Loading...
HomeMy WebLinkAbout06080010.6PERMANENT SEEDING SOD OR EROSION CONTROL BLANKET TEMPORARY CONSTRUCTION ENTRANCE INLET PROTECT10N SEE SHEET C801 FOR DETAILS SILT FENCE SEE SHEET C801 FOR DETAILS CONSTRUCTION LIMITS PERSON(s) RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENT CONTROL PRACTICES CONTACT: Jeremy Stephenson REI Real Estate Services, LLC 11711 North Pennsylvania Street, Suite 200 Carmel, IN 46032 317-573-6050 NOTE: 1. SEE LANDSCAPE PLAN FOR PERMANENT SEEDING AREAS. 2. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. 3. THERE SHALL BE NO STORAGE OF DIRT, DEBRIS, OR STORAGE MATERIAL IN THE STREET. 4� STRUC11ON UMIT Z-=CON 7 40 =X40 .......... n G , 8 "s - - -0- - J............................. ....... .... .. .................... .. .......... ............. ....... ............................................ .............. . ..... PRESERVE. .............. ................................... ...................... ....... ........... ..................... ..... .. ...................... ............. . .......... ............. .......... ....... .................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... \ ............ mwd .. ...... .... .... ... .................. ;� . . ..... ... ... ............... ........ ............ .................. ............. ..... ....... .......... .... ....... r I�0 1_; . . 1�� . . . . . . . . . . . . . . . . . . ........... ..... .. .... ....... < ...... ................... .'A6D. . ... ................... ...... .. ................... ................... X ................... . ...... . ........ .. .................... ..... .. A2 77, L 30' DRAINAGE EASEMENT ASPI 'Al P SAW CUT EXISTING 10 RErAC-E-- P P V1 WITH L) VEND X, ... ... OUT..Zlc ................ .................. .............. ...... ........ ..... . ........ ....... It%, I X ................... ......... ........... ........ ......... UMIT ..... ... ........... ... CONCRETE WASH . . . . . . . . . . ................... ................... ........... .. . . . . . ... . . . . . . . . . . . . . . . . . . . . . . '4� . . . 31 . . ....... rw ......... .............. ............. ...................... .............. X .................. -TafI ... ...... .... ................................................. .. . . 11 ; ............ ......... ........... .............. ... .... ........ .. .......... .... .......... ............. CONSTRU .... .. __ I . I I - �. I . t�. 1� , - ...... ........ �4 4 ......... ... ......... ..... . ...... 'A '11M 11t1d VE . . ..... ........... ........ ... !�ASE" SI,',N ......... .... ...... .... ........................... fc . ............. . . .. ..... .............. .. ............ ............ .......... ... ................... ....... .............. 00 ........... ........ -0-W.0 \\1 V ....... .. ................ v ................ . . ......... ---------- �3 . . . ....... - - - - - - - \'STR -nq�� -7)CON uc 7 1 Z Q iji �1, IIL A Ix Pl-' NA;!. 5JND G P A S I'll 6 a� 4 \�\x ASSUMED NORTH SCALE: 1 "= 30 ' HOLEY MOLEY SAYS DON'T DIG BLIND In "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1-800-382-5544 CALL TOLL FREE PER INDIANA STATE LAW IS-69-1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. Will vie DEVELOPMENT NOTES 1. The Contractor, whether owning the property or acting cs the agent of the property owner, shall be responsible for eras I on and sediment control requirements associated with activities on site. 2. Contractor shall install nnd mo�ntain a stable construction site access. 3. Contractor sho!' install and maintain perimeter soil erosion fence (Ind sediment control measures prior to land disturbance. 4. Contractor shall be responsible for minimizing sediment discharge and tracking from the site throughout the land disturbing activities until permanent stabilization has been achieved. 5. Contractor shall clean up sediment that is either tracked or washed onto roads. Bulk clearing of sediment shall not include flushing the arec with water. Cleared sediment must be redistributed or disposed of in a manner that is in complionce with all applicable statues and rule�;. 6. Adjacent lots dist-l-bed by contractor must be repaired and stabilized with temporary or permanent surface stabilization. GENERAL NOTES 1. This plan shall serve as a guideline for storm water quality. Additional requirements may be made in the field if provisions shown prove inadequate in preventing soil erosion and/or storm water pollution. 2. See erosion control sequence on sheet C801 for pre-construction through post- construction requirements. 