ARCHITECTURAL /SITE ABBREVIATIONS
E
ABBREVIATIONS USED ON THE CONTRACT DOCUMENTS,
INCLUDE BUT ARE NOT LIMITED TO THOSE LISTED BELOW
®
AT
FD
FLOOR DRAIN
QT
AC
AIR CONDITIONING
FHC
FIRE HOSE CABINET
a:
�Uo
ACT
ACOUSTICAL CEILING TILE
FIN
FINISH
R
AD
AREA DRAIN
FIN FL
FINISH FLOOR
RA
ADJ
ADJUSTABLE
FLR
FLOOR
RAD/R
AFF
ABOVE FINISHED FLOOR
FDN
FOUNDATION
RB
AFP
ACCORDION FOLDING PARTITION
FSR
FLEXIBLE SHEET ROOFING
RCP
AGG
AGGREGATE
FSSK
FLOOR SERVICE SINK
RD
ALT
ALTERNATIVE
FT
FEET
REF
AL
ALUMINUM
FfG
FOOTING
REFR
AP
ACCESS PANEL
FE
FIRE EXTINGUISHER
REINF
APPROX
APPROXIMATE
FEC
FIRE EXTINGUISHER CABINET
REQ'D
AR
ACID RESISTANT
EW
EACH WAY
REV
ARCH
ARCHITECTURAL)
GA
GAUGE
RM
ASPH
ASPHALT
GALV
GALVANIZE(D)
R.O.
AV
AUDIO— VISUAL
GB
GRAB BAR
ROW
AWG
AMERICAN WIRE GAUGE
GFCMU
GROUND FACE CONCRETE MASONRY UNIT
AWT
ACOUSTICAL WALL TREATMENT
GFRGU
GLASS FIBER REINFORCED GYPSUM UNIT
PSF
L
ANGLE
GL
GLASS
S
&
AND
GWB
GYPSUM WALLBOARD
SA
PENCIL SHARPENER SUPPORT
EXT
EXTERIOR
SAN
BIT
BITUMINOUS
H
HEIGHT /HIGH
SCHED
BLDG
BUILDING
HB
HOSE BIBB
SD
BLKG
BLOCKING
HDWE
HARDWARE
SECT
BM
BENCH MARK /BEAM
HM
HOLLOW METAL
SEW
B.O.
BOTTOM OF
HORIZ
HORIZONTAL
SGFT
HPT
HIGH POINT
SHT
BOS
BOTTOM OF STEEL
HS
HIGH STRENGTH
SIM
BOT
BOTTOM
HTG
HEATING
SP
BRG
BEARING
HVAC
HEATING/VENTILATING/
SPEC(S)
BRK
BRICK
AIR CONDITIONING
SPKR
BUR
BUILT —UP ROOF
HW
HOT WATER
HWY
HIGHWAY
SQ
SQ FT /SF
CAB
CABINET
ID
INSIDE DIAMETER
SQ IN /SI
CAR
CARPET
IN
INCH
CAT
CATALOG
INCL
INCLUDE(D), (ING)
SQ YD /SY
CB
CHALKBOARD /CATCH BASIN
INFO
INFORMATION
SS
INSUL
INSULATION /INSULATE
ST
CFM
CUBIC FEET PER MINUTE
INTR
INTERIOR
CH
CABINET HEATER
INV
INVERT
STD
STL
CI
CAST IRON
JS
JOIST SUBSTITUTE
STRUCT
CJ
CONTROL JOINT
CL
CENTERLINE
JST
JOIST
SUSP
JT
JOINT
SW
CLR
CLEAR
SYMM
CLG
CEILING
KIT
KITCHEN
CMP
CORRUGATED METAL PIPE
SYNTH
CMT
CERAMIC MOSAIC TILE
L
LENGTH
CMU
CONCRETE MASONRY UNIT
LAM
LAMINATE(D)
T
CO
CLEANOUT
LAV
LAVATORY
T &B
COL
COLUMN
LB /I
POUND
T &G
COMP
COMPACTED
LKR
LOCKER
TA
CONC
CONCRETE
LL
LIVE LOAD
TB
CONSTR
CONSTRUCTION
LLH
LONG LEG HORIZONTAL
TC
CONT
CONTINUOUS /CONTINUE
LLV
LONG LEG VERTICAL
TEL
CONTR
CONTRACTOR
LVR
LOUVER
TERR
CORR
CORRUGATED
LW
LONG WAY
T.O.
