Loading...
HomeMy WebLinkAbout07050008.15Z m 0 m x Z Z G) Z m m X Z 00 MASONRY PLAN NOTES: 1. SEE S1.3 FOR MASONRY NOTES AND REINFORCING REQUIREMENTS 2. SEE S1.3 FOR TYPICAL MASONRY DETAILS. TYPICAL DETAILS MAY NOT BE CUT ON PLANS, BUT APPLY UNLESS OTHERWISE NOTED. 3. CJ INDICATES CONTROL JOINT IN CMU. COORDINATE LOCATION WITH BONDING PATTERN AND WALL ELEVATION. (SEE 7 -S1.3) 4. SEE THE PROJECT MANUAL FOR ADDITIONAL CONTROL JOINT LOCATION REQUIREMENTS 5. SEE 15 -S1.3 FOR SLOPED BOND BEAM 6. SEE 14 -S1.3 FOR STEEL AND MASONRY LINTEL SCHEDULE. VERIFY MASONRY OPENING AND ELEVATION WITH ARCHITECTURAL PLANS 7. SL -1, SL -2, ETC., INDICATES SPECIAL LINTEL REQUIRED. SEE 12 -S1.3 8. BP1, BP2, ETC., INDICATES BEARING PLATE REQUIRED. SEE 13 -S1.2 9. PANEL 1, PANEL 2, ETC., INDICATES MASONRY PANEL SEE 3 -S1.3 FOR MASONRY PANEL SCHEDULE 15. LINTEL LEGEND: * INDICATES LINTEL REQUIRED FOR MECHANICAL OPENING. ONLY A PORTION OF THESE LINTELS REQUIRED FOR MASONRY OPENINGS ARE SHOWN ON THE PLANS. THE CONTRACTOR IS REQUIRED TO FURNISH AND INSTALL ALL LINTELS REQUIRED FOR MECHANICAL OPENINGS WHETHER OR NOT SHOWN ON THE PLANS. COORDINATE NUMBER, SIZE, ELEVATION, AND LOCATION OF ALL LINTELS FOR MECHANICAL OPENINGS. A. SEE 14 -S1.3 FOR LINTELS IN NON- BEARING WALLS V 7 L PANEL 2 MASONRY PLAN PANEL 2 Ir W N W J W a 1/8" = 1' -0" N Z II Q a04 N N fN � (/) a N N C14 I N OVERBUILD THIS AREA OVERBUILD THIS N 1 C9 Z II a NC-4 cNn F Q N I WOOD TRUSS PLAN NOTES: 1. SEE S1.3 FOR GENERAL WOOD TRUSS NOTES 2. ALL TRUSSES TO BE ANCHORED AT BEARING LOCATIONS WITH SIMPSON STRONG TIE H3 (OR EQ.) HURRICANE TIES 3. INTERNAL TRUSS CONFIGURATIONS MAY VARY AS LONG AS OUT TO OUT DIMENSIONS ARE MAINTAINED 4. MAX TRUSS SPACING = 24" O.C. (UON) 5. LIVE LOAD DEFL < SPAN /360 TOTAL LOAD DEFL < SPAN /240 6. SEE PROJECT MANUAL FOR ALL TRUSS AND PLYWOOD REQUIREMENTS 7. APPLIED LOADS TOP CHORD LIVE LOAD = 25 PSF + DRIFT DEAD LOAD = 12 PSF BOT CHORD LIVE LOAD = 10 PSF DEAD LOAD = 15 PSF 8. WIND AND SEISMIC LOADS - PER INDIANA BUILDING CODE REQUIREMENTS 2' -6' TRUSS SPACING 2' -6" 10 SPACES 0 24 = 20'-0' IN N12 z 4 12 - Lal - - - C.9 III illl E ����illi11llll ii 1 I � Cl co I Go N I CV N Go I 00 N FRAMING PLAN PLAN 1/8w = 1' -0" C a FOUNDATION PLAN NOTES: 1. SEE S1.2 FOR FOUNDATION NOTES 2. SEE S1.2 FOR TYPICAL FOUNDATION DETAILS. TYPICAL DETAILS MAY NOT BE CUT ON PLANS, BUT APPLY UNLESS OTHERWISE NOTED. 3. TOP EXTERIOR FOOTING EL 99' -0" (UON) 4. TOP INTERIOR FOOTING EL 97' -0" (LION) 5. � --- T INDICATES STEPPED FOOTING. SEE 14 -S1.2 (INDICATES ® I aa- TOP OF FOOTING ELEVATION) 6. FOOTINGS MAY BE EARTH- FORMED WHERE COHESIVE SOILS EXIST AT FOUNDATION ELEVATION. REFER TO THE PROJECT MANUAL THE CONTRACTOR SHALL INCLUDE IN HIS BID FORMING OF FOOTINGS WHERE REVIEW OF THE GEOTECHNICAL ENGINEERING REPORT INDICATES EARTH- FORMING MAY NOT BE POSSIBLE 7. SEE 6 -S1.2 FOR TYPICAL SLAB ON GRADE 8. SEE THE PROJECT MANUAL FOR CONTROL AND CONSTRUCTION JOINT SPACING. THE CONTRACTOR IS ENCOURAGED TO SUBMIT A SLAB PLAN SHOWING ALTERNATE SPACINGS AND LOCATIONS THAT ADAPTS TO THEIR PLANNED CONSTRUCTION SEQUENCE. 