Loading...
HomeMy WebLinkAboutCorrespondence Conn, Angelina V From: Justin Moffett[Justin @otdg.netj Sent: Monday, April 22, 2013 2:58 PM To: Conn, Angelina V Cc: Hollibaugh, Mike P Subject: Re: Review comments for Applegate Addition, Lot 3 (#13040015 SDR) Attachments: Rice 4-18-13 ELEV.pdf; Rice 4-18-13 BSMT.pdf; Rice 4-18-13 F1.pdf Angie, Attached are plan revisions based on your comments. 1) Added windows. 2)Direct vent fireplace unit to be vented out of side of house. 3) Columns adjusted. 4) Patio and fence design details TBD to be submitted with landscape plans. At this time there is no hardscape planned. Just landscape area outside of covered porch. Thanks, Justin Moffett The Old Town Design Group 317.966.2023 phone justin@otdcl.net On Thu, Apr 18, 2013 at 1:07 PM, Conn, Angelina V <Aconn @carmel.in.gov> wrote: Hi,Justin— Here are a few review comments, below,otherwise this one is close to being approved. 1. Please add a window to the Right Elevation, just east of the porch, either along that bathroom wall or that stairway wall. 2. Please show/label how the first floor fireplace will be vented through the roof. Is it a vent, a chimney, or other method? 3. Is there any way to make the porch columns a little bit wider/thicker? 4. Please provide the design details of the courtyard. Is it all pavers?Will it have a fence? Angie Conn, Planning Administrator City of Carmel Planning &Zoning Division Dept. of Community Services 1 Civic Square, 3rd Fir., Carmel, IN 46032 Office: 317-571-2417 I Direct: 317-571-2281 I Fax: 317-571-2426 I E-mail: aconn©carmel.in.gov I W: www.carmeldocs.com Please consider the environment before printing this e-mail 1 Conn, Angelina V From: Justin Moffett[Justin@otdg.net] Sent: Friday, April 19, 2013 9:29 AM To: Foley, Amanda J; dmyers @crossroadengineers.com; gilko @crossroadengineers.com Cc: Conn, Angelina V; Boone, Rachel M.; Duncan, Gary R; Thomas, John G; Redden, Nick; Barnes, David R Subject: Re: Docket No. Assignment:Applegate Addition, Lot 3 (#13040015 SDR) Per the meeting we had a few weeks ago with you and CrossRoad they were going to be looking into the offsite storage plan at Reading Tree Park as there is zero opportunity for onsite storage. They are still in process on that research and I'm hoping to get their response quickly. Once they have a plan in place I will get back to you to set a time to talk further. Thanks, Justin On Fri, Apr 19, 2013 at 9:17 AM, Foley, Amanda J<afolev @carmel.in.gov> wrote: All, Detention needs to be provided for Applegate. We have allowed the first two lots to be constructed, and the detention to be deferred. However,the detention needs to be provided at this time. Justin, Can you please provide an update of your plans for detention? Thanks, Amanda Foley Staff Engineer • City of Cannel Department of Engineering • 317-571-2309 (direct) 1