CT
CERAMIC TILE
TOC
M
METER/THOUSAND
C TO C
CENTER TO CENTER
TOF
MAS
MASONRY
CSK
COUNTER SINK
TOM
CU FT /CF
CUBIC FEET
MAT
MATERIAL
MAX
MAXIMUM
TOS
CU IN /CI
CUBIC INCH
TV
CU YD /CY
CUBIC YARD
MB
MARKER BOARD
MECH
MECHANICAL
�
CUSP
CUSPIDOR
TWS
MEZZ
MEZZANINE
CW
COLD WATER
MFR
MANUFACTURER
CWF
CEMENTITIOUS WOOD FIBER
MH
MOP HOLDER
LINO
d
PENNY (NAILS, ETC.)
MIN
MINIMUM
N/
D
DEPTH /DEEP
MISC
MISCELLANEOUS
UR
o
DEGREE
MM
MILLIMETER
DC
DISPLAY CASE
MO
MASONRY OPENING
DEPT
DEPARTMENT
MTL
METAL
VCT
VCGWB
DET
DETAIL
N
NORTH
DF
DRINKING FOUNTAIN
VERT
NIC
NOT IN CONTRACT
VFWC
DIA/
DIAMETER
NO /#
NUMBER
VIF
DIM
DIMENSION
NOM
NOM
NOMINAL
DIV
DIVISION
NTS
NOT TO SCALE
VOL
DL
DEAD LOAD
VR
DWG
DRAWING
OC
ON CENTER
VRB
DS
DOWNSPOUT
OD
OUTSIDE DIAMETER
DWC
DRINKING WATER COOLER
OPNG
OPENING
OPP
OPPOSITE
VS
E
EAST
O.H.
OPPOSITE HAND
VT
EA
EACH
0 TO 0
OUT TO OUT
Member
EARTH
a:
�Uo
:E
W
EF
EACH FACE
OW
OPERABLE WALL
z
SAND, GROUT, PLASTER, GWB,
LAMINATED WOOD BEAM
W/
EJ
EXPANSION JOINT
OZ
OUNCE
W/0
EL
ELEVATION
0
CONCRETE
ELEC
ELECTRIC(AL)
P
PAINT
WA
ELEV
ELEVATOR
PA
PUBLIC ADDRESS
�
ENGR
ENGINEER
PERF
PERFORATED
WC
EP
ELECTRICAL PANELBOARD
PLAS
PLASTER
WD
EQ
EQUAL
PL
PLASTIC LAMINATE
WH
EQUIP
EQUIPMENT
PLBG
PLUMBING
WP
EW
EACH WAY
PLYWD
PLYWOOD
WSSK
WWF
EFS (or DEFS)
DIRECT APPLIED EXTERIOR FINISH SYSTEM
PREFAB
PREFABRICATED
EIFS
EXTERIOR INSULATION FINISH SYSTEM
PS
PROJECTION SCREEN
YD
IXH
EXHAUST
PSF
POUNDS PER SQUARE FOOT
EXIST
EXISTING
PSI
POUNDS PER SQUARE INCH
IXP
EXPANSION
PSS
PENCIL SHARPENER SUPPORT
EXT
EXTERIOR
PT
PORCELAIN TILE
EXTN
EXTENSION
PVC
POLYVINYL CHLORIDE
PVMT
PAVEMENT
QUARRY TILE
RISER
RETURN AIR
RADIUS
RESILIENT BASE
REINFORCED CONCRETE PIPE
ROOF DRAIN
REFERENCE
REFRIGERATOR
REINFORCING
REQUIRED
REVISION(S)
ROOM
ROUGH OPENING
RIGHT —OF —WAY
SOUTH
SUPPLY AIR
SANITARY
SCHEDULE
STORM DRAIN /SMOKE DETECTOR
SECTION
SEWER
STRUCTURAL GLAZED FACING TILE
SHEET
SIMILAR
SPACE
SPECIFICATION(S)
SPEAKER
SQUARE
SQUARE FEET
SQUARE INCHES
SQUARE YARDS
STAINLESS STEEL
STORM /STREET
STANDARD
STEEL
STRUCTURAL
SUSPENDED
SHORT WAY /SIDEWALK
SYMMETRY(ICAL)
SYNTHETIC
TREAD
TOP AND BOTTOM
TONGUE AND GROOVE
TOILET ACCESSORY(IES)
TACKBOARD
TOP OF CURB
TELEPHONE
TERRAllO
TOP OF
TOP OF CONCRETE
TOP OF FOOTING
TOP OF MASONRY
TOP OF STEEL
TELEVISION
TYPICAL
TACKABLE WALL SURFACE
