HomeMy WebLinkAbout06080002.6ROSION CONTROL MONITORING & MAINTENANCE GUIDELINE
EROSION CONTROL MEASURE
MAINTENANCE
INSTALLATION SEQUENCE
15" and smaller
INSPECT WEEKLY AFTER STORM EVENTS, AND AFTER HEAVY USE;
9.5
CONSTRUCTION ENTRANCE
RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL;
TOP DRESS WITH CLEAN STONE AS NEEDED; REMOVE ALL MUD AND
PRIOR TO CLEARING AND GRADING
16
SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS IMMEDIATELY
21" to 30"
EXISTING INLET PROTECTION
WEEKLY, AFTER STORM EVENIS, AND AS NEEDED
PRIOR TO CLEARING AND GRADING
TREE PROTECTION
WEEKLY AFTER STORM EVENTS, AND AS NEEDED
PRIOR M CLEARING AND GRADING
11x17 INCH PLAT IS AVAILABLE IF REQUESTED.
INSPECT WEEKLY AND AFTER EACH STORM EVENT; REMOVE SEDIMENT
MATERIAL HANDLING AND SPILL PREVENTION PLAN: IN ORDER
DONE, CONSIDER APPLYING 400 -600 LBS. /ACRE OF 12 -0 -12
FROM CHANNEL AND REINFORCE RIDGE AS NEEDED; REPAIR OUTLET
M(31 »663-3206 A
Fax 017) 663 -3208 P
TEMPORARY DIVERSIONS
DAMAGE IMMEDIATELY; REMOVE SEDIMENT FROM TRAPS WHEN 5071 FULL;
ALONG WITH ROUGH GRADING
TILL THE SOIL TO OBTAIN A UNIFORM SEEDBED, WORKING THE
WHEN WORK AREA IS STABILIZED, REMOVE RIDGE, FILL CHANNEL, REMOVE
A3
THIS PROJECT INVOLVES THE CONSTRUCTION OF TWO PARKING
TEMPORARY SLOPE DROA AND STABILIZE ALL DISTURBED AREAS
CONSTRUCTION THE CONTRACTOR SHALL IMPLEMENT THIS
RAKE OPERATED ACROSS THE SLOPE.
INSPECT AFTER STORM EVENTS; REMOVE SEDIMENT AT ONE HALF DESIGN
DATE / ISSUE / INITIALS:
TEMPORARY SEDIMENT TRAP
DEPTH; REPLACE SPILLWAY GRAVEL FACING IF CLOGGED; REPAIR EROSION
DURING CLEARING AND PRIOR M GRADING
814 SEE EROSION CONTROL INSTALLATION DETAIL
AND HOLES AS NEEDED; REPLACE DISPLACED RIPRAP
AND A DRY DETENTION BASIN.
INSPECT PERIODICALLY TO VERIFY ADEQUATE ESTABLISHMENT OF
VEGETATIVE STANDS; RESEED AND MULCH AS NEEDED; INSPECT AFTER
TEMPORARY SEEDING
STORM EVENTS AND REPAIR EROSION DAMAGE; TOP DOSS FALL SEEDED
AFTER ROUGH GRADING
A4
WHEAT OR RYE SEFDINGS WITH 50 LBS /AC OF NITROGEN IN FEBRUARY
SQUARE FOOTAGE:
PLAN AS WELL. IF A SPILL SHOULD OCCUR PLEASE CONTACT
OR MARCH IF NITROGEN DEFICIENCY IS APPARENT; WATER AS NEEDED
STORMWATER
INSPECT PERIODICALLY AND AFTER STORM EVENTS UNTIL VEGETATIVE
POLLUTION
THE APPROPRIATE AUTHORITIES BELOW:
STAND IS ESTABLISHED; ADD FERTILIZER AFTER GROWING SEASON PER
EXPECTED POLLUTANTS WILL BE MINIMAL IN NATURE,
PERMANENT SEEDING
SOIL TEST RECOMMENDATIONS; REPAIR DAMAGED, BARE. OR SPARSE
AFTER FINISH GRADING OF EACH AREA
AREAS BY FILLING, REPREPARING THE SEED BED, FERWWZ K AND /OR
POST- DEVELOPMENT. OIL, GREASE, ANTIFREEZE, GASOLINE, ETC.
SEEDING AND MULCHING
EMERGENCY RESPONSE 911
INSPECT FOR AREAS OF EROSION BELOW THE BLANKET AFTER EACH
MAY OCCUR IN LIMITED AMOUNTS AS A RESULT OF THE
EROSION CONTROL BLANKET
STORY EVENT; REPAIR AREAS OF EROSION BY REMOVING AFFECTED
STORM OF BLANKET, ADD SOIL, RESETD, RELAY AND STAPLE BLANKET:
AFTER FINISH GRADING
CARMEL FIRE DEPARTMENT (317)571 -2600
INSPECT PERIODICALLY AFTER VEGETATION 5 ESTABLISHED
MAJORITY OF THIS PROJECT SITE BEING USED FOR TEMPORARY
INSPECT FABRIC BARRIER AFIER STORM EVENTS AND MAKE NEEDED
INLET PROTECTION
REPAIRS IMMEDIATELY; REMOVE SEDIMENT FROM THE POOL AREA WHILE
AFTER EACH INLET IS PLACED
A6
AVOIDING DAMAGING OR UNDERCUTTING THE FABRIC
SEED, SOD & LANDSCAPE
AROUND UNITS FINISHED
KEEP SOD MOIST UNTIL FULLY ROOTED; WATER AS NEEDED
AFTER FLASHED GRADING AROUND FINISHED UNITS
REMOVAL OF INLET PROTECTION
N/A
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
IDEM (317)233 -7745
THE POND SHALL BE MAINTAINED TO PREVENT LOSS OF AREA OF
A7
PONDER WATER AVAILABLE FOR EMIERGENT VEGETATION DUE TO
ALONG WITH ROUGH GRADING
PERMANENT WET POND
SEDIMENTATION AND /OR ACCUMULATION OF PLANT MATERIAL THE
ALL EROSION CONTROL MEASURES AS SHOWN ON THE PLAN VIEW
PONDER WATER SHALL BE MAINTAINED BY REMOVING ACCUMULATED
SOLIDS BY EXCAVATION. WATER LEVELS MAY NEED TO BE
WILL BE INSTALLED BEFORE ANY DISTURBANCE OF THE PROJECT
A8
SUPPLEMENTED OR DRAINED PERIODXALLY UNTIL VEGETATION IS FULLY
1.
