HomeMy WebLinkAbout05060198-Site Plan (rev)Rot PJ(]n Prepm~ Fort R.H. of Indium]
86 , containing 7,799 S,F.±, in
136'/1 Stanford. Drive (50'R/¥/)
Prepared Date: 05/1.7/05: By: AMA
Proposed BUym'(S): U~chaet & Melissa Uiller
C~x'~monity R,estr~ctlon~
Side Yard =5 min.
Rear Yard =
Aggregate =
(975.8)
per plan,
Sod Cblculations:
Drive = 513
Public Walk =244, SIr+
Private Walk =54
H)droseeding =2,541 SF±
Sod =320 SY:l:, from
Rear of residence.
elevetic~
r pron.
Note:
This drawing is based on construction plans or
record drawings, and is oat based upon a field
survey. '~e S~hneider Corporation does not warrant
the accuracy or sufficiency of this informstion,
c.~. Contractors should verify ex/stng conditions prat
to any construction, An~ discrel~oncy found ~n this
drawing should be reported to '[he Schneider
Corporation Irnmediatel~ foiling to do so results in
Plot Plan La.lend = the contractors 3ssumption of all liability.
~ Note:
000.0 P~- Carmel zoning ordinance 26,1,1:
Grade The residentM diet':ct limits height to twenty-five
feet (25'), however a ?ailing may be increcsed in height
to thirt)~-five feet (35) pro'~ded :the side and rear
are increased an addition~t one foot (1') for each
~ne foot (1') the structure exceeds the first
twenty-five feet (25') in height.
......... Row Line of swale
-- Building Une (BL / BSL)
Note: Sanitary Sewer
Top of Casting Information
Upstream Manhole, TC=g15.20
Downstream Manhole, TC=916.30
per plan.
Note:
The I~osomect ele~tioo depicted heronn has oeon Aseurn~. North
datormlned (md based upon the pod grades and/or Scale: 1 = 30'
contours token from the construction plans for this
subdivision. Unless stated, no information about
fluctuating water tobies, soil conditions, or soil types
hou been orovlded or stated on said plans. It is
Lot # 86 ,et ofeonhd/st,-,
.......... ,,... Water flow patten for
VDUb. UU3 bU at..
Note: Builder to ensure
positive drainage away
from structure(s),
recomrnonde~ that the boue'nont ~nlshed floor Note'
elewtions be at leant two feet (2) above the ~um~ pump(s) to be paced by
normal poel ele'~tion cf any odjoinlng bodies of build;r as needed.
water, unless c study of facts reveals otherwise. If
during the excavation process any ground water is
witnessed, The Schneider Corporation shooid be
notified immediately. ,~.e besernont elevation shoold
be raised two feet (2) ~bove the ground water, and
additional construction techniques should be
06/27/05
Flood Hazard Statement: The accuracy of any floo~ hazard data shown or this report is subject to
map sca~e uncertainty and to any othe- uncertainty in tocaflon or elevation on the referenced nODal
insurance rate map, ALL of the wdhm described land DOES NOT LIE within ~nat special flood hazard
zone A as said land plots by scale on flood insurance rate mad # ~80081 0205F f~r City Of Carmel
Indiana [rnaps dated February 19~ 20031.
120.00'1
15' R.D.E.
FLOOD HAZARD STATEMENT
CERllFICAllON
"J"fi'
~'~'b~'r IqUo
% STATE OF
Y/l~/~~~~ ,~ ,, \~\\~,~
IIIIIlllillt~t\\~.