Loading...
HomeMy WebLinkAboutPOYNTER SHEET METAL -001786 -4/7/2011 'CARMEL REDEVELOPMENT COMMISSION 001786 Poynter Sheet Metal Check: 1786 PO Box 427 Date: 4/7/2011 Bloomington, IN 47402 Vendor: POYNTER1 Prior Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid 28B 41 3,500.00 3,500.00 0.00 0.00 3,500.00 Application 28b 3,500.00 3,500.00 0.00 0.00 3,500.00 APPLICATION AND CERTIFICATE FOR PAYMENT CONSTRUCTION MANAGER-ADVISER EDITION A14 DOCUMENT 6702/CIvfa PAGE ONE OF 4 PAGES / TO OWNER: PROJECT: Parcel 7A, Regional Performing APPLICATION NO: 28B Distribution to: if Carmel Redevelopment Commission Arts Center nOWNER One Civic Square PERIOD TO: 1/31/11 CONSTRUCTION Carmel, IN 46032 PROJECT NO: 2695-4310 MANAGER FROM CONTRACTOR: VIA CONSTRUCTION MANAGER: Shiel-Sexton Co., Inc. (PSM#14065) ARCHITECT POYNTER SHEET METAL ATTN: Lynda Weaver, 902 N. Capitol Avenue. Indianapolis, IN 46204 CONTRACT DATE: 04/18/08 nCONTRACTOR 8768 N. STATE RD. 37 VIA ARCHITECT: BLOOMINGTON. IN 47404 CONTRACT FOR: Bid Package#4310- HVAC Sheet Metal CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, Application is made for payment,as shown below,in connection with the Contract. information and belief the Work covered by this Application for Payment has been Continuation Sheet,AIA Document G703,is attached. completed in accordance with the Contract Documents,that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner,and that current payment shown herein is now due. 1. ORIGINAL CONTRACT SUM $ 2,340,500.00 2. Net change by Change Orders $ (12,519.00) CONTRACTOR: 3. CONTRACT SUM TO DATE(Line 1 ±2) $ 2,327,981.00 4. TOTAL COMPLETED& STORED TO DATE $ 2,327,981.00 0 /if !.. -i , (Column G on G703) By: Date: Q/as��/ 5. RETAINAGE: 5%of Contract Total Josep R. 4 President a. 5 %of leted Work $ 116,399.00 State of D • County of MONROE (Column D+Eon G703) Subscribed . • orn to before e this day of J ail LA.Ctir�t a0// b. %of Stored Material $ 0.00 Notary Public: (Column F on G703) My Commission expires: August Z9,_ 14 Total Retainage(Lines 5a+5b or Total in Column I ofG703) $ 1 16,399.00 \.ER1 iFI A • ' A V 6. TOTAL EARNED LESS RETAINAGE 2,21 1,582.00 In accordance with the Contract Documents,based on on-site observations and the data (Line 4 less Line Ibtal) $ comprising this application,the Construction Manager and Architect certlty to the 7. LESS PREVIOUS CERTIFICATES FOR Owner that to the best of their knowledge,information and belief the Work has PAYMENT(Line 6 from prior Certificate) $ 2,208,082.00 progressed as indicated,the quality of the Work is in accordance with the Contract S. CURRENT PAYMENT DUE S 3.500.00 Documents,and the Contractor is entitled to payment of the AMOUNT CERTIFIED. 9. BALANCE TO FINISH.INCLUDING RETAINAGE $ 116,399.00 !!� (Line 3 less Line 6) AMOUNT CERTIFIED $ 3 B Cf-I . Jl`R-S-CJIVTI1lfCRYLL-- ADDI I IONS DI:DUC I IONS _ (.Attach explanation if amount certified differs from le amount applied fnr. Initial all ota c ranges approve figures on this.4p, 'cation and on the -ntinuati'n SI ,et that changed to conform to the in previous months by Owner $162,481.00 $175,000.00 amount certified COI'\TRU I M• K. .: / Total approved this Month $0.00 $0.00 By: `FAH,,77,��/��� A i_ Date: IP -, ' TOTALS $162,481.00 $175,000.00 B II -.'