L1.1 -01
DECIDUOUS TREE PLANTING
SCALE: NONE
o ALL
L1,1-03 SHRUB PLANTING
SCALE: NONE
PLANT MATERIAL SHALL NOT
BE PRUNED PRIOR TO
INSTALLATION; AFTER
INSTALLATION EACH PLANT
SHALL BE PRUNED FOR
UNIFORMITY.
REMOVE BURLAP AND
TWINE FROM TOP
1/3 OF ROOT BALL.
MULCH SEE PLANTING
NOTES.
SCARIFY SIDES
BEFORE PLANTING.
BACKFILL WITH
PREPARED TOPSOIL,
SEE PLANTING NOTES.
TOPSOIL MIXTURE
TAMPED FIRM TO
PREVENT SETTLEMENT.
SELECTIVELY PRUNE ALL BROKEN OR DAMAGED BRANCHES
IN SUCH A MANNER AS TO MAINTAIN THE NATURAL FORM
OF THE TREE.
ELASTIC OR POLYETHYLENE WOVEN GUYS
(2) GUYS PER TREE AT TRUNK.
FLAG ALL GUY WIRES.
2" X 2" X 6' HARDWOOD STAKES (2) PER TREE
PERPENDICULAR TO PREVAILING WINDS IN UNDISTURBED SOIL.
MULCH, SEE PLANTING NOTES.
CONSTRUCT EARTH SAUCER WITH 4" HIGH BERM.
FLOOD WITH WATER TWICE DURING FIRST 24 HOURS.
ROOT FLARE TO BE 1" TO 3" HIGHER THAN
G GRADE. CUT TWINE AND PULL BURLAP
BACK ON TOP 1/3 OF ROOT BALL.
BREAK SOIL WITH PICK AXE.
BACKFILL WITH PREPARED TOPSOIL: SEE PLANTING NOTES.
PROVIDE COMMERCIAL FERTILIZER, APPLY PER MANUFACTURER'S
DIRECTIONS PLACE BACKFILL IN 8" LAYERS. WATER EACH
LAYER UNTIL SETTLED. DO NOT TAMP DOWN.
ROOT BALL TO SIT ON UNDISTURBED SOIL WITH REMAINDER
OF HOLE TO BE EXCAVATED AN ADDITIONAL 6 INCHES.
CONTRACTOR SHALL EXCAVATE PIT WALLS VERTICALLY
AND 12" WIDER (ALL SIDES) THAN THE DIAMETER OF THE
ROOT BALL.
X i x
+ y T y T Y_T Y_ T Y_T
PLAN
SPACING
SEE PLAN IT
X
X
SECTION
L1, 1 -02 EVERGREEN TREE PLANTING
SCALE: NONE
PLANT SPACING
CHART
PLANT SPACING
ON CENTER X
PLANTS PER
SQUARE FOOT
6 ON CENTER
8 ON CENTER
4w'--ON CENTER
1.75
10 ON CENTER
1.50
12 ON CENTER
1.00
1 ON CENTER
0.50
MULCH, SEE PLANTING NOTES. APPLY MULCH
BEFORE INSTALLING GROUND COVER OR PERENNIALS.
BED EDGE SEE PLAN /PLANTING NOTES
PLANTING SOIL MIX, SEE PLANTING NOTES.
MIX FERTILIZER WITH PLANTING SOIL
AT RATE RECOMMENDED BY MANUFACTURER.
REMOVE ALL PLASTIC CONTAINERS BEFORE INSTALLATION.
L 1 ■ 1 -04 GROUND COVER PLANTING
SCALE: NONE
BUILDING WA
MULCH, SEE
PLANTING N(
WEED MESH
PRE - EMERGE
HERBICIDE A
AT PRODUCT
SPECIFIED R
8" MIN. PREI
TOPSOIL MIX
PLANTING N(
FOUNDATION
OTHERS
SELECTIVELY PRUNE ALL BROKEN OR DAMAGED BRANCHES
IN SUCH A MANNER AS TO MAINTAIN THE NATURAL FORM
OF THE TREE.
PROVIDE 6' HARDWOOD STAKE INSTALLED IN UNDISTURBED
SOIL. FACE TOP OF STAKE INTO PREVAILING WIND.
ATTACH WITH ELASTIC OR POLYETHYLENE WOVEN GUYS
MULCH, SEE PLANTING NOTES.
CONSTRUCT EARTH SAUCER WITH 4" HIGH BERM.
