Loading...
HomeMy WebLinkAbout06070031.40 I Zo N r- x C wl co I e 0 I N 1� \ Im — l� INSTALL STEEL LINTEL ABOVE NEW STOREFRONT INSTALL 14'02' NEW ENTRY WITH 5' AND 4'x8' TALL DOORS WITH ALL PROPER HARDWARE u.r.ru i r. u . ..r.�i it c.rr�nrrnn►tr ir- I I I � INSTALL NEW 10'x8' OVERHEAD DOOR IFRAME AND WRAP COLUMN WITH ALL PROPER HARDWARE FRAME AND WRAP COLUMN — �I REPLACE WINDOW FIELD VERY SIZE I I I I REPLACE 3 -0/7 -0 STOREFRONT DOOR ( I I ' / \ \ WITH ALL PROPER HARDWARE I :� u I / FRAME AND WRAP COLUMN '1 � REPLACE 3 -0/7 -0 STOREFRONT DOOR WITH ALL PROPER HARDWARE • 5 —0 4p-0". I I F 41 I / 3 5/8 (20ga) METAL STUD WALL / 24 "o.c. WITH (1) LAYER OF 5/8" DRYWALL BOTH SIDES (TYP ALL WALLS) TO BOTTOM OF DECK AND NEW DOOR REUSELEXIST. DOOR(FE LDEVERIFY DOOR SIZE) BLOCK IN OLD DOOR OPENING � � L FINISHES: –PAINT THE EXTERIOR OF 2 –STORY BUILDING INCLUDING THE HIGH METAL – DRYFOG PAIN ALL THE BAR – JOIST, DECKING, ELECTRICAL LINES, SPRINKLER LINES AND DUCTWORK –PAINT ALL MASONRY AND DRYWALL WALLS (COLOR BY OWNER) –3 COAT CONCRETE SEALER ON ALL FLORRS EXCEPT THE OLD RECORD STORAGE HIGH BAY AREA – REMOVE RUST FROM BEAMES ABOVE WINDOWS, PRIME WITH RUST INHIBITOR PRIMER AND PAINT BEAMS ti Baxter & SET Engineering L.L.C. 410 North U,S, 31 Whiteland, Indiana 46184 Phone No, 1 (317) 535 -4094 Fax No. 1 (317) 535 -3012 Email: info @baxterset.com H V1 W z O ~ � 1.4 O � � H Job No.: I Date: 06048 Drawn By: Checked By: MJT TAB // CAD FILE: G:\ 06048 \FLRPLAN.DWG FLOOR PLAN SCALE: 1/8"=l'–O" JUNE 2006 JU —scale. ale: 1/8"=V-00 No, *D.197003 9 *_ DA ..• ' CERTIFIED BY: THIS DRAWING IS THE PROPERTY OF BAXTER & SET ENGINEERING, INC. AND IS NOT TO BE USED FOR ANY OTHER PURPOSE THAN THE PROJECT DESCRIBED HEREIN. A201 O O � Q O Job No.: I Date: 06048 Drawn By: Checked By: MJT TAB // CAD FILE: G:\ 06048 \FLRPLAN.DWG FLOOR PLAN SCALE: 1/8"=l'–O" JUNE 2006 JU —scale. ale: 1/8"=V-00 No, *D.197003 9 *_ DA ..• ' CERTIFIED BY: THIS DRAWING IS THE PROPERTY OF BAXTER & SET ENGINEERING, INC. AND IS NOT TO BE USED FOR ANY OTHER PURPOSE THAN THE PROJECT DESCRIBED HEREIN. A201