HomeMy WebLinkAbout07050002.12 C701 Site DetailsAOUA- SWIRLTM SPECIFICATION NOTES
1)
CONTRACTOR SHALL FURNISH ALL EQUIPMENT, LABOR, AND MATERIALS
79"
1. Manufacturer shall be responsible for complete assembly of Swirl Concentrator. 2. Swirl Concentrator shall be
NECESSARY FOR THE HYDROSTATIC PRESSURE AND LEAKAGE TEST ON ALL
fabricated from high - density polyethylene (HDPE) ASTM F 714 cell class 3454640 per ASTM D 3350. The Swirl
CONTRACTOR SHALL REPLACE THOSE PIPES AND RETEST THE SECTION.
Concentrator wall (greater than 54" OD) shall be fabricated from profile wall HDPE ASTM F 894 RSC 250, 3.
3 3/16" DIA.
HDPE stub outs and internal components shall be extrusion welded using accepted welding practices. Stub outs
TESTS PRESSURE SHALL BE 100 PSI OR 150% OF NORMAL PIPE OPERATING
shall be supplied by Manufacturer and welded on inside and outside. 4. If lifting eyes disturb grade elevation
PIPE COUPLING
BY CONTRACTOR.
(rim) or concrete pad rebar alignment, they may be cut in field after installation of Swirl Concentrator by
12"
Contractor. 5. Manufacturer shall supply direct access to Swirl Concentrator via 32 -inch OD riser(s), which can be
LONG STUB -OUT
BY MANUFACTURER.
field cut to match finished grade by Contractor. 6. Contractor shall supply pipe couplings to and from Swirl
INSIDE PIPE DIAMETER
Concentrator, which shall be Femco or Mission :style neoprene boot with stainless steel tension bands and shear
A
guard. For corrugated plastic pipe, or pipe with a diameter of 24" or larger. it is recommended that Contractor
�r
M
use a Mar Mac coupling (www.marmac.com <http:/ /www.marmac.com> ), or equal, with adhesive mastic and
OUTLET N o
tightening bands to create a watertight seal around the joint. The joint shall then be immobilized with a concrete
THE CONTRACTOR SHALL FURNISH TESTING EQUIPMENT AND PERSONNEL
collar with compacted base as described in either Note 11 or 12 herein. Mar Mac, or equal, couplings shall overlap
/-O -RING GASKET
the pipe joint a minimum of 1 foot on either sidle. 7. Contractor shall prepare excavation and off -load Swirl
VENT
Concentrator. Contractor is responsible for bedding and backfill around Swirl Concentrator as detailed on site plan.
A REINFORCEMENT
(see notes 11 and 12)8. Manufacturer shall supply standard manhole frame(s) and cover(s). (Traffic rated H2O)
Z RCHED
9. Where traffic loading (H -20) is required or anticipated, a reinforced concrete pad must be placed over the entire
- BAFFLES
Swirl Concentrator per concrete design as calculated by Engineer. Sample of typical concrete design detail is
OCTAGONAL BASE PLATE
available upon request. 10. Unless other traffic barriers are present, bollards shall be placed around access risers
Z Z + g
in non -traffic areas to prevent inadvertent loading by maintenance vehicles. Sample of typical bollard installation
PIPE COUPLING
BY CONTRACTOR. 2 3 4 Plan View
detail and recommended locations of bollards around the Swirl Concentrator can be provided upon request. 11.
12" LONG STUB -OUT OD
Excavation and Bedding - The trench and trench bottom shall be constructed in accordance with ASTM D -2321,
BY MANUFACTURER.
Section 6, Trench Excavation, and Section 7, Installation. The HDPE Swirl Concentrator shall be installed on a
STANDARD NOTE:
stable base consisting of 12- inches of Class I stone materials as defined by ASTM D2321, Section 5, Materials, and
1. SYSTEM SHALL BE DESIGNED FOR THE FOLLOWING CAPACITIES:
compacted to 95% proctor density. All required safety precautions for Swirl Concentrator installation are the
PEAK TREATMENT FLOW: 4.4 CFS
responsibility of the Contractor. 12. Backfill Requirements - Backfill materials shall be Class I Stone or Class II
SEDIMENT STORAGE: 45 CUBIC FEET
materials (well graded gravels, gravelly sands; contains little or no fines), as defined by ASTM D2321, Section 5,
Materials, and compacted to 90% proctor density. Class I stone is Backfill
OIL DEBRIS STORAGE: 270 GAL.