CONSTRUCTION EQUIPMENT
ESTABLISHED.
OCCURS, UNLESS OTHERWISE NOTED. THE WETLANDS PLANTINGS
325
3DO
275
250
225
200
175
1p5�0
SLOPE
100
75
50
25
FT.
GENERAL STAPLE RECOMMENDATIONS
3 3
6' x 6
A
x
1 STAPLE PER SQ. YD. 1 1/2 STAPLE PER SO. YD.
2' 2'+
4' 4' x 4' _lx x x
20"�-
x x x x
4' x x x x x
C D
x x x x
4:1 3:1 2:1 1:1 LOW FLOW MED /HIGH FLOW
CHANNEL CHANNEL AND
SHORELINE 2 STAPLE PER SO. YD. 3 1/2 STAPLE PER SO. YD.
SLOPE GRADIENT
NOTE:
1. CHANNEL LINING UTILIZE STAPLE PATTERN "C" NTH
ADDITIONAL STAPLES ON SIDE SLOPES AT PROJECTED WATER
LINE.
2. STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN
EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VERY
DEPENDING UPON SOIL TYPE AND AVERAGE RAINFALL
3. AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE
DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE
BLANKETS, STAPLE PATTERN "C" SHOULD BE UTILIZED.
EROSION CONTROL MAT INSTALLATION GUIDE DETAIL
NO SCALE
SLOPE CHECK
BACKFILL
GROUND
LINE
SOIL
NON —WOVEN
FILTER FABRIC " X 6" TRENCH
EXTENDS INTO TRENCH
C
M
APRON AT
DITCH CHECK JOINING FENCES
DITCH- -
SILT FENCE DETAIL
NO SCALE
PIPE SIZE
"L"
'W'
I d5o
15" and smaller
8'
9.5
6
1 to 21
14
16
6 to 9
21" to 30"
20'
2,V
9" to 12"
i,t
WHEN JOINING TWO OR MORE
SILT FENCES TIE THE TWO
END POSTS TOGETHER WITH
EXISTING NYLON CORDS.
F_1
FABRIC
`-12' (MIN) OR 2 X d50, l -FILTER
WHICHEVER IS GREATER FABRIC
ROCK CHUTE
NO SCALE
STABIUZATION
PRACTICE_ JAN. FEB. MAR. APR. MAY JUNE JULY AUG_ SEPT. OCT. NOV. DEC.
PERMANENT A • / / //I / /// • •/I / ►
SEEDING
TEMPORARY B p • / //I / / /• —► —
SEEDING
E
MULCHING
A — KENTUCKY BLUEGRASS 407L, TURF TYPE TALL FESCUE 4074 ANNUAL RYE GRASS 207E
PLUS 2 TONS OF STRAW MULCH/ ACRE
APPLY MIXTURE AT A RATE OF 2 LBS. PER 1000 SQ.FT.
B — SPRING OATS 3 BUSHEL PER ACRE
C - WHEAT OR RYE 2 BUSHEL PER ACRE
D = ANNUAL RYE GRASS (1 LB. PER 1000 SQ. FT.)
E — STRAW MULCH (90 LBS. PER 1000 SQ.FT.)
*/1 / • IRRIGATION NEEDED DURING JUNE, JULY, AND / OR SEPTEMBER.
• • IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD
NOTE: ALL SEEDING SHALL HAVE 12 -0-12 (UNLESS SOILS TESTS SHOW PHOSPOROUS
DEFICIENCY) FERTILIZER APPLIED AT 400 -600 LBS. PER ACRE OR AS SPECIFIED.
A
SEEDING SCHEDULE
NO SCALE
SOILS MAP
NO SCALE
DANDY BAG ®II
".
I Ilk
".
m.:
Installation and Maintenance Guidelines
Installation: Remove the grate from catch basin. If using
optional oil absorbents; place absorbent pillow in unit. Stand
the grate on end. Move the top lifting straps out of the way
and place the grate into the Dandy Bag ®11 so that the grate is
below the top straps and above the lower straps. Holding the
lifting devices, insert the grate into the inlet.
Maintenance: Remove all accumulated sediment and debris from
vicinity of unit after each storm event. After each storm event
and at regular intervals, look into the Dandy Bag ®II. If the
containment area is more than 1/3 full of sediment, the unit
must be emptied. To empty unit, lift the unit out of the inlet
using the lifting straps and remove the grate. If using optional
oil absorbents; replace absorbent when near saturation.
