Loading...
HomeMy WebLinkAbout06070029.192' RO SIDE PLACE EXPANSION JOINT RAMP, AT BACK OF CURB LINE B B OR AT SIDEWALK LINE C L C 2' ROLL CURB J MAX. RAMP SLOPE 1 " /FT. A-J CLASS "A" CONC. ISIDEWALK PLAN VIEW RAMP PAVEMENT I 4" SECTION A -A CONTRACTION JOINT (TYP.) 1. SECTION C -C VAR. VAR. WIDTH OF RAMP SIDEWA K I 4" MIN I SECTION B -B TYPICAL SIDEWALK RAMP DETAIL FOR HANDICAPPED NOTE: WHERE STORM DRAINS CONFLICT WITH RAMP, RAMPS SHALL BE MOVED TO SIDE OF DRAIN, 6' -0" & 10'- SLOPE ASPHALT PATH TO 1,0AD OR TOWARD TOP OF BANK OF DITCH 1 /4 " /FT. MIN. TYPICAL ASPHALT PEDESTRIAN PATH X— SECTION ASPHALT PATH 110# SYD. BITUM SURFACE NO. 11. LV ON 220# SYD. BITUM BINDER NO. 8, LV ON 5" COMPACTED AGGREGATE BASE, SIZE NO. 53 COMPACTED BACKFILL RESIDENTIAL STREETS ONLY LIMITS OF FULL DEPTH GRANULAR BACKFILL SHOULDER, TOPSOIL, SEED w SIDEWALK, TOPSOIL, SEED OR SOD, AS REQUIRED TO z OR SOD, AS REQUIRED TO MATCH EXISTING GRANULAR PAVEMENT W TH VARIABLE I GRANULAR 3 MATCH EXISTING z BACKFILL BACKFILL SHOULDER SECTION CURB SECTION PAVEMENT SURFACE ALL CUTS MADE IN OR UNDER ANY ROAD SURFACE SHALL BE BACKFILLED WITH B. BORROW WHERE A CUT EITHER TRANSVERSES OR PARALLELS THE ROAD SURFACE. GRANULAR BACKFILL SHALL BE PLACED IN THAT PORTION OF THE CUT. THE ENTIRE EXCAVATED AREA WITHIN THE RIGHT -OF WAY. 3" TOPSOIL, SEED OR SOD AS REQUIRED z TOO MATCH EXISTING r (EXISTING GRADE i STANDARD FULL DEPTH GRANULAR BACKFILL DETAILS NOT -TO -SCALE 24' -0" ,)' Ani I nl iDQ TOPSOIL T_ 10" 7„ iI, COMPACTED BACKFILL 4)1 �),! 4"!` TYPICAL DRIVEWAY CROSS— SEC11ON 1" H.A.C. SURFACE #11 5" H.A.C. BINDER #5D 7" COMPACTED STONE #53 COMPACTED SUBGRADE PAVEMENT COMPOSITIONS NOT -TO -SCALE +� 18" NO GUTTER IN CURB SLOPE AWAY FROM CURB if COMPACTED SUBGRADE CONCRETE ROLL CURB NO GUTTER (TYPE I) 100' TOP OF CURB 1. .II - T= I' b t : Ih a: I I I ."Al l I ,I 1 II 1 1 1 1 II 1 PAVEMENT -/ BOTTOM BOTTOM OF CURB TRANSVERSE EXPANSION JOINTS \�L/ TRANSVERSE CONTRACTION JOINTS * * * ** WHEN BUILT IN CONJUCTION WITH CONCRETE PAVEMENT, EXPANSION AND CONTRACTION JOINTS SHOULD BE PLACED AT THE SAME LOCATIONS AS IN THE PAVEMENT SLABS. THE CURB AND GUTTER SHOULD BE TIED TO THE PAVEMENT BY 1/2" ROUND DEFORMED BARS AT ABOUT 3 FOOT INTERVALS. IF NO CONCRETE PAVEMENT IS BEING BUILT AT THE TIME THE CURB IS CONSTRUCTED, EXPANSION JOINTS SHOULD BE PLACED AT THE ENDS OF ALL RETURNS AND AT INTERVALS NOT TO EXCEED 100 FEET. CONTRACTION JOINTS SHOULD BE INSTALLED AT 20 FOOT SPACING. CURB JOINT DETAIL . z 0 w of Y a \` \. \1111111 ►,,,� z z + ui o w z af O o w J L, 1 LJ > w a a y o z 6' -0" BETWEEN TRANSVERSE a N o V JOINTS W � ON w c1- S Z m (6 w � oz o� �Ni��Q% P�i4� r` ��v ...........P,. -� vp I Do N Lv I� Lv Z_ ° 0 00 Z Ld 0 o Ln 0) _Z Ln J p� cn J w L0 0 o✓ Z BACK OF CURB 5• -0" MIN. 5' -0" MIN. GRADED LAWNS TOP SOIL III = III =III —I MIN. 4" MIN. 3" • * BACKFILL I PREPARED SUBGRADE PROPERTY LINE — TYPICAL SIDEWALK SECTION NOT -TO -SCALE TOP SOIL * THE SPACE BEHIND THE CURB ';HALL BE FILLED WITH SUITABLE MATERIAL TO THE REQUIRED ELEVATION AND COMPACTED IN LAYERS NOT TO EXCEED 6" IN DEPTH. SUBGRADE UNDER ALL CURB , SIDEWALK, AND DRIVES SHALL BE COMPACTED IN ACCORDANCE WITH SECTION 207.02 OF THE STANDARD SPECIFICATIONS. � Y O z z + ui o w z af O o w J L, 1 LJ > 0-) -- 00 a y o z 6' -0" BETWEEN TRANSVERSE a N o V JOINTS X 48' -0" BETWEEN EXPANSION JOINTS (MAX.) Z CONCRETE SIDEWALK NOT -TO -SCALE I LJ L� W U 0 � Lc) Q z }- I _ LJ > 0-) -- 00 V X Z Q J r` V ty I Do N Lv I� Lv Z_ ° 0 00 Z Ld o Ln 0) _Z Ln J p� cn J w 00 0 o✓ Z z z Q z Q z V I J Q Q • / In L z 0 00 J �U W orf z V) a rn� � V / J LLJ Q u SHEET NO. C802 JOB NO.4660OS1