3. Spill prevention and clean up measures shall be implemented for the storage and handling of materials, such as fuels or hazardous wastes, to minimize the potentio! for pollutants to contaminate surface or ground water or degrooe soil quality. 4. Material handling and storage associated with construction activity shall meet the spill prevention and spill response requirements of the 'Acte of Indiana laws governing reporting, containment, and response to spills of hazardous and/or objectionable materials. 5. Contractor shall implement measures to minimize or eliminate wastes or unused building materials, including garbage, debris, cleaning wastes, wastewater, concrete truck washout, and other substances from being carried from a project site by run-off or wind. Identification of areas where concrete truck washout is permissible must be clearly posted at appropriate orec,s of the site. Wastes arid unused building materials shall be managed and disposed of in accordance with all applicable statues and regulations. 6. Public or private roadwnys shall be kept cleared of accumulated sediment that is a result of run-off or tracking. Bulk clearing of sediment s . holl not include flushing the area with water. Cleared sediment shall be redistributed or disposed of in a manner that is in accordance with all applicable statues and regulations. 7. Land alterations which strip the land of vegetation, including regrading, shall be done in a way that will minimize erosion. Whenever feasible, natural vegetation shall be retained and protected. 8. As grading is done, install silt traps, silt fences, slope drains, temporary diversions and ot.�er runoff control measures at appropriate locations to keep sediment contained on site. 9. All disturbed areas shall be seeded and straw mulched as shown on the plans immediately after completion of ground activity. For larger projects, this seeding should be completed in phases as the different oreaq of the site ore completed. 10. The duration of tir-e which an area remains exposed shall be kept to a practical minimum depending upon the weather. If construction activity is to cease for more than fifteen calendar days, the disturbed area,. shall be temporarily seeded or mulched. 11. Permanent and final vegetation or structural erosion control devices shall be installed as soon as practical under the circumstances. 12. All storm sewer I nlet protection devices shall be put in place at the time each inlet is constructdd. 13. The contractor shall maintain erosion control measures and devices during construction and until siltation of the streets and storm sewers will not longer occur. 14. Vegetated areas with a density of less than seventy percent (70%) shall be re-stabilized u9ing appropriate methods to minimize the erosion potential. 15. Final stabilization of a project site is considered achieved when all land disturbing activities have been completed and a uniform perennial vegetative cover with a density of seventy percent (70%) has been established on all unpaved areas and areas not covered by permanent structures, or equivalent permanent stabilization measures have been employed. 16. Once onsite erosion and siltation of the streets and storm sewers will no longer occur, the contractor shall remove and dispose of the temporary erosion control devic-s. 17. Silt fence is required around all soil stockpiles. 18. If wells a, septic systems are found on site, abandon according to local, county, and state regulations. 19. During the period of construction activities, all storm water quality measures necessary to meet the requirements of this rule shall be maintained in working order. 20. A trained individuGI (as demonstrated by certification or experience) shall perform a written evaluation of the project site by the end of the next business dcy following each measurable storm event, but not less than once G week. 21. The written evaluation reports must address maintenance of storm water quality measures, problems identified at the project site and corrective actions recommended and completed to ensure compliance. Evaluation reports must be made available to the inspecting authority within 48 hours of a request. -WARNING- THIS SHEET TO BE USED FOR STORMWATER POLLUTION PREVENTION PURPOSES ONLY. FOR ANY OTHER INFCRMATION SEE SHEETS C101-C103 �SEE SHEET C801-C802 FOR ALL STORMWATER I POLLUTION PREVENTION DETAILS & NOTES1 10 C) C', CO Ln fif Ln :Z UJ UJ CD Ck� UJ V) Ln 2! CD Ln UJ UJ 0:: Ir- LLJ RT. 6\STC 0 PE19500'260 i J0, .. STATE OF /0NA1_ 0: Sr. DATL �?t2�1616 THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE I NTEI I ECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER I CORPORATION. COPYRIGHTED BY THE SCHNEIDER CORP. (2006) f q 40,11111 Schneider THE SCHNEIDER CORPORATION Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Telephone: 317.826.7100 Fax: 317.826.7200 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnicol Services GIS * LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering PROJECT NO.: C\2 V-) CD ...................... A CHECKED BY: ........ ALF SHEET TITLE: STORM WATER POLLUTION PREVENTION PLAN DRAWING FILES: S:\6k\6096\001\dwgs\ClO4.dwg XREF: S:\6k\6096\001\dwgs\001BS.dwg ...... .. XREF: S:\6k\6096\001\dwgs\6096001t.dwg . .............. .............. .............. SHEET NO.: ................... .. .. .... flkl NAI[ ...... .................. .................. x 20' x 20' .................... E-1 c::> E­ ........... ..... N� P ESMT. .......... ....... cZd E- .......... . 2�TOR Y OFFICE BUILDING ..... i in, E-1 I V ;X� ........ .. -,.,11,921 SF ...... / ............ C:> C:> . ............... .............. C_.) ... ... OUT..Zlc ................ .................. .............. ...... ........ ..... . ........ ....... It%, I X ................... ......... ........... ........ ......... UMIT ..... ... ........... ... CONCRETE WASH . . . . . . . . . . ................... ................... ........... .. . . . . . ... . . . . . . . . . . . . . . . . . . . . . . '4� . . . 31 . . ....... rw ......... .............. ............. ...................... .............. X .................. -TafI ... ...... .... ................................................. .. . . 11 ; ............ ......... ........... .............. ... .... ........ .. .......... .... .......... ............. CONSTRU .... .. __ I . I I - �. I . t�. 1� , - ...... ........ �4 4 ......... ... ......... ..... . ...... 'A '11M 11t1d VE . . ..... ........... ........ ... !�ASE" SI,',N ......... .... ...... .... ........................... fc . ............. . . .. ..... .............. .. ............ ............ .......... ... ................... ....... .............. 00 ........... ........ -0-W.0 \\1 V ....... .. ................ v ................ . . ......... ---------- �3 . . . ....... - - - - - - - \'STR -nq�� -7)CON uc 7 1 Z Q iji �1, IIL A Ix Pl-' NA;!. 5JND G P A S I'll 6 a� 4 \�\x ASSUMED NORTH SCALE: 1 "= 30 ' HOLEY MOLEY SAYS DON'T DIG BLIND In "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1-800-382-5544 CALL TOLL FREE PER INDIANA STATE LAW IS-69-1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. Will vie DEVELOPMENT NOTES 1. The Contractor, whether owning the property or acting cs the agent of the property owner, shall be responsible for eras I on and sediment control requirements associated with activities on site. 2. Contractor shall install nnd mo�ntain a stable construction site access. 3. Contractor sho!' install and maintain perimeter soil erosion fence (Ind sediment control measures prior to land disturbance. 4. Contractor shall be responsible for minimizing sediment discharge and tracking from the site throughout the land disturbing activities until permanent stabilization has been achieved. 5. Contractor shall clean up sediment that is either tracked or washed onto roads. Bulk clearing of sediment shall not include flushing the arec with water. Cleared sediment must be redistributed or disposed of in a manner that is in complionce with all applicable statues and rule�;. 6. Adjacent lots dist-l-bed by contractor must be repaired and stabilized with temporary or permanent surface stabilization. GENERAL NOTES 1. This plan shall serve as a guideline for storm water quality. Additional requirements may be made in the field if provisions shown prove inadequate in preventing soil erosion and/or storm water pollution. 2. See erosion control sequence on sheet C801 for pre-construction through post- construction requirements. 3. Spill prevention and clean up measures shall be implemented for the storage and handling of materials, such as fuels or hazardous wastes, to minimize the potentio! for pollutants to contaminate surface or ground water or degrooe soil quality. 4. Material handling and storage associated with construction activity shall meet the spill prevention and spill response requirements of the 'Acte of Indiana laws governing reporting, containment, and response to spills of hazardous and/or objectionable materials. 5. Contractor shall implement measures to minimize or eliminate wastes or unused building materials, including garbage, debris, cleaning wastes, wastewater, concrete truck washout, and other substances from being carried from a project site by run-off or wind. Identification of areas where concrete truck washout is permissible must be clearly posted at appropriate orec,s of the site. Wastes arid unused building materials shall be managed and disposed of in accordance with all applicable statues and regulations. 6. Public or private roadwnys shall be kept cleared of accumulated sediment that is a result of run-off or tracking. Bulk clearing of sediment s . holl not include flushing the area with water. Cleared sediment shall be redistributed or disposed of in a manner that is in accordance with all applicable statues and regulations. 7. Land alterations which strip the land of vegetation, including regrading, shall be done in a way that will minimize erosion. Whenever feasible, natural vegetation shall be retained and protected. 8. As grading is done, install silt traps, silt fences, slope drains, temporary diversions and ot.�er runoff control measures at appropriate locations to keep sediment contained on site. 9. All disturbed areas shall be seeded and straw mulched as shown on the plans immediately after completion of ground activity. For larger projects, this seeding should be completed in phases as the different oreaq of the site ore completed. 10. The duration of tir-e which an area remains exposed shall be kept to a practical minimum depending upon the weather. If construction activity is to cease for more than fifteen calendar days, the disturbed area,. shall be temporarily seeded or mulched. 11. Permanent and final vegetation or structural erosion control devices shall be installed as soon as practical under the circumstances. 12. All storm sewer I nlet protection devices shall be put in place at the time each inlet is constructdd. 13. The contractor shall maintain erosion control measures and devices during construction and until siltation of the streets and storm sewers will not longer occur. 14. Vegetated areas with a density of less than seventy percent (70%) shall be re-stabilized u9ing appropriate methods to minimize the erosion potential. 15. Final stabilization of a project site is considered achieved when all land disturbing activities have been completed and a uniform perennial vegetative cover with a density of seventy percent (70%) has been established on all unpaved areas and areas not covered by permanent structures, or equivalent permanent stabilization measures have been employed. 16. Once onsite erosion and siltation of the streets and storm sewers will no longer occur, the contractor shall remove and dispose of the temporary erosion control devic-s. 17. Silt fence is required around all soil stockpiles. 18. If wells a, septic systems are found on site, abandon according to local, county, and state regulations. 19. During the period of construction activities, all storm water quality measures necessary to meet the requirements of this rule shall be maintained in working order. 20. A trained individuGI (as demonstrated by certification or experience) shall perform a written evaluation of the project site by the end of the next business dcy following each measurable storm event, but not less than once G week. 21. The written evaluation reports must address maintenance of storm water quality measures, problems identified at the project site and corrective actions recommended and completed to ensure compliance. Evaluation reports must be made available to the inspecting authority within 48 hours of a request. -WARNING- THIS SHEET TO BE USED FOR STORMWATER POLLUTION PREVENTION PURPOSES ONLY. FOR ANY OTHER INFCRMATION SEE SHEETS C101-C103 �SEE SHEET C801-C802 FOR ALL STORMWATER I POLLUTION PREVENTION DETAILS & NOTES1 10 C) C', CO Ln fif Ln :Z UJ UJ CD Ck� UJ V) Ln 2! CD Ln UJ UJ 0:: Ir- LLJ RT. 6\STC 0 PE19500'260 i J0, .. STATE OF /0NA1_ 0: Sr. DATL �?t2�1616 THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE I NTEI I ECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER I CORPORATION. COPYRIGHTED BY THE SCHNEIDER CORP. (2006) f q 40,11111 Schneider THE SCHNEIDER CORPORATION Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Telephone: 317.826.7100 Fax: 317.826.7200 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnicol Services GIS * LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering PROJECT NO.: C\2 V-) CD ...................... DRAWN BY: CHECKED BY: ........ ALF SHEET TITLE: STORM WATER POLLUTION PREVENTION PLAN DRAWING FILES: S:\6k\6096\001\dwgs\ClO4.dwg XREF: S:\6k\6096\001\dwgs\001BS.dwg ...... .. XREF: S:\6k\6096\001\dwgs\6096001t.dwg . .............. .............. .............. SHEET NO.: ................... .. .. .... flkl NAI[ ...... .................. .................. 