HomeMy WebLinkAbout06080010.6PERMANENT SEEDING
SOD OR EROSION CONTROL BLANKET
TEMPORARY CONSTRUCTION ENTRANCE
INLET PROTECT10N SEE SHEET
C801 FOR DETAILS
SILT FENCE SEE SHEET
C801 FOR DETAILS
CONSTRUCTION LIMITS
PERSON(s) RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF EROSION AND
SEDIMENT CONTROL PRACTICES
CONTACT:
Jeremy Stephenson
REI Real Estate Services, LLC
11711 North Pennsylvania Street, Suite 200
Carmel, IN 46032
317-573-6050
NOTE:
1. SEE LANDSCAPE PLAN FOR
PERMANENT SEEDING AREAS.
2. ADDITIONAL EROSION CONTROL
MEASURES MAY BE REQUIRED IN THE
FIELD BY THE INSPECTOR.
3. THERE SHALL BE NO STORAGE OF
DIRT, DEBRIS, OR STORAGE MATERIAL
IN THE STREET.
4�
STRUC11ON UMIT
Z-=CON 7
40 =X40
..........
n G , 8 "s - - -0- -
J............................. ....... .... .. ....................
.. .......... ............. .......
............................................
..............
. ..... PRESERVE. .............. ................................... ...................... ....... ...........
..................... ..... ..
......................
.............
. ..........
............. .......... ....... ..................
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
... \ ............ mwd .. ......
.... .... ... .................. ;� . . .....
... ... ............... ........ ............
.................. ............. ..... .......
..........
.... .......
r
I�0 1_; . . 1�� . . . . . . . . . . . . . . . . . . ........... ..... ..
.... .......
<
...... ................... .'A6D. .
... ................... ...... ..
...................
...................
X ................... . ...... .
........ .. .................... ..... ..
A2
77,
L
30' DRAINAGE
EASEMENT
ASPI 'Al
P SAW CUT EXISTING
10 RErAC-E--
P
P V1
WITH L) VEND
X,
... ... OUT..Zlc ................
.................. .............. ......
........ ..... . ........ .......
It%, I X
................... .........
...........
........ .........
UMIT ..... ... ........... ... CONCRETE WASH
. . . . . . . . . .
...................
...................
........... .. . . . . .
... . . . . . . . . . . . . . . . . . . . . . .
'4�
. . . 31
. . .......
rw
.........
..............
.............
......................
.............. X ..................
-TafI ... ...... ....
................................................. .. . . 11 ;
............ .........
........... .............. ...
.... ........ .. ..........
.... .......... ............. CONSTRU .... ..
__ I . I I - �. I . t�. 1� , -
...... ........ �4
4 ......... ... .........
..... . ......
'A '11M 11t1d
VE
. . ..... ...........
........ ...
!�ASE" SI,',N
.........
.... ...... .... ...........................
fc . .............
. . .. ..... .............. .. ............
............
.......... ...
...................
....... ..............
00
........... ........ -0-W.0 \\1 V
....... .. ................ v ................
. . ......... ----------
�3
. . . ....... - - - - - - -
\'STR -nq��
-7)CON uc
7
1 Z
Q iji
�1, IIL A
Ix Pl-' NA;!. 5JND
G P A S I'll
6 a�
4
\�\x
ASSUMED NORTH
SCALE: 1 "= 30 '
HOLEY MOLEY SAYS
DON'T
DIG
BLIND In
"IT'S THE LAW"
CALL 2 WORKING DAYS BEFORE YOU DIG
1-800-382-5544
CALL TOLL FREE
PER INDIANA STATE LAW IS-69-1991.
IT IS AGAINST THE LAW TO EXCAVATE
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION SERVICE TWO (2) WORKING
DAYS BEFORE COMMENCING WORK.
Will vie
DEVELOPMENT NOTES
1. The Contractor, whether owning the property or acting cs the agent of
the property owner, shall be responsible for eras I on and sediment control
requirements associated with activities on site.
2. Contractor shall install nnd mo�ntain a stable construction site access.
3. Contractor sho!' install and maintain perimeter soil erosion fence (Ind
sediment control measures prior to land disturbance.
