Loading...
HomeMy WebLinkAbout07040022.73 —E - r N. Line NW 1 /4 Section 25, T 8 —N, R -3 —E _rEl (e)- ---- - ---(E) NW Corner NE 1Z4, NW 1/4 --- (E)---- ---_(� (`)— C 2o '- Section 25, T -18 —N, R -3 —E _ w■•• ---- -- - --�- -- Y� s 4 LAw ' (2) ULM-A _ 13 (7) MYR-P O (11) ILE -X / (8) LIGX ,-1t ♦ C7 (3) PHY-O (3) ACE -R (7) ILE -X / (28) ARC -U (5) MYR -P (4) DAP -X � �1 �� ,,i, ♦' / (10) LIGX / (1) QUE -R ?� (7) ILE -X 31 / (3) MYR-P JP (8) LIGX A � / y (9) PHY -O \ (3) LIR -T (12) ILE -X 20 (1) CAR -B - �- (14) ITE -V (4) DAP- LAw (1) ULM-A 3 t � 51 1 (45) SED-X (3) AME -X 10' ASPHALT PATH RO E — 1/ 4o' B.S.L. (12) ILE -X (17) LIGX (3) ACE-R LAWN (8) PHY a �e k TB � - s��.. !s' (11) PAN V (3) PHY-0 l4W (18) LAVA �s w „ ENTRY WALL o FEATURE Er ADA RAMP -TYP. \ \ ANNUALS PRO MED DR ENTRY SIGN (9) PAN -V ANNUALS , (11) CAL -x 'o ANNUALS © ENTRY WALL FEATURE TELEPHONE PEDESTAL (18) LAVA GAS MARKER (11) PAN -V (3) PHY-0 LAW t A ADA RAMP - TYP• PLANT SCHEDULE o (7)MYRAP I• SYMBOL QNTY. BOTANICAL NAME COMMON NAME SIZE CONTAINER NOTES TREES (7) PHY -0 Ace-r' 10 Acer rubrum Red Maple 2.5" cal. B &B full, matched 17 (3) ACE -R Amelanchier x grandifolia Autumn Brilliance m Arne -x 16 8' ht B &B multi- stemmed, 3-5 stems I -' 'Autumn Brilliance' Servicebeny ' Car -b 4 Carpinus betula'Fastigiata' Pyramidal European 1.5" cal. B &B full, symmetrical Hornbeam Cer -c 8 Cercis canadensis Eastern Redbud 8' ht B &B multi- stemmed, 3-5 stems N Gin -b 5 Ginkgo biloba Ginkgo Tree 2.5" cal. B &B male species only, matched o (2) CER -C Lir -t 6 Liriodendron tulipifera Tulip Tree 2.5" cal. B &B full, matched Pic -o 2 Picea omorika Serbian Spruce 6' ht B &B full, symmetrical ` (2) GIN-B Que-i 4 Quercus imbrica Swamp White Oak 2.5" cal. B &B specimin trees N ecimin trees o` Que-r 2 Quercus rubra Red Oak 2.5" cal. B &B s P 4 Taxodium distichum Bald Cypress 2.5" cal. B &B full, matched Tax -d ' Ulm -a 8 Ulmus amehcana'Pioneee Pioneer Elm 2.5" cal. B &B full, matched IS (3) PHY -o (1) QUE-R , SHRUBS Buxus sempervirones , Bux -s 61 Warder Valley' Varder Valley Boxwood #3 container allow to mass o f:. (5) PHY-O Dap -x 32 Daphne x burkwookii Carol Mackie Daphne 18" container allow to mass 'Carol Mackie' Ile-x 193 Ilex x'Willemee Emerald Magic Holly 24" container allow to mass into a hedge (5) MYR -P Ite -v 119 Itea virgin ica 'Henry's Henry's Garnet Sweetspire 18" container allow to mass Garnet' I ° (1) uu" Lig -x 138 Ligustrum x vicary Golden Vicary Privet 24" container allow to mass into a hedge (3) LIR -T Myr-p 36 Myrica pensybanica Bobzam Baybeny 24" container allow to mass 'Bobzam' 43 Physocarpos opulifolius Ph -o 'Nugget' Nugget Ninebark 24" container allow to mass, keep in natural form �w y � I.. Vib-x 12 Viburnum x juddii Judd Viburnum 24" container allow to mass (4) AMEX Groundcovers and Grasses (3) GIN -B y�S Arc -u 210 Arctostaphylos uva -ursi Bearberry #3 container triangular spacing @ 2 -0" o.c. (3) MYR-P N � Calamgrostis x acutifkxa spacing 2' -6" o.c. (5) PHY-0 Cal -x 23 'Karl Foerster' Karl Foerster Fountain Grass #3 container p 9 @ TB #� N� Lavendula angustifolia triangular spacing T -6" O.C. 'Munstead' Lav -a 425 Munstead Lavender #1 container trian 9 p 9 @ Pan -v 31 Panicum virgatum Heaavy Metal Switch Grass #3 container spacing @ 2' -6" o.c. 'Heavy Metal' ° Sed -x 238 Sedum x'Autumn Joy' Autumn Joy Stonecrop #1 container triangular spacing @ 7 -0" O.C. Sedum 102 �•'w1 YI (7) ILE -X — (8) LIGX — (4) DAP -X 25) ARC•U _ (7) ILE -X (4) TAX -D _ (38) AR C -U (1) CAR -B (6) DAP -X (8) LIGX (13)ILE -X LAM ET!'� 1 1 N A -• - LAWN J 0 .... J JIN , _Z Z /I l lllll,�l�Il,llli�!