Loading...
HomeMy WebLinkAbout07040022.4NW 1/4 Section 25, T 8-N, R-3-E N. Lin Ct [E) . ...... 1 ASPHALT P -3 "� -N, R -F Nt 1844.1 Yt PROPOSED 3' ca 40' B.S.L. SAfOKEY ROW RD mw--� BLOCK .0 46.0 TW Tw/ 40.00 40.00 Ld Ld 39.85 1 39.85 z 840 39.25 OTCH IN'CURB 39.2 LOT 2 1 A 38.7 fly i 50 39.18 IE 39.18 C.O. �C) / 1 / / - / U B N Tr- Y 38.72 L= 838.07 //G`_', -_ - / \ I \ C -44A TW 38.97 L= 7.5 ­-�Tw LOT 20A 83 at 69 3969 F 70 k 39 40.00 42.0 TW J N NOTCH IN 't B-,, N TCH JN CURB TW 39..60 9.60 41.0 TW. Qr1 / j % ',, j�,A�� / 46. TW 3n9.69 39.6 0 IAQ A 40.00, 4<, .00 L '837. D s Fl, = 83A7.33\ m 0 38,97 315.97 Tw- F 837.00 & NOTCH IN CU 8 i I N TCH IN CURB! 47. TW 38. 39.09 39,09 IE: 842-76 LOT 19 l j /', / / Tw -80 RQ a 39.1 Ov� M 45. TW ST UCTURE 39. 38OTGH IN CURB/ N .7 8 r Tw ---�Tw co 9.85 40. O -840" 40. LOT 18 x, 3n9 39.78 K 78 40.00 ��Tw 28,00 RIM: 827.71 2, F.E 28.50 WER FLOOR ­"r 835 .24 -6"SSD-6"SSD- 1D LD�' 17A C.O. -6' �$D IE 823.8 CONN IZ (a 394 40 .00 EXISTING MANHOLE A 49 39 ;a �, & 35' U.& D. E. 2&00 . LLO-sl- S) S - - - 11 PROPOSED 25-PLANTING STRIP TWO - STORY ♦ ---BUltDING W/ CO IE PARTIAL- BASEMENT RIY: 635.1511 I--- 1'3 (N) 40,000 SF 40.50 16"Wl (6 LOT 16 IE: 831.61 (S) S 61 S .-7 MAIN FLOOR 35,00 A I SPACE 162 TOTAL -4�-65 paC-e­8 I5e-r106-V 0 gsf (asphalt) CONNEC T TO 4Q50 EXISTING MANHOLE a I: J IM: 835.41 3 STOR"HOLIE TELEPHONE PEDESTAL E. 40839. IE: 32.16 TH 0 -,16�Ll`,, 10-HO PE LOT 15 10 ROOF DRAIN z ku 601 6 NECTIONS 5-s- 40.00 37.62 .40 RIM: 835.27= 9.00 IE: 83136 (N) f I V RIM, 835.48-) IE: 832.57 E- 83 .53 (W) �E: 83 .12 (S) 00 1 kwo-01 37-00 II 36.78 36.78 43 NOTCH IN CURB w 431.00 �36718 36.29 38 00 E 832. .29 FIL 834.50 NP. L FL �,835.00 F N CHIN CURB 9 36.00 a. S FL= 835.001 Fll�= 8 .50 NP.. 36.29 .0. IE 832. IE 832. 36.29 i OTC( 0 IN CURB T, Ir x t 1. I 36.78 36.7 i50% B. S.,L.' 37.00 3 Rim- 937 30 IE: 831. IE: 828 (E). e�E I 671 --P�A-N -T-�,I F9 STRIP Y 1 1.0 6 AC RIM: 837.57 tE: 832.57 tFAnm t R 827.93 tW) Ot 1 E 8218-12 (NXII 24" RCSt:w `TIE: 827.1 <D /, i' 00 1840.610 - 9. C.0 dROR CL OUT .60 I 832.. 37 @ I �01­ 1 'HOPE' ;-L EN�SE TION IE 83 if LIMPST 36.78 NCLOSIJ� 7.50 TVV 29 3 .78 3T00 50, GK[N Et`.LT Fti Li 11 B35.00 qNOTC IN CURB aH/ OVFLOW Il STRUCTURE L = 835.00 f1 It, 36.29 STORM MANHOLE Bt 1 838. 37.00 IE 829. 7.6 822. SE STOIRM.INLET 19 822W 7. IE 821.0 S 7 j f322--- PROPOSED29 'DRAINAGE EASEMENT CONNECT TO STING MANHOLE 22. - IE; 819-j6,[W) tt iti, 819.31 (JE LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 GRADING NOTES 1. TOPSOIL SHALL BE STRIPPED FROM ALL AREAS TO RECEIVE PAVING AND FROM WITHIN THE LIMITS OF PROPOSED BUILDINGS AND STRUCTURES. TOPSOIL SHALL BE STRIPPED TO THE DEPTH SHOWN IN THE GEOTECHNICAL REPORT, OR TO A DEPTH OF 6 INCHES, WHICHEVER IS GREATER. 