Loading...
HomeMy WebLinkAboutLandscape Plan approved The Contractor shall install and/or amend topsoil in all proposed bed areas to meet ASTM D5268 standards. Landscaper shall verify depth and quality of Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architect to inspect all plant locations and plant INTACT. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved,irregularities, with coverage exceeding 90 percent over any 10 sq. ft. (0.92 sq. m) and bare spots not exceeding 3 by 3 inches.Reestablish lawns that do All plant beds shall receive 3" minimum of genuine shredded hardwood bark mulch (unless otherwise noted). Apply pre-emergent herbicide as directed surface soil stockpiled on site, clean of roots, plants, sod, stones, clay lumps, and other extraneous or foreign materials larger than 1". Supplement with bed conditions prior to installation. Stake all plant locations for review and approval by the Landscape Architect before planting. On-site adjustments Maintain all plant material for a three (3) month period from date of Substantial Completion. Maintenance shall include pruning, cultivating, watering, may be required. Plants are to be freshly dug. Transporting of plants shall be done in a manner as to not destroy the natural shape, compromise theSatisfactory Seeded Lawn: At end of maintenance period, a healthy, uniform, close stand of grass has been established, free of weeds and surface topsoil prior to plant installation. A minimum of 4" of topsoil is required for lawn areas; 12" for plant beds. Topsoil sources shall include the reuse of weeding, fertilizing, restoring plant saucers, spraying for disease and insects, and replacing tree wrappings. Recommended long-term maintenance complete work. All workmanship and materials shall be guaranteed by the Contractor for a period of one (1) calendar year after Final Acceptance. imported topsoil from off-site sources when quantities are insufficient. Do not obtain supplemental topsoil from agricultural land, bogs, or marshes. by the manufacturer prior to installing mulch. Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to satisfaction of the Owner and Operating Authority at no Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, Notes specifications, and plant schedule requirements (i.e., spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed Inorganic amendments, organic amendments, and fertilizers shall be used to amend topsoil as needed for long-term plant health. Container These trees shall count toward the Buffer Yard D for 96th Street. Relocation approved by Carmel Urban Forester. not comply with requirements and continue maintenance until lawns are fully satisfactory to the Owner. Size Plant material to be installed and maintained by a qualified and experienced landscape installer. measurements and install appropriate quantities as governed by plant spacing per schedule. Common Name procedures shall be provided to the Owner before expiration of this period. GENERAL LANDSCAPE & PLANTING NOTES health, or alter the characteristics of plant materials. Botanical Name planting bed, or other treatment. Areas to be Seeded. Ordinance Chart PLANT SCHEDULE Symbol specified material. additional cost. Quantity 10. 4. 2.3.5.6.7.8.9. 1. * existing vegetation to remain along north boundary