.— Y I_ Date: "Zit,, ca ; ti — NET CHANGES by Change Order ($12,519.00) This Certi ica'e is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance,payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. Alf;DUCUMEN r'G702/CMa APPL[CA ZION ANU CERTIFICA I ION FOK PAYMENT—CbiNSTRUCITON'MANAGEK-AUVISEK EUI I ION-1992 t UlT7tSt�AIA—�1•• ► 'a- •• THE AMERICAN INSTITUTE OF ARCHITECTS,1745 NEW YORK AVE,N W,WASHINGTON,DC 20006-5292 Users may obtain validation of this document by requesting of the license a completed AIA Document D401 -Certification of Document's Authenticity NOW CONTINUATION SHEET A!A DOCUMENT G703 2 PAGE OF PAGES 4 AIA Document G702,APPLICATION AND CERTIFICATION FOR PAYMENT,containing APPLICATION NO: :8B Contractor's signed certification is attached APPLICATION DATE: 1/1 [1.011 In tabulations below,amounts are stated to the nearest dollar. PSM JOB#: 14065 PERIOD TO: 1/31/2011 Use Column I on Contracts where variable retainage for line items may apply NAME : Carmel PAC CONTRACT NO: 1695-4 5"10 A 13 C D I E F G H I LINE DESCRIPTION OF WORK SCHEDULED WORK COMPLETED MATERIALS TOTAL % BALANCE RETAINAGE NO VALUE FROM PREVIOUS THIS PERIOD PRESENTLY COMPLETED (G-C) TO FINISH (IF VARIABLE APPLICATION STORED AND STORED (C-G) RATE) (D+F) (NOT IN TC)DATE D OR E) _ (D+E+F) 5% 1 GENERAL CONDITIONS 200,000.00 $200,000 $0 $0 $200,000 100% $10,000 2 BOND& INSURANCE 45,000.00 $45,000 $0 $0 $45,000 100% $2,250 3 MOBILIZATION 15,000.00 $15,000 $0 $0 $15,000 100% $750 4 ALLOWANCE NO 11 BP 4310 651.00 $651 $0 $0 $651 100% $33 5 ALLOWANCE NO 16 CAD AS-BUILTS 10,000.00 $10,000 $0 $0 $10,000 100% $500 6 DRAWINGS/COORDINATION 80,000.00 $80,000 $0 $0 $80,000 100% $4,000 7 MECH BASEMENT LEVEL 8 MATERIAL 48,000.00 $48,000 $0 $0 $48,000 100% $2,400 9 LABOR 50,700.00 $50.700 $0 $0 $50.700 100% $2,535 10 LAGGING 7,000.00 $7,000 $0 $0 $7,000 100% $350 II BACKHOUSE 12 MATERIAL 56,000.00 $56.000 $0 $0 $56.000 100% $2,800 13 LABOR 59,000.00 $59,000 $0 $0 $59.000 100% $2,950 14 KITCHEN HOOD&DUCT 15 MATERIAL 15,400.00 $15,400 $0 $0 $15.400 100% $770 16 LABOR 10,800.00 $10.800 $0 $0 $10.800 100% $540 17 INSULATION 10,100.00 $10.100 $0 $0 $10,100 100% $505 18 MECH RM 1 19 MATERIAL 50,400.00 $50,400 $0 $0 $50,400 100% $2,520 20 LABOR 56,300 00 $56,300 $0 $0 $56,300 100% $2,815 21 INSULATION 16,800.00 $16.800 $0 $0 $16.800 100% $840 22 MECH RM 2 • 23 MATERIAL 77,000.00 $77,000 $0 $0 $77,000 100% $3,850 24 LABOR 93,900.00 $93,900 $0 $0 $93,900 100% $4.695 25 INSULATION 16,800.00 $16.800 $0 $0 $16.800 100% $840 26 MECH RM 3 27 MATERIAL 84,900.00 $84,900 $0 $0 $84,900 100% $4,245 28 LABOR 94,500.00 $94.500 $0 $0 $94,500 100% $4,725 29 INSULATION 16,800.00 $16.800 $0 $0 $16.800 100% $840 30 PLENUM LEVEL 31 MATERIAL 49,100.00 $40.100 $0 $0 $49,100 100% $2.455 32 LABOR 75,000.00 $75,000 $0 $0 $75,000 100% $3,750 