A UaSLn * Please see accompanied Aqua -swirl
preferred. and bedding aterials shall
g
be free of debris. Backfilling shall conform to A!TM F1759, Section 4.2, "Design Assumptions ". Backfill shall
extend at least 42 inches outward from Swirl Concentrator and for the full height of the Swirl Concentrator
specfication notes.
p„ � * � Site Plan for actual system orientation.
(including riser(s)) extending laterally to undisturbed soils.
A n1 1 w ewIni �+...■..�- ..�... _ _._ _ _ _ _ - -_ _ __
SL
NTS
M
I
NTS
D+ 6"
9„ (MIN) 1 3 4' SET GRATE 1/4" BELOW
SURFACE OF CONCRETE.
/-MEET EXISTING PAVEMENT
ELEVATION
2 0 #4 BARS
12" RISER HEIGHT
D
HIGH SLUMP CONCRETE
ROUGH SHAPE TRENCH
12" SLOTTED CMP DRAIN
3' MIN. AT SPRINGLINE
22 -3/4"
NEENAH R3287 -SB10
CURB INLET ( *1)
CONC. CURB
PVMT. GRADE:
PVMT.
#4 REBAR
111111 12" O.C. BOTH
°o Q i Il I I WAYS ( *:?) 11=
Z
I -I 1 1.
A illlllllll
5111 1
36" 1/2" MESH GALV. HARD-
WARE CLOTH VARMENT
STOP (D SUBDRAIN
48" X 36" FILL W/ CONC. &
WARP TO MEET INVERT
NOTE: *1. FOR DEPRESSED CURB USE NEENAH
R3067 -C CURB INLET FRAME & GRATE
* 2. CONTRACTOR'S OPTION: PRECAST W/
SAME REINFORCING. (INDOT TYPE V')
1 CURB INLET DETAIL 03
2" LETTERS, RECESSED, FLUSH
W /SURFACE SHALL READ "DUMP NO
WASTE DRAINS TO WATERWAY"
XNEENAH R- 1772 -C COVER
WITH NEENAH R- 1712 -B -SP
FRAME WITH SELF - SEALING
APPLicAriON OR EQUAL.
34" OR 36"
'ENDENT UPON O.D. OF
NG SECTION IN USE)
SECTION "A -A"
MANHOL17 FRAME & COVER
BY MANUFACTURER. 32" OD
(SEE DETAILS)
RADE (RIM)
N
RISER
_
0
0
'ter
0
Section A -A
2 CONCEALED
PICKHOLES 0 180*
"SELF- SEALING"
APPLICATION
MACHINED BEARING SURFACE
NTS
NEENAH MANHOLE FRAME & LI[
WHERE HEREDRAINAR 7
GE IS R Q'D) -.
FINISH GRADE
PRECAST CONCRETE
ADJUSTER RINGS IF
NEEDED (4 MAX)
ECCENTRIC CONE OR
REDUCER CAP AS
REQUIRED BY SITE
CONDITIONS. CONE TOP
TO MATCH ADJUSTING
RING PROFILE.
POLYPROPYLENE
PLASTIC STEPS
48" DIA.PRECAST
CONC. MANHOLE
STORM PIPE
6'X 6'X 8" CONC.
FOOTING W 6X6
10/10 W.W.F. "W/
#4 REBAR 12
O.C. BOTH WAYS,
OR PRECAST
MAX. D, 24"
6" MIN. COMPACTED BASE
( #8 OR #2 STONE)
MA
NTS
SANITARY NOTES:
ALL WATER MAIN AND SEWER PIPING SHALL BE TESTED IN ACCORDANCE WITH
INDIANA CODE AND IDEM REGULATIONS
AIR PRESSURE ACCEPTANCE TEST
1) CONTRACTOR SHALL PREFORM AN AIR PRESSURE TEST ON ALL GRAVITY
SEWER PIPE IN ACCORDANCE WITH ASTM F -1417 SPECIFICATIONS.
