Loading...
HomeMy WebLinkAbout5-96.5GENERAL STAPLE RECOMMENDATIONS 300 273 W 230 225 ? 200 x 173 150 J 125 W 100 $ 75 SO 23 r 6' r ,x A x t +' x 1 STAPLE PER SO. YD. 4d 3•] 2'1 Ir1 CHANNEL r SLOPE GRADIENT LINING z x r ADDITIONAL STAPLES AS REQUIRED C 6 x x "*- x 2 STALE PER S0. YD. X x x ® k x k X x CHANNEL LININGS UTILIZE STAPLE PATTERN 1 112 STAPLE PER SO. YD. 'C' WITH ADDITIONAL STAPLES ON SIDE SLOPES. NOTES, STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN EROSION CEINTR13L BLANKETS. STAPLE PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL. AT SLOPE LENGTHS GREATER THAN 3DO FEET OR WHERE DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE BLANKETS, STAPLE PATTERN 'C' SHOULD BE UTILIZED. CHANNEL LININGS REQUIRED A 2.0' MINIMUM OVERLAP AT LONGITUDINAL JOINTS. SIDESLOPES SHALL REQUIRE A 6' MINIMUM OVERLAP. WHERE OVERLAPS OCCUR, THE UPSTREAM BLANKET SHALL OVERLAP THE DO"STREAM. IF OTHER THAN NORTH AMERICAN GREEN EROSION CONTROL BLANKETS ARE INTALLED FOLLOW THE INSTALLATION DIRECTIONS RECOMMENDED BY THAT PRODUCTS COMPANY, EROSION CONTROL BLANKET STAPLE PATTERN U N 11 LLJ N c .J_J N 1 _ I I 1 - -4 I 1'x1.5' R c p (NO SCALE) STABILIZATION PRACTICE JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. PERMANENT A • / / //I / / //• • /I/� SEEDING DORMANT SEEDNG TEMPORARY C SEEDING � ' / / //I / / / /•"'� '� SODDING F It • • / / / //I / / / //• �-� MULCHING G A - KENTUCKY BLUEGRASS 40 LBS /ACRE; CREEPING RED FESCUE 40 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADO ANNUAL RYEGRASS 20 LBS /ACRE B - KENTUCKY BLUEGRASS 60 LOS /ACRE; CREEPING RED FESCUE 60 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADO ANNUAL RYEGRASS 30 LBS /ACRE. C - SPRING OATS 3 BUSHEL /ACRE. D - WHEAT OR RYE 2 BUSHEL /ACRE E - ANNUAL RYEGRASS 40 LBS /ACRE. F - SOD G - STRAW MULCH 2 TONS /ACRE. .^ IRRIGATION NEEDED FOR 2 0 3 WEEKS AFTERD�L SEPTEMBER SEASONAL SOIL PROTECTION CHART (NO SCALE) PERMANENT VEGETATIV( STABLIZATION� MULCH MAY BE APPLIED ANY TIME CONDITIONS ARE SUITABLE FOR SPREADING /ANCHORING SUITABLE MULCH 94CLUDES: 1. AIR OR" MEAT, BARLEY, OAT, OR RYE STRAW (APPROXIMATELY TWO TONS PER ACRE) 2. EXCELSIOR BLANKET, JUTE NETTING. PAPER FABRIC OR SIMUAA SYSTEM APPLIED PER MANUFACURERS SPECOXAT045 3. w0pp CELLULOSE FIBER MIXED WITH WATER AND APPLIED WITH A HYDRO- SEEDER TO FORM A DENSE MAT AFTER DRYING. IT K BEST SUITED TO SITES MAMNG SLOPES LESS THAN 31E IN GRADE. WOOD CELLULOSE FIBER SHOULD NOT CONTAIN GROWTH OR GERMINATION INHIBITING FACTORS AND SHOULD BE DYED GREEN FOR METERING AND APPLIED AT A RATE OF 1200] PER ACRE. STRAW MULCH SHOULD BE ANCHORED BY PRESSING