HomeMy WebLinkAbout219380 04/24/2013 CITY OF CARMEL, INDIANA VENDOR: 171000 Page 1 of 1
y}+�~f ONE CIVIC SQUARE JONES&HENRY ENGINEER INC CHECK AMOUNT: $43,266.75
•?o CARMEL, INDIANA 46032 3103 EXECUTIVE PARKWAY SUITE 300
TOLEDO OH 43606 CHECK NUMBER: 219380
CHECK DATE: 4/24/2013
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
609 5023990 62967 18, 880 . 02 OTHER EXPENSES
609 5023990 63066 13 , 104 . 45 OTHER EXPENSES
609 5023990 63174 4, 573 . 48 OTHER EXPENSES
609 5023990 63233 6, 708 . 80 OTHER EXPENSES
Jones & Henry Engineers, Ltd.
3103 Executive Parkway, Suite 300
Toledo, Ohio 43606
�a'dm-, . 419.473.9611
CITY OF CARMEL Invoice number 63174
MR. JOHN DUFFY Date 02/11/2013
UTILITY DIRECTOR
760 3rd AVE. S.W. Project 00451-6528 CONST-WTP 1
CARMEL, IN 46032
Professional services performed through January 31,2013
Professional engineering services during construction of the City's new Water Treatment Plant No. 1 in
accordance with Amendment No. 5-10 dated September 1, 2010.The projected fee is$960,000.
9-001 CONST-WTP 1 CONSTRUCTION SRVS
Labor
Cost Cost Billed
Hours Rate Amount Amount
MICHAEL P. MAGSAM 43.50 15.00 652.50
THOMAS J. SCHREIBER 28.00 27.6912 775.35
Subtotal 71.50 1,427.85
Rate Basis Markup Amount
DPE 35.00% 1,427.85 499.78 1,927.63
Overhead 130.00% 1,927.63 2,505.85 4,433.48 4,433.48
Reimbursable
Cost Billed
Amount Multiplier Amount
MAILING COST/UPS COSTS 23.56 23.56
Phase subtotal 4,457.04
9-002 CONST-FIBER OPTIC DUCT
Labor
Cost Cost Billed
Hours Rate Amount Amount
THOMAS J. SCHREIBER 8.00 27.6912 221.53
Subtotal 8.00 221.53
Rate Basis Markup Amount
DPE 35.00% 221.53 77.54 299.07
Overhead 130.00% 299.07 388.78 687.85 687.85
9-003 SUPSRV-UTILITY REVIEW
Labor
Cost Cost Billed
Hours Rate Amount Amount
MICHAEL P. MAGSAM 2.50 15.00 37.50
Subtotal 2.50 37.50
Rate Basis Markup Amount
DPE 35.00% 37.50 13.13 50.63
Overhead 130.00% 50.63 65.81 116.44 116.44
Page 1 of 2
CITY OF CARMEL Invoice number 63174
Project 00451-6528 CONST-WTP 1 Date 02/11/2013
Invoice total 5,261.33
Invoice Summary
Prior Current Total
Description Billed Billed Billed
9-001 CONST-WTP 1 CONSTRUCTION SRVS
9-002 CONST-FIBER OPTIC DUCT
9-003 SUPSRV-UTILITY REVIEW
Total 920,030.84 5,261.33 925,292.17
Thank you for your business.
Page 2 of 2
1
Prescribed by State Board of Accounts City Form No.201 (Rev 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show, kind of service, where
performed, dates of service rendered, by whom, rates per day, number of units,
price per unit, etc.
Payee
171000
JONES & HENRY ENGINEER INC Purchase Order No.
2000 WEST CENTRAL AVE Terms
TOLEDO, OH 43606 Due Date 4/2/2013
Invoice Invoice Description
Date Number (or note attached invoice(s) or bill(s)) Amount
4/2/2013 63174 $4,573.48
1 hereby certify that the attached invoice(s), or bill(s) is (are)true and
correct and I have audited same in accordance with IC 5-11-10-1.6
Date OfAcer
VOUCHER # 131318 WARRANT # ALLOWED
171000 IN SUM OF $
JONES & HENRY ENGINEER INC
2000 WEST CENTRAL AVE
TOLEDO, OH 43606
Carmel Water Utility
ON ACCOUNT OF APPROPRIATION FOR
Board members
PO# INV# ACCT# AMOUNT Audit Trail Code
63174 07-1050-06 $4,573.48
CoJ
Voucher Total $4,573.48
Cost distribution ledger classification if
claim paid under vehicle highway fund
. ._- _ � �a3 s. �� C�� zl�I ►3
Q
=- a Jones & Henry Engineers, Ltd.