2) THE CONTRACTOR SHALL FUNISH ALL EQUIPMENT, MATERIALS LABOR, AND
CONDUCT THE TEST UNDER OBSERVATION OF CITY PERSONNEL.
3) TEST METHOD:
A) LOW PRESSURE AIR TEST METHOD SHALL BE THE TIME PRESSURE
DROP METHOD. THE PRESSURE USED IN THE TEST SHALL BE THE
STATED PRESSURE GREATER THAN THE AVERAGE BACK PRESSURE OF
ANY GROUND WATER ABOVE THE PIPE. THE TIME REQUIRED FOR
THE PRESSURE IN THE TEST SECTION TO DROP 1.0 psig SHALL
BE MEASURED USING A STOP WATCH. IF THE TIME EXCEEDS THE
TIME DETERMINED FROM ASTM F -1417, THE SECTION FAILS.
B) MANHOLES - AIR TEST IN ACCORDANCE WITH ASTM C1244 -93
STANDARD TEST METHOD FOR CONCRETE SEWER MANHOLES BY
NEGATIVE AIR PRESSURE TEST (VACUUM).
FORCE MAIN AND WATER MAIN PRESSURE AND LEAKAGE TESTS
0701
1)
CONTRACTOR SHALL FURNISH ALL EQUIPMENT, LABOR, AND MATERIALS
FAILURES- SHOULD A PIPE EXCEED THE ALLOWABLE DEFLECTION, THE
-
NECESSARY FOR THE HYDROSTATIC PRESSURE AND LEAKAGE TEST ON ALL
rll
CONTRACTOR SHALL REPLACE THOSE PIPES AND RETEST THE SECTION.
MAINS UNDER THE SUPERVISION OF CITY PERSONNEL.
CIL a + w w
2)
TESTS PRESSURE SHALL BE 100 PSI OR 150% OF NORMAL PIPE OPERATING
PVMT.
Fr p
~ >
PRESSURE, WHICH EVER IS GREATER.
TYPE APPROVED BY THE CITY. A METAL OR PLASTIC GAUGING RING OF
DIAMETER EQUAL TO 95% OF THE SPECIFIED AVERAGE
3)
LEAKAGE TEST PRESSURE SHALL NOT BE LESS THAN THE MAXIMUM
iii-ASPHALTIC MASTIC
INSIDE PIPE DIAMETER
OPERATING PRESSURE OF THE PIPE. THE DURATION OF THE LEAKAGE
OR BUTYL RUBBER
SEAL BETWEEN JOINT
TEST SHALL NOT BE LESS THAN TWO HOURS. ALLOWABLE LEAKAGE
--
MAXIMUM WATER /CEMENT RATIO ....................0.45
SHALL NOT EXCEED 9 gal /in OF PIPE DIAMETER PER MILE OF PIPE IN 24hr.
THE CONTRACTOR SHALL FURNISH TESTING EQUIPMENT AND PERSONNEL
DEFLECTION TEST OF PVC SEWER PIPE
/-O -RING GASKET
1)
VERTICAL RING DEFLECTION- BEFORE FINAL ACCEPTANCE OF SEWER LINES,
ASPHALTIC MASTIC
io OR BUTYL RUBBER
OF PIPE 0 O.D. 6T
ALL SECTIONS OF SEWER PIPE 8- INCHES AND LARGER SPECIFIED DIAMETER
o SEAL AT JOINTS
NOTE:
SHALL BE MEASURED FOR VERTICAL RING DEFLECTION BY THE CONTRACTOR
U) N
USE OF MECHANICAL PULLING DEVICES IS NOT PERMITTED.
AND WITNESSED BY THE CITY. MAXIMUM DEFLECTION UNDER FULL LOAD
Z Z + g
6)
SHALL NOT EXCEED 5% OF THE ASTM DESIGNATED AVERAGE INSIDE DIAMETER
CL
Ua _
APPROVED EQUIV. CLASS I1�
AS DETERMINED BY THE LABORATORY FOR THE SPECIFIED PIPING.
48"
.5" __ ° W
2)
FAILURES- SHOULD A PIPE EXCEED THE ALLOWABLE DEFLECTION, THE
-
-MIN. w� -� o �
rll
CONTRACTOR SHALL REPLACE THOSE PIPES AND RETEST THE SECTION.
