Loading...
HomeMy WebLinkAbout05070073-Sq. Ft. k, All sidewalks and driveways Sewer and water I nes, septic system, (tanks & filed system) and/or well locations m Drainage flow arrows n. All drainage swa es and subsurface fac ties (retenton / detention areas, etc. ) discharge line locations p, *NOTE: If land is not withil FILIRTHER NOTES / NOTICES: CARMEL ZONING ORDINANCE Z-289, SECTION 29.0~,02 (3): "The Director shall approve or deny the Improvement Location Permit within five (5) working days of the receipt of the written application form and accompanying materia s. The Improvement Location Permit sba I b,e issued when the proposed structure, improvement, or use and its location conform in all respects to this ordinance. IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED WITH ANY iNFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE SUBMITTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETA~L~ TO INDICATE THE NATURE AND EXTENT OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES. SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAE SUBMTI'rAL, WILL EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW. THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE NOCCUPIABLE_ ~ .. I HED SPACE. IF AN AREA SO LABELED IS TO BE A FINISHED SPACE,,, CONSTRUCTI,O, N PLANS MUST BE LABELED ACCORDINGLY. IF IT IS DETERMINED THAT AN UNFINISHED, BONUS ROOM AREA IS TO BECOME A FINISHED AREA AFT_ER T_.~ THE PLANs AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING & CODE ENFORCEMENT ALL CONSTRUCT[ON IS SUB3ECT TO FIELD INSPECTION, AND SHOULD NOT BEGIN PRIOR TO THE ISSUANCE OF THE BUILDING pERI4ZT, ONCE THE PERMIT IS IssuED WORK SHOULD NOT BE POURED, INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginning prior to ol~tain ng a building permit and/or proceed ng with construction beyond the stage of a required inspection without approva constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinanca; 29.06.07, and 29.06.08. BL/ILDI NG ~t CODE ENFORCEMENT; CITY oF CARMEL One CiVic 5q.~ Carmel, IN 46032. Ph. [317) 571-2444.