DANDY BAG ®II
STRAPS
DANDY BAG '61I
STANDARD FABRIC Is
AN ORANGE WOVEN
MONOFILAMENT
DUMPING STRAP
ALLOWS FOR EASY
REMOVAL OF CONTENTS
EROSION CONTROL NOTES
Al
PLAN INDEX ITEMS RELATING TO THE SW PPP ARE INCLUDED AS
B12
SEE EROSION CONTROL INSTALLATION AND SEEDING SCHEDULE
TEST SOIL TO
IN THE EVENT OF ACCIDENTAL CONTAMINATION ALL EFFORTS
N E L L I N G
NOTES ON THIS SHEET
D I G
DIG
DETAILS.
ISTANCE AND ADDITIONAL SOILS INFORMATION)
SHOULD BE MADE TO REMOVE CONTAMINANTS IN AN
13295 Meridian ConwsBlvd.
IF SOIL pH IS UNSUITABLE FOR THE SPECIES TO BE SEEDED,
BLIND
Suile 142
LY LIME ACCORDING TO TEST RECOMMENDATIONS.
APPROPRIATE MANNER. THE CARMEL FIRE DEPARTMENT
A2
11x17 INCH PLAT IS AVAILABLE IF REQUESTED.
B13
MATERIAL HANDLING AND SPILL PREVENTION PLAN: IN ORDER
DONE, CONSIDER APPLYING 400 -600 LBS. /ACRE OF 12 -0 -12
(317- 571 -2600) SHOULD BE CONTACTED IMMEDIATELY TO
M(31 »663-3206 A
Fax 017) 663 -3208 P
LYSIS OR EQUIVALENT FERTIUZER (UNLESS SOILS TESTS SHOW
SPHOkOUS DEFICIENCY.
U r
TO MINIMIZE THE RELEASE OF POTENTIAL POLLUTANTS DURING
TILL THE SOIL TO OBTAIN A UNIFORM SEEDBED, WORKING THE
DETERMINE IF FURTHER MEASURES ARE NEEDED.
A3
THIS PROJECT INVOLVES THE CONSTRUCTION OF TWO PARKING
CONSTRUCTION THE CONTRACTOR SHALL IMPLEMENT THIS
RAKE OPERATED ACROSS THE SLOPE.
DATE / ISSUE / INITIALS:
LOTS, STORM SEWERS, A SITE AMENITIES AREAS, SIDEWALKS,
9- 6- 06/TAC REVISIONS /GSS
MATERIAL HANDLING AND SPILL PREVENTION PLAN. THE
814 SEE EROSION CONTROL INSTALLATION DETAIL
AND A DRY DETENTION BASIN.
CONTRACTOR SHALL REVIEW THIS PLAN WITH ALL
SUBCONTRACTORS AND REQUIRE THAT THEY IMPLEMENT THE
B15 NOT APPLICABLE.
A4
THE VICINITY MAP IS LOCATED ON THE COVER SHEET.
SQUARE FOOTAGE:
PLAN AS WELL. IF A SPILL SHOULD OCCUR PLEASE CONTACT
DRAWING TITLE:
STORMWATER
POLLUTION
THE APPROPRIATE AUTHORITIES BELOW:
Cl
EXPECTED POLLUTANTS WILL BE MINIMAL IN NATURE,
A5
LEGAL DESCRIPTION: 39'55'57" N. 86'14'19" W (NAD83)
PART
POST- DEVELOPMENT. OIL, GREASE, ANTIFREEZE, GASOLINE, ETC.
A OF SECTION 7, TOWNSHIP 17 NORTH, RANGE 3 EAST,
EMERGENCY RESPONSE 911
MAY OCCUR IN LIMITED AMOUNTS AS A RESULT OF THE
HAMILTON COUNTY, INDIANA.
CARMEL FIRE DEPARTMENT (317)571 -2600
MAJORITY OF THIS PROJECT SITE BEING USED FOR TEMPORARY
CARMEL POUCE DEPARTMENT (317)571 -2545
CUSTOMER PARKING. THE ONLY OTHER REASONABLY FORESEEN
A6
LOT BOUNDARIES ARE SHOWN ON THE PLAN
INDIANA DEPARTMENT OF NATURAL RESOURCES (812)477 -8773
POLLUTION FROM THIS SITE WILL BE UTTER AND TRASH.
IDEM (317)233 -7745
A7
HYDROLOGIC UNIT CODE: 05120201120080
HAMILTON CO. SURVEYOR (317)776 -8495
C2
ALL EROSION CONTROL MEASURES AS SHOWN ON THE PLAN VIEW
WILL BE INSTALLED BEFORE ANY DISTURBANCE OF THE PROJECT
A8
THERE ARE NO STATE PERMITS REQUIRED NEEDED FOR THIS
1.
CONSTRUCTION EQUIPMENT
OCCURS, UNLESS OTHERWISE NOTED. THE WETLANDS PLANTINGS
DEVELOPMENT.
SHALL BE INSTALLED AFTER THE SITE IS STABILIZED. FINAL
A.