�JI,IdIIIi�i� , H (23) ILE -X 4Q W _ .J, (8) LIGX Q (6) MYR-P A (7) ILE -X — (8) LIGX — (4) DAP -X 25) ARC•U _ (7) ILE -X (4) TAX -D _ (38) AR C -U (1) CAR -B (6) DAP -X (8) LIGX (13)ILE -X LAM 34 SE :o x _ ••..:•.r���IlUI l,■�• � �' �� �•• nip /, 5a Try iS A AIWA (1) ULWA (6) ITE -V (3) CER-C SEAT WALL PERMEABLE PAVING PATIO WI SSD c9 Z_ Z a 0 W w 0 W BLOCK 50• TREE PERSERVAT AREA (6) ITE V (1) AME -X :AT WALL (60) LAV -A (11) ITE -V PEPS (7) VIB•x (2) PIC -O LOT 21A LOT 1 LOT 2 1 LOT 3 Q V R 1 r1 LOT 4 1 � I LOT 19 t w t I I ' LOT 5 LOT 18 i ! LOT 6 LOT 17A ! LOT 16 i LOT 7 I I LOT 15 1 U z ! LOT 1 LOT 1 f _ BLOCK • a MEADOWLARK Fl+ _ARK L _ PROPOSED 20' DRAINAGE EASEMENT � 1 W I ry Z I 00 Lri N 0 20 40 60 80 HORIZONTAL SCALE: 1"=40' SOUTH BUFFER YARD 2171.f. - LEVEL A REQUIRED 124 I.f. - Tree Buffer Reserved 93 I.f. remaining 3 Shade x .93= 3 required / 3 provided 2 Ornamental x .93= 2 required 12 provided 9 Shrubs x .93= 8 required / 8 provided WEST BUFFER YARD 697 I.f. - LEVEL A REQUIRED 3 Shade x 6.97= 21 required 121 provided 2 Ornamental x 6.97 =14 required 114 provided 9 Shrubs x 6.97= 63 required / 63 provided NORTH BUFFER YARD 197 I.f: LEVEL A REQUIRED Preservation of Tree Buffer- No additional plantings needed. EAST BUFFER YARD 7361.f. LEVEL D REQUIRED Preservation of 59 Tree Buffer - No additinal plantings required PARKING SPACES 162 PARKING SPACES 1 Tree per 9 spaces: 18 required/ 18 provided 5 Shrubs per 9 spaces: 90 required/ 90 provided Q) 1 GENERAL LANDSCAPE & PLANTING NOTES 1. Plant material to be installed and maintained by a qualified and experienced landscape Z installer. N 2, All materials are subject to the approval of the Landscape Architect and Owner at any J tine. Landscape Architect to inspect all plant locations and plant bed conditions priorto Li installation. Stake all plant locations for review and approval by the Landscape Architect before planting. On -site adjustments may be required. Plants are to be freshly dug. Transporting of plants shall be done in a manner as to not destroy the natural shape, compromise the health, or alter the characteristics of plant materials. 3. Rootballs shall meet or exceed size standards as set forth in'Amedcan Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved, specified material. 4. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i -e., spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as governed by plant spacing per schedule. 5. All plant beds shall receive 3" minimum of genuine shredded hardwood bark mulch (unless otherwise noted). Apply pre - emergent herbicide as directed by the manufacturer prior to installing mulch. Seed all areas disturbed. by construction activities that are not otherwise noted to receive pavement, planting bed, or other treatment. 6. The Contractor shall install and /or amend topsoil in all proposed bed areas to meet ASTM D5268 standards. Landscaper shall verify depth and quality of topsoil prior to plant installation. A minimum of 4" of topsoil is required for sodded areas; 12" for plant beds. Topsoil sources shall include the reuse of surface soil stockpiled on site, clean of roots, plants, sod, stones, clay lumps, and other extraneous or foreign materials larger than 1 ". Supplement with imported topsoil from off -site sources when quantities are insufficient. Do not obtain supplemental topsoil from agricultural land, bogs, or marshes. Inorganic amendments, organic amendments, and fertilizers shall be used to amend topsoil as needed for long -term plant health. 7. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to satisfaction of the Owner and Operating Authority at no additional cost. 8. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work. All workmanship and materials shall be guaranteed by the Contractor for a period of one (1) calendar year after Final Acceptance. 