HomeMy WebLinkAbout07040022.8SEEDING SCHEDULE
STABILIZATION
PRACTICE:_ _ JAN. FEB. MAR_ APR._ MAY _JUNE _ JULY AUG. _ SEPT._ OCT. NOV. DEC.
PERMANENT A ®/ / / / I
SEEDING
B
TEMPORARY C
SEEDING
MULCHING
A = KENTUCKY BLUEGRASS 50 %, TURF TYPE TALL FESCUE 30 %, PERENNIAL RYEGRASS 20%
PLUS 2 TONS OF STRAW MULCH/ ACRE
APPLY MIXTURE AT A RATE OF 2 LBS. PER 1000 SQ.FT.
B = SPRING OATS 3 BUSHEL PER ACRE
C = ANNUAL RYEGRASS (1 LB. PER 1000 SQ. FT.)
D = STRAW MULCH (90 LBS. PER 1000 SQ.FT.)
®/ I / • IRRIGATION NEEDED DURING JUNE, JULY, AND / OR SEPTEMBER.
®® IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SEED
NOTE: ALL SEEDING SHALL HAVE 12 -12 -12 FERTILIZER APPLIED
400 -600 LBS. PER ACRE OR AS SPECIFIED.
Existing grade.
L m Area to receive hardwood bark mulch
T
it
� opso ( as
o
spec"'°")
3'
SPADE EDGE
Not to Scale
c'n
%-0
TREE PROTECTION
Not to Scale
lit
Not to Scale
Minimum protection area shall extend to
the drip line (outer perimeter of
branching)
4' high vinyl protection fence or 6'
chaintink for critical tree protection, as
indicated.
Metal fence post (6' o.a max.)
Contractor may submit alternate
xis of tree protection to Landscape
act for consideration.
Shredded Hardwood Organic Mulch
Place level with adjacent finish grades.
Steel landscape Edging, 0.
Topsoil, to include a min. of 5% organic matter
Remove all stones 1' & larger and
other extraneous materials.
Compacted subgrade
Q -- 0 - 0
Q--- 0- - -- 4 -- -
a____ -._ Note: Al groundoover beds shall be planted
using triangular planting scheme.
Refer to Planting Schedule for On-Center
planting dimension.
Refer to plans for finish grade.
T shredded hardwood bark mulch
Sort peat Pot
GROUNDCOVER PLANTING
Not to Scale
17 topsoil, as specified in Landscape
Bed Preparation detail
Compacted subgrade
�•1
C0.1 rn 54
w
Uj w
CONTEXT
landrsape arcbitectxre
12 & Mdn SbWO. Wft 100 Fatv1e, IN 46W0
tel 317.485.6900 fix 317.485.6912
NOTE: Remove burlap from top 1/3 of
root ball or carefully remove container.
3' shredded hardwood
bark mulch
/—3- high topsoil saucer for
ind'ividual plants.
O
v I
Equal to
1/2 ball dia. , 7
SHRUB PLANTING
Not to Scale
NOTES:
1. This detail used for evergreens 6' or
less in size; other evergreens staked in
standard fashion.
2. Do not prune evergreens except
under direction of landscape Architect
Remove all burlap & wire from
top 1/3 of root ball.
4" saucer rim sloped gradually
to finished grade
.�Wy SAS:' _--- Z- �v'•'4t •. _
Fertilized topsoil mix.
Water thoroughly
when pit is half full.
Thoroughly loosen subsoil at bottom of
plant pit
EVERGREEN TREE PLANTING
Not to Scale
i
CV
Existing grade.
Slope & scarify sides of pit.
Width of pit to be two
times ball diameter.
Fertilized excavated soil or topsoil back ill.
Water thoroughly after pit is half filled.
Set root ball on undisturbed
soil cone at bottom of pit
Do not cut leader.
g Flexible vinyl strip - black or green
#4 rebar painted flat black, be to trunk
with 1/2' flexible vinyl strip.
Rootflare to be set at
finished grade.
3' mulch
�— Finished grade
3' -0" min.
Lightly compacted topsoil mix
TREE PLANTING
Not to Scale
Wrap trees of 2" cal. or more w/trunk tape
DO NOT girdle tree.
3" shredded hardwood bark mulch
3" high topsoil saucer dia.of
saucer to equal ball dia.
Existing grade
Root flare to be planted at grade level
Slope & scarify sides of pit
Width of pit to be one and a half (11/2)
times ball diameter.
Fertilized excavated soil or topsoil backfill.
Water thoroughly after pit is half filled.
Set root ball on undisturbed
soil cone at bottom of pit
Auger minimum 4' wide x 16" deep hole and fill with
#2 stone ONLY in excavaions that hold water longer
than 24 hours.
a
L6
pW�
a
W
IL
Z
J
IL
m
D
W
f�
a
W
IL
N
Z
a
j
0.
vW�
ZaC4
..zp�te -o
W aZM�
� LU
=
a 0 M M
:C
�vlz V.
M
r�MZ
U
Q -U
P.
W H
c a�
o
N 6
Et
T
a0
i N
U
Qi N
W W
(D
C/) Z z
Z
p
o
-�
Z
�
�
Z
Co
Z
W
o
LU"
W
�"-LL
O
LL
�
p
p
\W
J
W
W
~
U)
2
�
U
E
N
J
Q
F
W
D
W
0m
a
v
H
D
Z
Q
J
Z
0
a
rY
U
U
W
W
a
D
W
.••o��E J. PRA,
r.,�tSTE�G''
No.
20200052 -
STATE OF
P
EMH &T JOB NO.
2007 -0698
DATE:
04-27 -07
SCALE:
1" = xx'
SHEET No.
L1.1