4. Contractor shall be responsible for minimizing sediment discharge and
tracking from the site throughout the land disturbing activities until
permanent stabilization has been achieved.
5. Contractor shall clean up sediment that is either tracked or washed
onto roads. Bulk clearing of sediment shall not include flushing the arec
with water. Cleared sediment must be redistributed or disposed of in a
manner that is in complionce with all applicable statues and rule�;.
6. Adjacent lots dist-l-bed by contractor must be repaired and stabilized
with temporary or permanent surface stabilization.
GENERAL NOTES
1. This plan shall serve as a guideline for storm water quality. Additional
requirements may be made in the field if provisions shown prove inadequate
in preventing soil erosion and/or storm water pollution.
2. See erosion control sequence on sheet C801 for pre-construction
through post- construction requirements.
3. Spill prevention and clean up measures shall be implemented for the
storage and handling of materials, such as fuels or hazardous wastes, to
minimize the potentio! for pollutants to contaminate surface or ground
water or degrooe soil quality.
4. Material handling and storage associated with construction activity shall
meet the spill prevention and spill response requirements of the 'Acte of
Indiana laws governing reporting, containment, and response to spills of
hazardous and/or objectionable materials.
5. Contractor shall implement measures to minimize or eliminate wastes or
unused building materials, including garbage, debris, cleaning wastes,
wastewater, concrete truck washout, and other substances from being
carried from a project site by run-off or wind. Identification of areas where
concrete truck washout is permissible must be clearly posted at appropriate
orec,s of the site. Wastes arid unused building materials shall be managed
and disposed of in accordance with all applicable statues and regulations.
6. Public or private roadwnys shall be kept cleared of accumulated
sediment that is a result of run-off or tracking. Bulk clearing of sediment
s . holl not include flushing the area with water. Cleared sediment shall be
redistributed or disposed of in a manner that is in accordance with all
applicable statues and regulations.
7. Land alterations which strip the land of vegetation, including regrading,
shall be done in a way that will minimize erosion. Whenever feasible, natural
vegetation shall be retained and protected.
8. As grading is done, install silt traps, silt fences, slope drains, temporary
diversions and ot.�er runoff control measures at appropriate locations to
keep sediment contained on site.
9. All disturbed areas shall be seeded and straw mulched as shown on the
plans immediately after completion of ground activity. For larger projects,
this seeding should be completed in phases as the different oreaq of the
site ore completed.
10. The duration of tir-e which an area remains exposed shall be kept to a
practical minimum depending upon the weather. If construction activity is
to cease for more than fifteen calendar days, the disturbed area,. shall be
temporarily seeded or mulched.
11. Permanent and final vegetation or structural erosion control devices
shall be installed as soon as practical under the circumstances.
12. All storm sewer I nlet protection devices shall be put in place at the
time each inlet is constructdd.
13. The contractor shall maintain erosion control measures and devices
during construction and until siltation of the streets and storm sewers will
not longer occur.
14. Vegetated areas with a density of less than seventy percent (70%) shall
be re-stabilized u9ing appropriate methods to minimize the erosion
potential.
15. Final stabilization of a project site is considered achieved when all land
disturbing activities have been completed and a uniform perennial vegetative
cover with a density of seventy percent (70%) has been established on all
unpaved areas and areas not covered by permanent structures, or
equivalent permanent stabilization measures have been employed.
16. Once onsite erosion and siltation of the streets and storm sewers will
no longer occur, the contractor shall remove and dispose of the temporary
erosion control devic-s.
17. Silt fence is required around all soil stockpiles.
18. If wells a, septic systems are found on site, abandon according to
local, county, and state regulations.
19. During the period of construction activities, all storm water quality
measures necessary to meet the requirements of this rule shall be
maintained in working order.
20. A trained individuGI (as demonstrated by certification or experience)
shall perform a written evaluation of the project site by the end of the
next business dcy following each measurable storm event, but not less than
once G week.
21. The written evaluation reports must address maintenance of storm
water quality measures, problems identified at the project site and
corrective actions recommended and completed to ensure compliance.