2- TOPSOILSHALL BE PLACED TO A DEPTH OF 4 TO 6 INCHES IN ALL AREAS TO BE SEEDED OR SODDED PER THE SPECIFICATIONS. (n N E Ik.o r n e r, N E 11 3. EXCESS TOPSOIL MAY BE PLACED IN MOUNDING AREAS AND NONSTRUCTURAL FILL AREAS AS z AVAILABLE. w Section 25, T-18 N! 2 P Nall Found Down 4. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE SEEDED OR SODDED UNLESS OTHERWISE 2 ti s , 0 County Surveyor ti s SHOWN. 0 5. FINAL GRADES AT THE PROJECT BOUNDARY SHALL MATCH EXISTING ELEVATIONS UNLESS 0 OTHERWISE SHOWN. UJI 6. THE CONTRACTOR SHALL PERFORM AN EARTHWORK QUANTITY ANALYSIS PRIOR TO COMMENCING CL CONSTRUCTION TO CONFIRM SUCH QUANTITIES WITH THE ENGINEER. ADJUSTMENTS TO 0 PROPOSED FINISH GRADES BASED UPON THE EARTHWORK QUANTITY ANALYSIS SHALL BE w APPROVED BY THE ENGINEER. U) LU r0 00 C14 C: 0 cn Z 1z' EXISTING OFF.-SITE DETENTION POND-\ z Corner, NW 1, :tion 25, T -18 hing Found. No available per Surveyor records I DL- Corner, SW Section 25, T-18 Nothing Found. No r- GRADING PLAN LEGEND LINE TYPE / SYMBOL DESCRIPTION LINE TYPE SYMBOL DESCRIPTION M.E. MATCH EXISTING 000 le 00 IE SWALE X-Eim PAVEMENT SPOT GRADE - - - POND BOTTOM AT LEAST TWO FULL GROUND SPOT GRADE WORKING DAYS BEFORE POND NORMAL POOL YOU DIG IT'S THE LAW CALL TOLL FREE CURB AND - - - - - - - - POND TOP OF BANK FOR CALLS OUTSIDE OF INDIANA GUTTER GRADE 1.00% FLOW DIRECTION w/ GRADE F.F.E. FINISHED FLOOR ELEVATION H:V RATIO GRADE H.Pt. HIGH POINT IE: 805.55 PIPE INVERT ELEVATION L. Pt. LOW POINT IRIM --1 STRUCTURE'S RIM OA--- INTERMEDIATE CONTOUR ELEVATION 11w I 'IBIM TOP & BOTTOM OF WALL INDEX CONTOUR ELEVATION O LO 0 0 U6 ul 19 49 UJI 11L 19 IL U) Z ca 0 la 99 41C IL lu 19 IL 0 Z BENCHMARK DATA C PROJECT BENCHMARK: T.B.M. LG. HIDGE NAIL IN WEST SIDE OF POWER POLE #191-395 ON SOUTH z > .94111C4 0 PROPERTY LINE, 300' WEST OF CENTERLINE OF OLD US 31. SITE BENCHMARK: B.M. RR. SPIKE IN EAST SIDE OF POWER POLE 100' + SOUTH OF TRI-COUNTY A A PROPERTY WEST SIDE OF GUILFORD STREET. 00�wjn MM B.M. ELEVATION = 840.69 "HOLEY MOLEY"SAYS CALL AT LEAST TWO FULL z z m WORKING DAYS BEFORE 1-800-382-5544 YOU DIG IT'S THE LAW CALL TOLL FREE 1-800-428-5200 19 FOR CALLS OUTSIDE OF INDIANA Z 0 w 0 LU w w C: > 6 N! C �3 s x >4q Z. - E A; c0Q--w- 0 a) COM � - =0 C! u c1c CIE 0 6) > C .1-8 U A Lij 0. 1 (D < U) z z z Z5 < Z a a og -j z CL Z mi F- Cn z 40. z LIJ 0 Lu c) 0 13 0 - o W 15 LL CL LIM I 0 0-2 < LIJ U) LLJ D < 0 DST E)Fee No. II\ PESWW55 STATE OF /ON A L \01' EMH&T JPYNO. 2007-0698 04-19-07 1" =40' SHEET No. c2.o C z > .94111C4 0 U) 2 Ina In C) WZZm (F A A ' ME 00�wjn MM 0 a 19 z z m j DMZ 19 C: > 6 N! C �3 s x >4q Z. - E A; c0Q--w- 0 a) COM � - =0 C! u c1c CIE 0 6) > C .1-8 U A Lij 0. 1 (D < U) z z z Z5 < Z a a og -j z CL Z mi F- Cn z 40. z LIJ 0 Lu c) 0 13 0 - o W 15 LL CL LIM I 0 0-2 < LIJ U) LLJ D < 0 DST E)Fee No. II\ PESWW55 STATE OF /ON A L \01' EMH&T JPYNO. 2007-0698 04-19-07 1" =40' SHEET No. c2.o