Loading...
HomeMy WebLinkAbout06070031.9NOTES ARE CONTINUED FROM SHEET SP -1 PART 7. EXAMINATION A. Inspection: 1. Prior to the commencement of surface preparation or other coating activities, thoroughly inspect the surfaces to determine if the Work is ready to be prepared and pointed. 2. Report in writing to ARCHITECT, all conditions that may potentially affect proper application. 3. Do not commence surface preparation or other coating activities until such defects have been corrected. B. Correction of defects: 1. Correct defects and deficiencies in surfaces which may adversely affect work of the Section. PART B. CLEANING: A. Remove spilled, splashed or spattered paint from all surfaces. B. Do not mar surface finish of item being cleaned. C. Prior to acceptance of the Work of this Section, thoroughly clean all painted surfaces and related areas in accordance with Section 01562 - Cleaning. PART 9. PROTECTION: A. General: 1. Adequately protect other surfaces from paint and damage. 2. Repair damage as a result of inadequate or unsuitable protection. B. Protective materials: 1. Furnish sufficient drop cloths, shields, and protective equipment to prevent spray or droppings from fouling surfaces not being painted and in particular, surfaces within storage and preparation area. C. Electrical plates and hardware: 1. Remove electrical plates, surface hardware, fittings and fastenings prior to painting operations. 2. These items are to be carefully stored, cleaned and replaced upon completion of work in each area. 3. Do not use solvent to clean hardware that may remove permanent lacquer finish. SECTION: 15000 MECHANICAL REQUIREMENTS: A. PLUMBING SCOPE Furnish all labor, material, equipment and services necessary to complete installation of all waste systems, drainage systems, vent systems, hot and cold water systems and all plumbing fixtures shown on the drawings and herein specified. SPECIAL REQUIREMENTS: 1. DELTA OR PEERLESS FAUCETS TO BE INSTALLED OR ACCEPTED EQUAL. 2. GERBER OR KOHLER HANDICAP TANK TYPE WATER CLOSETS AND LAVATORIES TO BE INSTALLED OR APPROVED EQUAL. 3. A.G. SMITH WALL HUNG WATER HEATERS TO BE INSTALLED IN RESTROOM ON WALL BRACKETS. 4. 1 1/2" FLOOR DRAINS (WITH COVER) TO BE INSTALLED IN ALL RESTROOMS. 5. ALL WATER LINES INSTALLED TO BE COPPER. 6. ALL WATER LINES ABOVE CEILING TO BE INSULATED. 7. ALL WATER LINES IN CEILINGS WITH RETURN AIR SYSTEMS SHALL BE WRAPPED IN FIRE RATED INSULATION. 9. ALL WATER LINES TO HAVE SHUT -OFF VALVES IN METER ROOM AND WHERE ENTERING UNITS. 10. ALL PLUMBING VENTS AND DRAINS TO BE PVC. (PIPES IN CEILINGS WITH RETURN AIR SYSTEMS TO BE WRAPPED IN FIRE RATED INSULATION) 11. ROOF FLASHINGS (ON DURALAST ROOFING SYSTEM) TO BE BY ROOFING CONTRACTOR. NOTE: ALL RESTROOMS TO HAVE THE FOLLOWING ITEMS INSTALLED: 1. HANDICAP BARS. 2. 20" X 24" MIRROR. 3. TOILET PAPER DISPENSER. 4. PAPER TOWEL HOLDER. CODES AND REGULATIONS Comply with the BOCA Plumbing Code, the State Plumbing Rules, the State Energy Conservation Code or the local codes having jurisdiction in the particular area. MATERIALS General: All material specified below shall conform to the standards listed in Table A- Plumbing Material Standards of the BOCA Plumbing Code. WATER HEATERS General: All water heaters shall be listed and labeled by a nationally recognized testing and inspection agency, and installed in accordance with the listing. All domestic hot water systems shall be equipped with means for limiting the temperature of the hot water for personal use at the fixtures to 140 degrees fahrenheit. All water heaters shall be provided with a reseating type temperature and pressure relief valve constructed, listed and installed in accordance with ANSI Z21.22, in addition to the energy cut off device installed by the heater manufacturer. Water heaters shall be provided with tank connections of stainless steel, copperlined steel, brass or copper plated steel threaded pipe nipples equipped with electrically inert waterway permanently fixed to each nipple. Dip tube may be metallic, electrically insulated from the tank or non - metallic conforming to ANSI A21.10. Copper dip tubes may be used with