FUEUNG, LUBRICATION, AND FLUIDS: ALL OPERATIONS INVOLVING
STABIUZATION OF THE SITE WILL BE ACCOMPUSHED USING
A9
STORM WATER WILL DISCHARGE INTO AN EXISTING SIDE DITCH
THE ADDITION OF FLUIDS TO EQUIPMENT SHOULD BE DONE
PERMANENT SEEDING OF ALL OPEN AREAS, LANDSCAPING WITH
THAT EVENTUALLY FLOWS TO THE CROOKED CREEK REGULATED
IN ONE LOCATION, AS DESIGNATED ON SHEET C301, SO
MULCH ON PARKING ISLANDS, AND PLACEMENT OF ASPHALT
DRAIN.
THAT SPILLS ARE LIMITED TO THAT SPECIFIC LOCATION
PAVEMENT.
WHICH WILL FACIUTATE THE CLEANUP OF SPILLS. IF AN
A10
ALL WETLANDS, LAKES, AND WATER COURSES ON AND ADJACENT
OUTSIDE FUEUNG TANK IS PLANNED TO BE ON SITE, IT
C3
THE PRIMARY POST - CONSTRUCTION BMP FOR THE SITE WILL BE
TO THE SITE ARE SHOWN AND LABELED ON THE PLAN.
SHALL BE DOUBLE WALLED AND STORED IN THIS
THE DRY EXTENDED DETENTION BASIN. IN ADDITION, THE
DESIGNATED AREA. THIS LOCATION IS AN AREA THAT WILL
OWNERS OF THE PARKING LOTS SHALL MAINTAIN ALL PAVEMENT
All
THE ULTIMATE RECEIVING WATER IS CROOKED CREEK.
NOT ALLOW SPILLED FLUIDS TO MIGRATE INTO SUBSURFACE
AREAS ON A WEEKLY BASIS. THIS MAINTENANCE INCLUDES
SOILS. IN THE EVENT OF A SPILL, THE FLUID SHALL
FREQUENT SWEEPING OF ALL PAVED SURFACES AS WELL AS
Al2
STORM WATER MAY POTENTIALLY ENTER GROUNDWATER WITHIN
IMMEDIATELY BE CLEANED UP BY REMOVING THE
COLLECTION OF ANY LITTER. ALL GREEN SPACES WILL BE
THE DETENTION POND AREA.
CONTAMINATED SOIL OR STONE WHICH SHALL BE DISPOSED
MAINTAINED WITH REGULAR MOWING DURING GROWING SEASONS.
OF IN AN ACCEPTABLE MANNER. SPILLS ON HARD
MINIMAL FERTIUZER APPUCATIONS WILL OCCUR TO THE GREEN
A13
THERE ARE NO FLOODPLAINS, FLOODWAY FRINGES OR FLOODWAYS
SURFACES SHALL BE SOAKED UP BY AN ACCEPTABLE
SPACES.
ON THE SITE.
MATERIAL, SUCH AS OIL DRY AND THE ABSORBENT
MATERIAL DISPOSED OF IN A PROPER MANNER. THE SPILL
C4
THE POST CONSTRUCTION BMP FOR OVERALL STORM WATER WILL
A14
PRE- CONSTRUCTION PEAK DISCHARGE: 10 CFS 10 -YEAR)
(100
SHALL ALSO BE REPORTED IMMEDIATELY TO THE
CONSIST OF A DRY EXTENDED DETENTION BASIN.
POST - CONSTRUCTION PEAK DISCHARGE: 1 CFS -YEAR)
CONTRACTOR'S SUPERINTENDENT.
DETENTION IS PROVIDED ON -SITE BY VIRTUE OF A DRY
C5
MAINTENANCE OF ALL STORM WATER POLLUTION PREVENTION
DETENTION BASIN.
B.
EQUIPMENT REPAIR, ESPECIALLY WHEN FLUIDS MUST BE REMOVED
MEASURES WILL BE THE RESPONSIBIUTY OF THE OWNERS,
FROM THE EQUIPMENT OR THE POSSIBIUTY OF FLUID SPILLS
UTIUZING PROCEDURES OUTUNED ON THESE PLANS. THE
A15
ADJACENT LAND USES:
IS HIGH, SHOULD ALWAYS BE DONE OFFSITE AT A FACIUTY
MAINTENANCE GUIDEUNES CONSIST MOSTLY OF GOOD
THAT IS MORE SUITABLE THAN A CONSTRUCTION SITE TO
HOUSEKEEPING MEASURES. ANY GRASSED OR VEGETATED AREAS
NORTH: INDUSTRIAL (UNDER CONSTRUCTION)
HANDLE SPILLS. WHEN EQUIPMENT MUST BE REPAIRED ON
THAT EXPERIENCE EROSION FROM RAINFALL EVENTS SHOULD BE
SOUTH: INDUSTRIAL /OFFICE
SITE, IT SHOULD BE MOVED TO THE MAINTENANCE AND
REPAIRED AND REVEGETATED AS SOON AS POSSIBLE. TRASH OR
EAST: OFFICE
FUELING AREA IF POSSIBLE. OTHERWISE, SUITABLE ON SITE
UTTER SHOULD BE PICKED UP AND PROPERLY DISPOSED TO
WEST: INDUSTRIAL /OFFICE
CONTAINERS SHOULD BE PLACED UNDER THE EQUIPMENT
PREVENT IT FROM GETTING INTO THE STORM DRAINAGE SYSTEM
DURING REPAIR TO CATCH ANY SPILLED FLUIDS AND THESE
AND DOWNSTREAM WATERWAYS.
