HomeMy WebLinkAbout07040022.3i
I
t'
i
- - --
° N. Line NW 1 /4 Se ion
f
■;
■
I
i
J (asphalt)
NW Corner NE 1/4, NW 1/4 _ _ - -In--- [Q LEI t ��
Section 25, T -18 -N, R -3- — T �--'' 10' ASPHALT PATH
�_ v Y 1 Y'l'�1-
1 1 .06 AC
C
(asphalt) SMOKEY ROW RD
ROP
TREE PROTECTION FENCING - TYP.
BLOCK C
E I
LUX
--
i I Uj
LOT 21A I
i 0VTREE
PERSERVATION
FA-
Fj
Xt
Q PROPOSED HOTEL S
(BY OTHERS)
LOT 20A
�, tv
F7
LOT 19
UJ
J
20 - -
nd
?s LOT 18
79
17A
�. 35' U.& D.E. `r O\
-- — — — `• PROPOSED — - -
25' PLANTING STRIP \°
4 TWO -STORY
. BUILDING W/
PARTIAL BASEMENT
40,000 SIF c� LOT 16 1
U "
Z
(asphalt) t ; 162 TOTAL SPACE S/N . U-
4.05 Spaces per 1 Q96 gsf
�
o
!�.Lo n
y -
/ z LOT 15 I
50' TREE-' �
PERSERVATION
L
LLJ
UMPSTER
NCLOSUR
�y\ c1 o
O
z
Z
PQ yam" o
LOT 1
LOT 2
LOT 3
I
LOT 4
I
Q" - -
Q /
U) ' / LOT F
/
I
LOT 6
1
LOT 7
I
NE Corn
Section
PK Nail
County '
/
01
LO
N
0
U
W
Un
s
z
a�
C
J
U-1
1 t71
10 10
50
{ i
TREE PROTECTION FENCING - TYP. .
10` PPLANTING, STRIP��,�,
^s \ 1L
MEADOWLARK F IQ`s - PA SRX ,
PROPOSED W
DRAINAGE EASEMENT
t=tr l
C(
tic
hir
c
5u rve
TREE PRESERVATION NOTES
Best Management Practices for Tree Preservation:
Before Construction:
d
C
■ .
Selected trees within the preservation zones shall be fertilized before
z
construction begins to increase their vigor. This will increase their ability to
w
- 9 7
handle stress from construction.
00-A N
MM
0
All site contractors shall meet with the Consulting Arborist at the site prior to
U
ZM M
beginning work to review all work procedures, access and haul routes, and tree
U
protection measures.
N!
Tree protection fencing shall be installed at the dripline (where possible) of the
It
V
trees in the buffer zone and proper "Tree Preservation Zone" signs affixed.
w
a
•
Trees should be inspected prior to construction to determine structural integrity.
o
Structurally unsound trees should be removed. Trees within the preservation
w
areas should be removed at the direction of a Registered Consulting Arborist
j
(RCA) or a Certified Arborist (CA).
w
a:
During
Construction:
•
Any damage to trees shall be reported to the Consulting Arborist within 6 hours
so that remedial action can be taken. Timeliness is critical to tree health.
•
No materials, spoil, washout water, waste or equipment, (especially concrete
equipment and tools) shall be deposited, stored, or parked within the tree
o
protection zone (fenced area).
M
•
Over -dig from the building foundation shall not be placed within the tree
LO
protection zone, either temporarily or permanently. It is suggested that the spoil
o
be placed in a space away from the trees.
• The preserved trees should be irrigated so that they will receive 1 -1.5 inches of
water per week during extreme dry periods and as is feasible.
•
If at all possible underground utilities, downspouts or irrigation lines and
landscape lighting shall be routed outside the tree protection zone.
•
In the areas where tree roots must be cut, the roots shall be cut using a
trenching machine and hand digging to provide a sharp, clean cut providing the
least disturbance possible. The exposed root ends shall be treated to heal,
covered, protected and kept from drying out during the time of exposure to air.
Ripping at the roots along the cut line with backhoes or excavators shall be
avoided at all cost.
•
There is to be no parking or equipment storage of any kind within the tree
protective zone.
Post Construction recommendations:
•
All trees shall have a post- construction evaluation performed by a qualified
19
arborist to determine any remedial actions necessary to maintain tree health.
0
•
Vertical mulching, or soil remediation with a grow gun may be necessary, for any
W
trees within 20 feet of construction activities. Especially those with any
G
compacted soils or altered drainages.
111.11
•
Regular mulching for any trees in the tree protection areas is recommended for
Q
trees that do not have regular leaf litter anymore. The mulch will give the trees
d
optimal conditions for their roots to recover from the stress of construction.
W
Z
I
d
LEGEND
LINE TYPE / SYMBOL DESCRIPTION
TREE PROTECTION FENCING
(REFER TO DETAILS ON
DETAIL SHEET)
TREE PRESERVATION AREA
-;BENCHMARK DATA
PROJECT BENCHMARK: T.B.M. LG. HIDGE NAIL IN WEST SIDE OF POWER POLE #191 -395 ON SOUTH
PROPERTY LINE, 300' WEST OF CENTERLINE OF OLD US 31.
SITE BENCHMARK: B.M. RR. SPIKE IN EAST SIDE OF POWER POLE 100'+ SOUTH OF TRI- COUNTY
PROPERTY WEST SIDE OF GUILFORD STREET.
B.M. ELEVATION = 840.69
"HOLEY MOLEY "SAYS CALL
AT LEAST TWO FULL A A
WORKING DAYS BEFORE E 1- 800 - 382 -5544
YOU DIG IT'S THE LAW * CALL TOLL FREE
1 -800- 428 -5200
FOR CALLS OUTSIDE OF INDIANA
ON
wI
Q
U 4
C
c
c U >
O N �
Q e6 �N��
X
a o QZ
IL Eat' -°�
W " 0$ _X
= O 'AC c
dt m co
3 s E -o
c
Z
C C Ns E E
IL a
ww 8
Z
Q
mi
V L
Z Z Q Z
4 0 0
J Z
J z �
� m z
Z w o a
U '
LL O w
a- L- -j W
0 0=
w �J W
> 2 19
w C/) IL
U
W
W
ed
Gi gG%STERfO��� <'�.�
No.
i PE19WW55
\\ STATE OF i
0 V-
�'� "�nlum 1 u I nu\\\a \`�•
EMH &T JWNO.
2007 -0698
DATE:
04 -19 -07
SCALE:
1 " =40'
SHEET No.
C1.1
d
C
■ .
y
zao
WZZMt)2
- 9 7
00-A N
MM
0
=Q
ZM M
a
M Z
N!
V
U 4
C
c
c U >
O N �
Q e6 �N��
X
a o QZ
IL Eat' -°�
W " 0$ _X
= O 'AC c
dt m co
3 s E -o
c
Z
C C Ns E E
IL a
ww 8
Z
Q
mi
V L
Z Z Q Z
4 0 0
J Z
J z �
� m z
Z w o a
U '
LL O w
a- L- -j W
0 0=
w �J W
> 2 19
w C/) IL
U
W
W
ed
Gi gG%STERfO��� <'�.�
No.
i PE19WW55
\\ STATE OF i
0 V-
�'� "�nlum 1 u I nu\\\a \`�•
EMH &T JWNO.
2007 -0698
DATE:
04 -19 -07
SCALE:
1 " =40'
SHEET No.
C1.1