brass nipples without dielectric fittings in copper tanks. In addition to water temperature control required, all water heaters shall be equipped with pressure and temperature relieve protection. The drain line from the temperature and pressure relief valve shall be galvanized pipe or hard drawn copper. This line will drain into an approved receptor in a manner constituting as indirect waste. Dielectric unions will be used to connect water lines to the water heater. TRENCHES Plumbing trenches under slabs shall be backfrlled with granular material and compacted to 98X SANITARY SYSTEM Laying Pipe: Establish all flow conditions prior to commencing work in order to avoid conflicts. Contractor will be allowed reasonable variations from the established grades and elevation of those shown on the plans in order to meet the final and exact condition. Vents; Fixtures shall be vented as indicated on drawings. Vents and soil stacks shall be extended through the roof. They shall be terminated 16" above the roof and flashed with an approved flashing by Duro -last Roofing Contractor. Hangers and Supports: Conform to Article 13 of the BOCA National Plumbing Code. Covering of Work: No work shall be covered until the required tests have been made and approval for cover -up has been granted by the Inspector. Tests: In accordance with Article 17 of the BOCA National Plumbing Code. Sterilization of Water Piping: The Contractor shall flush the entire system of all impurities. Additional disinfecting may be required by the local authority. Excuchions: Chrome plated, required where pipes pass through wall or floor. Exposed Piping and Fittings: Exposed Hotwater piping and fittings shall be insulated per ADA requirements. Testing: Comply with Article 17 of the BOCA National Plumbing Code. SECTION: 15500 MECHANICAL REQUIREMENTS: B. HEATING AND AIR CONDITIONING SCOPE Furnish all labor, material, equipment and services necessary to complete installation of all heating and air conditioning work and all fan duct work shown on the drawings and herein specified. SPECIAL REQUIREMENTS: 1. ALL BRANCH LINES TO BE MYLAR COATED FLEXIBLE INSULATED DUCT MAIN TRUNK LINES TO BE INSULATED METAL DUCT. 2. ALL SUPPLY DIFFUSERS TO BE 24 "x 24 3. HEATING CONTRACTOR TO SUPPLY RESTROOM FANS AND VENTS LOCATED PER PLANS. 4. ALL RTU SIZES AND SPECIFICATIONS LISTED ON THE MECHANICAL PLAN SHEETS. 5. HEATING CONTRACTOR TO FURNISH AND INSTALL ALL REQUIRED GAS LINES. CODE COMPLIANCES Comply with the BOCA Mechanical Code, the State Mechanical Rules, and the State Energy Conservation Code, or other local code having jurisdiction in the particular area. HEATING EQUIPMENT General: All equipment shall conform to the requirements of the latest edition of the Energy Conservation Code. The minimum efficiency rating of all electric heating and cooling equipment shall be a minimum of 9.0 SEER. The contractor shall verify that the equipment prior to submitting his bid. AIR CONDITIONING EQUIPMENT General: All equipment shall conform to the requirements of the latest edition of the Energy Conservation Code. The minimum efficiency rating of all electric heating and cooling equipment shall be a minimum of 9.0 SEER. The contractor shall verify that the equipment prior to submitting his bid. 1:111:11111 Heating: It is the intent of the drawings and specifications to provide for the installation of a heating system which is safe, quiet and economical in operation and complete in all respects and which will provide a uniform temperature of 72 degrees fahrenheit in all living spaces and temperature in other spaces as may be noted on the drawings, when the outside temperature is at +2 degrees fahrenheit. All materials and equipment necessary to accomplish this intent shall be furnished and installed by the Contractor. Air Conditioning: It is the intent of the drawings and specifications to provide for the installation of a cooling system which is safe, quiet and economical in operation and complete in all respects and which will provide a temperature of 78 degrees fahrenheit and 50% relative humidity at a dry bulb temperature of 90 degrees fahrenheit and wet