A16
CONSTRUCTION LIMITS ARE SHOWN IN THE PLAN VIEW.
FLUIDS SHOULD BE DISPOSED OF IN A PROPER MANNER.
EROSION OF THE DETENTION BASIN BANKS SHOULD BE
A17
VEGETATIVE COVER IS SHOWN IN THE PLAN VIEW. THE SITE IF
C.
ALL REUSABLE FLUID CONTAINERS, SUCH AS GASOLINE CANS,
ADDRESSED AS SOON AS IT BECOMES VISIBLE BY FIWNG THE
PREDOMINANTLY GRASS, WEEDS AND GRAVEL CURRENTLY.
SHALL BE INSPECTED FOR LEAKS EACH TIME THEY ARE
ERODED AREA WITH SUITABLE SOIL AND ESTABLISHING
USED. IF LEAKS ARE FOUND, THE FLUID SHALL BE
VEGETATION IMMEDIATELY, PREFERABLY BY SODDING. THE SAME
A18
SOILS INFORMATION:
REMOVED FROM THE CONTAINER IN A PROPER MANNER AND
MEASURE SHOULD BE USED FOR STEEP BANKS OF ANY BERMS
THE CONTAINER DISPOSED OF IN AN ACCEPTABLE MANNER.
OR SWALES. THE PONDS SHOULD ALSO BE MONITORED FOR
Br - BROOKSTON SILTY LOAM
EMPTY DISPOSABLE CONTAINERS, SUCH AS GREASE TUBES
SEDIMENT. IF THE BOTTOM OF THE BASIN RECEIVES SIGNIFICANT
AND LUBRICATING OIL AND BRAKE FLUID CONTAINERS, AND
SEDIMENT (6 -12 INCHES), THE SEDIMENT SHOULD BE REMOVED
THIS SOIL IS DARK COLORED, SILTY IN TEXTURE AND ON
THEIR PACKAGING, SHALL BE DISPOSED OF IN A PROPER
AND REPLACED ON SITE. AN ENGINEER SHOULD BE CONTACTED
DEPRESSIONAL UPLANDS. IT IS DEEP AND VERY POORLY
MANNER AND SHALL NOT BE LEFT ON THE GROUND OR IN
TO IDENTIFY THE SOURCE AND RECOMMEND REPAIRS.
DRAINED WITH MODERATE PERMEABILITY. IT HAS HIGH
THE OPEN ON THE CONSTRUCTION SITE.
AVAILABLE WATER FOR PLANT GROWTH AND HIGH ORGANIC
THE DETENTTN BASIN SHALL ALSO BE MAINTAINED BY REMOVING
MATTER CONTENT. IT HAS COMPACT TILL STARTING AT A DEPTH
2.
CONSTRUCTION MATERIALS AND THEIR PACKAGING
UNWANTED PLANTS, TRASH AND EXCESS VEGETATION.
OF 40 TO 60 INCHES. THE MAIN SOIL FEATURES THAT AFFECT
THE URBAN DEVELOPMENT USES ARE SEASONAL HIGH WATER
A.
EROSION CONTROL MEASURES SHOWN ON THESE PLANS SHALL
PAVEMENT AREAS SHOULD BE MONITORED FOR POLLUTANTS.
TABLE, HIGH POTENTIAL FROST ACTION, MODERATE
BE IMPLEMENTED PRIOR TO AND DURING CONSTRUCTION IN
ANY LARGE QUANTITIES OF FLUIDS SUCH AS OIL, ANTIFREEZE,
SHRINK -SWELL POTENTIAL, MODERATE PERMEABIUTY AND
THE PROPER SEQUENCING TO MINIMIZE SOIL EROSION.
BRAKE FLUID, ETC. FOUND ON THE PAVEMENT SHOULD BE
PONDED SURFACE WATER.
EROSION CONTROLS SHALL BE INSPECTED AND MAINTAINED
REPORTED TO THE OWNER. THE OWNER SHOULD CLEAN THE
AS DESCRIBED ELSEWHERE IN THESE PLANS. EXCESSIVE
POLLUTANTS AND PREVENT THE SOURCE FROM ENTERING THE
BECAUSE OF THESE ENGINEERING UMITATIONS THIS SITE WILL BE
DUSTING OF SOIL ON THE SITE SHALL BE MINIMIZED BY
SITE IN THE FUTURE. FINALLY, PAVEMENTS SHOULD ALSO BE
CONSTRUCTED AS FOLLOWS: ACES POWER MARKETING, BEING A
REDUCING CONSTRUCTION TRAFFIC ACROSS BARE SOIL
MONITORED FOR SEDIMENT COMING FROM VEGETATIVE AREAS. IF
COMMERCIAL DEVELOPMENT WITHIN THE JURISDIC11ON OF THE
DURING DRY AND /OR WINDY WEATHER, AND BY APPLYING
POST - CONSTRUCTION EROSION IS OCCURRING, THE SOURCE
CITY OF CARMEL AND HAMILTON COUNTY WILL HAVE TO ABIDE
WATER OR OTHER ACCEPTABLE DUST CONTROL MEASURES
SHOULD BE RE- STABIUZED AS SOON AS POSSIBLE BY SEEDING,
BY THE CURRENT SUBDIVISION CONTROL ORDINANCE. THIS
TO THE SOIL. UPON COMPLETION OF CONSTRUCTION AND
SODDING OR MULCHING.