9. LEGEND INDICATES MASONRY WALL SUPPORTED ON FOOTING ,)Q,-n" FOUNDATION PLAN 1/8" = 1' -0' 1/8* = 1' -0" NOTE: WHERE NO DETAILS ARE SHOWN, CONSTRUCTION SHALL CONFORM TO SIMILAR WORK ON THE PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL DIMENSIONS AND DETAILS WITH THE ARCHITECTURAL DRAWINGS PRIOR TO CONSTRUCTION RESOLVE ANY DISCREPANCIES WITH THE ARCHffECT PRIOR TO v Z W v co co a Z m ti 0 N H Q v �1 0 0 1r=, �Uo z v� a � = U IN N12 z 4 12 - Lal - - - C.9 III illl E ����illi11llll ii 1 I � Cl co I Go N I CV N Go I 00 N FRAMING PLAN PLAN 1/8w = 1' -0" C a FOUNDATION PLAN NOTES: 1. SEE S1.2 FOR FOUNDATION NOTES 2. SEE S1.2 FOR TYPICAL FOUNDATION DETAILS. TYPICAL DETAILS MAY NOT BE CUT ON PLANS, BUT APPLY UNLESS OTHERWISE NOTED. 3. TOP EXTERIOR FOOTING EL 99' -0" (UON) 4. TOP INTERIOR FOOTING EL 97' -0" (LION) 5. � --- T INDICATES STEPPED FOOTING. SEE 14 -S1.2 (INDICATES ® I aa- TOP OF FOOTING ELEVATION) 6. FOOTINGS MAY BE EARTH- FORMED WHERE COHESIVE SOILS EXIST AT FOUNDATION ELEVATION. REFER TO THE PROJECT MANUAL THE CONTRACTOR SHALL INCLUDE IN HIS BID FORMING OF FOOTINGS WHERE REVIEW OF THE GEOTECHNICAL ENGINEERING REPORT INDICATES EARTH- FORMING MAY NOT BE POSSIBLE 7. SEE 6 -S1.2 FOR TYPICAL SLAB ON GRADE 8. SEE THE PROJECT MANUAL FOR CONTROL AND CONSTRUCTION JOINT SPACING. THE CONTRACTOR IS ENCOURAGED TO SUBMIT A SLAB PLAN SHOWING ALTERNATE SPACINGS AND LOCATIONS THAT ADAPTS TO THEIR PLANNED CONSTRUCTION SEQUENCE. 9. LEGEND INDICATES MASONRY WALL SUPPORTED ON FOOTING ,)Q,-n" FOUNDATION PLAN 1/8" = 1' -0' 1/8* = 1' -0" NOTE: WHERE NO DETAILS ARE SHOWN, CONSTRUCTION SHALL CONFORM TO SIMILAR WORK ON THE PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL DIMENSIONS AND DETAILS WITH THE ARCHITECTURAL DRAWINGS PRIOR TO CONSTRUCTION RESOLVE ANY DISCREPANCIES WITH THE ARCHffECT PRIOR TO v Z W v co co a Z m ti 0 N H Q v KEY PLAN a r� r� Q H U r E V / s O 3 3 3 V � o1k. � o 00 1� M 0 0 0 co Cl 1- 0 O r\7 Z � H n n J me Z W Y < W Z 00 FABRICATION OR INSTALLATION. TYPICAL DETAILS MAY NOT NECESSARILY BE CUT ON THE PLANS BUT APPLY UNLESS OTHERWISE NOTED. WHERE DISCREPANCIES OCCUR PROJECT TITLE BETWEEN THE PLANS, DETAILS, AND THE PROJECT MANUAL, THE GREATER 206104 do 206097 REQUIREMENT SHALL GOVERN. W 1- 0 O Z aD 2 O ao W R r r J 0 0 �Uo z v� a � = U '2�' Z ��Q J �Wm Q ��Q U �U Q U KEY PLAN a r� r� Q H U r E V / s O 3 3 3 V � o1k. � o 00 1� M 0 0 0 co Cl 1- 0 O r\7 Z � H n n J me Z W Y < W Z 00 FABRICATION OR INSTALLATION. TYPICAL DETAILS MAY NOT NECESSARILY BE CUT ON THE PLANS BUT APPLY UNLESS OTHERWISE NOTED. WHERE DISCREPANCIES OCCUR PROJECT TITLE BETWEEN THE PLANS, DETAILS, AND THE PROJECT MANUAL, THE GREATER 206104 do 206097 REQUIREMENT SHALL GOVERN. W 1- 0 O Z aD 2 O ao W R r r