.. (CONCRETE GUTTER)
GENERAL NOTES:
1. ALL EXCAVATED AREAS TO BE SEEDED OR SODDED AFTER FINAL
GRADING UNLESS OTHERWISE NOTED. SEE LANDSCAPE PLAN AND
OR EROSION CONTROL PLAN FOR DIRECTION AND VERIFICATION.
2. PROVIDE POSITIVE DRAINAGE IN ALL PAVED AREAS WITHOUT PONDING
WATER. THE PAVING CONTRACTOR SHALL TEST ALL PAVED AREAS
FOR BIRD BATH CONDITIONS BY FLOODING THE ENTIRE PAVEMENT
AREA WITH WATER AND MARKING THE PONDED AREAS PRIOR TO THE
INSTALLATION OF THE TOPPING COURSE. CORRECTIONS SHALL BE
MADE IF NECESSARY.
3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS
IN THE FIELD PRIOR TO THE START OF CONSTRUCTION. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS
AND ELEVATIONS DURING THE ENTIRE CONSTRUCTION SCHEDULE. IF
ANY DISCREPANCIES ARE FOUND IN THESE ENGINEERING PLANS OR
LANDSCAPE PLANS FROM ACTUAL FIELD CONDITIONS, THE
CONTRACTOR SHALL CONTACT THE A/E IMMEDIATELY. IF ANY
DISCREPANCIES FOUND ON THE SURVEY PLAN OR ACTUAL FIELD
CONDITIONS THE CONTRACTOR SHALL CONTACT THE A/E IMMEDIATELY
FOR INSTRUCTIONS.
4. ALL CONTRACTORS BUT NOT LIMITED TO THE EXCAVATING
CONTRACTOR OR CONTRACTORS MUST TAKE PARTICULAR CARE WHEN
EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND
EQUIPMENT. ACTUAL FIELD LOCATIONS OF ALL THE EXISTING
UTILITIES ARE THE CONTRACTORS RESPONSIBILTY AND MUST BE
LOCATED EITHER BY THE REPRESENTATIVE OF THE UTILITY COMPANY
OR BY A PRIVATE UNDERGROUND UTILITY LOCATION COMPANY
PRIOR TO THE START OF EXCAVATING. VERIFY MINIMUM COVER
REQUIREMENTS BY THE UTILITY CONTRACTOR OR CONTRACTORS OR
AGENCIES WHICHEVER UTILITY COMPANIES OR AGENCIES THAT HAS
JURISDICTION SO NOT TO CAUSE DAMAGE.
5. IT IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY ALL THE UTILITY
COMPANIES AND DEPARTMENTS 72 HOURS BEFORE CONSTRUCTION
IS TO START TO VERIFY ANY UTILITIES THAT MAY BE PRESENT ON
SITE. ALL VERIFICATIONS, LOCATIONS, SIZE AND DEPTHS SHALL BE
MADE BY THE APPROPRIATE UTILITY COMPANIES OR DEPARTMENTS.
WHEN EXCAVATING AROUND OR OVER EXISTING UTILITIES, THE
CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A
REPRESENTATIVE OF THE UTILITY CAN BE PRESENT DURING THE
EXCAVATION TO INSTRUCT AND OBSERVE DURING THE EXCAVATION.
6. TRENCHES FOR ALL UTILITIES SHALL BE BACKFILLED COMPLETELY WITH
APPROVED ENGINEERED GRANULAR MATERIAL. WITHIN THE RIGHT -OF -WAY
BACKFILL MUST MEET CITY STANDARDS. SEE THE APPROPRIATE DETAILS
AND SPECIFICATIONS FOR APPROVED MATERIALS.
7. ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL TOP OF
PAVEMENT, TOP OF CURB OR FINAL GRADE ELEVATION.
8. TO DETERMINE THE SUBGRADE ELEVATION REQUIRED BELOW A
PROPOSED FINAL ELEVATION, SEE APPROPRIATE DETAIL.