ORDINANCE REQUIRES THAT WE HAVE AN ARTIFICIALLY DRAINED
SUITABLE ESTABUSHMENT OF PERMANENT VEGETATION,
SITt AND THAT THE CONSTRUCTION WITHIN THIS DEVELOPMENT
TEMPORARY EROSION CONTROL MEASURES SUCH AS SILT
E WELL ABOVE THE 100 YR. ELEVATION OF THE PROPOSED
FENCE, CHECK DAMS, AND INLET PROTECTION DEVICES
OETENTION BASIN AND THEREFORE BE PROTECTED FROM
SHALL BE REMOVED IN A MANNER TO MINIMIZE ADDITIONAL
FLU )DING. IN CASES WHERE A HIGH WATER TABLE IS PRESENT
LAND DISTURBANCE. ANY AREAS DISTURBED BY THESE
SPECIAL FOOTINGS SHALL BE CONSTRUCTED. ALL PAVEMENT
OPERATIONS SHALL BE PROPERLY REVEGETATED.
AREAS WILL HAVE ADEQUATE SUB -BASE.
B.
LARGE WASTE MATERIALS CREATED BY CUTTING, SAWING,
CrA - CROSBY SILT LOAM, 0 TO 3 PERCENT SLOPES
DRILUNG, OR OTHER OPERATIONS SHALL BE PROPERLY
DISPOSED OF IN SUITABLE ON SITE WASTE CONTAINERS.
THII� SOIL IS UGHT COLORED, SILTY IN TEXTURE AND ON SLOPING
THE SITE SHALL BE CHECKED AT THE END OF THE DAY, AT
L!;= .ANDS. IT IS DEEP AND SOMEWHAT POORLY DRAINED WITH
A MINIMUM, AND ALL WASTE MATERIALS, INCLUDING THOSE
SLOW PERMEABILITY. IT HAS HIGH AVAILABLE WATER FOR PLANT
BLOWN ACROSS OR OFF THE SITE BY WIND, SHALL BE
CONSTRUCTION SEQUENCE
GROWTH AND MEDIUM ORGANIC MATTER CONTENT. THE SOIL
PICKED UP AND DISPOSED OF IN SUITABLE CONTAINERS.
HAS COMPACT TILL STARTING AT A DEPTH BETWEEN 20 -40
WHERE POSSIBLE, OPERATIONS SUCH AS SAWING THAT
PRE
- CONSTRUCTION
INCHES. THE MAIN SOIL FEATURES THAT AFFECT URBAN
CREATE SMALL PARTICLES SHOULD BE PERFORMED IN ONE
DEVELOPMENT USES ARE SEASONAL HIGH WATER TABLE,
MODERATE SHRINK -SWELL POTENTIAL, HIGH POTENTIAL FROST
SPOT IN AN AREA PROTECTED FROM WIND, AND WASTE
PARTICLES COLLECTED AND DISPOSED OF FREQUENTLY TO
1.
SCHEDULE PRE - CONSTRUCTION MEETING WITH HAMILTON COUNTY
ACTION AND SLOW PERMEABILITY.
MINIMIZE WIND DISPERSAL.
SURVEYOR (317) 776 -8495.
BECAUSE OF THERE ENGINEERING UMITATIONS THIS SITE WILL BE
PACKAGING USED TO TRANSPORT MATERIALS TO THE SITE
2•
POST N01 W /LOCAL CONTACT INFORMATION AT JOB TRAILER AND
CONSTRUCTED AS FOLLOWS: FULLER ENGINEERING, BEING A
FOR CONSTRUCTION OF THE FACILITY SHALL BE DISPOSED
DESIGNATE PERSON RESPONSIBLE FOR COMPLETING SITE REVIEW
COMMERCIAL DEVELOPMENT WITHIN THE JURISDICTION OF THE
OF PROPERLY, WHETHER THE MATERIAL IS TAKEN OUT OF
AFTER EACH V RAIN (OR GREATER) OR A MINIMUM OF ONCE PER
CITY OF CARMEL AND HAMILTON COUNTY WILL HAVE TO ABIDE
ITS PACKAGE AND INCORPORATED INTO THE PROJECT
WEEK.
BY THE CURRENT SUBDIVISION CONTROL ORDINANCE. THIS
IMMEDIATELY OR STORED ON SITE FOR FUTURE USE.
ORDINANCE REQUIRES THAT WE HAVE AN ARTIFICIALLY DRAINED
PACKAGED MATERIALS STORED ON SITE SHALL BE
3.
PROTECT EXISTING INLETS AS SHOWN.
SITE AND THAT THE BUILDING WITHIN THIS DEVELOPMENT BE
INSPECTED REGULARLY AND ANY LOOSE PACKAGING SHALL
WELL ABOVE THE 100 YR. ELEVATION OF THE PROPOSED
BE REPAIRED OR DISPOSED OF PROPERLY.
4.
INSTALL CONSTRUCTION ENTRANCE, MAINTENANCE, REFUEUNG AND
- DETENTION BASINS AND THEREFORE BE PROTECTED FROM
CONCRETE WASH -OUT FACIU11ES AS SHOWN.
FLOODING. THE BUILDING WILL BE OF LARGE SLAB TYPE
C.