STRAW INTO THE SOIL A DEPTH OF Two INCHES WITH THE USE OF A MULCH ANCHORING TOOL LEGEND MIEROSION CONTROL SEEDING AREA EROSION CONTROL A TEMPORARY SEEDING MIXTURE IN THE AREAS WHERE STRIPPING OR FILL HAVE BEEN GRADED SMALL BE SEEDED FOR SILT EROSION PROTECTION. AFTER GRADING, ALL CONSTRUCTION AREAS ARE TO BE SEEDED AS FOLLOWS A_ SWALE SEEDING: SEED AND FERTILIZE WITHIN CONSTRUCTION LIMITS WITH S /ACRE 'REDTOP GRASS ". 20/ /ACRE 'RYE r77 GRASS'. 20/ /ACRE -BLUEGRASS', 25/ /ACRE 'FESCUE' AND 600/ /ACRE 12 -12 -12 FERTILIZER. B CUT/FILL SEEDING (ALONG PAVED AREASY SEED AND FERTILIZE WITH 25// ACRE "FESCUE'. 20/ /ACRE 'RYE GRASS -. IS/ /ACRE 'BLUEGRASS' AND 600# /ACRE 12 -12 -12 FERTILIZER. C. SEEDED AREAS SMALL HAVE A SUITABLE MULCH APPLIED FOR EROSION AND SILT CONTROL MULCH MAY BE STRAW. SHREDOCD HARDWOOD OR EROSION CONTROL MAT D. DEVELOPERS OPTION: CONSTRUCTION AREAS RECUWM EROSION CONTROL MAY BE MYDROSEEDED IN ACCORDANCE WITH ABOVE SEED AND FERTILIZER SPECIFICATIONS CONTROL SEEDING LIMITS V AM F VARIR APL F EROSION CONTROL SEEDING LIMITS VARIABLE VARIABLE -GRADE AS SHOWN DRAINAGE S WA L E SECTION (NO SCALE) file: SWALE.DWG PREPARED FOR: MIKE KEEN 330 NORTH RANGELINE ROAD CARMEL, IN 46032 TELE: (317) 844 -9999 PREPARED BY: EROSION CONTROL BLANKET WEIHE ENGINEERS, INC. 10505 N. COLLEGE AVE. O STRAW BALE PLACEMENT for Erosion Control #1 INDIANAPOLIS, IN 46 280 TELE: (317) 846 -6611 SILT FENCE ---WILSON VILLAGE r ,r,' n__.4 nk /FPO AP LL! 0 Q J _J Z 0 if i I 15q Rcp SOILS MAP 0 15 30 60 PLAN VIEW II II lm-ffl STRAW BALES BURIED 3" STORM BEEHIVE 3' -N4 REBAR STAKE 2'X6" SILT TRAP TYPICAL SLOTTED RISER (CAN BE USED INSTEAD OF STRAW BALES) TYPICAL SLOTTED RISER (CAN BE USED INSTEAD OF STRAW BALES) - STORM BEEHIVE f ' REBAR STAKE BALES BURIED 3" 2'X6" SILT TRAP r"-- SECTION VIEW STRAW BALE PL A CEMEN T FOR EROSION CONTROL (NO SCALE) MAINTENANCE: 1. INSPECT STRAW BALE DAMS WEEKLY AND AFTER EACH STORM EVENT. 2. REMOVE ANY SEDIMENT DEPOSITS PROMPTLY TAKING CARE NOT TO UNDERMINE ENTRENCHED BALES. 1,0' 3. INSPECT WEEKLY FOR DETERIORATION OR DAMAGE BY CONSTRUCTION Deed ACTIVITIES ANF REPAIR IMMEDIATELY. 4 AFTER DRAINAGE AREA AHS BEEN STABILIZED, REMOVE BALES AND OVERLAP SEDIMENT, BRING DISTURBED AREA TO GRADE AND STABILIZE IT. POST ;., ?AOs" STEEL 10 MAX. SPACING 14 GAC(MIHFI "_1r _;�N FILTER FABRIi LENGTH SZO JpN O�N)G I n j STAPLE OR WIRE TO FENCEM in 4'XE4' TRENCH TO AND C CCIM�ACTED I 3 I I I SILT FENCE SECTION (NO SCALE) MAINTENANCE: 1. INSPECT WEEKLY AND AFTER EACH STORM EVENT. 2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY. 3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF THE FENCE OR IS CAUSING FABRIC TO BULGE. 