9. Maintain all plant material for a three (3) month period from date of Substantial Completion. Maintanenace shall include pruning, cultivating, watering, weeding, fertilizing, restoring plant saucers, spraying for disease and insects, and replacing tree wrappings. Recommended long -term maintenance procedures shall be provided to the Owner before expiration of this period. 10. All disturbed areas not otherwise planted shall be seeded. CONTEXT landscape arehitectmrs 1N a 12 S. Min Street, Suite 100 Fot'tvie, IN 46040 � td 317.485.6900 fix 317.485.6912 0 r t a I— W a 0 w v7 w 0 M L6 0 Z 0 a W 0 ■ V W � � Za0 im 'I V- 0 W az ;y W T Oa. MN W 0 a W U) 99 x Q M M IL Z nZZ�� I-�a Well IL Z m W Q IL UJ H Z J IL U Ja C U 2z > .a o c C D E x = O D Z � �n v. N 1^_ :E U C W W Zz Z Z Q a Q ° Z Mel m Z Z w 0 W wovz �0 Q CL LL E-- O 11.1 � LLI Z o �< a • J. p •. filStE�'Rq�E`.�' 4, G No. 20200052 - STATE OF ' EMH &T JOB NO. 2007 -0698 DATE: 04 -27 -07 SCALE: 1" = 40' SHEET No. L1.0 ET!'� 1 1 N A -• - - .... J JIN , F 4 /I l lllll,�l�Il,llli�!�JI,IdIIIi�i� , , 4Q _ .J, ANNUALS (6) MYR-P A r4 �'• . ., .�LM A ANNUALS FA STORY %10.4-1 B dyaf��� �.. ■ ■� a oo O Od PARTIAL BO PERMEABLE p 40,000 SF PAVEMENT � i" ! !4 162 TOTAL SPACES 4,05 Spaces per 111 gsf �O CONCRETE r ANNUALS ..� I /�,��► � �` (54) SED-X L L ANNUALS a` �O ANNUALS D.- F—AMIK �o F '' 5a Try iS A AIWA (1) ULWA (6) ITE -V (3) CER-C SEAT WALL PERMEABLE PAVING PATIO WI SSD c9 Z_ Z a 0 W w 0 W BLOCK 50• TREE PERSERVAT AREA (6) ITE V (1) AME -X :AT WALL (60) LAV -A (11) ITE -V PEPS (7) VIB•x (2) PIC -O LOT 21A LOT 1 LOT 2 1 LOT 3 Q V R 1 r1 LOT 4 1 � I LOT 19 t w t I I ' LOT 5 LOT 18 i ! LOT 6 LOT 17A ! LOT 16 i LOT 7 I I LOT 15 1 U z ! LOT 1 LOT 1 f _ BLOCK • a MEADOWLARK Fl+ _ARK L _ PROPOSED 20' DRAINAGE EASEMENT � 1 W I ry Z I 00 Lri N 0 20 40 60 80 HORIZONTAL SCALE: 1"=40' SOUTH BUFFER YARD 2171.f. - LEVEL A REQUIRED 124 I.f. - Tree Buffer Reserved 93 I.f. remaining 3 Shade x .93= 3 required / 3 provided 2 Ornamental x .93= 2 required 12 provided 9 Shrubs x .93= 8 required / 8 provided WEST BUFFER YARD 697 I.f. - LEVEL A REQUIRED 3 Shade x 6.97= 21 required 121 provided 2 Ornamental x 6.97 =14 required 114 provided 9 Shrubs x 6.97= 63 required / 63 provided NORTH BUFFER YARD 197 I.f: LEVEL A REQUIRED Preservation of Tree Buffer- No additional plantings needed. EAST BUFFER YARD 7361.f. LEVEL D REQUIRED Preservation of 59 Tree Buffer - No additinal plantings required PARKING SPACES 162 PARKING SPACES 1 Tree per 9 spaces: 18 required/ 18 provided 5 Shrubs per 9 spaces: 90 required/ 90 provided Q) 1 GENERAL LANDSCAPE & PLANTING NOTES 1. Plant material to be installed and maintained by a qualified and experienced landscape Z installer. N 2, All materials are subject to the approval of the Landscape Architect and Owner at any J tine. Landscape Architect to inspect all plant locations and plant bed conditions priorto Li installation. Stake all plant locations for review and approval by the Landscape Architect before planting. On -site adjustments may be required. Plants are to be freshly dug. Transporting of plants shall be done in a manner as to not destroy the natural shape, compromise the health, or alter the characteristics of plant materials. 3. Rootballs shall meet or exceed size standards as set forth in'Amedcan Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved, specified material. 4. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i -e., spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as governed by plant spacing per schedule. 5. All plant beds shall receive 3" minimum of genuine shredded hardwood bark mulch (unless otherwise noted). Apply pre - emergent herbicide as directed by the manufacturer prior to installing mulch. Seed all areas disturbed. by construction activities that are not otherwise noted to receive pavement, planting bed, or other treatment. 6. The Contractor shall install and /or amend topsoil in all proposed bed areas to meet ASTM D5268 standards. Landscaper shall verify depth and quality of topsoil prior to plant installation. A minimum of 4" of topsoil is required for sodded areas; 12" for plant beds. Topsoil sources shall include the reuse of surface soil stockpiled on site, clean of roots, plants, sod, stones, clay lumps, and other extraneous or foreign materials larger than 1 ". Supplement with imported topsoil from off -site sources when quantities are insufficient. Do not obtain supplemental topsoil from agricultural land, bogs, or marshes. Inorganic amendments, organic amendments, and fertilizers shall be used to amend topsoil as needed for long -term plant health. 7. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to satisfaction of the Owner and Operating Authority at no additional cost. 8. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work. All workmanship and materials shall be guaranteed by the Contractor for a period of one (1) calendar year after Final Acceptance. 9. Maintain all plant material for a three (3) month period from date of Substantial Completion. Maintanenace shall include pruning, cultivating, watering, weeding, fertilizing, restoring plant saucers, spraying for disease and insects, and replacing tree wrappings. Recommended long -term maintenance procedures shall be provided to the Owner before expiration of this period. 10. All disturbed areas not otherwise planted shall be seeded. CONTEXT landscape arehitectmrs 1N a 12 S. Min Street, Suite 100 Fot'tvie, IN 46040 � td 317.485.6900 fix 317.485.6912 0 r t a I— W a 0 w v7 w 0 M L6 0 Z 0 a W 0 ■ V W � � Za0 im 'I V- 0 W az ;y W T Oa. MN W 0 a W U) 99 x Q M M IL Z nZZ�� I-�a Well IL Z m W Q IL UJ H Z J IL U Ja C U 2z > .a o c C D E x = O D Z � �n v. N 1^_ :E U C W W Zz Z Z Q a Q ° Z Mel m Z Z w 0 W wovz �0 Q CL LL E-- O 11.1 � LLI Z o �< a • J. p •. filStE�'Rq�E`.�' 4, G No. 20200052 - STATE OF ' EMH &T JOB NO. 2007 -0698 DATE: 04 -27 -07 SCALE: 1" = 40' SHEET No. L1.0 LOT 1 LOT 1 f _ BLOCK • a MEADOWLARK Fl+ _ARK L _ PROPOSED 20' DRAINAGE EASEMENT � 1 W I ry Z I 00 Lri N 0 20 40 60 80 HORIZONTAL SCALE: 1"=40' SOUTH BUFFER YARD 2171.f. - LEVEL A REQUIRED 124 I.f. - Tree Buffer Reserved 93 I.f. remaining 3 Shade x .93= 3 required / 3 provided 2 Ornamental x .93= 2 required 12 provided 9 Shrubs x .93= 8 required / 8 provided WEST BUFFER YARD 697 I.f. - LEVEL A REQUIRED 3 Shade x 6.97= 21 required 121 provided 2 Ornamental x 6.97 =14 required 114 provided 9 Shrubs x 6.97= 63 required / 63 provided NORTH BUFFER YARD 197 I.f: LEVEL A REQUIRED Preservation of Tree Buffer- No additional plantings needed. EAST BUFFER YARD 7361.f. LEVEL D REQUIRED Preservation of 59 Tree Buffer - No additinal plantings required PARKING SPACES 162 PARKING SPACES 1 Tree per 9 spaces: 18 required/ 18 provided 5 Shrubs per 9 spaces: 90 required/ 90 provided Q) 1 GENERAL LANDSCAPE & PLANTING NOTES 1. Plant material to be installed and maintained by a qualified and experienced landscape Z installer. N 2, All materials are subject to the approval of the Landscape Architect and Owner at any J tine. Landscape Architect to inspect all plant locations and plant bed conditions priorto Li installation. Stake all plant locations for review and approval by the Landscape Architect before planting. On -site adjustments may be required. Plants are to be freshly dug. Transporting of plants shall be done in a manner as to not destroy the natural shape, compromise the health, or alter the characteristics of plant materials. 