bulb temperature of 74 degrees fahrenheit. Accomplishment of these intents shall be furnished and installed by the Contractor. TESTS Each system shall be tested to insure that the intent stated above has been realized. Bonnet temperature and equipment noise level shall be checked to insure proper equipment operation. Air flow at each register shall be checked to insure proper and unrestricted air flow through the duct system. BACKDRAFT DAMPERS Air discharge openings through roofs or exterior walls shall be protected against the entrance of rain, snow, birds, large insects and foreign objects. Automatic louvers or backdraft dampers shall be provided on other than attic ventilators to prevent a reverse flow of air when the fan is not In operation. SECTION: 15900 MECHANICAL REQUIREMENTS: C. FIRE PROTECTION SCOPE All Fire Suppresions Systems to be designed and submitted by Fire Protection Contractor. Flow Indicater to be installed on Sprinkler Systems Riser for connection to alarm. (Alarm to be Supplied and Installed by Owner) SECTION: 16000 ELECTRICAL REQUIREMENTS: SCOPE Furnish all labor, material, equipment and services necessary to install and connect all electrical equipment shown on the drawings and specified in these specifications. SPECIAL REQUIREMENTS: 1. ALL WIRING SHALL TO BE #12 MINIMUM COPPER. 2. ALL ELECTRIC SERVICE INFORMATION TO BE COORDINATED WITH LOCAL UTILITY REQUIREMENTS. 3. ALL ELECTRIC PANELS TO BE COPPER BUSS TYPE. 4. ALL CONDUITS TO BE STRAPPED OR CLAMPED ACCORDING TO NEC AND ALL BENDS TO BE MADE WITH APPROVED BENDERS. 5. ALL JUNCTION BOXES ARE TO HAVE COVERS INSTALLED AND CIRCUITS CONTAINED INSIDE TO BE MARKED ON COVER. 6. ALL RECEPTACLES TO BE 16" TO CENTER A.F.F. UNLESS OTHERWISE NOTED. 7. NO MORE THAN FIVE (5) RECEPTACLES SHALL BE ALLOWED ON ANY ONE (1) CIRCUIT. 8. ALL PANELS SHALL HAVE TYPED IDENTIFICATION LABLES FOR ALL CIRCUITS. 9. A SEPERATE GROUND WIRE SHALL BE PULLED IN ALL CONDUIT RUNS AND SHALL BE CONTINUOUS THROUGH SYSTEM. (EMT IS NOT AN ACCEPTABLE GROUND) 10. THERE WILL BE A WATER PIPE GROUND ALONG WITH BUILDING GROUND FOR THE SERVICE. 11. ALL WEATHERPROOF COVERS SHALL BE FLUSH, COVERED AND GASKETED TO KEEP OUT ANY MOISTURE. 12. ALL ELECTRICAL CONNECTIONS SHALL BE DONE BY APPROVED METHODS. 13. ALL CONDUITS AND WIRING FOR ELECTRICAL SERVICE TO BE FURNISHED AND INSTALLED PER LOCAL POWER COMPANYS REQUIREMENTS. 14. TELEPHONE SERVICE CONDUIT TO BE FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR. GENERAL The installation shall comply with all laws of local regulating authorities, the regulations of the current edition of the Natioinal Electric Code and with wiring rules of the local electrical utility company. After completion of work, the Contractor shall furnish the Owner, a certificate of final inspection and approval from the local inspection department or bureau having jurisdiction. MATERIAL Prohibited Material: The use of aluminum wire is prohibited. all material shall be new, bearing Underwriter's stamp of approval. WORKMANSHIP All work shall be executed in a workmanlike manner and shall present a neat appearance when completed. Markers: Each meter and its associated switch shall be identified by number. Each meter and switch shall have a panel. Sleeves: Passage of conduit through any firewall shall be provided with pipe sleeves. seal space between and conduit with fireproof caulking. PROGRESS OF WORK The Contractor shall order the progress of this work so as to conform to the progress of the work of other trades and shall complete the entire installation as soon as the condition of the building will permit. Z 0 U) W Baxter &c SET Engine erirzg L.L.C. 410 North U.S. 31 Whiteland, Indiana 46184 Phone No. 1 (317) 535 -4094 Fax No. 1 (317) 535 -3012 Email: info@boxterset.com V1 O � F---I W H nO H F-i V1 V1 00 W H F-+- -i W I-i V1 V1 Job No.: Date: 06048 06.20.06 Drawn By: Checked By: Scale: KDW tab CAD FILE: G: \06048 \SPEC2.DWG �N`. ...... STATE OF, 81111 1 CERTIFIED BY: DATE STAMP 06.20.06 THIS DRAWING IS THE PROPERTY OF BAXTER & SET ENGINEERING, INC. AND IS NOT To BE USED FOR ANY OTHER PURPOSE THAN THE PROJECT DESCRIBED HEREIN. SHEET TITLE: