HomeMy WebLinkAboutCSO Schenkel Shultz invoices Ca•CD
CSO SCHENKEL SHULTZ
September 1, 2006
Project No: 25407HC
Invoice No: 32342
LES OLDS
CARMEL REDEVELOPMENT COMMISSION
ONE CIVIC SQUARE
CARMEL, IN 46032
Project 25407HC CCC-PARCEL 48 4TH GATEWAY-SURVEY
For professional services rendered for the period July 29. 2006 to August 25. 2006 for the
referenced project.
Phase P4CD CONSTRUCTION DOCUMENTS
Professional Personnel
Hours Rate Amount
Sellers, Kevin 8/2/06 8.00 95.00 760.00
Working with Tim Butler on electrical &finishing civil
Sellers, Kevin 8/15/06 4.00 95.00 380.00
Working on specs and electrical with Tim Bulter
Totals 12.00 1,140.00
Total Labor 1,140.00
Total this Phase $1,140.00
Phase RE REIMBURSABLE
Reimbursable Expenses
Reim. Consultants
8/8/06 SMITH/ROBERTS & 1,500.00
ASSOCIATES, INC. /
Total Reimbursables 1,500.00 1,500.00 1/
Unit Billing
8.5 X 11 B/W COPIES 0.48
24 X 36 B/W PLOTS 22.75
Total Units 23.23 23.23
Total this Phase $1,523.23
Total this Invoice $2,663.23
Please remit to:CSO,PO Box 6069,Dept 94,Indianapolis, IN 46206-6069. Unpaid amounts over 30 days will be subject to 1 1/2%
mnnthlv interact champ
V
(93
CSO SCHENKEL SHULTZ
CARMEL REDEVELOPMENT COMMISSION May 31,2006
ONE CIVIC CENTER Invoice No: 31808
CARMEL IN 46032 Project No: 25407HC
ATTN: MR. LES OLDS
Principal: 172
Project Manager: 172
Re: CCC-PARCEL 48-4TH GATEWAY-SURVEY
For professional services rendered for the period May 1,2006 to May 26,2006 for the referenced project.
Fee Charges
Week Ending Rate Hours Amount Description of Work
SCHEMATIC DESIGN
Olson,Robert R. 5/12/2006 $ 120.00 2.50 $ 300.00 Review survey and get copies from
(Sr.Professional III) surveyor. Review the location with
Les and start project in office
Sellers,Kevin R 5/12/2006 $ 95.00 8.00 $ 760.00 Begin work on construction
(Professional II) documents for the 4th Gateway on
North Rangeline Road. Working on
cover sheet,demo plan
DESIGN
DEVELOPMENT
Morgan, Leslie 5/19/2006 $ 65.00 1.00 $ 65.00 Took survey photos of the future 4th
(Technician II) Gateway site
CONSTRUCTION
DOCUMENTS
Sellers,Kevin R 5/19/2006 $ 95.00 16.00 $ 1,520.00 Working on site,demo,and grading
(Professional II) plan civil documents
Sellers, Kevin R 5/26/2006 $ 95.00 12.00 $ 1,140.00 Coordinating the electrical with Tim
(Professional II) Butler of LACE,structural with Smith
Roberts Associates,and
architectural with Brandon Bogan.
Also,working on the grading,
erosion control and details
Stoner, Mark 5/26/2006 $ 65.00 4.00 $ 260.00 Developing construction documents
(Technician II) adjusting existing previous gateway
plans to reflect new(4th)gateway.
Creating gateway plan,elevation
and section documents
Total Fee Charges $ 4,045.00
Total Current Billing $ 4,045.00
r.r
Please Remit to: CSO,PO Box 6069,Dept.94,Indianapolis,IN 46206-6069
Unpaid amounts over 30 days will be subject to a 1 1/2%monthly interest charge
(.19)
CSO SCHENKEL SHULTZ
July 31, 2006
Project No: 25407HC
Invoice No: 32108
LES OLDS
CARMEL REDEVELOPMENT COMMISSION
ONE CIVIC SQUARE
CARMEL, IN 46032
Project 25407HC CCC-PARCEL 48 4TH GATEWAY-SURVEY
For professional services rendered for the period June 24. 2006 to July 28.2006 for the
referenced project.