�
ry` 3103 Executive Parkway, Suite 300
Toledo, Ohio 43606
419.473.9611
CITY OF CARMEL Invoice number 62967
MR.JOHN DUFFY Date 12/13/2012
UTILITY DIRECTOR
760 3rd AVE. S.W. Project 00451-6528 CONST-WTP 1
CARMEL, IN 46032
Professional services performed through November 30,2012
Professional engineering services during construction of the City's new Water Treatment Plant No. 1 in
accordance with Amendment No. 5-10 dated September 1, 2010.The projected fee is$960,000.
9-001 CONST-WTP 1 CONSTRUCTION SRVS
Labor
Cost Cost Billed
Hours Rate Amount Amount
BRIAN W. HOUGHTON 27.00 45.7482 1,235.20
BRYAN J. CLEVENGER 69.50 18.00 1,251.00
GARY L.WILLIAMS 6.00 45.1425 270.86
J. DOUGLAS BROOKHART 35.50 31.00 1,100.50
LEROY K. BROWN 20.00 22.0376 440.75
ROBERT P. SHUMATE 6.00 34.4987 206.99
THOMAS J. SCHREIBER 48.00 27.6912 1,329.18
Subtotal 212.00 5,834.48
Rate Basis Markup Amount
DPE 35.00% 5,834.48 2,042.05 7,876.53
Overhead 130.00% 7,876.53 10,239.56 18,116.09 18,116.09
Reimbursable
. Cost Billed
Amount Multiplier Amount
MAILING COST/UPS COSTS 103.72 103.72
OTHER CONTRACT COST 52.99 1.10 58.29
PRINTING,COPYING,BLUEPRINTING rr 5.00 1.10 5.50
SUBSISTENCE �J �' 257.49 257.49
Transportation Costs 152.63 152.63
Phase subtotal 18,693.69
9-002 CONST-FIBER OPTIC DUCT
Labor
Cost Cost Billed
Hours Rate Amount Amount
THOMAS J. SCHREIBER 26.00 27.6912 719.97
Subtotal 26.00 719.97
Rate Basis Markup Amount
DPE 35.00% 719.97 251.98 971.95
Overhead 130.00% 971.95 1,263.53 2,235.48 2,235.48
Pace 1 of 2
r-TY OF CARMEL Invoice number 62967
Project 00451-6528 CONST-WTP 1 Date 12/13/2012
9-003 SUPSRV-UTILITY REVIEW
Labor
Cost Cost Billed
Hours Rate Amount Amount
MICHAEL P. MAGSAM 4.00 15.00 60.00
Subtotal 4.00 60.00
Rate Basis Markup Amount
DPE 35.00% 60.00 21.00 81.00
Overhead 130.00% 81.00 105.30 186.30 186.30
Invoice total 21,115.50
Invoice Summary
Prior Current Total
Description Billed Billed Billed
9-001 CONST-WTP 1 CONSTRUCTION SRVS
9-002 CONST-FIBER OPTIC DUCT
9-003 SUPSRV-UTILITY REVIEW
Total 883,865.56 21,115.50 904,981.06
Thank you for your business.
Paste 2 of 2 I
I
Prescribed by State Board of Accounts City Form No.201 (Rev 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show, kind of service, where
performed, dates of service rendered, by whom, rates per day, number of units,
price per unit, etc.
Payee
171000
JONES & HENRY ENGINEER INC Purchase Order No.
2000 WEST CENTRAL AVE Terms
TOLEDO, OH 43606 Due Date 4/2/2013
Invoice Invoice Description
Date Number (or note attached invoice(s) or bill(s)) Amount
4/2/2013 62967 $18,880.02
1 hereby certify that the attached invoice(s), or bill(s) is (are) true and
correct and I have audited same in accordance with IC 5-11-10-1.6
Date O cer
i
VOUCHER # 131316 WARRANT# ALLOWED
171000 IN SUM OF $
JONES & HENRY ENGINEER INC
2000 WEST CENTRAL AVE
TOLEDO, OH 43606
Carmel Water Utility
ON ACCOUNT OF APPROPRIATION FOR
Board members
PO# INV# ACCT# AMOUNT Audit Trail Code
62967 07-1050-06 $18,880.02
CO �1Nccr/
Voucher Total $18,880.02
Cost distribution ledger classification if
claim paid under vehicle highway fund
Jones.& Henry Engineers, Ltd.
3103 Executive Parkway, Suite. 300
Toledo, Ohio 43606
419.473.9611
CITY OF CARMEL Invoice number 63066
MR.JOHN DUFFY Date 01/09/2013
UTILITY DIRECTOR
760 3rd AVE.S.W. Project 00451-6528 CONST-WTP 1
CARMEL, IN 46032
Professional services performed through December 31,2012
Professional engineering services during construction of the City's new Water Treatment Plant No. 1 in
accordance with Amendment No. 5-10 dated September 1,2010.The projected fee is$960,000.
9-001 CONST-WTP 1 CONSTRUCTION SRVS
Labor
Cost Cost Billed
Hours Rate Amount Amount
BRIAN W. HOUGHTON �l ` f�� e(I5��tsc�as 25.00 45.7482 1,143.71
BRYAN J. CLEVENGER- Rc�e�� (���,� 35.00 18.00 630.00
CLIFFORD M. GORDON 14.00 43.2964 606.15
GARY L.WILLIAMS " e�� I° '`��� 6.00 45.1425 270.86
J. DOUGLAS BROOKHART- C.I.,I v r; ( .S 9.00 31.00 279.00
LEROY K. BROWN 10.00 22.0376 220.38
MICHAEL P. MAGSAM 33.00 15.00 495.00
THOMAS J. SCHREIBER �� I ° ° ` f 16.00 27.6912 443.06
Subtotal 148.00 4,088.16
Rate Basis Markup Amount
DPE 35.00% 4,088.16 1,430.83 5,518.99
Overhead 130.00% 5,518.99 7,174.72 12,693.71 12,693.71
Reimbursable
Cost Billed
Amount Multiplier Amount
Large Format Copies 143.22 1.10 157.54
SUBSISTENCE 137.76 137.76
Transportation Costs 115.44 115.44
�- Phase subtotal 13,104.45
9-002 CONST-FIBER OPTIC DUCT /
Labor -=/
Cost Cost Billed
Hours Rate Amount Amount
BRYAN J. CLEVENGER 2.50 18.00 45.00
THOMAS J. SCHREIBER 21.00 27.6912 581.52
Subtotal 23.50 626.52
Rate Basis Markup Amount
DPE 35.00% 626.52 21926 845.78
Overhead 130.00% 845.78 1,099.55 1,945.33 1,945.33
Phase subtotal 1,945.33
Page 1 of 2
CITY OF CARMEL Invoice number 63066
Project 00451-6528 CONST-WTP 1 Date 01/09/2013
Invoice total 15,049.78
Invoice Summary
Prior Current Total
Description Billed Billed Billed
9-001 CONST-WTP 1 CONSTRUCTION SRVS
9-002 CONST-FIBER OPTIC DUCT
9-003 SUPSRV-UTILITY REVIEW
Total 904,981.06 15,049.78 920,030.84
Thank you for your business.
JI 1
i
Page 2 of 2
i Prescribed by State Board of Accounts City Form No.201 (Rev 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show, kind of service, where
performed, dates of service rendered, by whom, rates per day, number of units,
price per unit, etc.
Payee
171000
JONES & HENRY ENGINEER INC Purchase Order No.