ALL DEWATERING ACTIVITIES SHALL BE DONE IN ACCORDANCE TO
LONSTRUCTION. IN CASES WHERE A HIGH WATER TABLE IS
GOOD EROSION CONTROL PRACTICES. THESE PRACTICES
PENT SPECIAL FOOTINGS SHALL BE CONSTRUCTED. ALL
SHOULD INCLUDE THE USE OF DIRT BAGS SUCH AS DANDY
CONSTRUCTION
RS WILL HAVE ADEQUATE SUB -BASE. ALL SANITARY
DIRT BAGS. THE USE OF THESE TYPES OF DEWATERING
SRS SHALL BE PUBUC AND THEREFORE NO SEPTIC SYSTEMS
DEVICES WILL REMOVE LARGE QUANTITIES OF SILT,
5.
SITE DEMOLITION
SL BE ALLOWED.
SEDIMENT, AND DIRT AND PREVENT THESE MATERIALS FROM
ENTERING THE STORM SEWER SYSTEM.
6.
CLEAR AND EXCAVATE DETENTION BASIN AND OUTLET PIPE.
A19
Al PROPOSED STORM WATER SYSTEMS ARE SHOWN IN THE
INSTALL TEMPORARY SLOTTED RISER.
OLAN VIEW. DETAILED INFORMATION CAN BE FOUND ON THE
D.
IF THE USE OF UME IS USED TO STABILIZE THE SOIL OF THE
UTT TY PLAN.
SITE THEN ALL CONSTRUCTION EQUIPMENT USED SHALL BE
7•
INSTALL EROSION CONTROL BLANKETS.
CLEANED ALL EXCESS MATERIAL WITH WATER IN THE
A20
RE IS NO OFF -SITE CONSTRUCTION ACTIVITY PLANNED WITH
CONSTRUCTION STAGING AREA AS SHOWN WITHIN THESE
8.
REMOVE EXISTING PAVEMENTS AND ROUGH GRADE ENTIRE SITE.
PROJECT.
PLANS.
DISTURBED AREAS ARE TO BE KEPT TO A MINIMUM. CONTRACTOR
SHALL CONTROL MUD ACCUMULATION ON ALL STREETS
A21
t
SOIL STOCKPILES ARE ANTICIPATED.
E.
NUTRIENTS AND FERTILIZERS SHALL ONLY BE USED TO ESTABUSH
SURROUNDING PROJECT BY INSTAWNG STONE SURFACE AT ALL
RAPID VEGETATION. WHEN THESE PRODUCTS ARE UTIUZED,
LOCATIONS WHERE CONSTRUCTION TRAFFIC LEAVES THE SITE.
A22
I;
T1NG TOPOGRAPHY IS SHOWN IN THE PLAN VIEW.
THE USER SHOULD PAY STRICT ATTENTION TO THE
DUST SHALL BE KEPT TO A MINIMUM BY UTTUZING SPRINKLING,
PRODUCTS RECOMMENDED USAGE.
CALCIUM CHLORIDE, VEGETATIVE COVER, SPRAY ON ADHESIVES OR
A23
POSED SPOT ELEVATIONS ARE PROVIDED ON THE GRADING
OTHER APPROVED METHODS.
N VIEW TO INDICATE DRAINAGE PATTERNS.
3.
CONCRETE WASTE WATER
9.
INSTALL STORM SEWERS, INLETS AND INLET PROTECTION.
B1
NTIAL POLLUTANT SOURCES DURING CONSTRUCTION
A.
ALL CONCRETE WASTE WATER SHALL BE DISPOSED OF IN THE
VITTES INCLUDE CONCRETE WASTEWATER, TRASH, FOSSIL
DESIGNATED AREA AS SHOWN ON SHEET C301. THIS AREA
10.
INSTALL CONCRETE AND FINE GRADE PAVEMENT AREAS.
F
LS, OIL, GREASE AND PAINT. EXPOSURE OF THESE
IS A 4' HIGH, 10' DIAMETER DOUGHNUT TYPE MULCH BERM
P
UTANTS TO STORM WATER RUNOFF SHOULD BE MINIMIZED
WHICH SHALL BE CONSTRUCTION OVER A GEOTEXTTLE
11.
STONE PAVEMENT AREAS.
E,
PERFORMING ACTIVITIES SUCH AS EQUIPMENT STORAGE,
FABRIC. THIS AREA SHALL BE INSPECTED ON A DAILY
ELING, MAINTENANCE AND PORT -A -LET PLACEMENT IN
BASIS AT A MINIMUM, WHEN THIS AREA BECOMES FULL, THE
12•
APPLY TEMPORARY SEEDING TO DISTURBED AREAS TO REMAIN
IGNED AREAS AS SHOWN ON THIS SHEET.
POLLUTANTS SHALL BE EXCAVATED, PLACED IN AN
EXPOSED FOR 15 DAYS OR LONGER..
ACCEPTABLE CONTAINER AND DISPOSED OF IN A PROPER
B2
STRUCTTON SEQUENCE: SEE TABLE ON THIS SHEET.
MANNER.
13.
ADD BINDER COURSE ON PAVEMENT AREAS.
B3-
I
APPROPRIATE EROSION CONTROL MEASURES ARE SHOWN IN
4.
PAINT PRODUCTS
14.
INSTALL LANDSCAPING.
B9
PLAN VIEW. SEE DETAILS SHEETS FOR THE CONSTRUCTION
CIFICATIONS OF EACH MEASURE.
A.
ALL EXCESS PAINT AND THEIR RELATED PRODUCTS SHALL BE
15.
PERMANENT SEEDING AREAS TO HAVE LAWN.