4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC. 5. AFTER DRAINAGE AREA IS STABILIZED. REMOVE FENCE AND SEDIMENT. BRING DISTURBED AREA TO GRADE AND STABILIZE IT. EROSION CONTROL STATEMENT' I. IrTt SCOPE OF THE WORK 15 TO REESTABLISH VEGETATIVE COVER BY SEEDING. EITHER PERMANENT \TEMPORARY. OR ER05ION CONTROL TYPES. AS SHOWN ON THE PLAN. AFTER FINISH GRADING. ALL CONSTRUCTION AREAS ARE TO BE SEEDED. 2. PERMANENT AND TEMPORARY SEEDING SHALL BE IN ACCORDANCE WITH THE DETAILS SPECIFICATIONS SHOWN. 3. EROSION CONTROL SEEDING' AN INTERIM SEEDING TO BE APPLIED TO ALL DISTURBED AREAS AS SOON AS FINAL GRADING IS ESTABLISHED. MIX AND APPLY AS SHOWN IN THE SPECIFICATIONS. CIF THIS SEEDING 15 APPLIED IMMEDIATELY UPON FINISH GRADING. IT CAN SAVE SOME OF THE FURTHER SEEDING AND LENGTHEN THE DURATION BETWEEN THE MAINTENANCE OF THE SILTATION TRAPS AND BARRIERS.) 4. IF GRADING OCCURS DURING DECEMBER. JANUARY OR FEBRUARY. DORMANT SEEDING PROCEDURES SHALL BE USED. IT IS IMPERATIVE THAT ALL SEDIMENT FILTERS AND TRAPS ARE IN PLACE PRIOR TO BULK EARTHMOVING OR CLEARING OPERATIONS COMMENCE. 5. DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING' OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND /OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. G. IF DURING THE CONSTRUCTION PROCESS. THE CONTRACTOR 15 ABLE TO MAINTAIN A 25' MINIMUM WIDTH OF VEGETATIVE COVER AROUND THE PERIMETER OF THE CONSTRUCTION ACTIVITY. THI5 WILL GREATLY REDUCE OR IN SOME CASES ELIMINATE THE NEED FOR SOME SILTATION BARRIERS. 7. THE IMPLEMENTATION AND MAINTENANCE OF THIS EROSION CONTROL PLAN 15 THE 50LE RESPONSIBILITY OF THE CONTRACTOR AND /OR OWNER. 8. IT SHALL BE THE CONTRACTORS AND /OR OWNERS RESPONSIBILITY TO MINIMIZE SEDIMENTATION CFROM ON -SITE CONSTRUCTION ACTIVITY) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS /DITCHES IN STRICT COMPLIANCE WITH 'RULE 5' C327 IAC 15 -5. CONSTRUCTION ACTIVITY STORMWATER RUNOFF CONTROL. IT SHALL AL50 BE THE CONTRACTORS OR OWNERS RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT. INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY. E?0510N AND SEDIMENT CONTROL MEASURES 1. *CONSTRUCTION ENTRANCE 15 TO BE INSTALLED PRIOR TO ANY CONSTRUCTION ON SITE. 2. IF SEDIMENT IS TO RISE ABOVE ONE THIRD THE HEIGHT OF ANY EROSION CONTROL STRUCTURE. THE STRUCTURE SHOULD BE CLEARED OF ALL SEDIMENTATION. 3. EROSION CONTROL IS TO BE MAINTAINED THROUGH THE TOTAL COMPLETION OF THE CONSTRUCTION PROCESS. 4. ALL INLETS AND EROSION CONTROL STRUCTURES ARE TO BE CHECKED ONCE A WEEK AND AFTER EACH RAINFALL TO INSURE PROPER PROTECTION FROM SEDIMENTATION. 