4. MAINTAIN ALL FILTERS AND TRAPS DURING CONSTRUCTION TO PREVENT ANY BLOCKAGES FROM ACCUMULATED SEDIMENT, ADDITIONAL SEEDING AND STRAW BALES MAY BE REQUIRED ATI DURING CONSTRUCTION AS SPECIFIED BY ENGINEER OR SOI L CONSERVATION SERVICE. RIP RAP SHALL BE PLACED IN AREAS OF HIGH VELOCITY STREAM FLOW (MINIMUM SIZE 1/3 CU.FT.). PAYMENT FOR ADDITIONAL STRAW BALES AND RIP RAP NOT SHOWN ON PLANS AND SEEDING SHALL BE ON A UNIT BASIS. 5. CONTRACTOR SHALL INSTALL ALL STORM SEWER INLET FILTERS AS STORM SEWER SYSTEM IS INSTALLED. 6. ALL PROPOSED PARKING AREAS TO BE PAVED AS SOON AS POSSIBLE AFTER SUBGRADE IS PREPARED. 7. CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROLS ONLY WHEN THERE IS A SUFFICIENT GROWTH OF GROUND COVER TO PREVENT FURTHER EROSION. 8. ALL SWALES SHALL BE SEEDED IMMEDIATELY AFTER FINAL GRADING. PARKING LOT STRIPING 1. PAINT MATERIAL SHALL COMPLY WITH FEDERAL SPECIFICATION TT- P -115A FOR TRAFFIC PAINT WITHOUT GLASS SPHERES. (COLOR BY OWNER SELECTION). 2. STRIPE PARKING LINES AS SHOWN ON DRAWINGS WITH STRIPING PAINT. SUBCONTRACTOR TO PERFORM ALL FIELD LAYOUT WORK NECESSARY TO ACHIEVE STRAIGHT AND TRUE LINES. ASPHALT MUST BE CLEANED WITH POWER BROOM AND HAND BROOM TO REMOVE ALL LOOSE MATERIAL BEFORE STRIPING. THE SUBCONTRACTOR TO PROVIDE BARRIERS TO PREVENT MARRING OF LINES BY VEHICLES UNTIL PAINT HAS DRIED. STRIPING PAINT SHALL BE APPLIED AT THE MINIMUM RATE OF ONE GALLON PER 10D SQUARE FEET OF PAINT (BASED ON 39% SOLIDS) AT A WIDTH OF FOUR INCHES. PAVEMENT CONSTRUCTION 1. THE INDIANA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, LATEST EDITION SHALL APPLY TO WORKMANSHIP AND MATERIALS IN CONSTRUCTION OF SUBGRADE, PAVEMENT, CURBS AND WALKS. o. PREPARE THE SUBGRADE IN ACCORDANCE WITH INDOT SECTION 207. NO TRAFFIC WILL BE PERMITTED ON THE PREPARED SUBGRADE PRIOR TO PAVING. b. BITUMINOUS PAVEMENT IN ACCORDANCE WITH INDICT SECTION 402. c. FINISHING EARTH GRADED SHOULDERS, DITCHES AND SLOPES IN ACCORDANCE WITH INGOT SECTION 208. CONCRETE CURB AND WALKS 1. SEE DETAIL SHEET FOR TYPE AND DETAILS. 2. CONCRETE SHALL BE READY MIXED PORTLAND CEMENT AND WATER CONFORMING TO A.S.T.M C -150. AGGREGATES SHALL CONFORM TO A.S.T.M, C -33. COMPRESSIVE STRENGTH OF CONCRETE AT 28 DAYS SHALL BE 4000 P.S.I. WHERE REQUIRED, REINFORCEMENT SHALL BE WELDED STEEL WIRE FABRIC CONFORMING TO A.S.T.M. A -185. 3. ALL EXTERIOR CONCRETE SHALL CONTAIN 3% TO 6% AIR ENTRAINMENT. 4. APPLICATION a, PLACE CONCRETE ONLY ON A MOIST, COMPACT SUBGRADE OR BASE FREE FROM LOOSE MATERIAL. PLACE NO CONCRETE ON MUDDY OR FROZEN SUBGRADE IN ACCORDANCE WITH INDOT SECTION 604 AND 605. b. CONCRETE SHALL BE DEPOSITED SO AS TO REQUIRE AS LITTLE REHANDLING AS PRACTICAL. WHEN CONCRETE IS TO BE PLACED AT AN ATMOSPHERIC TEMPERATURE OF 35 DEGREES F OR LESS, PARAGRAPH 702.11 OF THE INDOT SPECIFICATIONS SHALL APPLY. c. EXCEPT AS OTHERWISE SPECIFIED, CURE ALL CONCRETE BY ONE OF THE METHODS DESCRIBED IN INDOT SECTION 501.17. 5. TOP OF CASTING ELEVATIONS REFER TO THE CASTING'S RIM OR TOP OF CURB. THE CURB CONTRACTOR SHALL INSURE THAT CURB INLET CASTINGS ARE SET AT PROPER ELEVATION PRIOR TO CONSTRUCTION OF ADJACENT CURB. DEMOLITION 1. THE CONTRACTOR SHALL EXCAVATE, DEMOLISH, REMOVE AND DISPOSE OF THE DEBRIS FROM THE AREAS SHOWN ON THE SITE DEVELOPMENT PLAN. a. BUILDING WALLS. b. FOUNDATIONS. c. PAVEMENT (CONCRETE, ASPHALT AND BRICK). d. CONCRETE SLABS. 2. ALL MATERIAL AS A RESULT OF THE GENERAL DEMOLITION SHALL BE THE PROPERTY OF THE CONTRACTOR, THE CONTRACTOR'S LUMP SUM BID PRICE FOR THE DEMOLITION SHALL TAKE INTO ACCOUNT THE SALVAGEABLE VALUE OF MATERIALS AND SAID BID PRICE SHALL REFLECT SAID SAVINGS. 3. THE CONTRACTOR SHALL BE REQUIRED TO DEMOLISH AND REMOVE DESIGNATED FOUNDATION WALLS, RETAINING WALLS, CURBING, CONCRETE SLABS, PAVING, TANKS, STRUCTURES, PIPES, MANHOLES AS SHOWN ON THE CONTRACT DOCUMENTS. ALL EXISTING BASEMENT FLOOR SLABS THAT ARE NOT REMOVED SHALL BE BROKEN UP SUFFICIENTLY TO PERMIT DRAINAGE THROUGH THE SLAB. ALL EXISTING BASEMENT WALLS, FOUNDATIONS, FLOOR SLABS, AND ETC. SHALL BE REMOVED TO AN ELEVATION SUCH THAT THEY WILL NOT SUPPORT PROPOSED FLOOR SLABS OR PAVEMENTS. 