Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1-96.1
M L K J H G F 5 C C N tT A 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 I 15 PLANTING PLAN 1 10 SCALE: i` = ao' 1 2 3 4 5 Q 7 8 �a 10 12 13 14 15 GENERAL N= 1. THE CONTRACTOR SHALL LOCATE AND VERIFY THE EXISTENCE OF ALL UTILITIES PRIOR TO STARTING WORK. M 2. THE CONTRACTOR SHALL SUPPLY ALL PLANT MATERIALS IN QUANTITIES SUFFICIENT TO COMPLETE THE PLANTING AS SHOWN ON DRAWINGS. 3. ALL MATERIAL SHALL CONFORM TO THE GUIDELINES ESTABLISHED BY THE CURRENT *AMERICAN ASSOCIATION OF NURSERY STOCK', PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN OR EQUIVALENT. 4. NO PLANT SHALL BE INSTALLED BEFORE ROUGH GRADING HAS BEEN FINISHED AND APPROVED. 5. ALL PLANTS SHALL BEAR THE SAME RELATIONSHIP TO FINISHED GRADE AFTER INSTALLED AS THEY DID PRIOR TO BEING DUG. L 6. ALL PLANTS SHALL BE BALLED AND WRAPPED OR CONTAINER GROWN AS SPECIFIED. NO CONTAINER GROWN STOCK WILL BE ACCEPTED IF IT IS ROOT BOUND. ALL ROOT WRAPPING MATERIAL MADE OF SYNTHETICS OR PLASTICS SHALL BE REMOVED AT THE TIME OF PLANTING. 7. WITH CONTAINER GROWN STOCK, THE CONTAINER SHALL BE REMOVED AND THE CONTAINER BALL SHALL BE CUT THROUGH THE SURFACE IN TWO VERTICAL LOCATIONS. 8. THE DAY PRIOR TO PLANTING, THE LOCATIONS OF ALL TREES AND SHRUBS SHALL BE STAKED FOR APPROVAL BY THE OWNER'S K REPRESENTATIVE. 9. THE LANDSCAPE CONTRACTOR SHALL REFER TO THE CONTRACT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 10. CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR YEAR FROM TIME OF PROVISIONAL ACCEPTANCE. 11. IF THERE IS A DISCREPANCY BETWEEN THE PLANT QUANTITY SHOWN ON THE PLANT LIST AND THE QUANTITY SHOWN ON THE PLANS, THE QUANTITY SHOWN ON THE PLANS WILL TAKE PRECEDENCE. 12. CONTRACTOR SHALL REPAIR ANY DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO THE OWNER. 13. SOD SHALL BE LAID OUT PARALLEL TO THE CONTOURS AND HAVE STAGGERED JOINTS. ON STEEP SLOPES GREATER THAN 3:1 OR DRAINAGE, SWALES, THE SOD SHALL BE STAKED WITH STAPLES AT THE CORNERS TO BE SECURED TO THE GROUND. 14. SOD SHALL BE LAID OVER A MINIMUM OF 2' TOPSOIL. TOPSOIL SHALL NOT BE SPREAD OUT UNTIL FINAL GRADING HAS BEEN APPROVED BY THE PROJECT ENGINEER. TOPSOIL SHALL ALSO BE APPROVED BEFORE SOD IS LAID. 15. CRABAPPLE TREES SHALL NOT HAVE HAVE ANY BRANCHES BELOW 36' ABOVE THE ROOTBALL, AND SHALL HAVE NO 'V' CROTCHES. 16. FOR SEEDING SPECIFICATIONS, SEE PROJECT SPECIFICATIONS. H Revisions CERTIFIED BY THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPT$ CONTAINED HEREIN ARE THE D(CLUSIVE INTELLECTUAL PROPERTY OF SCIUM ENGINEERING CORPORATION AND ARE NOT To BE USED OR REPRODUCED IN WHOLE OR, IN PART, WITHOUT THE WRITTEN CONSENT OF SCHNEIDER ENGINEERING CORPORATION. ©1995, Schneider Engineering Corporation r &Imeida LJ Coipomtion 3020 North Post Road Engineering Indianapolis, Indiana Surveying 46226 -0068 GIS a LIS 317 -898 -8282 Geology 317 -899 -8010 Fax A Partnered Entity with Bohlen, Meyer, Gibson & Associates, Incorporated C. P. MORGAN COMMUNITIES, LP PARKSIDE VILLAGE CAM094 INDIANA PRELIMINARY PLANTING PLAN Date Project No. Drawn Approv. 12/19/95 1045 DAR Computer Files Sheet No. 1054LI01 XREF NAME 1054PRE XRff NAME 1054TOP0 of 1 G I E 01 C 0 n