FLOOD WITH WATER TWICE DURING FIRST 24 HOURS.
R 0 FLARE 0 BE 1" TO 3" HIGHER THAN
SU R G GRADE. CUT TWINE AND PULL BURLAP
BACK ON TOP 1/3 OF ROOT BALL.
BREAK SOIL WITH PICK AXE.
BACKFILL WITH PREPARED TOPSOIL: SEE PLANTING NOTES.
PROVIDE COMMERCIAL FERTILIZER, APPLY PER MANUFACTURER'S
DIRECTIONS PLACE BACKFILL IN 8" LAYERS. WATER EACH
LAYER UNTIL SETTLED. DO NOT TAMP DOWN.
ROOT BALL TO SIT ON UNDISTURBED SOIL WITH REMAINDER
OF HOLE TO BE EXCAVATED AN ADDITIONAL 6 INCHES.
CONTRACTOR SHALL EXCAVATE PIT WALLS VERTICALLY
AND 12" WIDER (ALL SIDES) THAN THE DIAMETER OF THE
ROOT BALL.
L1. 1 —05 PLANTING BED
SCALE: NONE
SOD /SEEDING NOTES
SPADE DUG "V"
EARTH EDGE 3" TO
4" DEEP, 3" TO 4"
WIDE
LAWN OR GROUND
COVER AREA
PRE - EMERGENT
NOT USED
4" MIN. PREPARED
FINISHED GRADE.
SEE SOD /SEED
NOTES.
SITE PREPARATION:
A. SITE TO BE FINE GRADED BEFORE PERMANENT SEEDING OR SODDING.
B. SOIL SHALL BE LOOSENED TO A DEPTH OF (4) INCHES BY DISCING, RAKING, ROTOTILLING OR
OTHER ACCEPTABLE MEANS. AND RAKED SMOOTH AND FREE OF ROOTS AND STONES OVER 1"
DIAMETER.
C. PROVIDE SOIL PH TESTING. ADJUST THE PH RANGE OF SOILS THAT ARE UNACCEPTABLE PER
LOCAL
COOPERATIVE EXTENSION SERVICE TURF STANDARDS. INCORPORATE RAW GROUND AGRICULTURAL
LIMESTONE OR ALUMINUM SULFATE UNIFORMLY AT THE RATE SPECIFIED BY THE MANUFACTURER.
SOD INSTALLATION:
A. ALL SOD AND INSTALLATION TECHNIQUES SHALL ADHERE TO TURFGRASS PRODUCERS
INTERNATIONAL, GUIDELINE SPECIFICATIONS, CURRENT EDITION.
B. SOD AREAS TO BE SODDED WITH WORKABLE SIZE ROLLS THAT ARE NOT BROKEN OR STRETCHED.
SOD SHALL BE FREE OF THATCH. SODDING IS TO BE DONE IN EARLY - SPRING OR EARLY -FALL. SOD
SHALL BE INSTALLED WITHIN 24 HOURS OF ARRIVAL AT THE SITE.
C. SOD SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON
SLOPES GREATER THAN 3:1 OR IN DRAINAGE SWALES SOD SHALL BE STAKED.
D. APPLY STARTER FERTILIZER AT TIME OF SODDING AT RATE RECOMMENDED BY MANUFACTURER.
CONTRACTOR IS RESPONSIBLE FOR THE INITIAL WATERING.
SEED INSTALLATION:
A. APPLY STARTER FERTILIZER AT TIME OF SEEDING AT RATE RECOMMENDED BY MANUFACTURER.
CONTRACTOR IS RESPONSIBLE FOR THE INITIAL WATERING.
B. APPLY SEED UNIFORMLY WITH CYCLONE SEEDER, DRILL, CULTIPACKER SEEDER OR HYDROSEEDER
(SLURRY INCLUDES SEED AND FERTILIZER ON A FIRM, MOIST SEEDBED). MAXIMUM SEEDING DEPTH
SHOULD BE 1/4 INCH ON CLAY SOILS AND 1/2 INCH ON SANDY SOILS, WHEN USING OTHER THAN
HYDROSEEDER METHOD OF APPLICATION.
C. STRAW MULCH SHALL BE APPLIED IMMEDIATELY AFTER SEEDING (NON HYDROSEEDING). AT A RATE
OF 140 LBS.t (2 BALES) PER 1000 SF. MULCH MAY BE APPLIED BY HAND OR WITH A BLOWER.