4. THE CONTRACTOR SHALL OBTAIN FROM THE CITY OF CARMEL, AND ALL OTHER APPLICABLE GOVERNMENTAL AUTHORITIES, NECESSARY PERMITS REQUIRED, A COPY OF SUCH PERMITS TO BE FURNISHED TO THE OWNER PRIOR TO COMMENCEMENT OF ANY WORK REQUIRED HEREIN. THE CONTRACTOR SHALL FURTHER FURNISH TO THE OWNER PROOF THAT HE HAS COMPLIED WITH THE PROVISIONS OF THE MUNICIPAL CODE OF INDIANAPOLIS, INDIANA. UTILITIES 1. ALL WATER LINES FROM CITY OF CARMEL WATER COMPANY MAIN TO ANY LOT SHALL BE INSTALLED OF MATERIAL AND WORKMANSHIP AS APPROVED WITH THE CITY OF CARMEL WATER COMPANY. 2. CONDUIT SHALL BE REQUIRED FOR ALL ELECTRICAL AND TELEPHONE LINES UNDER PAVED AREAS. 3. COMPACTED GRANULAR BACKFILL SHALL BE REQUIRED FOR ALL CROSSINGS OF PAVED AREAS PER CITY OF CARMEL DEPARTMENT OF TRANSPORTATION SPECIFICATIONS. NOTE: THE DEVELOPER/ OWNER AND THE ENGINEER / FINAL CONSTRUCTION PLANS NOTE_ PRIOR TO ISSUANCE OF ANY BUILDING PERMITS 9 -16 -08 NOTE. IT 15 THE CONTRACTORS RESPONSIBILITY TO `,`,`,`ON R-5050 Series 9 -24 -08 THE BITUMINOUS BASE AND BINDER LAYERS FOR ALL LL O Z COORDINATE WITH PROJECT ENGINEER TO INSURE THE 0 ULTIMATELY RESPONSIBLE TO ENSURE THE PROJECT IS Automatic Drainage Gate i..- �.- -.®.o. ".�.-- .. -.-�. H OQ `"' CONTRACTOR HAS THE MOST CURRENT, COMPLETE. Automatic drainabe gates are used In areas xith a requirement io prevent back Novo, such BUILT WITH ALL PLAN COMMISSION CONDITIONS BEING AND ALL WATER MAINS AND HYDRANTS FOR THE SITE APPROVED SET OF PLANS AND SPECIFICATIONS FOR THIS U) /I/111111'11�1� as storm and sanitari sawar „rsterls R • wo«a 'Y PROJECT. ENGINEER DOES NOT ACCEPT RESPONSIBILITY, STANDArD CATES Furnished w1h tiAe�rtca clo3ure for rrexrnLm eaae of opera -Ion SPECIFICATIONS AND MADE SERVICEABLE. u GENE: Al_ INF3FIUTATION Gates arr made d cast iron. All mcvlrg pars operate un MEET THE FORESAID CRITERIA. stainless steel hinge pins. The cover ia hung with cast iron arms (Ductile Iron arms on ' larger sizes) located at the outer edges near the certer of grave y to ensure sensitive ".� , ` s•s�4� evGrx cpe-ation. For Improvec seating order with naoprena seat at antra cost. W U_ Aluminum covers can ba funllshad 4o spec al -ecuirrn -ents, It spe ifiLd Also available on U. speaa orde- and at axtra cost are neoprene or 5dlc bronze seat mounts and bronze z O w tua-lcd hngoa. J R U/ z z Q U O O w W For apcilcaUans with ex-reme nead pressure contact Neenan's FXodut It ~ U V / Q Engneering Depairrent W z LL LL > U O � w Maxlm.trr heat loss occurs when Flpe is flowing -ull Consider the f-ead loss to L-e one -hall z CL W U) the pipe dlame-er TL W O ix These flan Cates are self- drainlrq when no .1p- stream Clow exists and nc� head Is or the C � 'k rn cownstream side zr Lin z W 0 --ii Dlmen3tons n inci-es Catalog No. Catalog No. Catalog No. Type SF Type CF Type FF Diameter A B C D E F N 5 R -5050 SF6 R- 5053 -CFE• -1 5050 -FFE. 6 7 11 13 1 334 7 foul 516 R 5050 �F8 53 F E 8 9 1 1 /" 114 four 5/8 R- 51350 -RF1 5 1 .• 50 10 0 4 1 2 151 a 1 2 1 1/ 11 1 4 four 51E R -�5050- F12 8-5053 -CF12 H-5050 -FF12 12 131 /4 1G 7/8 18 15 3/4 1 116 -31/4 four 5/8 R -5050 -c r1 s R- 5053 -CF15 is 16114 1 Q 21 105/4 11/0 -6 1 /4 four 5/c R 5060 GF18 R 5063 CF1a p E050 FF18 18 10114 22118 2141/4 22 1/9 1 114 -0 1/4 tour 914 R -5050 SF20 121- 5053 -CF2,0 :1- E050 -17172'0 20 22114 25119 27114 25 118 1 114 22 114 four 314 R -5u15n =1721 R-s,ObO -CF21 2- 22114 25118 271/4 251!9 1 114 221/4 four ?M _ R-Sn50 PF�)4 R- S)F.71- ,F`4 :� rOSr 1717:'4 ;)4 25114 PR 114 R(' 114 ?R 114 1 114 7S 114 SIX f14 R-15050-5F27 2; 28114 31 114 351/4 91 114 1 114 281/4 six 71E R- 51)50 -EF30 R- 5050 -CF3D 30 31 114 341/4 3E 12 34 114 11/4 31 114 six 71E R -5050 SF36 R- 5050 -CF56 36 3711'2 41 112 45112 z-1 1/2 1 316 371/2 Six 7/E R -9)50 c_F42 R- 5050 -CF42 42 43112 471/2 4S 12 7 112 1 318 491/2 sun 7/E R -5050 SF46 R- 505D -CF48 48 49112 54 5612 54 1 112 49 112 six 1 III ill Type SFatfached to Typo CF attached to I Type FFaffached to concrete wall corrugated metal pipe. fanged Iron pipe (not II use with hellcat CUP) NEENAH xqF FOUNDRY SOIL EROSION CONTROL SUMMARY CONTRACTOR SHALL INSTALL SEDIMENT TRAPS AND CONTRUCTION EROSION CONTROL DEVICES AS SHOWN. 