20' x 20' .................... E-1 c::> E­ ........... ..... N� P ESMT. .......... ....... cZd E- .......... . 2�TOR Y OFFICE BUILDING ..... in, E-1 ;X� ........ .. -,.,11,921 SF ...... / ............ C:> C:> . ............... .............. C_.) ..... .... ...... ... ........ .... .. ...... I ............ ..................... f / .. ......... ... ...... ... ............. ........ I ....... . ................. .. 9, AQUASVARL AS-4 ................... .................. ..... .... ........ *.*.*.* ........ ............ ......... ... ... OUT..Zlc ................ .................. .............. ...... ........ ..... . ........ ....... It%, I X ................... ......... ........... ........ ......... UMIT ..... ... ........... ... CONCRETE WASH . . . . . . . . . . ................... ................... ........... .. . . . . . ... . . . . . . . . . . . . . . . . . . . . . . '4� . . . 31 . . ....... rw ......... .............. ............. ...................... .............. X .................. -TafI ... ...... .... ................................................. .. . . 11 ; ............ ......... ........... .............. ... .... ........ .. .......... .... .......... ............. CONSTRU .... .. __ I . I I - �. I . t�. 1� , - ...... ........ �4 4 ......... ... ......... ..... . ...... 'A '11M 11t1d VE . . ..... ........... ........ ... !�ASE" SI,',N ......... .... ...... .... ........................... fc . ............. . . .. ..... .............. .. ............ ............ .......... ... ................... ....... .............. 00 ........... ........ -0-W.0 \\1 V ....... .. ................ v ................ . . ......... ---------- �3 . . . ....... - - - - - - - \'STR -nq�� -7)CON uc 7 1 Z Q iji �1, IIL A Ix Pl-' NA;!. 5JND G P A S I'll 6 a� 4 \�\x ASSUMED NORTH SCALE: 1 "= 30 ' HOLEY MOLEY SAYS DON'T DIG BLIND In "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1-800-382-5544 CALL TOLL FREE PER INDIANA STATE LAW IS-69-1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. Will vie DEVELOPMENT NOTES 1. The Contractor, whether owning the property or acting cs the agent of the property owner, shall be responsible for eras I on and sediment control requirements associated with activities on site. 2. Contractor shall install nnd mo�ntain a stable construction site access. 3. Contractor sho!' install and maintain perimeter soil erosion fence (Ind sediment control measures prior to land disturbance. 4. Contractor shall be responsible for minimizing sediment discharge and tracking from the site throughout the land disturbing activities until permanent stabilization has been achieved. 5. Contractor shall clean up sediment that is either tracked or washed onto roads. Bulk clearing of sediment shall not include flushing the arec with water. Cleared sediment must be redistributed or disposed of in a manner that is in complionce with all applicable statues and rule�;. 6. Adjacent lots dist-l-bed by contractor must be repaired and stabilized with temporary or permanent surface stabilization. GENERAL NOTES 1. This plan shall serve as a guideline for storm water quality. Additional requirements may be made in the field if provisions shown prove inadequate in preventing soil erosion and/or storm water pollution. 2. See erosion control sequence on sheet C801 for pre-construction through post- construction requirements. 3. Spill prevention and clean up measures shall be implemented for the storage and handling of materials, such as fuels or hazardous wastes, to minimize the potentio! for pollutants to contaminate surface or ground water or degrooe soil quality. 4. Material handling and storage associated with construction activity shall meet the spill prevention and spill response requirements of the 'Acte of Indiana laws governing reporting, containment, and response to spills of hazardous and/or objectionable materials. 5. Contractor shall implement measures to minimize or eliminate wastes or unused building materials, including garbage, debris, cleaning wastes, wastewater, concrete truck washout, and other substances from being carried from a project site by run-off or wind. Identification of areas where concrete truck washout is permissible must be clearly posted at appropriate orec,s of the site. Wastes arid unused building materials shall be managed and disposed of in accordance with all applicable statues and regulations. 