2000 WEST CENTRAL AVE Terms
TOLEDO, OH 43606 Due Date 4/2/2013
Invoice Invoice Description
Date Number (or note attached invoice(s) or bill(s)) Amount
4/2/2013 63066 $13,104.45
1 hereby certify that the attached invoice(s), or bill(s) is (are) true and
correct and I have audited same in accordance with IC 5-11-10-1.6
Date Offi
VOUCHER # 131314 WARRANT # ALLOWED
171000 IN SUM OF $
JONES & HENRY ENGINEER INC
2000 WEST CENTRAL AVE
TOLEDO, OH 43606
Carmel Water Utility
ON ACCOUNT OF APPROPRIATION FOR
Board members
PO# INV# ACCT# AMOUNT Audit Trail Code
63066 07-1050-06 $13,104.45
o���Gf ,fir✓
Voucher Total $13,104.45
Cost distribution ledger classification if
claim paid under vehicle highway fund
se
Jones & Henry Engineers, Ltd.
3103 Executive Parkway, Suite 300
Toledo, Ohio 43606
MidTW.U4! 419.473.9611
ra:a TMnw;�:'
CITY OF CARMEL Invoice number 63233
MR. JOHN DUFFY Date 03/12/2013
UTILITY DIRECTOR
760 3rd AVE. S.W. Project 00451-6528 CONST-WTP 1
CARMEL, IN 46032
Professional services performed through February 28,2013
Professional engineering services during construction of the City's new Water Treatment Plant No. 1 in
accordance with Amendment No. 5-10 dated September 1,2010.The projected fee is$960,000.
9-001 CONST-WTP 1 CONSTRUCTION SRVS
Labor
Cost Cost Billed
Hours Rate Amount Amount
BRIAN W. HOUGHTON 11.00 46.4694 511.16
CLIFFORD M. GORDON 29.00 44.0175 1,276.51
GARY L.WILLIAMS 8.00 45.8636 366.91
Subtotal 48.00 2,154.58
Rate Basis Markup Amount
DPE 35.00% 2,154.58 754.09 2,908.67
Overhead 130.00% 2,908.67 3,781.29 6,689.96 6,689.96
Reimbursable
Cost Billed
Amount Multiplier Amount
MAILING COST/UPS COSTS 18.84 18.84
Phase subtotal 6,708.80
9-002 CONST-FIBER OPTIC DUCT
Labor
Cost Cost Billed
Hours Rate Amount Amount
THOMAS J. SCHREIBER 12.00 27.6912 332.29
Subtotal 12.00 332.29
Rate Basis Markup Amount
DPE 35.00% 332.29 116.30 448.59
Overhead 130.00% 448.59 583.18 1,031.77 1,031.77
Consultant
Cost Billed
Amount Multiplier Amount
OUTSIDE CONSULTANTS
MILLER SURVEYING INC. 650.00 1.10 715.00
Phase subtotal 1,746.77
Invoice total 8,455.57
Page 1 of 2
CITY OF CARMEL Invoice number 63233
Project 00451-6528 CONST-WTP 1 Date 03/12/2013
Invoice Summary
Prior Current Total
Description Billed Billed Billed
9-001 CONST-WTP 1 CONSTRUCTION SRVS
9-002 CONST-FIBER OPTIC DUCT
9-003 SUPSRV-UTILITY REVIEW
Total 925,292.17 8,455.57 933,747.74
Thank you for your business.
I
Page 2 of 2
Prescribed by State Board of Accounts City Form No.201 (Rev 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show, kind of service, where
performed, dates of service rendered, by whom, rates per day, number of units,
price per unit, etc.
Payee
171000
JONES & HENRY ENGINEER INC Purchase Order No.
2000 WEST CENTRAL AVE Terms
TOLEDO, OH 43606 Due Date 4/16/2013
Invoice Invoice Description
Date Number (or note attached invoice(s) or bill(s)) Amount
4/16/2013 63233 $1,746.77
1 hereby certify that the attached invoice(s), or bill(s) is (are) true and
correct and I have audited same in accordance with IC 5-11-10-1.6
Date O i er
it
I
VOUCHER # 131424 WARRANT # ALLOWED
171000 IN SUM OF $
JONES & HENRY ENGINEER INC
2000 WEST CENTRAL AVE
TOLEDO, OH 43606
Carmel Water Utility
ON ACCOUNT OF APPROPRIATION FOR
Board members
PO# INV# ACCT# AMOUNT Audit Trail Code
63233 07-1050-06
co N p/ec f G AJ
Voucher Total
Cost distribution ledger classification if
claim paid under vehicle highway fund