3. Rootballs shall meet or exceed size standards as set forth in'Amedcan Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved, specified material. 4. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i -e., spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as governed by plant spacing per schedule. 5. All plant beds shall receive 3" minimum of genuine shredded hardwood bark mulch (unless otherwise noted). Apply pre - emergent herbicide as directed by the manufacturer prior to installing mulch. Seed all areas disturbed. by construction activities that are not otherwise noted to receive pavement, planting bed, or other treatment. 6. The Contractor shall install and /or amend topsoil in all proposed bed areas to meet ASTM D5268 standards. Landscaper shall verify depth and quality of topsoil prior to plant installation. A minimum of 4" of topsoil is required for sodded areas; 12" for plant beds. Topsoil sources shall include the reuse of surface soil stockpiled on site, clean of roots, plants, sod, stones, clay lumps, and other extraneous or foreign materials larger than 1 ". Supplement with imported topsoil from off -site sources when quantities are insufficient. Do not obtain supplemental topsoil from agricultural land, bogs, or marshes. Inorganic amendments, organic amendments, and fertilizers shall be used to amend topsoil as needed for long -term plant health. 7. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to satisfaction of the Owner and Operating Authority at no additional cost. 8. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work. All workmanship and materials shall be guaranteed by the Contractor for a period of one (1) calendar year after Final Acceptance. 9. Maintain all plant material for a three (3) month period from date of Substantial Completion. Maintanenace shall include pruning, cultivating, watering, weeding, fertilizing, restoring plant saucers, spraying for disease and insects, and replacing tree wrappings. Recommended long -term maintenance procedures shall be provided to the Owner before expiration of this period. 10. All disturbed areas not otherwise planted shall be seeded. CONTEXT landscape arehitectmrs 1N a 12 S. Min Street, Suite 100 Fot'tvie, IN 46040 � td 317.485.6900 fix 317.485.6912 0 r t a I— W a 0 w v7 w 0 M L6 0 Z 0 a W 0 ■ V W � � Za0 im 'I V- 0 W az ;y W T Oa. MN W 0 a W U) 99 x Q M M IL Z nZZ�� I-�a Well IL Z m W Q IL UJ H Z J IL U Ja C U 2z > .a o c C D E x = O D Z � �n v. N 1^_ :E U C W W Zz Z Z Q a Q ° Z Mel m Z Z w 0 W wovz �0 Q CL LL E-- O 11.1 � LLI Z o �< a • J. p •. filStE�'Rq�E`.�' 4, G No. 20200052 - STATE OF ' EMH &T JOB NO. 2007 -0698 DATE: 04 -27 -07 SCALE: 1" = 40' SHEET No. L1.0 W I ry Z I 00 Lri N 0 20 40 60 80 HORIZONTAL SCALE: 1"=40' SOUTH BUFFER YARD 2171.f. - LEVEL A REQUIRED 124 I.f. - Tree Buffer Reserved 93 I.f. remaining 3 Shade x .93= 3 required / 3 provided 2 Ornamental x .93= 2 required 12 provided 9 Shrubs x .93= 8 required / 8 provided WEST BUFFER YARD 697 I.f. - LEVEL A REQUIRED 3 Shade x 6.97= 21 required 121 provided 2 Ornamental x 6.97 =14 required 114 provided 9 Shrubs x 6.97= 63 required / 63 provided NORTH BUFFER YARD 197 I.f: LEVEL A REQUIRED Preservation of Tree Buffer- No additional plantings needed. EAST BUFFER YARD 7361.f. LEVEL D REQUIRED Preservation of 59 Tree Buffer - No additinal plantings required PARKING SPACES 162 PARKING SPACES 1 Tree per 9 spaces: 18 required/ 18 provided 5 Shrubs per 9 spaces: 90 required/ 90 provided Q) 1 GENERAL LANDSCAPE & PLANTING NOTES 1. Plant material to be installed and maintained by a qualified and experienced landscape Z installer. N 2, All materials are subject to the approval of the Landscape Architect and Owner at any J tine. Landscape Architect to inspect all plant locations and plant bed conditions priorto Li installation. Stake all plant locations for review and approval by the Landscape Architect before planting. On -site adjustments may be required. Plants are to be freshly dug. Transporting of plants shall be done in a manner as to not destroy the natural shape, compromise the health, or alter the characteristics of plant materials. 