MULCH SHALL BE CLEAN, WELL SEASONED STRAW FREE OF SEEDS OR ROOTS OF NOXIOUS WEEDS.
D. STRAW MULCH SHALL BE KEPT IN PLACE WITH ASPHALT EMULSION APPLIED AT A MIN. RATE OF
60
GAL. / TON OF MULCH.
E. IF HYDROSEEDING IS USED AND THE SEED, FERTILIZER AND MULCH ARE MIXED, THEY WILL BE
MIXED ON SITE AND SEEDING SHALL BE IMMEDIATE WITHOUT INTERRUPTION.
F. MULCH FOR HYDROSEEDING SHALL BE WOOD CELLULOSE FIBER MULCH APPLIED AT A RATE OF
2,000 LBS. / ACRE.
MAINTENANCE:
A. WATER 1 INCH MIN. WITHIN THE FIRST HOUR OF SOD OR SEED INSTALLATION BEGIN IRRIGATION.
SYSTEM DURING THE FOLLOWING 3 DAYS KEEPING THE SODDED OR SEEDED AREA MOIST.
B. CONTINUED MAINTENANCE (MOWING, FERTILIZATION, WEEDING, ECT.) OF THE SODDED OR SEEDED
AREA SHOULD BE PROVIDED BY A PROFESSIONAL LANDSCAPE MAINTENANCE CONTRACTOR.
PLANTING NOTES
A. THE LANDSCAPE CONTRACTOR SHALL GUARANTEE ALL PLANTS INSTALLED FOR ONE FULL YEAR FROM
DATE OF ACCEPTANCE BY THE OWNER. ALL PLANTS SHALL BE ALIVE AND AT A VIGOROUS RATE OF
GROWTH AT THE END OF THE GUARANTEE PERIOD.
B. PRIOR TO INSTALLATION, THE LANDSCAPE CONTRACTOR SHALL INSPECT THE SUBGRADE, GENERAL SITE
CONDITIONS, VERIFY ELEVATIONS, UTILITY LOCATIONS, IRRIGATION, APPROVE TOPSOIL PROVIDED BY
GENERAL CONTRACTOR AND OBSERVE THE SITE CONDITIONS UNDER WHICH THE WORK IS TO BE DONE. HE
SHALL NOTIFY GENERAL CONTRACTOR OF ANY UNSATISFACTORY CONDITIONS AND WORK SHALL NOT
PROCEED UNTIL SUCH CONDITIONS HAVE BEEN CORRECTED AND ARE ACCEPTABLE TO THE LANDSCAPE
CONTRACTOR.
C. IF THE LANDSCAPE CONTRACTOR OBSERVES ANY DEFICIENCIES IN THE PLANT SELECTIONS, SOIL
CONDITIONS OR ANY OTHER CONDITION WHICH MIGHT NEGATIVELY AFFECT PLANT ESTABLISHMENT,
SURVIVAL OR GUARANTEE, HE SHALL NOTIFY THE LANDSCAPE ARCHITECT OR OWNERS REPRESENTATIVE
PRIOR TO PROCUREMENT AND /OR INSTALLATION.
D. PLANT MATERIAL SHALL CONFORM TO THE PLANT LIST AND KEYS ON THE DRAWINGS AND TO THEQUALITY
STANDARDS OF DARD FOR NURSERY STOCK', BY THE AMERICAN ASSOCIATION OF
NURSERYMEN, ANSI 260.1 -1996. ALL PLANTS SHALL EQUAL OR EXCEED THE MEASUREMENTS AND SIZES
SPECIFIED IN
E. SUBSTITUTI ERMITTED WITH NOTIFICATION AND WRITTEN APPROVAL FROM LANDSCAPE
ARCHITECT CITY FORESTER OWNERS REPRESENTATIVE. SUBSTITUTED MATERIAL SHALL BE THE NEAREST
EQUIVALENT SI , GROWTH HABIT HAVING THE SAME ESSENTIAL CHARACTERISTICS WITH AN
EQUITABLE ADJUSTMENT IN WHOLESALE PRICE.
F. IF THE LANDSCAPE CONTRACTOR OBSERVES ANY DEFICIENCIES IN THE SITE CONDITIONS OR WHICH COULD
NEGATIVELY AFFECT PLANT ESTABLISHMENT, SURVIVAL OR GUARANTEE, NOTIFY THE OWNERS
REPRESENTATIVE PRIOR TO PROCUREMENT AND /OR INSTALLATION.
LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR SOIL PREPARATION AS DESCRIBED IN NOTES G -J
G. SOIL TESTS SHALL BE PERFORMED IN LAWN AND PLANTING BED AREAS WHEN MATERIAL IS IN QUESTION.
SOILS TEST: OBTAIN FROM .A CERTIFIED TESTING LABORATORY, AN ANALYSIS OF THE EXISTING SOIL FOR
NITROGEN, PHOSPHORUS, POTASSIUM, SOLUBLE SALT CONTENT, MICRO NUTRIENTS, ORGANIC MATTER
CONTENT AND PH VALUE.
H. TOPSOIL TO BE USED SHALL HAVE THE FOLLOWING CHARACTERISTICS: FERTILE, FRIABLE, NATURAL TOPSOIL
OF LOAMY CHARACTER, WITHOUT ADMIXTURE OF SUBSOIL MATERIAL, OBTAINED FROM WELL- DRAINED
ARABLE SITE, REASONABLY FREE FROM CLAY, LUMPS, COARSE SANDS, STONES 1 INCH AND LARGER,
PLANTS, GRASS, WEEDS, ROOTS, STICKS, AND OTHER FOREIGN MATERIALS. TOPSOIL SHALL CONFORM TO
ASTM D5268 WITH A PH RANGE OF 5.5 TO 7, AND A MIN. 4 PERCENT ORGANIC MATERIAL.
1. IN AREAS OF INDIGENOUS HEAVY CLAY SOILS A PERCOLATION TEST SHALL BE PERFORMED. SOIL DRAINAGE
AMENDMENTS AND /OR DRAINAGE STRUCTURES SHALL BE INSTALLED IN PLANTING BEDS AND TREE PITS AS
RECOMMENDED BY THE SOILS PERCOLATION TEST REPORT.
J. ALL PLANTING BEDS TO RECEIVE 8" MIN. OF PREPARED BACK FILL MIX. ALL INDIVIDUALLY PLANTED TREES
AND SHRUBS TO BE BACK FILLED WITH PREPARED BACK FILL MIX. PREPARED BACKFILL MIXTURES SHALL
BE MIXED ON SITE, CONSISTING OF ONE PART TOPSOIL, ONE PART SOIL AMENDMENT, AND ONE PART SOIL
FROM EXCAVATION. THE LANDSCAPE CONTRACTOR SHALL INCORPORATE FERTILIZER AND /OR SOIL
AMENDMENT ADDITIVES AS RECOMMENDED BY THE SOIL TEST AND COMPLY WITH REGULATORY AGENCIES
FOR FERTILIZER, AMENDMENT AND HERBICIDE COMPOSITION
K. ALL PLANTING BED EDGES TO BE SMOOTH FLOWING ARCS. BEDS TO BE LAID OUT AND APPROVED BY
LANDSCAPE ARCHITECT OR OWNERS REPRESENTATIVE PRIOR TO PLANTING.
L. BED EDGE SHALL BE SMOOTH, CONSISTENT, HAND TRENCHED 3" TO 4" INCHES DEEP, AND "V" SHAPED.
ALL EXCAVATED MATERIAL SHALL BE REMOVED FROM THE BED EDGE AND PLANTING BED,
M. CONTRACTOR TO SLIGHTLY FIELD ADJUST PLANT LOCATIONS AS NECESSARY TO AVOID UTILITIES. FINISHED
PLANTING BEDS SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE AWAY FROM BUILDING(S).
N. PARKING LOT TREES SHALL HAVE A CLEAR CANOPY DISTANCE OF 6' MINIMUM FROM PAVING.
0. TREES SHALL BE PLACED A MINIMUM OF 3' FROM SIDEWALKS, CURBS OR FIRE HYDRANTS.
P. PLANTINGS AT THE END OF PARKING SPACES SHALL BE SET BACK A MINIMUM OF 3' FROM FACE OF
CURB.
Q. PLANTINGS SHALL BE FERTILIZED UPON INSTALLATION WITH A SLOW RELEASE GRANULAR COMMERCIAL
TREE /SHRUB FERTILIZER. RATE PER MANUFACTURES INSTRUCTIONS. FERTILIZER TO MIXED WITH BACK FILL
PREVIOUSLY DESCRIBED. FERTILIZER TABLETS ARE NOT ACCEPTABLE.
R. PLANTING BEDS SHALL BE COVERED WITH PRE - EMERGENT HERBICIDE APPLIED AT PRODUCT SPECIFIED
RATE UNLESS OTHERWISE NOTED.