2. MASS GRADE THE SITE (SIDES OF SWALES, AND MOUNDS TO BE SODDED OR SEEDED AND MULCHED IMMEDIATELY UPON COMPLETION). TEMPORARY SEEDING SHALL BE RECOMMENDED FOR ALL SWALES AND DISTURBED AREAS THAT CANNOT BE FINAL SEEDED WITHIN A TIME PERIOD THAT WILL PREVENT SOIL EROSION, FOR TEMPORARY SEEDING THE CONTRACTOR SHALL UTILIZE A FAST GROWING SEED OF EITHER OATS, ANNUAL RYEGRASS, WHEAT OR RYE DEPENDING UPON TIME OF YEAR. DISTURBED AREAS SHOULD BE KEPT TO A MINIMUM AT ALL TIMES. 3. CONTRACTOR SHALL CONTROL MUD ACCUMULATION ON ALL STREETS SURROUNDING THE PROJECT BY INSTALLING STONE SURFACE AT ALL LOCATIONS WHERE CONSTRUCTION TRAFFIC LEAVES THE SITE. DUST SHALL BE KEPT TO A MINIMUM BY UTILIZING SPRINKLING, CALCIUM CHLORIDE, VEGETATIVE COVER, SPRAY ON ADDITIVES OR OTHER APPROVED METHODS. CLEANING OF STREET SHALL BE REQUIRED AS DIRECTED BY LOCAL AUTHORITIES, OWNER, ARCHITECT, OR ENGINEER. 4. MAINTAIN ALL FILTERS AND TRAPS DURING CONSTRUCTION TO PREVENT ANY BLOCKAGES FROM ACCUMULATED SEDIMENT, ADDITIONAL SEEDING AND STRAW BALES MAY BE REQUIRED ATI DURING CONSTRUCTION AS SPECIFIED BY ENGINEER OR SOI L CONSERVATION SERVICE. RIP RAP SHALL BE PLACED IN AREAS OF HIGH VELOCITY STREAM FLOW (MINIMUM SIZE 1/3 CU.FT.). PAYMENT FOR ADDITIONAL STRAW BALES AND RIP RAP NOT SHOWN ON PLANS AND SEEDING SHALL BE ON A UNIT BASIS. 5. CONTRACTOR SHALL INSTALL ALL STORM SEWER INLET FILTERS AS STORM SEWER SYSTEM IS INSTALLED. 6. ALL PROPOSED PARKING AREAS TO BE PAVED AS SOON AS POSSIBLE AFTER SUBGRADE IS PREPARED. 7. CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROLS ONLY WHEN THERE IS A SUFFICIENT GROWTH OF GROUND COVER TO PREVENT FURTHER EROSION. 8. ALL SWALES SHALL BE SEEDED IMMEDIATELY AFTER FINAL GRADING. PARKING LOT STRIPING 1. PAINT MATERIAL SHALL COMPLY WITH FEDERAL SPECIFICATION TT- P -115A FOR TRAFFIC PAINT WITHOUT GLASS SPHERES. (COLOR BY OWNER SELECTION). 2. STRIPE PARKING LINES AS SHOWN ON DRAWINGS WITH STRIPING PAINT. SUBCONTRACTOR TO PERFORM ALL FIELD LAYOUT WORK NECESSARY TO ACHIEVE STRAIGHT AND TRUE LINES. ASPHALT MUST BE CLEANED WITH POWER BROOM AND HAND BROOM TO REMOVE ALL LOOSE MATERIAL BEFORE STRIPING. THE SUBCONTRACTOR TO PROVIDE BARRIERS TO PREVENT MARRING OF LINES BY VEHICLES UNTIL PAINT HAS DRIED. STRIPING PAINT SHALL BE APPLIED AT THE MINIMUM RATE OF ONE GALLON PER 10D SQUARE FEET OF PAINT (BASED ON 39% SOLIDS) AT A WIDTH OF FOUR INCHES. PAVEMENT CONSTRUCTION 1. THE INDIANA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, LATEST EDITION SHALL APPLY TO WORKMANSHIP AND MATERIALS IN CONSTRUCTION OF SUBGRADE, PAVEMENT, CURBS AND WALKS. o. PREPARE THE SUBGRADE IN ACCORDANCE WITH INDOT SECTION 207. NO TRAFFIC WILL BE PERMITTED ON THE PREPARED SUBGRADE PRIOR TO PAVING. b. BITUMINOUS PAVEMENT IN ACCORDANCE WITH INDICT SECTION 402. c. FINISHING EARTH GRADED SHOULDERS, DITCHES AND SLOPES IN ACCORDANCE WITH INGOT SECTION 208. CONCRETE CURB AND WALKS 1. SEE DETAIL SHEET FOR TYPE AND DETAILS. 2. CONCRETE SHALL BE READY MIXED PORTLAND CEMENT AND WATER CONFORMING TO A.S.T.M C -150. AGGREGATES SHALL CONFORM TO A.S.T.M, C -33. COMPRESSIVE STRENGTH OF CONCRETE AT 28 DAYS SHALL BE 4000 P.S.I. WHERE REQUIRED, REINFORCEMENT SHALL BE WELDED STEEL WIRE FABRIC CONFORMING TO A.S.T.M. A -185. 3. ALL EXTERIOR CONCRETE SHALL CONTAIN 3% TO 6% AIR ENTRAINMENT. 4. APPLICATION a, PLACE CONCRETE ONLY ON A MOIST, COMPACT SUBGRADE OR BASE FREE FROM LOOSE MATERIAL. PLACE NO CONCRETE ON MUDDY OR FROZEN SUBGRADE IN ACCORDANCE WITH INDOT SECTION 604 AND 605. b. CONCRETE SHALL BE DEPOSITED SO AS TO REQUIRE AS LITTLE REHANDLING AS PRACTICAL. WHEN CONCRETE IS TO BE PLACED AT AN ATMOSPHERIC TEMPERATURE OF 35 DEGREES F OR LESS, PARAGRAPH 702.11 OF THE INDOT SPECIFICATIONS SHALL APPLY. c. EXCEPT AS OTHERWISE SPECIFIED, CURE ALL CONCRETE BY ONE OF THE METHODS DESCRIBED IN INDOT SECTION 501.17. 