CHLORIDE IONS ARE NOT PERMITTED.
CIL a + w w
3)
EQUIPMENT- TESTING SHALL BE GO -NO -GO PULL THROUGH GAGES OF A
D)
Fr p
~ >
-1 -I
TYPE APPROVED BY THE CITY. A METAL OR PLASTIC GAUGING RING OF
DIAMETER EQUAL TO 95% OF THE SPECIFIED AVERAGE
12" MIN.
INSIDE PIPE DIAMETER
"B" BORROW OR EQUIV. II ••
= ' '
SHALL BE WITH EACH GAGE.
B
MAXIMUM WATER /CEMENT RATIO ....................0.45
4)
THE CONTRACTOR SHALL FURNISH TESTING EQUIPMENT AND PERSONNEL
I l.. _
TO MAX.
MINIMUM CEMENT CONTENT (POUNDS /CY) .... 564
AND PERFORM THE REQUIRED TESTS. TESTS MUST BE WITNESSED BY CITY
;: •.;,•
OF PIPE 0 O.D. 6T
PERSONNEL.
NOTE:
SHRINK CEMENT GROUT.
5)
USE OF MECHANICAL PULLING DEVICES IS NOT PERMITTED.
MANHOLE
CONFORMS TO ASTM C478.
6)
DEFLECTION TESTING SHALL NOT BE PERFORMED UNTIL THE COMPLETED
AIR CONTENT ....................... ...........................6.0%
APPROVED EQUIV. CLASS I1�
I II
AND ACCEPTED TRENCH BACKFILL HAS BEEN IN PLACE FOR AT LEAST
04
30 DAYS.
0701
CONCRETE SPECIFICATIONS
E)
1)
MATERIALS
D994. W.R. MEADOWS SEALTIGHT, OR EQUAL.
A) CEMENT: ASTM C150 TYPE I OR II
EDGE OF PVMT
F)
REINFORCING BARS: ASTM A615 OR ASTM A616, GRADE 60.
B) AGGREGATE: ASTM C33
--MIN. OF 6" TOP SOIL
TO ENSURE GRASS
C) ADMIXTURES:
GROWTH
1. AIR ENTRAINING: ASTM C260
_
2. FIBER: AASHTO M213.
3. PROHIBITED ADMIXTURES: CALCIUM CHLORIDE, THIOCYANATES, OR
EDGE OF PVMT., 'L
MIN'..;125 :.'
27'& SMALLER
ADMIXTURES CONTAINING MORE THAN 0.05%
CURB, GUTTER = -
OR SIMILAR _ I .: `Bc
• }: 12..
rll
6
CHLORIDE IONS ARE NOT PERMITTED.
STRUCTURE
D)
CLASS A CONCRETE SHALL BE AS FOLLOWS:
-1 -I
'
` ,
12" MIN.
28 -DAY COMPRESSIVE STRENGTH (PSI) ....... 3500
"B" BORROW OR EQUIV. II ••
= ' '
MAXIMUM WATER /CEMENT RATIO ....................0.45
GRANULAR M.
COMPACTED TO 95% : �.
TO 95
; :.; ;
I l.. _
MINIMUM CEMENT CONTENT (POUNDS /CY) .... 564
STD. PROCTOR DENSITY -11=
TI =
;: •.;,•
•-
4' ,
SLUMP ( INCHES) ................ ............................2 -4
8" CRUSHED STONE OR
_ " •'
AIR CONTENT ....................... ...........................6.0%
APPROVED EQUIV. CLASS I1�
I II
, Ih -!Ili
31
1 BEDDING MATERIAL
Bc
E)
PREMOLDED JOINT FILLER: ASPHALT TYPE IN CONFORMANCE WITH ASTM
HAND TAMPED OR WALKED
INTO PLACE
D994. W.R. MEADOWS SEALTIGHT, OR EQUAL.
WITHIN 5' OF
EDGE OF PVMT
F)
REINFORCING BARS: ASTM A615 OR ASTM A616, GRADE 60.
NOTE: 1. ALL INTITAL BACKFILL. SHALL BE: INSTALLED IN 6"
TO 12" BALANCED LIFTS.