UNLESS NOTED OTHERWISE
UNIT VENTILATOR
URINAL
VINYL COMPOSITION TILE
VINYL COVERED GYPSUM WALLBOARD
VERTICAL
VINYL FABRIC WALLCOVERING
VERIFY IN FIELD
VITREOUS
VOLUME
VAPOR RETARDER
VENTED RESILIENT BASE
VENT STACK
VINYL TILE
WEST /WIDE /WIDTH
WITH
WITHOUT
WARDROBE ACCESSORIES
WOOD BASE
WATER CLOSET /WIND COLUMN
WOOD
WATER HEATER
WORKING POINT
WALL SERVICE SINK
WELDED WIRE FABRIC
YARD/YARD DRAIN
MATERIAL SYMBOLS LEGEND
MATERIAL SMMS USED ON IM CONTRACT DOCUMENTS. MUM MN ARE NOT LMTED TO THOSE LISTED MOW
FACE BRICK(PLM)
GLAZED BRICK
CONCRETE MASONRY UNIT (PLAN)
CONCRETE MASONRY UNIT
(SECTION)
r4 CONCRETE MASONRY UNIT
(SOLID, IN SECTION)
SPRAY —ON INSULATION OR
=J FIRE PROTECTION
PLYWOOD
GYPSUM WALLBOARD (LARGE SCALE)
STUD WALL PLAN)—DIMENSIONS TAKEN
TO FINISH ,ACE OF WALL —SEE WALL TYPES.
_ SOLID PANEL FOLDING PARTITION
OR OPERABLE WALL
FABRIC ACCORDION FOLDING
PARTITION
ACOUSTIC TILE CEILING
EXTERIOR INSULATION FINISH SYSTEM
DRAWING SYMBOLS LEGEND
DRAWING SYMBOLS USED ON THE CONTRACT DOCUMENTS, INCLUDE BUT ARE NOT LIMITED TO THOSE LISTED BELOW
_0�
ASPHALT
M?
MUSIC CASEWORK
TM�
TEST BORING & NO.
—X—X— WIRE FENCE OR PARTITION
MEDIA CENTER CASEWORK
Member
EARTH
a:
�Uo
:E
EXISTING CONTOUR
E?
EDUCATIONAL CASEWORK
GRAVEL, STONE OR DRAINAGE FILL
METAL ROOF DECK
z
SAND, GROUT, PLASTER, GWB,
LAMINATED WOOD BEAM
LOCKER TYPE
U
; • T
OR PLAN VIEW OF SIDEWALK
EXISTING POINT ELEVATION
(SMALL SCALE, SECTION)
0
CONCRETE
cr
a1s2
NEW POINT ELEVATION
Alb
BATT INSULATION
TERRAllO
W
FOR ROOM AREA & CEILING HEIGHT
1
RIGID INSULATION
CUT STONE
a
y�Q
ROUGH WOOD (NOM.)
�v
MARBLE
FINISH WOOD
a
SLATE
WOOD OTHER THAN NOMINAL
-- = =—
FACE BRICK(PLM)
GLAZED BRICK
CONCRETE MASONRY UNIT (PLAN)
CONCRETE MASONRY UNIT
(SECTION)
r4 CONCRETE MASONRY UNIT
(SOLID, IN SECTION)
SPRAY —ON INSULATION OR
=J FIRE PROTECTION
PLYWOOD
GYPSUM WALLBOARD (LARGE SCALE)
STUD WALL PLAN)—DIMENSIONS TAKEN
TO FINISH ,ACE OF WALL —SEE WALL TYPES.
_ SOLID PANEL FOLDING PARTITION
OR OPERABLE WALL
FABRIC ACCORDION FOLDING
PARTITION
ACOUSTIC TILE CEILING
EXTERIOR INSULATION FINISH SYSTEM
DRAWING SYMBOLS LEGEND
DRAWING SYMBOLS USED ON THE CONTRACT DOCUMENTS, INCLUDE BUT ARE NOT LIMITED TO THOSE LISTED BELOW
_0�
LEVEL LINE
M?
MUSIC CASEWORK
TM�
TEST BORING & NO.
L?
MEDIA CENTER CASEWORK
Member
ADMINISTRATION
a:
�Uo
:E
EXISTING CONTOUR
E?