5. TOP OF CASTING ELEVATIONS REFER TO THE CASTING'S RIM OR TOP OF CURB. THE CURB CONTRACTOR SHALL INSURE THAT CURB INLET CASTINGS ARE SET AT PROPER ELEVATION PRIOR TO CONSTRUCTION OF ADJACENT CURB. DEMOLITION 1. THE CONTRACTOR SHALL EXCAVATE, DEMOLISH, REMOVE AND DISPOSE OF THE DEBRIS FROM THE AREAS SHOWN ON THE SITE DEVELOPMENT PLAN. a. BUILDING WALLS. b. FOUNDATIONS. c. PAVEMENT (CONCRETE, ASPHALT AND BRICK). d. CONCRETE SLABS. 2. ALL MATERIAL AS A RESULT OF THE GENERAL DEMOLITION SHALL BE THE PROPERTY OF THE CONTRACTOR, THE CONTRACTOR'S LUMP SUM BID PRICE FOR THE DEMOLITION SHALL TAKE INTO ACCOUNT THE SALVAGEABLE VALUE OF MATERIALS AND SAID BID PRICE SHALL REFLECT SAID SAVINGS. 3. THE CONTRACTOR SHALL BE REQUIRED TO DEMOLISH AND REMOVE DESIGNATED FOUNDATION WALLS, RETAINING WALLS, CURBING, CONCRETE SLABS, PAVING, TANKS, STRUCTURES, PIPES, MANHOLES AS SHOWN ON THE CONTRACT DOCUMENTS. ALL EXISTING BASEMENT FLOOR SLABS THAT ARE NOT REMOVED SHALL BE BROKEN UP SUFFICIENTLY TO PERMIT DRAINAGE THROUGH THE SLAB. ALL EXISTING BASEMENT WALLS, FOUNDATIONS, FLOOR SLABS, AND ETC. SHALL BE REMOVED TO AN ELEVATION SUCH THAT THEY WILL NOT SUPPORT PROPOSED FLOOR SLABS OR PAVEMENTS. 4. THE CONTRACTOR SHALL OBTAIN FROM THE CITY OF CARMEL, AND ALL OTHER APPLICABLE GOVERNMENTAL AUTHORITIES, NECESSARY PERMITS REQUIRED, A COPY OF SUCH PERMITS TO BE FURNISHED TO THE OWNER PRIOR TO COMMENCEMENT OF ANY WORK REQUIRED HEREIN. THE CONTRACTOR SHALL FURTHER FURNISH TO THE OWNER PROOF THAT HE HAS COMPLIED WITH THE PROVISIONS OF THE MUNICIPAL CODE OF INDIANAPOLIS, INDIANA. UTILITIES 1. ALL WATER LINES FROM CITY OF CARMEL WATER COMPANY MAIN TO ANY LOT SHALL BE INSTALLED OF MATERIAL AND WORKMANSHIP AS APPROVED WITH THE CITY OF CARMEL WATER COMPANY. 2. CONDUIT SHALL BE REQUIRED FOR ALL ELECTRICAL AND TELEPHONE LINES UNDER PAVED AREAS. 3. COMPACTED GRANULAR BACKFILL SHALL BE REQUIRED FOR ALL CROSSINGS OF PAVED AREAS PER CITY OF CARMEL DEPARTMENT OF TRANSPORTATION SPECIFICATIONS. SANITARY SEWER SPECIFICATIONS 1. STANDARDS SPECIFICATIONS OF CITY OF CITY OF CARMEL UTILITIES, INDIANA DEPARTMENT OF TRANSPORTATION AND INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT SHALL APPLY FOR ALL WORK AND MATERIALS. PIPE SHALL BE INSTALLED IN WITH INDOT SECTION 715, ASTM AND MANUFACTURER SPECIFICATIONS. 2. SANITARY SEWER PIPE SHALL BE PVC TYPE 1, CONFORMING TO ASTM D -3034 OR PVC IN ACCORDANCE WITH ASTM D -3034 (S.D.R. 35) AND ASTM 2321. JOINTS FOR P.V.C. SHALL BE COMPRESSION TYPE FLEXIBLE GASKETED JOINTS. 3. ALL SANITARY SEWER MANHOLES SHALL BE "PRECAST CONCRETE" MANHOLES IN ACCORDANCE WITH ASTM C -478 AND 720. MANHOLE SECTIONS SHALL HAVE KENT SEAL AND "0" RING TYPE GASKETS WHICH SHALL CONFORM TO ASTM D -443. BACK PLASTERING OF ADJUSTING RINGS IS REQUIRED. 4. THE TYPE OF NEW MANHOLE CASTING AND COVER SHALL BE NEENAH R- 1712 -B -SP. 5. THE CASTING ELEVATIONS ARE SET BY PLAN. HOWEVER, THE CASTINGS ARE TO BE ADJUSTED IN THE FIELD BY THE ENGINEER OR HIS REPRESENTATIVE SHOULD A DISCREPANCY OCCUR BETWEEN PLAN GRADE AND EXISTING GRADE. 6. NEW MANHOLE RING AND COVER SHALL BE INSTALLED TO ESTABLISHED GRADE. 7. BACKFILL AROUND ALL STRUCTURES AND ALL CUTS UNDER PAVED AREAS WITH COMPACTED GRANULAR MATERIAL. TRENCH OPENINGS WITHIN 5 FEET OF PAVED ROADWAYS SHALL BE BACKFILLED WITH COMPACTED GRANULAR MATERIAL IN ACCORDANCE WITH INDOT SECTION 211. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT ALL STATE HIGHWAYS, CITY AND COUNTY PERMITS HAVE BEEN OBTAINED BY OWNER PRIOR TO START OF CONSTRUCTION. 9. THE CONTRACTOR SHALL BE REQUIRED TO FURNISH THE ENGINEER WITH A SET OF PRINTS, MARKED IN RED PENCIL, SHOWING ACTUAL SEWER LOCATIONS AND INVERTS TO INCLUDE LATERAL LOCATIONS, DEPTH AND LENGTHS. SUCH "AS- BUILT" PRINTS MUST BE RECEIVED BY THE ENGINEER BEFORE THE FINAL CONTRACT PAYMENT CAN BE AUTHORIZED. THE SANITARY SEWER LATERAL AND STUB TERMINATIONS SHALL BE INDICATED BY A MAGNETIC TAPE LOCATOR PLACED AT THE END OF EACH LATERAL. 