Loading...
HomeMy WebLinkAbout13040197 Right-of-Way Permit -_. _. _. ___- -- — I � \ , q APPROVED RIGHT.-OF-WAY PERMIT PERMIT NO: 0 `/a 9/3 -,S PERMIT ISSUED FOR WORK WITHIN CITY RIGHT-OF-WAY AND/OR,CONSTUCTION ENTRANCE OR CONSTRUCTION TRAFFIC FROM THE RIGHT-OF-WAY Note: Open cuts in pav ement,�r'e/quire Board of:Public Works(BPW) Approval/ ADDRESS OF WORK: /4-5-4q avr yr4'/�c - j 104J-c9 tt.0 /j(.1. 4/6077 DESCRIPTION OF WORK (check all that apply): Road Bore Construction Entrance x Street Cut Driveway Replacement: Lane Closure Road Closure Other USE OF HEAVY EQUIPMENT (yes or no): 'tS IF YES, TYPE OF HEAVY EQUIPMENT (Bobcat or larger) TO BE USED:, E XC1v!+'T � a/-- TODAY'S DATE:" 2--CIl3 ESTIMATED DATE OF WORK: J'r__l TYPE OF SURFACE TO BE CUT (if applicable): r3�u��v���"rXXS APPLICANT'S NAME (Person doing the work): �g ?Wi7t4t6 Phone: it'7) 7/91---/t8 3/ Address: /2. 0 . 60X S'l Z. LE7maia,3 a vec -Z WHO IS APPLICANT DOING WORK FOR: Name: �Ke Sou/.._S Address: //.i /9 � Y* /2. Phone: (76s-) .71.-- 7274Z. DRAWING ATTACHED (yes or no) YC5 NOTE: ON REVERSE SIDE OF THIS PERMIT, PROVIDE NAMES AND CONTACTS OF ALL SUB- CONTRACTORS TO BE INVOLVED IN ON-SITE WORK ONTHIS PROJECT. SURETY BOND: Please see Item•#1 of the Right,of Way Conditions BONDING COMPANY: rr "' BONDING# As applicant for this right-of-way permit, I understand and a II the specifications and conditions listed on the attached sheet., / , 174-G (Applicant's,Signature) PERMIT GRANTED BY: le ■ - `' 3 'ity Off fe 1s: ed) REPAIR WORK INSPECTED.AND,APPROVED I have inspected the repair of the above right-of-way and find it to be completely satisfactory. (City Inspector) (Date Released)