Loading...
HomeMy WebLinkAboutSanctuary Amenity Areale ®r v s N®® NMI N I MI May 2, 2013 JAmES BRAINARD, MAYOR Ms. Lori McElroy CESO Civil Engineers, Architects, and Surveyors 8534 Yankee Street, Suite 213 Dayton, Ohio 45458 RE: Sanctuary at 116th Street amenity area - Project Review #3 Dear Ms. McElroy: The City received the site plans for this project on April 4, 2013, in response to the City's comment letter dated November 29, 2012. We offer the following comments: CONSTRUCTION DRAWING REVIEW COMMENTS 1. Previous comment 3 of a letter dated November 29, 2012. The plans shall be stamped by a Professional Engineer. The Department repeats this comment. 2. Previous comment 11 of a letter dated November 29, 2012. More details are required for the parking area. What type of pavement will be used? Improvements within the City's right -of- way shall meet City standards. As discussed in a meeting on 511113, the parking area shall meet City standards for a residential driveway with 6- inches of concrete pavement. 3. Please label the locations of the sidewalks and the path on Sheet 3 (within a legend). 4. Please indicate the locations of all ADA ramps to be installed with this project on Sheet 3. 5. Please replace the City's detail for ADA ramps on Sheet 4 with the applicable INDOT standard ADA ramp detail (the City now requires INDOT standard ADA ramps). 6. The symbols for "Existing Spot Grade" and "Proposed Spot Grade" on Sheet 5 appear to be transposed in the legend. 7. Please add a note to the plans indicating that the path shall be installed at the same grade as the surrounding soil to prevent any drainage issues. GENERAL INFORMATION 8. Previous Comment 39 of a letter dated November 29, 2012, Commercial Curb Cut Approval. Please provide 8' /z x 11 exhibits with the request for approval. Provide all pertinent information including lane widths, overall width, radii, lane markings, location of opposing drives or streets, relationship to the location of previous curb cut, etc. The Department repeats this comment. 9. Previous Comment 40 of a letter dated November 29, 2012. Temporary Construction Entrance Approval. A construction entrance is not shown on this submittal. Please indicate the location of a construction entrance on the plans. If the construction entrance is at a location other than that of a permanent curb cut, then Board of Public Works and Safety approval is required for the construction entrance. If you have questions, please contact me at 571 -2441. Sincerely, Gary R. can, DEPARTMENT OF ENGINEERING ONE Q IC SQL-A.RE, CARMEL, IN 46032 OFFICE 317-571.2441 FAx 317. 71.2439 EMAIL engineeringarumei. ill, gcn Ms. Lori McElroy May 2, 2013 RE: Sanctuary at 116"' Street amenity area - Project Review #3 Page 2 of 2 Assistant City Engineer Department of Engineering cc: Angelina Conn, Department of Community Services Rachel Boone, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Paul Arnone, Carmel Utilities Greg Hoyes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers, PC issvrdppsluser datalz:lsharedlDeveloptnent ReviewslPROJREV131 SANC TUARYAT116THSTREETAMENITYAREAREV #3