3. Rootballs shall meet or exceed size standards as set forth in'Amedcan Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved, specified material. 4. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i -e., spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as governed by plant spacing per schedule. 5. All plant beds shall receive 3" minimum of genuine shredded hardwood bark mulch (unless otherwise noted). Apply pre - emergent herbicide as directed by the manufacturer prior to installing mulch. Seed all areas disturbed. by construction activities that are not otherwise noted to receive pavement, planting bed, or other treatment. 6. The Contractor shall install and /or amend topsoil in all proposed bed areas to meet ASTM D5268 standards. Landscaper shall verify depth and quality of topsoil prior to plant installation. A minimum of 4" of topsoil is required for sodded areas; 12" for plant beds. Topsoil sources shall include the reuse of surface soil stockpiled on site, clean of roots, plants, sod, stones, clay lumps, and other extraneous or foreign materials larger than 1 ". Supplement with imported topsoil from off -site sources when quantities are insufficient. Do not obtain supplemental topsoil from agricultural land, bogs, or marshes. Inorganic amendments, organic amendments, and fertilizers shall be used to amend topsoil as needed for long -term plant health. 7. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to satisfaction of the Owner and Operating Authority at no additional cost. 8. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work. All workmanship and materials shall be guaranteed by the Contractor for a period of one (1) calendar year after Final Acceptance. 9. Maintain all plant material for a three (3) month period from date of Substantial Completion. Maintanenace shall include pruning, cultivating, watering, weeding, fertilizing, restoring plant saucers, spraying for disease and insects, and replacing tree wrappings. Recommended long -term maintenance procedures shall be provided to the Owner before expiration of this period. 10. All disturbed areas not otherwise planted shall be seeded. CONTEXT landscape arehitectmrs 1N a 12 S. Min Street, Suite 100 Fot'tvie, IN 46040 � td 317.485.6900 fix 317.485.6912 0 r t a I— W a 0 w v7 w 0 M L6 0 Z 0 a W 0 ■ V W � � Za0 im 'I V- 0 W az ;y W T Oa. MN W 0 a W U) 99 x Q M M IL Z nZZ�� I-�a Well IL Z m W Q IL UJ H Z J IL U Ja C U 2z > .a o c C D E x = O D Z � �n v. N 1^_ :E U C W W Zz Z Z Q a Q ° Z Mel m Z Z w 0 W wovz �0 Q CL LL E-- O 11.1 � LLI Z o �< a • J. p •. filStE�'Rq�E`.�' 4, G No. 20200052 - STATE OF ' EMH &T JOB NO. 2007 -0698 DATE: 04 -27 -07 SCALE: 1" = 40' SHEET No. L1.0 m W Q IL UJ H Z J IL U Ja C U 2z > .a o c C D E x = O D Z � �n v. N 1^_ :E U C W W Zz Z Z Q a Q ° Z Mel m Z Z w 0 W wovz �0 Q CL LL E-- O 11.1 � LLI Z o �< a • J. p •. filStE�'Rq�E`.�' 4, G No. 20200052 - STATE OF ' EMH &T JOB NO. 2007 -0698 DATE: 04 -27 -07 SCALE: 1" = 40' SHEET No. L1.0 Zz Z Z Q a Q ° Z Mel m Z Z w 0 W wovz �0 Q CL LL E-- O 11.1 � LLI Z o �< a • J. p •. filStE�'Rq�E`.�' 4, G No. 20200052 - STATE OF ' EMH &T JOB NO. 2007 -0698 DATE: 04 -27 -07 SCALE: 1" = 40' SHEET No. L1.0