Evaluation reports must be made available to the inspecting authority within
48 hours of a request.
-WARNING-
THIS SHEET TO BE USED FOR STORMWATER
POLLUTION PREVENTION PURPOSES ONLY. FOR
ANY OTHER INFCRMATION SEE SHEETS C101-C103
�SEE SHEET C801-C802 FOR ALL STORMWATER I
POLLUTION PREVENTION DETAILS & NOTES1
10 C)
C',
CO
Ln
fif
Ln
:Z
UJ UJ
CD
Ck�
UJ
V) Ln
2!
CD
Ln
UJ UJ
0:: Ir-
LLJ
RT.
6\STC
0
PE19500'260
i J0, .. STATE OF
/0NA1_
0:
Sr.
DATL �?t2�1616
THIS DRAWING AND THE IDEAS, DESIGNS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE
I NTEI I ECTUAL PROPERTY OF THE SCHNEIDER
CORPORATION, AND ARE NOT TO BE USED OR
REPRODUCED, IN WHOLE OR IN PART, WITHOUT
THE WRITTEN CONSENT OF THE SCHNEIDER
I CORPORATION.
COPYRIGHTED BY THE SCHNEIDER CORP. (2006)
f q
40,11111
Schneider
THE SCHNEIDER CORPORATION
Historic Fort Harrison
8901 Otis Avenue
Indianapolis, IN 46216-1037
Telephone: 317.826.7100
Fax: 317.826.7200
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnicol Services
GIS * LIS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering
PROJECT NO.:
C\2
V-)
CD
......................
A
CHECKED BY:
........
ALF
SHEET TITLE:
STORM WATER POLLUTION
PREVENTION PLAN
DRAWING FILES:
S:\6k\6096\001\dwgs\ClO4.dwg
XREF: S:\6k\6096\001\dwgs\001BS.dwg
...... ..
XREF: S:\6k\6096\001\dwgs\6096001t.dwg
. ..............
..............
..............
SHEET NO.:
...................
.. .. ....
flkl NAI[
......
.................. ..................
x
20' x 20'
....................
E-1
c::>
E
...........
.....
N� P ESMT.
..........
.......
cZd
E-
.......... .
2�TOR Y OFFICE BUILDING
.....
i
in,
E-1
I V
;X�
........ ..
-,.,11,921 SF
......
/ ............
C:>
C:>
. ...............
..............
C_.)
... ... OUT..Zlc ................
.................. .............. ......
........ ..... . ........ .......
It%, I X
................... .........
...........
........ .........
UMIT ..... ... ........... ... CONCRETE WASH
. . . . . . . . . .
...................
...................
........... .. . . . . .
... . . . . . . . . . . . . . . . . . . . . . .
'4�
. . . 31
. . .......
rw
.........
..............
.............
......................
.............. X ..................
-TafI ... ...... ....
................................................. .. . . 11 ;
............ .........
........... .............. ...
.... ........ .. ..........
.... .......... ............. CONSTRU .... ..
__ I . I I - �. I . t�. 1� , -
...... ........ �4
4 ......... ... .........
..... . ......
'A '11M 11t1d
VE
. . ..... ...........
........ ...
!�ASE" SI,',N
.........
.... ...... .... ...........................
fc . .............
. . .. ..... .............. .. ............
............
.......... ...
...................
....... ..............
00
........... ........ -0-W.0 \\1 V
....... .. ................ v ................
. . ......... ----------
�3
. . . ....... - - - - - - -
\'STR -nq��
-7)CON uc
7
1 Z
Q iji
�1, IIL A
Ix Pl-' NA;!. 5JND
G P A S I'll
6 a�
4
\�\x
ASSUMED NORTH
SCALE: 1 "= 30 '
HOLEY MOLEY SAYS
DON'T
DIG
BLIND In
"IT'S THE LAW"
CALL 2 WORKING DAYS BEFORE YOU DIG
1-800-382-5544
CALL TOLL FREE
PER INDIANA STATE LAW IS-69-1991.
IT IS AGAINST THE LAW TO EXCAVATE
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION SERVICE TWO (2) WORKING
DAYS BEFORE COMMENCING WORK.
Will vie
DEVELOPMENT NOTES
1. The Contractor, whether owning the property or acting cs the agent of
the property owner, shall be responsible for eras I on and sediment control
requirements associated with activities on site.
2. Contractor shall install nnd mo�ntain a stable construction site access.
3. Contractor sho!' install and maintain perimeter soil erosion fence (Ind
sediment control measures prior to land disturbance.
4. Contractor shall be responsible for minimizing sediment discharge and
tracking from the site throughout the land disturbing activities until
permanent stabilization has been achieved.
5. Contractor shall clean up sediment that is either tracked or washed
onto roads. Bulk clearing of sediment shall not include flushing the arec
with water. Cleared sediment must be redistributed or disposed of in a
manner that is in complionce with all applicable statues and rule�;.
6. Adjacent lots dist-l-bed by contractor must be repaired and stabilized
with temporary or permanent surface stabilization.
GENERAL NOTES
1. This plan shall serve as a guideline for storm water quality. Additional
requirements may be made in the field if provisions shown prove inadequate
in preventing soil erosion and/or storm water pollution.
2. See erosion control sequence on sheet C801 for pre-construction
through post- construction requirements.
3. Spill prevention and clean up measures shall be implemented for the
storage and handling of materials, such as fuels or hazardous wastes, to
minimize the potentio! for pollutants to contaminate surface or ground
water or degrooe soil quality.
4. Material handling and storage associated with construction activity shall
meet the spill prevention and spill response requirements of the 'Acte of
Indiana laws governing reporting, containment, and response to spills of
hazardous and/or objectionable materials.
5. Contractor shall implement measures to minimize or eliminate wastes or
unused building materials, including garbage, debris, cleaning wastes,
wastewater, concrete truck washout, and other substances from being
carried from a project site by run-off or wind. Identification of areas where
concrete truck washout is permissible must be clearly posted at appropriate
orec,s of the site. Wastes arid unused building materials shall be managed
and disposed of in accordance with all applicable statues and regulations.
6. Public or private roadwnys shall be kept cleared of accumulated
sediment that is a result of run-off or tracking. Bulk clearing of sediment
s . holl not include flushing the area with water. Cleared sediment shall be
redistributed or disposed of in a manner that is in accordance with all
applicable statues and regulations.
7. Land alterations which strip the land of vegetation, including regrading,
shall be done in a way that will minimize erosion. Whenever feasible, natural
vegetation shall be retained and protected.
8. As grading is done, install silt traps, silt fences, slope drains, temporary
diversions and ot.�er runoff control measures at appropriate locations to
keep sediment contained on site.
9. All disturbed areas shall be seeded and straw mulched as shown on the
plans immediately after completion of ground activity. For larger projects,
this seeding should be completed in phases as the different oreaq of the
site ore completed.
10. The duration of tir-e which an area remains exposed shall be kept to a
practical minimum depending upon the weather. If construction activity is
to cease for more than fifteen calendar days, the disturbed area,. shall be
temporarily seeded or mulched.
11. Permanent and final vegetation or structural erosion control devices
shall be installed as soon as practical under the circumstances.
12. All storm sewer I nlet protection devices shall be put in place at the
time each inlet is constructdd.
13. The contractor shall maintain erosion control measures and devices
during construction and until siltation of the streets and storm sewers will
not longer occur.
14. Vegetated areas with a density of less than seventy percent (70%) shall
be re-stabilized u9ing appropriate methods to minimize the erosion
potential.
15. Final stabilization of a project site is considered achieved when all land
disturbing activities have been completed and a uniform perennial vegetative
cover with a density of seventy percent (70%) has been established on all
unpaved areas and areas not covered by permanent structures, or
equivalent permanent stabilization measures have been employed.
16. Once onsite erosion and siltation of the streets and storm sewers will
no longer occur, the contractor shall remove and dispose of the temporary
erosion control devic-s.
17. Silt fence is required around all soil stockpiles.
18. If wells a, septic systems are found on site, abandon according to
local, county, and state regulations.
19. During the period of construction activities, all storm water quality
measures necessary to meet the requirements of this rule shall be
maintained in working order.
20. A trained individuGI (as demonstrated by certification or experience)
shall perform a written evaluation of the project site by the end of the
next business dcy following each measurable storm event, but not less than
once G week.
21. The written evaluation reports must address maintenance of storm
water quality measures, problems identified at the project site and
corrective actions recommended and completed to ensure compliance.
Evaluation reports must be made available to the inspecting authority within
48 hours of a request.
-WARNING-
THIS SHEET TO BE USED FOR STORMWATER
POLLUTION PREVENTION PURPOSES ONLY. FOR
ANY OTHER INFCRMATION SEE SHEETS C101-C103
�SEE SHEET C801-C802 FOR ALL STORMWATER I
POLLUTION PREVENTION DETAILS & NOTES1
10 C)
C',
CO
Ln
fif
Ln
:Z
UJ UJ
CD
Ck�
UJ
V) Ln
2!
CD
Ln
UJ UJ
0:: Ir-
LLJ
RT.
6\STC
0
PE19500'260
i J0, .. STATE OF
/0NA1_
0:
Sr.
DATL �?t2�1616
THIS DRAWING AND THE IDEAS, DESIGNS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE
I NTEI I ECTUAL PROPERTY OF THE SCHNEIDER
CORPORATION, AND ARE NOT TO BE USED OR
REPRODUCED, IN WHOLE OR IN PART, WITHOUT
THE WRITTEN CONSENT OF THE SCHNEIDER
I CORPORATION.
COPYRIGHTED BY THE SCHNEIDER CORP. (2006)
f q
40,11111
Schneider
THE SCHNEIDER CORPORATION
Historic Fort Harrison
8901 Otis Avenue
Indianapolis, IN 46216-1037
Telephone: 317.826.7100
Fax: 317.826.7200
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnicol Services
GIS * LIS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering
PROJECT NO.:
C\2
V-)
CD
......................
DRAWN BY:
CHECKED BY:
........
ALF
SHEET TITLE:
STORM WATER POLLUTION
PREVENTION PLAN
DRAWING FILES:
S:\6k\6096\001\dwgs\ClO4.dwg
XREF: S:\6k\6096\001\dwgs\001BS.dwg
...... ..
XREF: S:\6k\6096\001\dwgs\6096001t.dwg
. ..............
..............
..............
SHEET NO.:
...................
.. .. ....
flkl NAI[
......
.................. ..................
20' x 20'
....................
E-1
c::>
E
...........
.....
N� P ESMT.
..........
.......
cZd
E-
.......... .
2�TOR Y OFFICE BUILDING
.....
in,
E-1
;X�
........ ..
-,.,11,921 SF
......
/ ............
C:>
C:>
. ...............
..............
C_.)
.....
.... ...... ...
........ .... ..
...... I ............
.....................
f /
.. .........
... ...... ...
.............
........ I ....... .
................. ..
9,
AQUASVARL AS-4
...................
..................
..... ....
........ *.*.*.* ........
............
.........
... ... OUT..Zlc ................
.................. .............. ......
........ ..... . ........ .......
It%, I X
................... .........
...........
........ .........
UMIT ..... ... ........... ... CONCRETE WASH
. . . . . . . . . .
...................
...................
........... .. . . . . .
... . . . . . . . . . . . . . . . . . . . . . .
'4�
. . . 31
. . .......
rw
.........
..............
.............
......................
.............. X ..................
-TafI ... ...... ....
................................................. .. . . 11 ;
............ .........
........... .............. ...
.... ........ .. ..........
.... .......... ............. CONSTRU .... ..
__ I . I I - �. I . t�. 1� , -
...... ........ �4
4 ......... ... .........
..... . ......
'A '11M 11t1d
VE
. . ..... ...........
........ ...
!�ASE" SI,',N
.........
.... ...... .... ...........................
fc . .............
. . .. ..... .............. .. ............
............
.......... ...
...................
....... ..............
00
........... ........ -0-W.0 \\1 V
....... .. ................ v ................
. . ......... ----------
�3
. . . ....... - - - - - - -
\'STR -nq��
-7)CON uc
7
1 Z
Q iji
�1, IIL A
Ix Pl-' NA;!. 5JND
G P A S I'll
6 a�
4
\�\x
ASSUMED NORTH
SCALE: 1 "= 30 '
HOLEY MOLEY SAYS
DON'T
DIG
BLIND In
"IT'S THE LAW"
CALL 2 WORKING DAYS BEFORE YOU DIG
1-800-382-5544
CALL TOLL FREE
PER INDIANA STATE LAW IS-69-1991.
IT IS AGAINST THE LAW TO EXCAVATE
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION SERVICE TWO (2) WORKING
DAYS BEFORE COMMENCING WORK.
Will vie
DEVELOPMENT NOTES
1. The Contractor, whether owning the property or acting cs the agent of
the property owner, shall be responsible for eras I on and sediment control
requirements associated with activities on site.
2. Contractor shall install nnd mo�ntain a stable construction site access.
3. Contractor sho!' install and maintain perimeter soil erosion fence (Ind
sediment control measures prior to land disturbance.
4. Contractor shall be responsible for minimizing sediment discharge and
tracking from the site throughout the land disturbing activities until
permanent stabilization has been achieved.
5. Contractor shall clean up sediment that is either tracked or washed
onto roads. Bulk clearing of sediment shall not include flushing the arec
with water. Cleared sediment must be redistributed or disposed of in a
manner that is in complionce with all applicable statues and rule�;.
6. Adjacent lots dist-l-bed by contractor must be repaired and stabilized
with temporary or permanent surface stabilization.
GENERAL NOTES
1. This plan shall serve as a guideline for storm water quality. Additional
requirements may be made in the field if provisions shown prove inadequate
in preventing soil erosion and/or storm water pollution.
2. See erosion control sequence on sheet C801 for pre-construction
through post- construction requirements.
3. Spill prevention and clean up measures shall be implemented for the
storage and handling of materials, such as fuels or hazardous wastes, to
minimize the potentio! for pollutants to contaminate surface or ground
water or degrooe soil quality.
4. Material handling and storage associated with construction activity shall
meet the spill prevention and spill response requirements of the 'Acte of
Indiana laws governing reporting, containment, and response to spills of
hazardous and/or objectionable materials.
5. Contractor shall implement measures to minimize or eliminate wastes or
unused building materials, including garbage, debris, cleaning wastes,
wastewater, concrete truck washout, and other substances from being
carried from a project site by run-off or wind. Identification of areas where
concrete truck washout is permissible must be clearly posted at appropriate
orec,s of the site. Wastes arid unused building materials shall be managed
and disposed of in accordance with all applicable statues and regulations.
6. Public or private roadwnys shall be kept cleared of accumulated
sediment that is a result of run-off or tracking. Bulk clearing of sediment
s . holl not include flushing the area with water. Cleared sediment shall be
redistributed or disposed of in a manner that is in accordance with all
applicable statues and regulations.
7. Land alterations which strip the land of vegetation, including regrading,
shall be done in a way that will minimize erosion. Whenever feasible, natural
vegetation shall be retained and protected.
8. As grading is done, install silt traps, silt fences, slope drains, temporary
diversions and ot.�er runoff control measures at appropriate locations to
keep sediment contained on site.
9. All disturbed areas shall be seeded and straw mulched as shown on the
plans immediately after completion of ground activity. For larger projects,
this seeding should be completed in phases as the different oreaq of the
site ore completed.
10. The duration of tir-e which an area remains exposed shall be kept to a
practical minimum depending upon the weather. If construction activity is
to cease for more than fifteen calendar days, the disturbed area,. shall be
temporarily seeded or mulched.
11. Permanent and final vegetation or structural erosion control devices
shall be installed as soon as practical under the circumstances.
12. All storm sewer I nlet protection devices shall be put in place at the
time each inlet is constructdd.