S. ALL PLANTING BEDS SHALL BE COVERED WITH MESH WEED BARRIER. IMPERVIOUS PLASTIC IS NOT
ACCEPTABLE.
T. MULCH SPECIFIED PLANTING BEDS WITH DISEASE AND PEST FREE MULCH OF UNIFORM-.COLOR. WITE _AbI_ ,
AVERAGE APPLIED THICKNESS OF 2" TO 3 ". IT SHALL BE FREE OF TWIGS, LEAVES OR OTHER MATERIAL
UNSIGHTLY OR INJURIOUS TO PLANTS. SEE LANDSCAPE PLAN.
U. SEED OR SOD ALL AREAS, WITHIN CONTRACT LIMITS, NOT COVERED BY PAVING, BUILDINGS PLANTING
BEDS UNLESS OTHERWISE NOTED. SODDING SHALL NOT BEGIN UNTIL AREA HAS RECEIVED A IS D
GRADE.
V. LANDSCAPE CONTRACTOR RESPONSIBLE FOR MAINTENANCE OF ALL LANDSCAPE AREA X► 3T OR i.
PROPOSED) UNTIL SITE TURNOVER.
W. ANY ITEM OR AREAS DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED OR REPLA 0 S
ORIGINAL CONDITION AT THE CONTRACTORS EXPENSE.
X. LANDSCAPING TO COMPLY WITH ALL APPLICABLE CITY /LOCAL REGULATIONS. \�\
Y. ALL PLANTING BEDS SHALL HAVE APPROVED ULTRAVIOLET
RESISTANT, NONWOVEN GEOTEXTILE FABRIC WEED BARRIER WITH
MIN. MASS (WEIGHT) OF 60 G /M2 (1.75 OZ. /SQ. YD.)
MAINTENANCE NOTES
TURF MAINTENANCE
A. STANDARD WEEKLY OCCURRENCE - SHALL BE EXECUTED 38 TIMES DURING THE ACTIVE GROWING SEASON
AND 4 TIMES IN THE DORMANT SEASON. MECHANICAL WORK MAY BE DELETED IN THE DORMANT SEASON IF
NOT NEEDED.
B. REMOVAL AND DISPOSAL OF ALL TRASH AND DEBRIS FROM LANDSCAPED AREAS PRIOR TO COMMENCEMENT
OF MOWING, TRIMMING, AND MECHANICAL EDGING.
C. MECHANICALLY EDGE ALL WALKS, CURBS, AND BEDDED AREAS.
D. AIR SWEEP ALL WALKS, CURBS, AND HARD SURFACED AREAS TO THE TURF PRIOR TO BAGGING OF GRASS
CLIPPINGS AND MINOR DEBRIS: CIGARETTE BUTTS, ETC.
E. MOW ALL TURF AREAS TO A HEIGHT THAT WILL SUSTAIN A HEALTHY AND VIGOROUS APPEARANCE TO THE
SITE AND REGION SPECIFIC; BAG ALL GRASS CLIPPINGS AND MINOR DEBRIS.
F. APPLY A POST EMERGENT HERBICIDE SUCH AS "ROUND -UP" TO ALL BEDDED AREAS AND PAVEMENT
AREAS TO CONTROL ANY WEEDS.
G. AIR SWEEP ANY RESIDUAL DEBRIS AFTER MOWING.
H. REMOVE ALL LEAF MATTER FROM TURF AND LANDSCAPED AREAS DURING EACH AUTUMN VISIT.
TURF CHEMICAL APPLICATIONS
A. SPRING - EXECUTE A PRE - EMERGENT CHEMICAL AND FERTILIZER APPLICATION TO ALL TURF AREAS THAT
SHALL BE SITE AND REGION SPECIFIC TO PROMOTE A HEALTHY AND VIGOROUS APPEARANCE.
B. OBTAIN AND EVALUATE A PH ANALYSIS TO DETERMINE THE CORRECT APPLICATIONS OF FERTILIZER, LIME,
ETC., AND COORDINATE WITH THE RED ROBIN'S GENERAL MANAGER AT THE STORE LEVEL TO PERFORM
ANY NECESSARY CORE- AERATION, OVER- SEEDING AND PH CORRECTIONS. THIS PORTION SHALL BE
EXECUTED IN A TIME FRAME THAT IS CONDUCIVE TO THE SITE AND REGION SPECIFIC. THIS SPECIFIC
PORTION SHALL BE COST PLUS TO THE MAINTENANCE CONTRACT AMOUNT.
