Loading...
HomeMy WebLinkAbout07030006.5Seedbed Preparation Apply lime to raise the pH to the level needed for species being seeded. Apply 23 pounds of 12 -12 -12 analysis fertilizer (or equivalent) c. 1000 sq. ft. (approximately 1000 pounds per acre) or fertilize according •a test. Application of 150 lbs. of ammonium nitrate on areas low in orgc- c matter and fertility will greatly enhance vegetative growth. Wheat or Rye Work the fertilizer and lime into the soil to a depth of 2 -3 rches pats with a harrow, disk or rake operated across the slope as much as possible. Seeding Annual Ryegross Select a seed mixture based on projected use of the area (Figure 5-2), while considering best seeding dates. See Figure 5 -3 this sheet. If toler- ances are a problem, such as salt tolerance of seedings adjacent to streets and highways, see Figure 5 -4 this sheet before final selection. Figure 5 -2: Permanent Seed Mixtures Species Seeding Rate Suitable pH Site Suitability* lbs/acre lbs/1000 well sq. ft. Droughty Brained Wet Level and Sloping, Open Areas 1. Tall Fescue 35 .8 2. Tall Fescue 25 .6 Red Clover ** 5 .12 3. Kentucky Bluegrass 15 .4 Creeping Red Fescue 15 .4 Steep Banks and Cuts 5.5 -8.3 2 1 2 5.5 -8.3 1 5.5 -7.5 2 1 4. Tall Fescue 15 .4 5.8 -7.5 2 1 2 Kentucky Bluegrass 25 .6 All silt fence shall be prefabricated by the if mulch is applied. 5. Tall Fescue 35 .8 5.5 -8.3 2 1 Emerald Crownvetch ** 10 .25 Trapezoidal Tear Strength ........ ............................... Temporary Seedlings Lawns and High Maintenance Areas Wheat or Rye 3.5 lbs. 2 bu. Cover seed 1" to A. 0. S .......................................... ............................... 6. Kentucky Bluegrass 40 .9 5.8 -7.5 2 1 Creeping Red Fescue 40 .9 AFTER FINISH GRADING N 7. Perennial Ryegross 17e 4.0 5.0 -7.5 (Turf Type) be Buried 6" Below Ground Ground Surface Surface. SILT FENCE 8. Tall Fescue 170 4.0 5.5 -8.3 2 1 2 * 1 - Preferred 2 - Will Tolerate ** Inoculate with specific Inoculant. Non - Irrigated* Irrigated Dormant Seeding ** Temporary Seeding and Stablization Dates * Not necessary where mulch is applied. \ GOAD 50' (MIN) ° " 6" (MIN) 2 " -3" COARSE 12 (MIN) AGGREGATE ° SFOTEXTILE FABRIC TO STABILIZE OUNOATION (ESPECIALLY IMP9RTANT NH[ RE WETNESS IS ANTICIPATED) TEMPORARY CONSTRUCTION ENTRANCE DETAIL STORMWATER POLLUTION PREVENTION LEGEND N SILT BOX INLET PROTECTION S SILT FENCE 50' STABILIZED CONSTRUCTION ENTRANCE SILT FENCE Irrigation needed during this period. To control Silt Fence shall be a machine produced, erosion at times other than in the shaded areas, polypropylene meeting the physical properties below. use mulch. * Late summer seeding dates may be extended 5 days All silt fence shall be prefabricated by the if mulch is applied. ** Increase seeding application by 50 %. NOTE: MULCHING REQUIRED WHEN ACTUAL CONDTIONS HAMPER THE Grab Strength ........................... ............................... ESTABLISHMENT OF VEGATATIVE GROUND COVER. Elengation................................. ............................... FIGURE 5 -3 Trapezoidal Tear Strength ........ ............................... Temporary Seedlings Kind of Seed 1000 Sq. Ft. Acre Remarks Wheat or Rye 3.5 lbs. 2 bu. Cover seed 1" to A. 0. S .......................................... ............................... 