Professional Personnel
Hours Rate Amount
Sellers, Kevin 7/11/06 8.00 95.00 760.00 ,/
Working on Gateway#4 civil plans. Working in site plan.
Sellers, Kevin 7/12/06 2.00 95.00 190.00 ✓
Working on Gateway#4 civil plans. Working in site plan and grading
plan.
Sellers, Kevin 7/14/06 4.00 95.00 380.00
Working on Gateway#4 civil plans. Working in site plan. (./
Sellers, Kevin 7/19/06 4.00 95.00 380.00
Working on site layout and sending a set for pricing to Shiel
Sexton.
Morgan, Leslie 7/25/06 2.00 65.00 130.00
Labeled plan according to Demo Notes through the
instruction of Kevin.
Sellers, Kevin 7/28/06 6.00 95.00 570.00
Working with Dan Newberry of Shiel Sexton on the estimate of the 4th
gateway and completing the civil part of the Const. Doc's.
Totals 26.00 2,410.00
Total Labor 2,410.00
Unit Billing
11 X 17 BAN COPIES
6/26/06 0.16
24 X 36 B/W PLOTS
6/26/06 39.00
8.5 X 11 BAN COPIES
6/26/06 0.32
8.5 X 11 COLOR COPY
6/26/06 6.00
Total Units 45.48 45.48
Total this Invoice $2,455.48
Please remit to:CSO,PO Box 6069,Dept 94,Indianapolis, IN 46206-6069.Unpaid amounts over 30 days will be subject to 1 1/2%
monthly interest charge,
(,,S
CSO SCHENKEL SHULTZ
July 31, 2006
Project No: 26005HC
Invoice No: 32115
LES OLDS .
CARMEL REDEVELOPMENT COMMISSION
ONE CIVIC SQUARE
CARMEL, IN 46032
Project 26005HC CCC-PARCEL 55-MASTER PLAN 2006
For professional services rendered for the period June 24,2006 to July 28.2006 for the
referenced project.
Professional Personnel
Hours Rate Amount
Olson, Robert 6/9/06 3.50 120.00 420.00
Master plan changes for two boards for Mr. Ron Carter for
Monday's TV interview. /
Olson, Robert 6/16/06 2.00 120.00 240.00
Master plan changes.
Sellers, Kevin 6/23/06 16.00 95.00 1,520.00 l/
Finalizing the masterplan through aerials. Tentative
completion of master plan by July 7th.
Olson, Robert 6/30/06 1.00 120.00 120.00
Changes to the Ron Carter CRC involvement plan and
having a new drawing plotted and mounted per
Sherry's request.
Olson, Robert 6/30/06 1.25 120.00 150.00 /
Master Plan changes review for street parking review.
Sellers, Kevin 6/30/06 1.00 95.00 95.00 L/
Reviewing Master Plan final layout will be presented to
Bob and Dan next week.
Sellers, Kevin 6/30/06 2.00 95.00 190.00 ✓
Revised Carmel Master Plan for CRC/Private Owners.
si
Sellers, Kevin 7/6/06 4.00 95.00 380.00
Working on Master Plan.
Sellers, Kevin 7/7/06 6.00 95.00 570.00 Li
Reviewing Master Plan. Checking on 90% progress.
Olson, Robert 7/10/06 .25 120.00 30.00 ./
Review changes on plans.
Olson, Robert 7/11/06 1.00 120.00 120.00
Review aerials for Master Plan. I
Sellers, Kevin 7/12/06 1.00 95.00 95.00
Reviewing drawing. /
Olson, Robert 7/17/06 .50 120.00 60.00 �l
Review master plan to insert Oliver's design.
Please remit to:CSO,PO Box 6069,Dept 94, Indianapolis,IN 46206-6069.Unpaid amounts over 30 days will be subject to 1 1/2%
monthly interest charge.