C. FALL - APPLY 3 APPLICATIONS OF LAWN FERTILIZER TO PROMOTE A VIGOROUS AND HEALTHY
APPEARANCE THAT IS SITE AND REGION SPECIFIC.
D. APPLY THE APPROPRIATE POST- EMERGENT BROADLEAF WEED CONTROL IN THE TURF AREAS TO MANAGE
ANY BROADLEAF -TYPE WEEDS THAT MAY HAVE PROLIFERATED WHEN EXCESSIVE SUMMER HEAT PROHIBITED
THE APPLICATIONS OF POST- EMERGENT WEED CONTROL.
PLANT MATERIALS
A. ALL BEDDED AND TREE RINGS SHALL BE MULCHED TWICE THRU THE CONTRACT PERIOD WITH A
TOP- QUALITY TYPE MULCH. IT SHALL BE THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO DETERMINE
THE SITE SPECIFIC MULCH REQUIREMENTS AS TO THE APPUCAT10N OF THE CORRECT AMOUNTS AND TYPE
TO SUSTAIN HEALTHY AND VIGOROUS PLANT MATERIAL.
B. PRIOR TO MULCHING, ALL DEBRIS AND LEAF MATTER SHALL BE REMOVED FROM BEDDED AREAS AND
DISPOSED OF. ALL TREE RINGS AND BEDDED AREAS SHALL BE EDGED PRIOR TO MULCHING. A
PRE - EMERGENT TYPE WEED CONTROL AND FERTILIZER SHALL BE APPLIED TO ALL BEDDED AREAS PRIOR
TO MULCHING THAT IS SITE AND REGION SPECIFIC.
C. ALL PLANT MATERIAL SHALL BE PRUNED 4 TIMES PER YEAR (3 DURING THE ACTIVE GROWING SEASON
AND
1 TIME DURING DORMANCY).
D. ALL HEDGED MATERIAL MAY BE PRUNED WITH SHEARS; ALL OTHER PLANT MATERIAL SHALL BE
HAND - PRUNED TO MAINTAIN A NATURAL APPEARANCE WITH ALL CUTS BEING MADE WITHIN THE CROWN OF
THE PLANT TO MINIMIZE VISUAL CUTS. ALL TREES, SHRUBS AND VINES SHALL HAVE CORRECTIVE PRUNING
PERFORMED DURING THE DORMANT SEASON.
E. ALL PLANT MATERIAL SHALL BE CARED FROM UNDER AN IPM (INTEGRATED PEST MANAGEMENT) PROGRAM.
ALL PESTICIDE APPLICATIONS SHALL BE MADE DURING SITE AND REGION SPECIFIC TIME FRAMES THAT WILL
MAXIMIZE THE EFFECTS OF THE CHEMICAL TO CONTROL ANY PESTS OR PATHOGENS AND THAT WILL
MAXIMIZE THE CONCEPT OF IPM.
N
co
O
N
J
0 Z
Q -
0- w
o4
0 Q
U
0
O
110 w
O uJ
. Q:�
O V)
2
(LJ.J w U
�Up
::DOZ
m Q
WUQ
j De
Z
w Q
0 � (D
Q =
Z��
io �i m
p0:�lDe
Q
�v0
oNLn
Lu Lu
> 04-
Cy �0 N
L PIZ
Q 3 0 o
00 .0 W
Q w = w
Z ~ w C
• c o
Q •t -10
_ C b
Z O
L Z N
V O
n
=..'000
V<10d�
III�IIII
V)
_j
Q
LLB O
CN
LLJ
a O
Q
U w
V)
0 (/i
zo
Q
CO
Revisions
PERMIT ISSUE
3/26/07
REVISION PER CITY PLANNING
04/23/07
BID CLARIFICATION
2
05/02/07
AREV.
PER CITY FORESTER
05/02/07
1 HEREBY CUM THAT THESE PLANS HAVE MEN PRE
PARED LNIM MY SUPERVISION APO THAT TO THE BEST
OF MY KNOWLEDGE, THE SAME COMPLY WITH ALL RULES,
REGULATIONS AND ORDBUNCf3 OF CARMEL N
RELAT ING TO ST UCT U RES AND BUILDINGS.
ARCHITECT
Drawn By Checked By
Scale Date
3/26/07
Job No.
06 -4030
Sheet No.
X1.1