DISPOSED OF IN THE MANNER BY WHICH THE
810
PROPOSED EXTENDED DRY DETENTION BASIN IS ANTICIPATED
MANUFACTURER SUGGESTS. UNDER NO CIRCUMSTANCES
16.
ADD SURFACE COURSE OF ASPHALT.
IMPROVE WATER QUALITY BY ALLOWING SEDIMENTS TO
SHALL PAINT OR THEIR RELATED PRODUCTS BE CLEANED OR
E.
DISPOSED OF IN SOIL, SANITARY SEWERS, STORM SEWERS
OR DETENTION BASINS. ANY VIOLATIONS OF THIS SHALL BE
POST - CONSTRUCTION
Bll
SEEDING SCHEDULE DETAIL
REPORTED TO THE JOB SUPERINTENDENT.
"HOLEY MOLEY"
1- 800 - 382 -5544
CALL TOLL FREE
17. REMOVE ANY SEDIMENT FROM DETENTION BASIN.
18. STABIUZE ANY BARE AREAS OF SITE.
19. TEMPORARY INLET PROTECTION SHALL REMAIN IN PLACE UNTIL
ALL AREAS ARE STABIUZED.
20. SUBMIT NOTICE OF TERMINATION TO INDIANA DEPARTMENT OF
ENVIRONMENTAL MANAGEMENT.
Lq-
"
CARSON
DESIGN
ASSOCIATES
TEL 317.843.5979
FAX 317.843.5975
2325 POINTE PARKWAY
SUITE 200
CARMEL INDIANA 46032
TEL 512.977.0520
FAX 512.977.0384
12301 RESEARCH BLVD.
BUILDING IV, SUITE 104
AUSTIN TEXAS 78759
www.carsondesign.com
THIS DRAWING AND THE IDEAS, CONCEPTS AND DESIGNS
CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY
OF CARSON DESIGN ASSOCIATES, AND ARE NOT TO BE USED
OR REPRODUCED, WHOLE OR IN PART, WITHOUT THE WRITTEN
CONSENT OF CARSON DESIGN ASSOCIATES.
® COPYRIGHT 2003 CARSON DESIGN ASSOCIATES
STAMP
DBED PREPARATION REQUIREMENTS:
D 0 N ' T
S '
TEST SOIL TO
N E L L I N G
R COUNTY SWCD ORMCOOPERATIVE EXTENSION OFFICE( FOR
D I G
DIG
ENGINEERING, LLC
ISTANCE AND ADDITIONAL SOILS INFORMATION)
Q
13295 Meridian ConwsBlvd.
IF SOIL pH IS UNSUITABLE FOR THE SPECIES TO BE SEEDED,
BLIND
Suile 142
LY LIME ACCORDING TO TEST RECOMMENDATIONS.
3
FERTIUZE AS RECOMMENDED BY THE SOIL TEST. IF TESTING WAS
O C.
IZ R�:
Camlel, IN 46032 N
DONE, CONSIDER APPLYING 400 -600 LBS. /ACRE OF 12 -0 -12
M(31 »663-3206 A
Fax 017) 663 -3208 P
LYSIS OR EQUIVALENT FERTIUZER (UNLESS SOILS TESTS SHOW
SPHOkOUS DEFICIENCY.
U r
www.stnellin®ergxwn 4
TILL THE SOIL TO OBTAIN A UNIFORM SEEDBED, WORKING THE
W
1ILIZER AND UME INTO THE SOIL 2 -4 INCHES DEEP WITH A DISC
0
RAKE OPERATED ACROSS THE SLOPE.
"HOLEY MOLEY"
1- 800 - 382 -5544
CALL TOLL FREE
17. REMOVE ANY SEDIMENT FROM DETENTION BASIN.
18. STABIUZE ANY BARE AREAS OF SITE.
19. TEMPORARY INLET PROTECTION SHALL REMAIN IN PLACE UNTIL
ALL AREAS ARE STABIUZED.
20. SUBMIT NOTICE OF TERMINATION TO INDIANA DEPARTMENT OF
ENVIRONMENTAL MANAGEMENT.
Lq-
"
CARSON
DESIGN
ASSOCIATES
TEL 317.843.5979
FAX 317.843.5975
2325 POINTE PARKWAY
SUITE 200
CARMEL INDIANA 46032
TEL 512.977.0520
FAX 512.977.0384
12301 RESEARCH BLVD.
BUILDING IV, SUITE 104
AUSTIN TEXAS 78759
www.carsondesign.com
THIS DRAWING AND THE IDEAS, CONCEPTS AND DESIGNS
CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY
OF CARSON DESIGN ASSOCIATES, AND ARE NOT TO BE USED
OR REPRODUCED, WHOLE OR IN PART, WITHOUT THE WRITTEN
CONSENT OF CARSON DESIGN ASSOCIATES.
® COPYRIGHT 2003 CARSON DESIGN ASSOCIATES
STAMP
SHEET NUMBER:
C303
SHEET OF
W
C= N
W C/)
Q
CIO i
an
^
O C.
IZ R�:
E
C/)
U
U r
Q �
W
y
DATE / ISSUE / INITIALS:
9- 6- 06/TAC REVISIONS /GSS
SQUARE FOOTAGE:
DRAWING TITLE:
STORMWATER
POLLUTION
PREVENTION DETAI
JOB NO.
10670002 August 1, 2006
SHEET NUMBER:
C303
SHEET OF