9. HEAVY CONSTRUCTION AND EQUIPMENT TRAFFIC MAY CREATE
PUMPING AND GENERAL DETERIORATION OF THE SHALLOWER SOILS
IF EXCESS SURFACE WATER IS PRESENT. PROPER PRECAUTIONARY
STEPS MUST BE TAKEN DURING THE ENTIRE CONSTRUCTION
SCHEDULE TO ALLEVIATE SUCH DAMAGE.
10. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO
CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE,
COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS
JURISDICTION.
11. EXISTING PAVEMENT, SIDEWALKS CURBS DRIVEWAYS, ELECTRICAL
TRANSFORMERS AND PADS, DITCHES, DRAINAGE PIPES, AND
STRUCTURES, FENCES, LAWNS, TREES, BUSHES, MAILBOXES, SIGNS,
POWER POLES ETC., TO REMAIN AND BE PROTECTED FROM DAMAGE
BY THE CONTRACTOR. ANY DAMAGE DURING CONSTRUCTION SHALL
BE RESTORED, RECONSTRUCTED OR REPLACED BY THE CONTRACTOR
AT HIS EXPENSE. ALL DAMAGES SHALL BE RESTORED OR
REPLACED TO AT LEAST THEIR ORIGINAL CONDITION OR AS REQUIRED
OR DICTATED BY FEDERAL, STATE, COUNTY, CITY OR LOCAL
AGENCIES.
12. IT IS THE RESPONSIBILITY OF TH`' CONTRACTOR OR CONTRACTORS
TO OBTAIN ALL FEDERAL, STATE, COUNTY, CITY OR LOCAL PERMITS
FOR ANY AND ALL WORK REQUIRED UNLESS OTHERWISE NOTED.
THE CONTRACTOR OR CONTRACTORS ARE RESPONSIBLE TO PAY FOR
ALL REQUIRED PERMITS BY ANY OR ALL AGENCIES MENTIONED
ABOVE UNLESS OTHERWISE NOTED IN THE CONTRACT OR
SPECIFICATIONS.
13. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BEAR
ALL EXPENSES TO REMOVE, RELOCATE AND OR MODIFY ALL
UTILITIES, PRIVATE OR PUBLIC, OR OTHERWISE. IT FURTHER SHALL
BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY WITH EACH
UTILITY COMPANY AND OR AGENT TO WHO IS RESPONSIBILITY TO
REMOVE, RELOCATE, AND OR MODIFY SUCH UTILITY EXISTING OR
PROPOSED. IT FURTHER SHALL BE THE CONTRACTORS
RESPONSIBILITY TO VERIFY IF ANY FUTURE UTILITIES ARE PLANNED
AND HOW IT MAY EFFECT THIS PROJECT AND IT'S OWNER AS TO
THEIR FUTURE RESPONSIBILITIES.
14. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE AT HIS
EXPENSE ALL AUTOMOBILE AND PEDESTRIAN TRAFFIC CONTROL
DEVICES REQUIRED BY FEDERAL, STATE, COUNTY, CITY OR LOCAL
AGENCIES.
15. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT EACH
DAY AND REMOVE ALL MUD, DIRT, GRAVEL AND LOOSE MATERIALS
TRACKED, DUMPED, SPILLED OR WIND BLOWN FROM THE SITE ONTO
OTHER SITES, RIGHT OF WAYS, PUBLIC OR PRIVATE STREETS OR
ROADS, DRAVEEWAYS, YARDS OR SIDEWALKS. THE CONTRACTOR
MUST CLEAN OR PICK UP DAILY IF NECESSARY, OR IMMEDIATELY
WHEN REQUESTED TO DO SO BY THE CITY. THE CONTRACTOR
SHALL REDUCE THE AIRBORNE DUST DURING THE ENTIRE
CONSTRUCTION SCHEDULE. WATER MAY BE USED AS A REDUCER.
16. THE UTILITIES INDICATED ON THESE PLANS AND ON THE SURVEY
MAY NOT BE A COMPLETE INVENTORY OF ALL THE EXISTING
UTILITIES PRESENT ON AND AROUND THIS SITE. THE LOCATION
AND SIZE OF THESE UTILITIES MAY BE APPROXIMATE. THIS
INFORMATION WAS GATHERED OR SUPPLIED BY OTHERS AND USED
BY THE A/E AND MAY NOT BE ACTUAL, THE A/E SHALL NOT BE
HELD LIABLE FOR ANY INCORRECT OR MISLEADING UTILITY
INFORMATION INDICATED, IMPLIED OR NOT INDICATED ON THESE
PLANS.