10.ALL SANITARY SEWER LINES UPON COMPLETION WILL BE REQUIRED TO PASS A LOW PRESSURE AIR TEST, UNLESS OTHERWISE DIRECTED BY ENGINEER. SAID TEST SHALL BE CONDUCTED ACCORDING TO TEN STATES STANDARDS, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT. AND CITY OF CARMEL DEPARTMENT OF PUBLIC WORKS AND SHALL BE WITNESSED BY AN ENGINEER. INFILTRATION UNDER TEST SHALL NOT EXCEED 100 GALLONS PER INCH OF INSIDE DIAMETER OF SEWER PIPE PER MILE OF SEWER IN 24 HOURS AND INCLUSIVE OF ALL APPURTANCES WITHIN THE SECTION BEING TESTED SUCH AS MANHOLES, HOUSE CONNECTIONS, ETC. 11.DEFLECTION TESTS SHALL BE PERFORMED ON ALL *FLEXIBLE PIPE AFTER THE FINAL BACKFILL HAS BEEN IN PLACE AT LEAST 30 DAYS. NO PIPE SHALL EXCEED A VERTICAL DEFLECTION OF 5% ( *THE FOLLOWING ARE CONSIDERED NON- FLEXIBLE PIPES: CONCRETE PIPE, DUCTILE IRON PIPE, CAST IRON PIPE AND ASBESTOS CEMENT PIPE). 12. ALL TESTING SHALL BE CERTIFIED BY A PROFESSIONAL ENGINEER. 13,THE ENDS OF LATERALS ARE TO BE PLUGGED TIGHT WITH CLAY OR PLASTIC DISC OR CAP CAPABLE OF WITHSTANDING A LOW PRESSURE AIR TEST WITHOUT LEAKAGE. 14.CLASS I BEDDING AS DESCRIBED IN ASTM -2321 SHALL BE USED, EXCEPT WHERE SPECIFIED OTHERWISE. 15. WATER AND SEWER LINE CROSSINGS AND SEPARATIONS SHALL BE IN ACCORDANCE WITH TEN STATES STANDARDS AS SHOWN ON THE DETAIL SHEET. 16. TRENCH SHALL BE OPENED SUFFICIENTLY AHEAD OF PIPE LAYING TO REVEAL OBSTRUCTIONS, AND SHALL BE PROPERLY PROTECTED AND /OR BARRICADED WHEN LEFT UNATTENDED. 17,ALTERNATE PRESSURE PIPE MATERIAL SHALL BE POLYVINYL CHLORIDE PLASTIC PIPE WITH A STANDARD DIMENSION RATIO OF SDR 21 OR AWWA C -900 WITH A SDR OF 21(CLASS 20D) AND BE DESIGNED FOR A RATED WORKING PRESSURE OF 200 PSI WATER PRESSURE. ALL PLASTIC WATER MAINS SHALL BE COLORED BLUE. PLASTIC PIPE SHALL BE SUITABLE FOR USE AT THE MAXIMUM HYDROSTATIC WORKING PRESSURE IDENTIFIED ABOVE, AT 73 DEGREES F. ALL PIPE SHALL MEET THE REQUIREMENTS AS SET FORTH IN ASTM D -2241, WITH THE STANDARD DIMENSION RATIO IDENTIFIED ABOVE AND SHALL BEAR THE NATIONAL SANITATION FOUNDATION (N.S.F.) SEAL OF APPROVAL FOR POTABLE WATER PIPE. PROVISIONS SHALL BE MADE FOR EXPANSION AND CONTRACTION AT EACH JOINT WITH A RUBBER RING. AND INTEGRAL THICKENED BELL AS PART OF EACH JOINT. PIPE AND FITTINGS SHALL BE ASSEMBLED WITH A NONTOXIC LUBRICANT. STANDARD LAYING LENGTHS SHALL BE 20 FEET PLUS OR MINUS 1 INCH. 18.SANITARY SEWER CONSTRUCTION WILL NOT BE ALLOWED TO COMMENCE UNTIL A VALID 327 IAC ARTICLE 3 IS OBTAINED (WHEN REQUIRED). 19, THE MINIMUM CELL CLASSIFICATION FOR P.V.C. PIPE SHALL BE 12454 -B OR 12454 -C. 20.THE FLOW CHANNELS FOR THE SANITARY SEWER MANHOLES SHALL BE U- SHAPED WITH THE THE BENCHWALLS EXTENDING TO THE CROWN OF THE INCOMING AND AND OUTGOING PIPES. 21. MANHOLES LINED IN THEIR ENTIRITY SHALL BE VACCUUM TESTED. ALL PIPES ENTERING THE MANHOLE SHOULD BE PLUGGED, TAKING CARE TO SECURELY PLACE THE PLUG FROM BEING DRAWN INTO THE MANHOLE, THE TEST HEAD SHALL BE PLACED AND THE SEAL INFLATED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. A VACUUM PUMP OF TEN (10) INCHES OF MERCURY SHALL BE DRAWN AND THE VACUUM PUMP SHUT OFF. WITH THE VALVES CLOSED, THE TIME SHALL BE MEASURED FOR THE VACUUM TO DROP TO NINE (9) INCHES. FOLLOWING ARE A MINIMUM ALLOWABLE TEST TIMES FOR MANHOLE ACCEPTANCE AT THE SPECIFIED VACUUM DROP. DEPTH (FEET) TIME (SECONDS) 48" DIAMETER 60" DIAMATER 72" DIAMETER 4 10 13 16 8 20 26 33 12 30 39 49 16 40 52 67 20 50 65 81 24 59 78 97 ADD FOR 2 FT. MORE DEPTH 5 6.66 8 NOTE: THESE NUMBERS HAVE BEEN TAKEN FROM ASTM C 1244 -93 (REAPPROVED 2000) IF THE MANHOLE FAILS IN THE INITIAL TEST, REPAIRS AND ADJUSTMENTS NECESSARY DUE TO EXTENUATING CIRCUMSTANCES (IE. PIPE JOINT, LINER, PLUG SEALING) SHOULD BE MADE RETESTING SHALL PROCEED UNTIL A SATISFACTORY TEST IS OBTAINED. STORM SEWER SPECIFICATIONS 1. STANDARD SPECIFICATIONS OF THE CITY OF CARMEL AND INDIANA DEPARTMENT OF TRANSPORTATION SHALL APPLY FOR ALL WORK AND MATERIALS. PIPE SHALL BE INSTALLED IN ACCORDANCE WITH INDOT SECTION 715. 2. ALL REINFORCED CONCRETE STORM SEWER PIPE (RCP) SHALL CONFORM TO ASTM DESIGNATION C -76 CLASS III. ALL HELICALLY CORRUGATED STEEL PIPE (HCSP) SHALL CONFORM AASHTO M36, 16 GAUGE IN ACCORDANCE WITH INDOT SECTION 908. ALL HIGH DENSITY POLEYETHELINE (HDPE) SHALL CONFORM TO AASHTO M294 AND SHALL BE TYPE S WITH MINIMUM CELL CLASS OF d324420C CONFORMING TO ASTM D 3350, FLEXIBILITY FACTOR NOT TO EXCEED 0.095 AND ALL JOINTS SHALL BE ASTM D3212 & F477. ALL POLYVINYL CHLORIDE PIPE (PVC) SHALL CONFORM TO AASHTO M3D4 & MINIMUM CELL CLASS OF 12454C OR 12364C PER ASTM D1784 AND JOINTS SHALL CONFORM TO ASTM D3212 AND F447. 