33 LAGGING 13,000.00 $13.000 $0 $0 $13,000 100% $650 CONTINUATION SHEET AIA DOCUMENT G7O3 3 PAGE OF PAGES 4 AlA Document G702,APPLICATION AND CERTIFICATION FOR PAYMENT,containing APPLICATION NO: B Contractor's signed certification is attached. APPLICATION DATE: 1/14 2011 In tabulations below,amounts are stated to the nearest dollar. PSM J013#: 14065 PERIOD TO: 1/31 i 2011 Use Column I on Contracts where variable retainage for line items may apply. NAME: Carmel PAC CONTRACT NO: 2695-4310 A 13 C D I E F G 1-I I LINE DESCRIPTION OF WORK SCHEDULED WORK COMPLETED MATERIALS 'TOTAL % BALANCE RE'I'AINAGE NO VALUE FROM PREVIOUS THIS PERIOD PRESENTLY COMPLETED (0-C) TO FINISH (IF VARIABLE APPLICATION STORED AND STORED (C-G) RATE) (D+E) (NOT IN TO DATE D OR E) (D+E+F) 5% 34 ORCHESTRA HIGH LEVEL 35 MATERIAL 34,600.00 $34,600 $0 $0 $34,600 100% $1,730 36 LABOR 35,400.00 $35,046 $354 $0 $35,400 100% $1.770 37 ORCHESTRA LOW LEVEL , 38 MATERIAL 49,400.00 $49,400 $0 $0 $49,400 100% $2,470 39 LABOR 62,600.00 $61,974 $626 $0 $62,600 100% $3,130 40 BOX TIER LEVEL 41 MATERIAL 70,000.00 $70,000 $0 $0 $70,000 100% $3,500 42 LABOR 100,300.00 $99,297 $1,003 $0 $100,300 100% $5,015 43 LOW BALCONY LEVEL 44 MATERIAL 94,100.00 $94,100 $0 $0 $94.100 100% $4.705 45 LABOR 85,300 00 $84.447 $853 $0 $85,300 100% $4,265 46 HIGH BALCONY LEVEL 47 MATERIAL 38,400.00 $38.400 $0 $0 $38,400 100% $1.920 48 LABOR 50,200.00 $49,698 $502 $0 $50.200 100% $2.510 49 ATTIC LEVEL+50 50 MATERIAL 41,600.00 $41,600 $0 $0 $41,600 100% $2.080 51 LABOR 44,700.00 $44,700 $0 $0 $44,700 100% $2.235 52 ATTIC LEVEL+61 53 MATERIAL 16,800.00 $16,800 $0 $0 $16,800 100% $840 54 LABOR 16,300.00 $16.137 $163 $0 $16,300 100% $815 55 ATTIC LEVEL+66 56 MATERIAL 39,500.00 $39,500 $0 $0 $39,500 100% $1,975 57 LABOR 37,900.00 $37,900 $0 $0 $37.9.00 100% $1,895 58 ATTIC LEVEL+79-6 59 MATERIAL 6,700.00 $6,700 $0 $0 $6,700 100% $335 60 LABOR 5,200 00 $5.200 $0 $0 $5,200 100% $260 4-A ALLOWANCE NO. 11 BP 4310(ASI-031) 7,322.00 $7,322 $0 $0 $7.322 100% $366 4-13 ALLOWANCE NO 11 BP 4310A-002 10,000.00 $10,000 $0 $0 $10.000 100% $500 4-C ALLOWANCE NO 11 BP 4310B-002 4,798.00 $4,798 $0 $0 $4,798 100% $240 4-D ALLOWANCE NO 11 BP 4310B-003 1,534.00 $1,534 $0 $0 $1,534 100% $77 4-E ALLOWANCE NO 11 BP4310B-004 27,142.00 $27,142 $0 $0 $27,142 100% $1,357 4-F ALLOWANCE NO 11 BP 4310B-005 9,625.00 $9,625 $0 $0 $9,625 100% $481 s CONTINUATION SHEET AIA DOCUMENTG7O3 4 PAGE OF PAGES 4 AIA Document G702,APPLICATION AND CERTIFICATION FOR PAYMENT,containing APPLICATION NO: :38Y Contractor's signed certification is attached. APPLICATION DATE: 1/1 4/.:'U 11 In tabulations below,amounts are stated to the nearest dollar. PSM JOB#: 14065 PERIOD TO: 1/31/2011 Use Column Ion Contracts where variable retainage for line items may apply. NAME : Carmel PAC CONTRACT NO: 3605-4310 A I 13 I C D E F G H I LINE DESCRIP'T'ION OF WORK SCHEDULED WORK COMPLETED MATERIALS TOTAL % BALANCE RETAINAGE NO VALUE FROM PREVIOUS THIS PERIOD PRESENTLY COMPLETED (G—C) TO FINISH (IF VARIABLE APPLICATION STORED AND STORED (C-G) RATE) (D+E) (NOT IN TO DATE D OR E) (D+E+F) 5% 4-G ALLOWANCE NO 11 BP 4310B-006 175,000.00 $175,000 $0 $0 $175,000 100% $8.750 4-I-I ALLOWANCE NO 11 BP 43108-007 546.00 $546 $0 $0 $546 100% $27 4-I ALLOWANCE NO 11 BP 4310B-008 10,933.00 $10,933 $0 $0 $10,933 100% $547 4-J ALLOWANCE NO 11 BP 4310B-009 12,449.00 $12,449 $0 $0 $12,449 100% $622 4-K ALLOWANCE NO 11 BP 4310B-010 $30K 4-L ALLOWANCE NO 11 BP 4310B-011 5,001.00 $0 $0 $0 $0 0% $250 4-M ALLOWANCE NO 11 BP 4310B-012 3,021.00 $0 $0 $0 $0 0% $151 4-N ALLOWANCE NO 11 BP 4310B-013 6,103.00 $0 $0 $0 $0 0% $305 4-0 ALLOWANCE NO 11 BP 4310B-014 5,979.00 $0 $0 $0 $0 0% $299 4-P ALLOWANCE NO 11 BP 4310B-015 1,806.00 $0 $0 $0 $0 0% $90 4-Q ALLOWANCE NO 11 BP 4310B-016 2,480.00 $0 $0 $0 $0 0% $124 4-14 ALLOWANCE NO 11 BP 4310B-017 2,334.00 $0 $0 $0 $0 0% $117 4-S ALLOWANCE NO 11 BP 4310B-018 3,254.00 $0 $0 $0 $0 0% $163 Café' 5,006.00 $0 $0 $0 $0 0% $250 $0 $0 $0 $0 900 PENDING CHANGE ORDERS 901 CHANGE ORDER#1 38,542.00 $38,542 $0 $0 $38,542 100% $1.927 902 CHANGE ORDER#2(RCP-10) 19,219.00 $19.219 $0 $0 $19.219 100% $961 903 CHANGE ORDER#3 BP 4310B-005 -175.000.00 ($175.000) $0 $0 ($175.000) 100°A, ($8.750) 904 905 CHANGE ORDER#5 30,000.00 $30,000 $0 $11 $30,000 100% $1,500 906 CHANGE ORDER#6 24,720.00 $24,720 $0 $0 $24,720 100% $1236 907 CHANGE ORDER#7 50,000.00 $50,000 $0 $0 $50.000 100% $2,500 $2.327,981 2,324,480 3,501 0 2.327,981 100% 0 $116,399 Og L411+ 141.7 SHEET METAL POYNTER SHEET METAL, INC. CONTRACTOR'S AFFIDAVIT AND WAIVER OF LIEN PARTIAL ( X) FINAL ( ) We, the undersigned, having been employed by CARMEL REDEVELOPMENT COMMISSION furnish labor and materials to do construction work on the premises known as PARCEL 7A, CARMEL REGIONAL PERFORMING ARTS CENTER hereby warrant that the premises of the above named job cannot be made subject to any valid lien by anyone who furnished material, supplies, labor or services to the undersigned for use in the above named project for any labor, materials or supplies furnished or services performed through 01/31/11 to the extent that the undersigned has been paid as set forth herein. This waiver is given in order to induce payment in the amount of$3,500.00 and upon receipt of the amount due by the undersigned, this waiver as to the amount due becomes valid, enforceable and of full effect. Upon attachment of the canceled check and the legal description of the project, this waiver may be recorded by the Owner or mortgage holder(s) of the project. This Contractor's Affidavit and Waiver of Lien only applies to the extent paid, and does not apply to or cover retention, unresolved claims or unresolved changes, change orders or change requests. Given under our hand and seal this 25T11 day of JANUARY, 2011 POYNTER SHEET METAL, INC. ete Signat, re elk orized Representative Joseph ' . s ell PRESIDENT Title of Authorized Representative STATE OF: Indiana ) COUNTY OF: Monroe ) Subscribed and sworn to before me this 25TH day of JANUARY, 2011 (Notary Public) Commission Expires: August 29, 2014 County of Residence: Morgan