17. THE EXCAVATING CONTRACTOR OR LANDSCAPE CONTRACTOR SHALL
INSTALL THE FINISHED GRADE AT 1/2' BELOW PAVEMENT WHEN
SHEET DRAINAGE IS PROPOSED ACROSS THAT SEEDED AREA.
18, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ACQUAINT
HIMSELF WITH THE SOIL CONDITIONS.
19. ALL AREAS WHERE THE EXISTING PAVEMENT OR PAVEMENTS ARE
DAMAGED DURING CONSTRUCTION FROM HEAVY EQUIPMENT, FUEL
OIL, OIL, GASOLINE ETC., BY THE GENERAL CONTRACTOR,
SUBCONTRACTOR, OR SUPPLIERS, SHALL BE RECONSTRUCTED TO
IT'S ORIGINAL OR AS REQUIRED OR DICTATED BY FEDERAL, STATE,
COUNTY, CITY OR LOCAL AGENCIES, AND TO THE SATISFACTION
OF THESE AGENCIES. THIS RECONSTRUCTION AND OR REPAIR
SHALL TAKE PLACE AT THE END OF THE PROJECT CONSTRUCTION
OR DURING THE SCHEDULED PAVING.
20. ALL STRIPES ARE TO BE 4" PAINTED WHITE, UNLESS OTHERWISE
NOTED ON THE PLANS, DETAILS, OR IN THE SPECIFICATIONS.
21. ALL 4" CONCRETE PAVEMENTS OR SIDEWALKS ARE NOT TO EXCEED
A MAXIMUM OF 3/4" SLOPE PER FOOT. CONTROL JOINTS SHALL
NOT EXCEED 10' -0" MAXIMUM ON CENTER. EXPANSION JOINTS
SHALL NOT EXCEED 40' -0" MAXIMUM ON CENTER UNLESS
OTHERWISE NOTED OR INDICATED ON PLANS.
22. ALL CONCRETE CURBS SHALL BE TOOLED FOR CONTROL JOINTS
AND NOT TO EXCEED 10' -0" MAXIMUM. EXPANSION JOINTS SHALL
NOT EXCEED 40' -0" MAXIMUM. CONTROL JOINTS MAY BE SAW CUT
WITHIN 24 HOURS AFTER THE CURBS ARE POURED.
23. ALL DIMENSIONS OF PAVEMENTS ARE TO THE EDGE OF PAVEMENT
OR FACE OF CURB UNLESS OTHERWISE NOTED.
24. ALL DIMENSIONS ARE PARALLEL AND PERPENDICULAR TO THE BASE
LINES, PROPERTY LINES AND OR BUILDING LINES UNLESS
OTHERWISE NOTED.
25. ALL RADII INDICATED SHALL BE FORMED AS CIRCULAR ARCS.
26. PROVIDE A SMOOTH TRANSITION FROM NEWLY PAVED AREAS TO
EXISTING AREAS AS NECESSARY.
27. ALL AREAS WHERE THE PROPOSED ASPHALT PAVEMENT MEETS THE
EXISTING PAVEMENT, THE EXISTING PAVEMENT EDGE SHALL BE SAW
CUT TO A CLEAN EDGE. THE EDGE OF THE EXISTING ASPHALT
SHALL BE SEALED WITH A TACT COAT MATERIAL BEFORE THE NEW
ASPHALT IS INSTALLED.
28. ALL HANDICAP RAMPS THAT ARE PERPENDICULAR TO THE CURB
SHALL NOT EXCEED A SLOPE OF 1" IN 12" LONGITUDINALLY.
HANDICAP RAMPS AND SIGNS SHALL BE IN ACCORDANCE WITH THE
ADA REQUIREMENTS. SEE SITE PLAN FOR LOCATION OF RAMPS
AND SIGNS AND THE DETAILS FOR SPECIFICATIONS.
29. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO IDENTIFY
WHETHER AN EXISTING IRRIGATION SYSTEM IS PRESENT ON SITE
AND WITHIN THE PROPOSED CONSTRUCTION AREA. IF AN EXISTING
IRRIGATION SYSTEM IS PRESENT AND WILL BE AFFECTED BY THE
NEW CONSTRUCTION, IT IS THE GENERAL CONTRACTOR'S
RESPONSIBILITY TO EMPLOY AN IRRIGATION SUBCONTRACTOR TO
REVIEW THE EXISTING SYSTEM. THE IRRIGATION SUBCONTRACTOR
SHALL MODIFY THE EXISTING IRRIGATION SYSTEM AS NECESSARY TO
ASSURE THE SYSTEM'S INTEGRITY, INCLUDING BUT NOT LIMITED TO
ADDING OR MODIFYING AND DELETING EXISTING IRRIGATION HEADS,
VALVE BOXES, WIRING OR OTHER ELEMENTS TO PROVIDE ADEQUATE
IRRIGATION.
30. REMOVAL OF THE EXISTING ASPHALT PAVEMENT INDICATED
IN THE PROPOSED PAVED AREAS SHALL INCLUDE ALL
AGGREGATE BASE MATERIALS. SAW CUT AREAS CLEAN,
NEAT AND TRUE TO LINE SO NO CHIPPING OR BREAKING
OF THE EXISTING PAVEMENT OCCURS.
0--- PLAN NOTES: LEGEND:
O1 CONCRETE STOOP. = PROPOSED PROPERTY LINE
❑ �_� O2 CONCRETE CURB.
RIGHT /WAY CONCRETE PAVEMENT
:f
O3 CONCRETE CURB AND GUTTER.
O CONCRETE GUTTER. = CONCRETE PAVEMENT
O5 6 CONCRETE PAVEMENT.
O6 4" CONCRETE PAVEMENT. = ASPHALT PAVEMENT PATCHING
7
PAVER A '
4" PAVEMENT OVER CONCRETE STRUCTURE. = REGULAR DUTY ASPHALT PAVEMENT
0 ASPHALT PAVEMENT.
t0 ASPHALT PAVEMENT, HEAVY DUTY. = HEAVY DUTY ASPHALT PAVEMENT
t t LIGHT POLE LOCATION.
12 BUILDING MOUNTED "STREET LIGHTING" = PAVER WALK
SITE LAYOUT PLAN
SCALE: I" = 3 0 '
01 10' 20' 40'
UR =1
SCALE: 1 " - 20'
NORTH
111 = TRANSFORMER LOCATION
C.L.L. = CONSTRUCTION LIMIT LINE
HOLEY MOLEY SAYS,
"DON'T
DIG
BLIND"
1- 800 -382 -5544
CALL TOLL FREE
1- 800 - 428 -5200
FOR CALLS OUTSDE OF WIANA
Developer:
Carmel
Redevelopment Commission
111 West Main Street
Carmel, Indiana 46032
317.571 -2787 (ARTS)
Engineers:
CSO SCHENKEL SHULTZ
280 F x1 960, Shell. Suit 200, fi h—wW, IN 16140
T 317.818.7800 F 317.571.0957 vww .i-
Project
PARCEL 67
STREETSCAPE
/STREET
INDIANA DESIGN
CENTER - P12
200 SOUTH
RANGE LINE ROAD
CARMEL, IN. 46032
Scope Drawings:
These drawings indicate the general scope or the protect
in terms of architectural design concept, the J,mens,ons of
the building, the major architectural elements and the type
of structural, mechanical and electncol systems
The drawings do not necessarily indicate or descrbe all
work required for full performance and completion of the
requirements of the Contract
On the basis of the general scope indicated „r Iescnbed,
the trade contractors shall furnish all items rec—ed for the
proper execution and completion of the work
Drawing Title:
SITE
LAYOUT
PLAN
Revisions:
Issue Date
Drawn By
Checked By
3/11/07
KM
GS
Certified By:
Drawing Number:
C200
Project Number:
26236