EDUCATIONAL CASEWORK
��>IP►�'
z
NEW CONTOUR
air
LOCKER TYPE
U
; • T
DETAIL REFERENCE
EXISTING POINT ELEVATION
Z
0
cr
a1s2
NEW POINT ELEVATION
Alb
ROOM NO. — SEE ROOM LEGEND
W
FOR ROOM AREA & CEILING HEIGHT
ui STORM SEWER INLETS
W? WINDOW DESIGNATION
5 Al 1 DOOR NUMBER(S)
0—( 3 STRUCTURAL GRID REFERENCE
O KEY NOTE
w1 INTERIOR WALL TYPE
1 WALL SECTION
A6.1
4
1 3 A8.1 1 INTERIOR ELEVATIONS
A8.1
1 2
A BUILDING SECTION
A4.1
STEPHEN BACKER
President
BRUCE CALABRESE
Vice President
JEFFRY CARTER
Secretary
GREG PHILLIPS
Member
JOSEPH MILLER
Member
ADMINISTRATION
DR. BARBARA UNDERWOOD Superintendent
ROGER MCMICHAEL Assistant Superintendent
STEVE STEPHANOFF Director of Operations /Staff Relations
ROLLIN FARRAND Director of Facilities and Transportation
SHEET INDEX
COVER
ABBREVIATIONS AND INDEX
SITE
— SITE SURVEY
GD1.0 DEMOLITION PLAN
G1.0 LAYOUT PLAN
G2.0 GRADING AND UTILITY PLAN
G3.1 TENNIS RESURFACING PLAN
G4.1 SITE DETAILS
STRUCTURAL
S1.1 FOUNDATION, FRAMING AND MASONRY PLAN
S1.2 STRUCTURAL DETAILS, NOTES, SCHEDULES
S1.3 STRUCTURAL DETAILS, NOTES, SCHEDULES
ARCHITECTURAL
A1.1 TENNIS BUILDING — FLOOR PLAN, CEILING PLAN,
ROOF PLAN, ELEVATIONS, DETAILS AND SCHEDULES
A1.2 TENNIS BUILDING — DETAILS, ENLARGED TOILET
PLANS AND WALL SECTIONS
A1.3 HIGH SCHOOL — FLOOR PLAN
A1.4 FOOTBALL STADIUM PLAN, ELEVATIONS AND
SECTIONS
PLUMBING
P1.1 PLUMBING SYMBOLS, ABBREVIATIONS, AND NOTES
P2.1 TENNIS BUILDING — FOUNDATION / FLOOR PLAN
PSU.1 PLUMBING SITE PLAN
MECHANICAL
M1.1 MECHANICAL SYMBOLS AND ABBREVIATIONS
M2.1 TENNIS BUILDING VENTILATION PLAN, DETAILS AND
SCHEDULES
M2.2 HIGH SCHOOL — VENTILATION PLAN
ELECTRICAL
E1.1 ELECTRICAL SYMBOLS AND DETAILS
E2.2 TENNIS BUILDING ELECTRICAL PLANS
E2.2 HIGH SCHOOL — ELECTRICAL PLANS
TECHNOLOGY
T1.1 TECHNOLOGY SITE PLAN
T1.2 FIRST FLOOR TECHNOLOGY PLAN
SITE LOCATION MAP
MICHIGAN
wC7w arr
souT1'i t3o+o
FORT WAYW
"°R'M INDIANA C"A
ILLINOIS OHIO
STATE INDIANAPOLIS
T.ERRE HAUTE
MAP
EvA MU E
KENTUCKY
LOCATION "o�` I
MA.�, PRO.Em
126th SHM
11M STREET
106th SIRED �
.. 96tH STREET
r
e
131st SnW
I CARMEL, INDIANA I
PH
3
a�
W
3
Z
i
>m
8
N
v
a
co 6
...
W
Z
Z_
3
a
>wo Ld E
V
/ s
O
3
� 3
V 110
o--
lqt
00
I•�•r
M
0
o
0
is
N ^O
PZ
O
Z
O <
nn
U
N
}
mn
Z W
Y
< W
Ir _
00
PROJECT TITLE
206104 & 206097
W
H
Z
0
Z
O
CD
W
x
LLI
Z
J
0
0
a:
�Uo
:E
z
a
FW=
0
U
'2�'
Z
0
cr
J
a2v
W
mWx
a
y�Q
U
�v
a
U
W
Z
Z_
3
a
>wo Ld E
V
/ s
O
3
� 3
V 110
o--
lqt
00
I•�•r
M
0
o
0
is
N ^O
PZ
O
Z
O <
nn
U
N
}
mn
Z W
Y
< W
Ir _
00
PROJECT TITLE
206104 & 206097
W
H
Z
0
Z
O
CD
W
x
LLI
Z