6. Public or private roadwnys shall be kept cleared of accumulated sediment that is a result of run-off or tracking. Bulk clearing of sediment s . holl not include flushing the area with water. Cleared sediment shall be redistributed or disposed of in a manner that is in accordance with all applicable statues and regulations. 7. Land alterations which strip the land of vegetation, including regrading, shall be done in a way that will minimize erosion. Whenever feasible, natural vegetation shall be retained and protected. 8. As grading is done, install silt traps, silt fences, slope drains, temporary diversions and ot.�er runoff control measures at appropriate locations to keep sediment contained on site. 9. All disturbed areas shall be seeded and straw mulched as shown on the plans immediately after completion of ground activity. For larger projects, this seeding should be completed in phases as the different oreaq of the site ore completed. 10. The duration of tir-e which an area remains exposed shall be kept to a practical minimum depending upon the weather. If construction activity is to cease for more than fifteen calendar days, the disturbed area,. shall be temporarily seeded or mulched. 11. Permanent and final vegetation or structural erosion control devices shall be installed as soon as practical under the circumstances. 12. All storm sewer I nlet protection devices shall be put in place at the time each inlet is constructdd. 13. The contractor shall maintain erosion control measures and devices during construction and until siltation of the streets and storm sewers will not longer occur. 14. Vegetated areas with a density of less than seventy percent (70%) shall be re-stabilized u9ing appropriate methods to minimize the erosion potential. 15. Final stabilization of a project site is considered achieved when all land disturbing activities have been completed and a uniform perennial vegetative cover with a density of seventy percent (70%) has been established on all unpaved areas and areas not covered by permanent structures, or equivalent permanent stabilization measures have been employed. 16. Once onsite erosion and siltation of the streets and storm sewers will no longer occur, the contractor shall remove and dispose of the temporary erosion control devic-s. 17. Silt fence is required around all soil stockpiles. 18. If wells a, septic systems are found on site, abandon according to local, county, and state regulations. 19. During the period of construction activities, all storm water quality measures necessary to meet the requirements of this rule shall be maintained in working order. 20. A trained individuGI (as demonstrated by certification or experience) shall perform a written evaluation of the project site by the end of the next business dcy following each measurable storm event, but not less than once G week. 21. The written evaluation reports must address maintenance of storm water quality measures, problems identified at the project site and corrective actions recommended and completed to ensure compliance. Evaluation reports must be made available to the inspecting authority within 48 hours of a request. -WARNING- THIS SHEET TO BE USED FOR STORMWATER POLLUTION PREVENTION PURPOSES ONLY. FOR ANY OTHER INFCRMATION SEE SHEETS C101-C103 �SEE SHEET C801-C802 FOR ALL STORMWATER I POLLUTION PREVENTION DETAILS & NOTES1 10 C) C', CO Ln fif Ln :Z UJ UJ CD Ck� UJ V) Ln 2! CD Ln UJ UJ 0:: Ir- LLJ RT. 6\STC 0 PE19500'260 i J0, .. STATE OF /0NA1_ 0: Sr. DATL �?t2�1616 THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE I NTEI I ECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER I CORPORATION. COPYRIGHTED BY THE SCHNEIDER CORP. (2006) f q 40,11111 Schneider THE SCHNEIDER CORPORATION Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Telephone: 317.826.7100 Fax: 317.826.7200 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnicol Services GIS * LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering DATE: PROJECT NO.: C\2 V-) CD 6096.001 DRAWN BY: CHECKED BY: RJS ALF SHEET TITLE: STORM WATER POLLUTION PREVENTION PLAN DRAWING FILES: S:\6k\6096\001\dwgs\ClO4.dwg XREF: S:\6k\6096\001\dwgs\001BS.dwg XREF: S:\6k\6096\001\dwgs\TRIe1.dwg XREF: S:\6k\6096\001\dwgs\6096001t.dwg XREF: S:\6k\6096\001\dwgs\PLAT.dwg SHEET NO.: (C134 CQ E-1 c::> E­ E- cZd E- in, E-1 ;X� E- C:> C:> C_.) DATE: PROJECT NO.: 7/20/06 6096.001 DRAWN BY: CHECKED BY: RJS ALF SHEET TITLE: STORM WATER POLLUTION PREVENTION PLAN DRAWING FILES: S:\6k\6096\001\dwgs\ClO4.dwg XREF: S:\6k\6096\001\dwgs\001BS.dwg XREF: S:\6k\6096\001\dwgs\TRIe1.dwg XREF: S:\6k\6096\001\dwgs\6096001t.dwg XREF: S:\6k\6096\001\dwgs\PLAT.dwg SHEET NO.: (C134