13. The contractor shall maintain erosion control measures and devices
during construction and until siltation of the streets and storm sewers will
not longer occur.
14. Vegetated areas with a density of less than seventy percent (70%) shall
be re-stabilized u9ing appropriate methods to minimize the erosion
potential.
15. Final stabilization of a project site is considered achieved when all land
disturbing activities have been completed and a uniform perennial vegetative
cover with a density of seventy percent (70%) has been established on all
unpaved areas and areas not covered by permanent structures, or
equivalent permanent stabilization measures have been employed.
16. Once onsite erosion and siltation of the streets and storm sewers will
no longer occur, the contractor shall remove and dispose of the temporary
erosion control devic-s.
17. Silt fence is required around all soil stockpiles.
18. If wells a, septic systems are found on site, abandon according to
local, county, and state regulations.
19. During the period of construction activities, all storm water quality
measures necessary to meet the requirements of this rule shall be
maintained in working order.
20. A trained individuGI (as demonstrated by certification or experience)
shall perform a written evaluation of the project site by the end of the
next business dcy following each measurable storm event, but not less than
once G week.
21. The written evaluation reports must address maintenance of storm
water quality measures, problems identified at the project site and
corrective actions recommended and completed to ensure compliance.
Evaluation reports must be made available to the inspecting authority within
48 hours of a request.
-WARNING-
THIS SHEET TO BE USED FOR STORMWATER
POLLUTION PREVENTION PURPOSES ONLY. FOR
ANY OTHER INFCRMATION SEE SHEETS C101-C103
�SEE SHEET C801-C802 FOR ALL STORMWATER I
POLLUTION PREVENTION DETAILS & NOTES1
10 C)
C',
CO
Ln
fif
Ln
:Z
UJ UJ
CD
Ck�
UJ
V) Ln
2!
CD
Ln
UJ UJ
0:: Ir-
LLJ
RT.
6\STC
0
PE19500'260
i J0, .. STATE OF
/0NA1_
0:
Sr.
DATL �?t2�1616
THIS DRAWING AND THE IDEAS, DESIGNS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE
I NTEI I ECTUAL PROPERTY OF THE SCHNEIDER
CORPORATION, AND ARE NOT TO BE USED OR
REPRODUCED, IN WHOLE OR IN PART, WITHOUT
THE WRITTEN CONSENT OF THE SCHNEIDER
I CORPORATION.
COPYRIGHTED BY THE SCHNEIDER CORP. (2006)
f q
40,11111
Schneider
THE SCHNEIDER CORPORATION
Historic Fort Harrison
8901 Otis Avenue
Indianapolis, IN 46216-1037
Telephone: 317.826.7100
Fax: 317.826.7200
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnicol Services
GIS * LIS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering
DATE:
PROJECT NO.:
C\2
V-)
CD
6096.001
DRAWN BY:
CHECKED BY:
RJS
ALF
SHEET TITLE:
STORM WATER POLLUTION
PREVENTION PLAN
DRAWING FILES:
S:\6k\6096\001\dwgs\ClO4.dwg
XREF: S:\6k\6096\001\dwgs\001BS.dwg
XREF: S:\6k\6096\001\dwgs\TRIe1.dwg
XREF: S:\6k\6096\001\dwgs\6096001t.dwg
XREF: S:\6k\6096\001\dwgs\PLAT.dwg
SHEET NO.:
(C134
CQ
E-1
c::>
E
E-
cZd
E-
in,
E-1
;X�
E-
C:>
C:>
C_.)
DATE:
PROJECT NO.:
7/20/06
6096.001
DRAWN BY:
CHECKED BY:
RJS
ALF
SHEET TITLE:
STORM WATER POLLUTION
PREVENTION PLAN
DRAWING FILES:
S:\6k\6096\001\dwgs\ClO4.dwg
XREF: S:\6k\6096\001\dwgs\001BS.dwg
XREF: S:\6k\6096\001\dwgs\TRIe1.dwg
XREF: S:\6k\6096\001\dwgs\6096001t.dwg
XREF: S:\6k\6096\001\dwgs\PLAT.dwg
SHEET NO.:
(C134