1 1/2" deep ipring Oats 2.3 lbs. 3 bu. Cover seed 1" deep Annual ryegrass 1 lb. 49 lbs. Cover seed 1/4 "deep* * Not necessary where mulch is applied. \ GOAD 50' (MIN) ° " 6" (MIN) 2 " -3" COARSE 12 (MIN) AGGREGATE ° SFOTEXTILE FABRIC TO STABILIZE OUNOATION (ESPECIALLY IMP9RTANT NH[ RE WETNESS IS ANTICIPATED) TEMPORARY CONSTRUCTION ENTRANCE DETAIL STORMWATER POLLUTION PREVENTION LEGEND N SILT BOX INLET PROTECTION S SILT FENCE 50' STABILIZED CONSTRUCTION ENTRANCE SILT FENCE EROSION CONTROL MEASURE Silt Fence shall be a machine produced, non -woven geotextile of 100% polypropylene meeting the physical properties below. All stakes shall be 2" X 2" hardwood 36" tall with 24" tall lath stapled to stakes over fabric as reinforcement. STONE ENTRANCE All silt fence shall be prefabricated by the supplier. No field assembly will be accepted. WEEKLY AFTER STORM EVENTS AND AS NEEDED Fabric Weight ............................ ............................... 4 oz /syd Grab Strength ........................... ............................... Warp 125 lbs. Elengation................................. ............................... Warp 50 % Trapezoidal Tear Strength ........ ............................... 50 lbs Burst Strength .......................... ............................... 200 psi UVResistance ........................... ............................... > 70 7 A. 0. S .......................................... ............................... 50-80 Slurry Flow Rate ....................... ............................... 225 gpm /sq. ft Sediment Retention .................. ............................... 75 % Silt Fence Material Stakes ® 5' O.C. Fence Post AFTER FINISH GRADING N WEEKLY, AFTER STORM EVENTS AND AS NEEDED AFTER EACH INLET IS PLACED Ground Surface Fence Post Should It Fence Material Should be Buried 1' Below be Buried 6" Below Ground Ground Surface Surface. SILT FENCE DETAIL NTS N A CROSSBARS BEEHIVE INLET OR DRAINAGE COVER 24" W / W LAIHS SILT FENCE MATERIAL - SILT FENCE EXTENDS 6" BELOW FINISHED GRA NOTE: 1. SEE SILT FENCE DETAIL FOR MATERIAL SPECIFICATIONS. 2. SILT FENCE SHALL BE PREASSEMBLED BY SUPPLIER. NEET PROTECTION -SET FENCE STORMWATER POLLUTION REVENTION SCHEDULE EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE TEMP. DIVERSION SWALE & SILT TRAPS AS NEEDED PRIOR TO CLEARING AND GRADING STONE ENTRANCE AS NEEDED PRIOR TO CLEARING AND GRADING SILT FENCE WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING EXISTING INLET PROTECTION WEEKLY, AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING TREE PROTECTION WEEKLY, AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADNG TEMPORARY DIVERSIONS WEEKLY, AFTER STORM EVENTS AND AS NEEDED ALONG WITH ROUGH GRADING TEMPORARY SEEDING WATER AS NEEDED AFTER ROUGH GRADING PERMANENT SEEDING WATER AS NEEDED AFTER FINISH GRADING EROSION CONTROL MATTING WEEKLY AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING STRAW BALES WEEKLY, AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING INLET PROTECTION WEEKLY, AFTER STORM EVENTS AND AS NEEDED AFTER EACH INLET IS PLACED SEED SOD & LANDSCAPE AROUND WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS UNITS FINISHED REMOVAL OF STRAW BALES N A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF INLET PROTECTION N A AFTER ALL AREAS DRAINING TC THESE AREAS ARE STABILIZED REMOVAL OF SILT FENCE N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED •• • PROJECT AREA = 0.57 ACRES SWPP PLAN 1" = 20' -0" Z 0 10 20 40 GENERAL NOTES NORTH 1. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 2. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE NRCS. 3. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE COUNTY. 4. THE CONTRACTOR SHALL PROVIDE EROSION CONTROL AS INDICATED ON THE PLANS AND REQUIRED BY THE CITY. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EROSION CONTROL MEASURE S & RECORD KEEPING AS REQUIRED BY THE NPDES PERMIT FOR THE SITE. 6. THE CONTRACTOR SHALL KEEP THE STREETS CLEAN OF DEBRIS AND PROVIDE `,WEEPING OF THE STREET AS REQUIRED BY THE CITY. 7. IN AREAS WHERE WORK IS COMPLETE, PERMANENT STABILIZATION SHALL OCCUR WITHIN 3 DAYS OF COMPLETION, AND IN AREAS WHERE WORK HAS TEMPORARILY CEASED FOR 21 DAYS OR MORE, TEMPORARY STABILIZATION SHALL OCCUR BY THE 14th DAY AFTER WORK HAS CEASED. 8. STOCKPILES OF SOIL OR OTHER BUILDING MATERIALS TO REMAIN IN PLACE MORE THAN 3 DAYS SHALL BE FURNISHED WITH EROSION AND SEDIMENT CONTROL MEASURES (i.e. PERIMETER SILT FENCE). STOCKPILES TO PEMAIN IN PLACE MORE THAN 30 DAYS OR MORE SHALL RECIEVE TEMPORARY STABILIZATION. 9. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO SEDIMENT BASINS OR SILT TRAPS. DEWATERING DIRECTLY INTO FIELD TILES, THE WETLAND, OR STORMWATER STRUCTURES IS PROHIBITED. 10. SOIL DISTURBANCE SHALL BE CONDUCTED IN SUCH A MANNER AS TO MINIMIZE EROSION. SOIL STABILIZATION MEASURES SHALL CONSIDER THE TIME OF YEAR, SITE CONDITIONS AND THE USE OF TEMPORARY OR PERMANENT MEASURES. 11. SOIL EROSION AND SEDIMENT CONTROL FEATURES SHALL BE CONSTRUCTED PRIOR TO THE COMMENCEMENT OF HYDROLOGIC DISTURBANCE OF UPLAND AREAS. 12. AREAS OR ENBANKMENTS HAVING SLOPES GREATER THAN OR EQUAL TO 3H I V, AND APPROVED BY THE ENFORCEMENT OFFICER, SHALL BE STABILIZED WITH SOD, MAT OR BLANKET IN COMBINATION WITH SEEDING. 13. ALL STORM SEWERS THAT ARE OR WILL BE FUNCTIONING DURING CONSTRUC PION SHALL BE PROTECTED, BY AN APPROPRIATE SEDIMENT CONTROL MEASURE. 14. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED. 15. ALL TEMPORARY AND PERMANENT EROSION CONTROL MEASURES MUST BE MAINTAINED AND REPAIRED AS NEEDED. THE PROPERTY OWNER SHALL BE ULTIMATELY RESPONSIBLE FOR MAINTENANCE AND REPAIR. 16. A STABILIZED MAT OF AGGREGRATE UNDERLAIN WITH FILTER CLOTH (OR OTHER APPROPRIATE MEASURE) SHALL BE LOCATED AT ANY POINT WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM A PUBLIC RIGHT -OF -WAY, STREET, ALLEY OR PARKING AREA. ANY SEDIMENT OR SOIL REACHING AN IMPROVED PUBLIC RIGHT -OF -WAY, STREET, ALLEY OR PARKING AREA SHALL BE REMOVED BY SCRAPING OR STREET CLEANING AS ACCUMULATIONS WARRANT AND TRAN',PORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA. 17. SOIL STOCKPILES SHALL NOT BE LOCATED IN A FLOOD PRONE AREA OR A DESIGNATED BUFFER PROTECTING WATERS OF THE UNITED STATES OR ISOLATED WATERS OF LAKE COUNTY. 18. IF DEWATERING SERVICES ARE USED, ADJOINING PROPERTIES AND DISCHAR(;E LOCATIONS SHALL BE PROTECTED FROM EROSION. DISCHARGES SHALL BE ROUTED THROUGH AN EFFECTIVE SEDIMENT CONTROI MEASURE (e.g. SEDIMENT TRAP, SEDIMENT BASIN, OR OTHER APPROPRIATE MEASURE. 19. THE EROSION CONTROL MEASURES INDICATED ON THE PLANS ARE THE MINIMUM REQUIREMENTS. ADDITIONAL MEASURES MAY BE REQUIRED, AS DIRECTED BY THE ENGINEER OR GOVERNING AGENCY. 0 40 J o q J 5 CO 2 .p O* o N Lu '7 E Q 3404 ~ -0 n000 Q a- 00� o0 �o U C Q w_ O o J a O o a) Z V 3= O Q•C 0. E a c t � Q a E L -Z 13 H� 0r-, o C4 U-) c Z Z N - Ln w = � C" U dt N aD MAAM LU a� III���IIII) O Revisions PERMIT / PLANNING ISSUE 3/9/07 0 A 0 0 Drawn By Checked By R.J.B. J.C.U. Scale Date 1 " = 20' - 0" 3/9/07 Job No. 2007-08_ Sheet No. Cl .3 Z J Z 0 Z W LL1 (� 12L 0 Z o' w U' 0 M CIO J J U � O 00 Z �U LX_ Z Z (O 0 LU LU Q Q Z� J m 0U- i Z � 06 w LU '0Q w , U IL 0 40 J o q J 5 CO 2 .p O* o N Lu '7 E Q 3404 ~ -0 n000 Q a- 00� o0 �o U C Q w_ O o J a O o a) Z V 3= O Q•C 0. E a c t � Q a E L -Z 13 H� 0r-, o C4 U-) c Z Z N - Ln w = � C" U dt N aD MAAM LU a� III���IIII) O Revisions PERMIT / PLANNING ISSUE 3/9/07 0 A 0 0 Drawn By Checked By R.J.B. J.C.U. Scale Date 1 " = 20' - 0" 3/9/07 Job No. 2007-08_ Sheet No. Cl .3