2. UNDER PVMT. AREAS, TRENCH TO BE BACKFILLED
W B" BORROW TO BOTTOM OF BASE, ALL OTHER
AREAS SHALL HAVE "B" BORROW BACKFILL TO V -0"
ABOVE PIPE.
3. A MIN. 9" OF CLEARANCE SHALL BE PROVIDED ON
EACH SIDE OF THE INSTALLED PIPE.
09 P1
0701 NTS
1' -0
BC
d
-EDGE OF PVMT., CURB, GUTTER, OR STRUCTURE
OR LESS MIN. OF 6" TOP SOIL TO
ENSURE GRASS GROWTH
77-7 = II i i i i jl_I DEPTH OF BEDDING
111 III' MATER. BELOW PIPE
,2.5.. 911
• 'li
3,
PIPE DIA.
d (MIN.)
27'& SMALLER
3
30' TO 60'
4
66' & LARGER
6
GULAR BACKFILL UNLESS
UNDER PAVEMENT.
"B" BORROW OR EQUIV.
GRANULAR MATER'L.
COMPACTED TO 95%
STD. PROCTOR DENSITY
IQI, BC c11,
WITHIN 5 OF EDGE OF PVMT.
RIM ELEVATIONS TO MATCH NOTE: 1. ALL INTITAL BACKFILL SHALL BE PLACED IN 6"
FINISHED GRADE. HDPE COMPACTED LIFTS.
RISERS CAN BE FIELD 2. UNDER PVMT. AREAS, TRENCH TO BE BACKFILLED
CUT BY CONTRACTOR. W/ "B" BORROW TO BOTTOM OF BASE, ALL OTHER
AREAS SHALL HAVE "B" BORROW 1ACKFILL TO 1' -0"
- - - - ABOVE PIPE.
:NT 3. A MIN. 9" OF CLEARANCE SHALL 13E PROVIDED ON
EACH SIDE OF THE INSTALLED PIPE.
EINFORCED
TOP RCP BEDDING & IRACKFILL
c
L
0
NTS
NTS
FIN. PVMT. ELEV.
TOP OF SUBGRADE FOR
PVMT. AGGREGATE
FILTER FABRIC (TYPAR 4.0
OZ /SY OR AN APPROVED
EQUAL, LAP 6" & STAPLE
4" DIA. CORRUGATED
PERFORATED PLASTIC PIPE
8" COURSE AGGREGATE
WELL COMPACTED SUBSOIL
0
M
Z
M
cl
0
if
SEWER MAT
BEND AS S
ury rLAv4
R -1976 INSPECTION
FRAME W/ BOLTED LID
i- TROWELED FINISH
�-- FINISH GRADE
NTS
NEENAH R3070 CURB
CONC. CURB INLET Z211RAE V GRATE
7 & 1 DIUS CU RB
PVMT. BOX EQUAL
GRADE --
_ #4 REBAR
2" O.C.
BOTH WAYS
w Q
_
Ci . I
NTS
CLEANOUT
CONC. ENCASEMENT
PVC PIPE
PVC BEND
INVERT ELEV.
PVMT.
I II l t' ' " X1/2" MESH GALV. HARD -
24 SQ. WARE CLOTH VARMENT
36" SQ. STOP 0 SUBDRAIN
FILL W/ CONC. &
WARP TO MEET INVERT
6" MIN. COMPACTED AGGREGATE
BASE. ( #8 OR #2 )
NOTE: CONTRACTOR'S OPTION: PRECAST W/ SAME
REINFORCING. (INDOT TYPE "A MODIFIED ")
Owner:
L
• �1
Developer.
Carmel
Redevelopment Commission
111 West Main Street
Carmel, Indiana 46032
317.571 -2787 (ARTS)
Engineers:
CSO SCHENKEL SHULTZ
28 0 Hart %h sRem. t zo, 10�l, W 46UO
T 17.9.7800
F 317374.0357
Project
PARCEL 67
STREETSCAPE
/STREET
INDIANA DESIGN
CENTER - P12
200 SOUTH
RANGE LINE ROAD
CARMEL, IN. 46032
Scope Drawings:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
(� Drawing Title:
SITE
DETAILS
Revisions:
Issue Date
Drawn By
Checked By
3/5/01
KM
GS
Certified By:
Drawing Number:
0701
Project Number:
26236