1 BACKFILL AROUND ALL STRUCTURES AND CUTS UNDER PAVED AREAS WITH COMPACTED GRANULAR MATERIAL IN ACCORDANCE WITH INDOT SECTION 21.1 AND 715. 4. SEE STANDARD DETAIL SHEET FOR CONSTRUCTION DIMENSIONS OF STORM STRUCTURES. MANHOLE, INLETS AND CATCH BASINS SHALL BE IN ACCORDANCE WITH INDOT SECTION 720. PRECAST CONCRETE AND STEEL FOR MANHOLES AND INLETS SHALL BE IN ACCORDANCE WITH ASTM C -478. 5. STORM SEWER DISCHARGE AREAS AND INVERTS ARE TENTATIVE AND ARE SUBJECT TO FIELD MODIFICATIONS BY THE ENGINEER OR HIS REPRESENTATIVE. THE CONTRACTOR WILL BE REIMBURSED FOR ANY ADDITIONAL LABOR AND MATERIALS NECESSARY TO COMPLETE ANY MODIFICATIONS ACCORDING TO THE UNIT PRICES SUBMITTED BY THE CONTRACTOR OR THE CONTRACT AMOUNT. 6. THE CONTRACTOR SHALL PROVIDE AT LEAST 2' OF COVER OVER ALL STORM SEWERS, UNLESS OTHERWISE INDICATED BY PLANS. 7. RIP RAP SHALL BE A MINIMUM OF 1/3 CUBIC FOOT IN SIZE AND A MINIMUM 18" IN DEPTH, DIMENSIONS FOR RIP RAP IN THESE PLANS ARE FOR ESTIMATING PURPOSES ONLY, ACTUAL BEST PLACEMENT OF RIP RAP SHALL BE DETERMINED BY FIELD CONDITIONS AND SHALL BE IN ACCORDANCE WITH INDOT SECTION 616. 8. ALL DRAINAGE PIPE AND DITCH OUTFALLS TO RECEIVING STREAMS SHALL BE CONSTRUCTED IN ACCORDANCE WITH DRAWINGS, SUBJECT HOWEVER, TO ANY MODIFICATION REQUIRED BY THE ENGINEER AT THE TIME INSTALLATION IS COMPLETED AND TO ANY ADJUSTMENTS NEEDED FOR FIELD CONDITIONS NOT ADEQUATELY ANTICIPATED BY THE DESIGN DRAWING. CASTINGS SHALL BE AS SHOWN ON DETAIL SHEET FOR MANUFACTURER, TYPE AND 9' NUMBER. ALL CASTINGS SHALL BE NEENAH OR EAST JORDAN APPROVED EQUAL. 3 »^ ap 71 1 :1$ a 1b F, a M A a O m 0 DJ Ir CL w it a- NOTE: THE DEVELOPER/ OWNER AND THE ENGINEER / FINAL CONSTRUCTION PLANS NOTE_ PRIOR TO ISSUANCE OF ANY BUILDING PERMITS 9 -16 -08 NOTE. IT 15 THE CONTRACTORS RESPONSIBILITY TO `,`,`,`ON SURVEYOR FOR THE DEVELOPER/ OWNER ARE 9 -24 -08 THE BITUMINOUS BASE AND BINDER LAYERS FOR ALL LL O Z COORDINATE WITH PROJECT ENGINEER TO INSURE THE 0 ULTIMATELY RESPONSIBLE TO ENSURE THE PROJECT IS STREETS, DRIVES AND PARKING LOTS TO BE INSTALLED H OQ `"' CONTRACTOR HAS THE MOST CURRENT, COMPLETE. BUILT WITH ALL PLAN COMMISSION CONDITIONS BEING AND ALL WATER MAINS AND HYDRANTS FOR THE SITE APPROVED SET OF PLANS AND SPECIFICATIONS FOR THIS U) /I/111111'11�1� MET AND ALSO PER CITY / TOWN STANDARDS AND DEVELOPMENT MUST BE INSTALLED PER APPROVED PROJECT. ENGINEER DOES NOT ACCEPT RESPONSIBILITY, SPECIFICATIONS. SPECIFICATIONS AND MADE SERVICEABLE. SHOULD CONTRACTOR UTILIZE ANY PLANS THAT DO NOT MEET THE FORESAID CRITERIA. SANITARY SEWER SPECIFICATIONS 1. STANDARDS SPECIFICATIONS OF CITY OF CITY OF CARMEL UTILITIES, INDIANA DEPARTMENT OF TRANSPORTATION AND INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT SHALL APPLY FOR ALL WORK AND MATERIALS. PIPE SHALL BE INSTALLED IN WITH INDOT SECTION 715, ASTM AND MANUFACTURER SPECIFICATIONS. 2. SANITARY SEWER PIPE SHALL BE PVC TYPE 1, CONFORMING TO ASTM D -3034 OR PVC IN ACCORDANCE WITH ASTM D -3034 (S.D.R. 35) AND ASTM 2321. JOINTS FOR P.V.C. SHALL BE COMPRESSION TYPE FLEXIBLE GASKETED JOINTS. 3. ALL SANITARY SEWER MANHOLES SHALL BE "PRECAST CONCRETE" MANHOLES IN ACCORDANCE WITH ASTM C -478 AND 720. MANHOLE SECTIONS SHALL HAVE KENT SEAL AND "0" RING TYPE GASKETS WHICH SHALL CONFORM TO ASTM D -443. BACK PLASTERING OF ADJUSTING RINGS IS REQUIRED. 4. THE TYPE OF NEW MANHOLE CASTING AND COVER SHALL BE NEENAH R- 1712 -B -SP. 5. THE CASTING ELEVATIONS ARE SET BY PLAN. HOWEVER, THE CASTINGS ARE TO BE ADJUSTED IN THE FIELD BY THE ENGINEER OR HIS REPRESENTATIVE SHOULD A DISCREPANCY OCCUR BETWEEN PLAN GRADE AND EXISTING GRADE. 6. NEW MANHOLE RING AND COVER SHALL BE INSTALLED TO ESTABLISHED GRADE. 7. BACKFILL AROUND ALL STRUCTURES AND ALL CUTS UNDER PAVED AREAS WITH COMPACTED GRANULAR MATERIAL. TRENCH OPENINGS WITHIN 5 FEET OF PAVED ROADWAYS SHALL BE BACKFILLED WITH COMPACTED GRANULAR MATERIAL IN ACCORDANCE WITH INDOT SECTION 211. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT ALL STATE HIGHWAYS, CITY AND COUNTY PERMITS HAVE BEEN OBTAINED BY OWNER PRIOR TO START OF CONSTRUCTION. 9. THE CONTRACTOR SHALL BE REQUIRED TO FURNISH THE ENGINEER WITH A SET OF PRINTS, MARKED IN RED PENCIL, SHOWING ACTUAL SEWER LOCATIONS AND INVERTS TO INCLUDE LATERAL LOCATIONS, DEPTH AND LENGTHS. SUCH "AS- BUILT" PRINTS MUST BE RECEIVED BY THE ENGINEER BEFORE THE FINAL CONTRACT PAYMENT CAN BE AUTHORIZED. THE SANITARY SEWER LATERAL AND STUB TERMINATIONS SHALL BE INDICATED BY A MAGNETIC TAPE LOCATOR PLACED AT THE END OF EACH LATERAL. 10.ALL SANITARY SEWER LINES UPON COMPLETION WILL BE REQUIRED TO PASS A LOW PRESSURE AIR TEST, UNLESS OTHERWISE DIRECTED BY ENGINEER. SAID TEST SHALL BE CONDUCTED ACCORDING TO TEN STATES STANDARDS, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT. AND CITY OF CARMEL DEPARTMENT OF PUBLIC WORKS AND SHALL BE WITNESSED BY AN ENGINEER. INFILTRATION UNDER TEST SHALL NOT EXCEED 100 GALLONS PER INCH OF INSIDE DIAMETER OF SEWER PIPE PER MILE OF SEWER IN 24 HOURS AND INCLUSIVE OF ALL APPURTANCES WITHIN THE SECTION BEING TESTED SUCH AS MANHOLES, HOUSE CONNECTIONS, ETC. 11.DEFLECTION TESTS SHALL BE PERFORMED ON ALL *FLEXIBLE PIPE AFTER THE FINAL BACKFILL HAS BEEN IN PLACE AT LEAST 30 DAYS. NO PIPE SHALL EXCEED A VERTICAL DEFLECTION OF 5% ( *THE FOLLOWING ARE CONSIDERED NON- FLEXIBLE PIPES: CONCRETE PIPE, DUCTILE IRON PIPE, CAST IRON PIPE AND ASBESTOS CEMENT PIPE). 12. ALL TESTING SHALL BE CERTIFIED BY A PROFESSIONAL ENGINEER. 13,THE ENDS OF LATERALS ARE TO BE PLUGGED TIGHT WITH CLAY OR PLASTIC DISC OR CAP CAPABLE OF WITHSTANDING A LOW PRESSURE AIR TEST WITHOUT LEAKAGE. 14.CLASS I BEDDING AS DESCRIBED IN ASTM -2321 SHALL BE USED, EXCEPT WHERE SPECIFIED OTHERWISE. 15. WATER AND SEWER LINE CROSSINGS AND SEPARATIONS SHALL BE IN ACCORDANCE WITH TEN STATES STANDARDS AS SHOWN ON THE DETAIL SHEET. 16. TRENCH SHALL BE OPENED SUFFICIENTLY AHEAD OF PIPE LAYING TO REVEAL OBSTRUCTIONS, AND SHALL BE PROPERLY PROTECTED AND /OR BARRICADED WHEN LEFT UNATTENDED. 17,ALTERNATE PRESSURE PIPE MATERIAL SHALL BE POLYVINYL CHLORIDE PLASTIC PIPE WITH A STANDARD DIMENSION RATIO OF SDR 21 OR AWWA C -900 WITH A SDR OF 21(CLASS 20D) AND BE DESIGNED FOR A RATED WORKING PRESSURE OF 200 PSI WATER PRESSURE. ALL PLASTIC WATER MAINS SHALL BE COLORED BLUE. PLASTIC PIPE SHALL BE SUITABLE FOR USE AT THE MAXIMUM HYDROSTATIC WORKING PRESSURE IDENTIFIED ABOVE, AT 73 DEGREES F. ALL PIPE SHALL MEET THE REQUIREMENTS AS SET FORTH IN ASTM D -2241, WITH THE STANDARD DIMENSION RATIO IDENTIFIED ABOVE AND SHALL BEAR THE NATIONAL SANITATION FOUNDATION (N.S.F.) SEAL OF APPROVAL FOR POTABLE WATER PIPE. PROVISIONS SHALL BE MADE FOR EXPANSION AND CONTRACTION AT EACH JOINT WITH A RUBBER RING. AND INTEGRAL THICKENED BELL AS PART OF EACH JOINT. PIPE AND FITTINGS SHALL BE ASSEMBLED WITH A NONTOXIC LUBRICANT. STANDARD LAYING LENGTHS SHALL BE 20 FEET PLUS OR MINUS 1 INCH. 18.SANITARY SEWER CONSTRUCTION WILL NOT BE ALLOWED TO COMMENCE UNTIL A VALID 327 IAC ARTICLE 3 IS OBTAINED (WHEN REQUIRED). 19, THE MINIMUM CELL CLASSIFICATION FOR P.V.C. PIPE SHALL BE 12454 -B OR 12454 -C. 20.THE FLOW CHANNELS FOR THE SANITARY SEWER MANHOLES SHALL BE U- SHAPED WITH THE THE BENCHWALLS EXTENDING TO THE CROWN OF THE INCOMING AND AND OUTGOING PIPES. 21. MANHOLES LINED IN THEIR ENTIRITY SHALL BE VACCUUM TESTED. ALL PIPES ENTERING THE MANHOLE SHOULD BE PLUGGED, TAKING CARE TO SECURELY PLACE THE PLUG FROM BEING DRAWN INTO THE MANHOLE, THE TEST HEAD SHALL BE PLACED AND THE SEAL INFLATED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. A VACUUM PUMP OF TEN (10) INCHES OF MERCURY SHALL BE DRAWN AND THE VACUUM PUMP SHUT OFF. WITH THE VALVES CLOSED, THE TIME SHALL BE MEASURED FOR THE VACUUM TO DROP TO NINE (9) INCHES. FOLLOWING ARE A MINIMUM ALLOWABLE TEST TIMES FOR MANHOLE ACCEPTANCE AT THE SPECIFIED VACUUM DROP. DEPTH (FEET) TIME (SECONDS) 48" DIAMETER 60" DIAMATER 72" DIAMETER 4 10 13 16 8 20 26 33 12 30 39 49 16 40 52 67 20 50 65 81 24 59 78 97 ADD FOR 2 FT. MORE DEPTH 5 6.66 8 NOTE: THESE NUMBERS HAVE BEEN TAKEN FROM ASTM C 1244 -93 (REAPPROVED 2000) IF THE MANHOLE FAILS IN THE INITIAL TEST, REPAIRS AND ADJUSTMENTS NECESSARY DUE TO EXTENUATING CIRCUMSTANCES (IE. PIPE JOINT, LINER, PLUG SEALING) SHOULD BE MADE RETESTING SHALL PROCEED UNTIL A SATISFACTORY TEST IS OBTAINED. STORM SEWER SPECIFICATIONS 1. STANDARD SPECIFICATIONS OF THE CITY OF CARMEL AND INDIANA DEPARTMENT OF TRANSPORTATION SHALL APPLY FOR ALL WORK AND MATERIALS. PIPE SHALL BE INSTALLED IN ACCORDANCE WITH INDOT SECTION 715. 2. ALL REINFORCED CONCRETE STORM SEWER PIPE (RCP) SHALL CONFORM TO ASTM DESIGNATION C -76 CLASS III. ALL HELICALLY CORRUGATED STEEL PIPE (HCSP) SHALL CONFORM AASHTO M36, 16 GAUGE IN ACCORDANCE WITH INDOT SECTION 908. ALL HIGH DENSITY POLEYETHELINE (HDPE) SHALL CONFORM TO AASHTO M294 AND SHALL BE TYPE S WITH MINIMUM CELL CLASS OF d324420C CONFORMING TO ASTM D 3350, FLEXIBILITY FACTOR NOT TO EXCEED 0.095 AND ALL JOINTS SHALL BE ASTM D3212 & F477. ALL POLYVINYL CHLORIDE PIPE (PVC) SHALL CONFORM TO AASHTO M3D4 & MINIMUM CELL CLASS OF 12454C OR 12364C PER ASTM D1784 AND JOINTS SHALL CONFORM TO ASTM D3212 AND F447. 1 BACKFILL AROUND ALL STRUCTURES AND CUTS UNDER PAVED AREAS WITH COMPACTED GRANULAR MATERIAL IN ACCORDANCE WITH INDOT SECTION 21.1 AND 715. 4. SEE STANDARD DETAIL SHEET FOR CONSTRUCTION DIMENSIONS OF STORM STRUCTURES. MANHOLE, INLETS AND CATCH BASINS SHALL BE IN ACCORDANCE WITH INDOT SECTION 720. PRECAST CONCRETE AND STEEL FOR MANHOLES AND INLETS SHALL BE IN ACCORDANCE WITH ASTM C -478. 5. STORM SEWER DISCHARGE AREAS AND INVERTS ARE TENTATIVE AND ARE SUBJECT TO FIELD MODIFICATIONS BY THE ENGINEER OR HIS REPRESENTATIVE. THE CONTRACTOR WILL BE REIMBURSED FOR ANY ADDITIONAL LABOR AND MATERIALS NECESSARY TO COMPLETE ANY MODIFICATIONS ACCORDING TO THE UNIT PRICES SUBMITTED BY THE CONTRACTOR OR THE CONTRACT AMOUNT. 6. THE CONTRACTOR SHALL PROVIDE AT LEAST 2' OF COVER OVER ALL STORM SEWERS, UNLESS OTHERWISE INDICATED BY PLANS. 7. RIP RAP SHALL BE A MINIMUM OF 1/3 CUBIC FOOT IN SIZE AND A MINIMUM 18" IN DEPTH, DIMENSIONS FOR RIP RAP IN THESE PLANS ARE FOR ESTIMATING PURPOSES ONLY, ACTUAL BEST PLACEMENT OF RIP RAP SHALL BE DETERMINED BY FIELD CONDITIONS AND SHALL BE IN ACCORDANCE WITH INDOT SECTION 616. 8. ALL DRAINAGE PIPE AND DITCH OUTFALLS TO RECEIVING STREAMS SHALL BE CONSTRUCTED IN ACCORDANCE WITH DRAWINGS, SUBJECT HOWEVER, TO ANY MODIFICATION REQUIRED BY THE ENGINEER AT THE TIME INSTALLATION IS COMPLETED AND TO ANY ADJUSTMENTS NEEDED FOR FIELD CONDITIONS NOT ADEQUATELY ANTICIPATED BY THE DESIGN DRAWING. CASTINGS SHALL BE AS SHOWN ON DETAIL SHEET FOR MANUFACTURER, TYPE AND 9' NUMBER. ALL CASTINGS SHALL BE NEENAH OR EAST JORDAN APPROVED EQUAL. 3 »^ ap 71 1 :1$ a 1b F, a M A a O m 0 DJ Ir CL w it a- DATE DESCRIPTION ►110111►,,,/,'','''' FINAL CONSTRUCTION PLANS 9 -16 -08 CITY REVIEW `,`,`,`ON 9 -24 -08 CITY REVIEW LL O Z 0 0 =a �N DO i�•S� H OQ `"' U) /I/111111'11�1� DATE DESCRIPTION CLIENT NAME: WOLFSON YOUNG CORPORATION MR. RICHARD YOUNG 9510 -1 ROSS LANE INDIANAPOLIS, INDLANA46268 (317) 876 -2300 (317) 876 -2313 © 2005 DeBoy Land Development Services, Inc. DESIGNED: BAW APPROVED: CRP DRAWN: CLH / RCB CHECKED BY: MIS SCALE: NITS DATE: 06 -30 -06 PROJECT NO.: 2006 -0065 c9ml OF 19 PRO,.FCT: F: \2006 \2006 -0065 - 11505 N. Penn - Wolfson Young \ENGINEERING \DRAWNGS DWG C9A SITE SPECRCATIONS.dwg PLOTTED Or R.C. BERGER DATE. Mondeyr, October 06, 2008 9:40:23 AM 7 9 -5 -08 FINAL CONSTRUCTION PLANS 9 -16 -08 CITY REVIEW 9 -24 -08 CITY REVIEW 10 -06 -08 CITY REVIEW W U_ U. L z O w J U/ z z Q U O O w W It ~ U V / Q W z LL LL > U O � w z CL W U) 0 TL W O ix I- O z rn 0 zr Lin z W CLIENT NAME: WOLFSON YOUNG CORPORATION MR. RICHARD YOUNG 9510 -1 ROSS LANE INDIANAPOLIS, INDLANA46268 (317) 876 -2300 (317) 876 -2313 © 2005 DeBoy Land Development Services, Inc. DESIGNED: BAW APPROVED: CRP DRAWN: CLH / RCB CHECKED BY: MIS SCALE: NITS DATE: 06 -30 -06 PROJECT NO.: 2006 -0065 c9ml OF 19 PRO,.FCT: F: \2006 \2006 -0065 - 11505 N. Penn - Wolfson Young \ENGINEERING \DRAWNGS DWG C9A SITE SPECRCATIONS.dwg PLOTTED Or R.C. BERGER DATE. Mondeyr, October 06, 2008 9:40:23 AM 7