5. ALL EXISTING STORM STRUCTURES THAT DRAIN UNDER COUNTY ROADS OR TOWARD ADJACENT PROPERTIES SHALL BE PROTECTED AS SHOWN ON THE EROSION CONTROL PLAN. 6. IF 501L IS TO BE STOCKPILED, IT SHALL BE SURROUNDED WITH A SILT FENCE TO PREVENT EROSION. 7. SILT TRAPS ARE TO PROTECT ALL EARTH DITCH INLETS. 8, PRIOR TO EARTH WORK, MEASURES SHOULD BE TAKEN TO PREVENT EROSION INTO EXISTING WATERSHEDS. AND PREVENT SILTATION ON ADJACENT PROPERTIES. PERMANENT VEGETATIVE STABILIZATION MULUM MAY BE APPLIED ANY TIME CONDITIONS ARE SUITABLE FOR SPREADING ANCHORING REGARDLESS OF VEGETATIVE COVER. SOME EXAMPLES OF SUITABLE MULCH INCLUDE' 1. AIR DRIED WHEAT. BARLEY, OAT. OR RYE STRAW. FREE FROM NOXIOUS WEEDS AND OTHER FOREIGN MATTER. IT SHOULD BE SPREAD UNIFORMLY SO 807. OF THE SURFACE 15 COVERED FIVE OR SIX STRAWS THICK CTWO BALES PER 1000 50. FT. OR APPROXIMATELY TWO TONS PER ACRE). 2. EXCELSIOR BLANKET. JUTE NETTING. PAPER FABRIC. OR A SIMILAR SYSTEM APPLIED ACCORDING TO MANUFACTURERS' SPECIFICATIONS. 2. WOOD CELLULOSE FIBER MIXED WITH WATER AND APPLIED WITH A HYDRO- SEEDER TO FORM A DENSE MAT AFTER DRYING. IT IS BEST SUITED TO SITES HAVING SLOPES LESS THAN 37. IN GRADE AND LE55 THAN 150 FEET IN LENGTH. WOOD CELLULOSE FIBER ' SHOULD NOT CONTAIN GROWTH OR GERMINATION INHIBITING FACTORS AND SHOULD BE DYED GREEN FOR METERING. IT SHOULD BE APPLIED IN A UNIFORM MANNER AT A RATE OF 1.200 POUNDS PER ACRE. MIXING AND APPLICATION SHOULD BE PERFORMED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS. STRAW MULCH SHOULD BE ANCHORED BY PRESSING STRAW INTO THE 501L A DEPTH OF TWO INCHES WITH THE USE OF A MULCH ANCHORING TOOL. OR SECURING WITH TWINE OR HEAVY STRING AROUND PEGS OR STAPLES. ALL MULCH INSTALLATION TECHNIQUES ARE TO CONFORM WITH THE URBAN DEVELOPMENT PLANNING GUIDE. FOURTH EDITION, JUNE 1990. W `j O 6W pa W X Ag V .3 a xQ .3 11" Z cn �w > a w W W d z B' 0 z ra Wrao ra 00 z d 04 Lu 3q ur�� A 0) Im u K. II- m W z�Do o ul) azn O 1 t� 610 0 as w w z z w a U Q- C 0 0 B Q ii C Z0 W DC LLJ C v, B . v C LL_ A Z �a 0w B B r 6' r ,x A x t +' x 1 STAPLE PER SO. YD. 4d 3•] 2'1 Ir1 CHANNEL r SLOPE GRADIENT LINING z x r ADDITIONAL STAPLES AS REQUIRED C 6 x x "*- x 2 STALE PER S0. YD. X x x ® k x k X x CHANNEL LININGS UTILIZE STAPLE PATTERN 1 112 STAPLE PER SO. YD. 'C' WITH ADDITIONAL STAPLES ON SIDE SLOPES. NOTES, STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN EROSION CEINTR13L BLANKETS. STAPLE PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL. AT SLOPE LENGTHS GREATER THAN 3DO FEET OR WHERE DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE BLANKETS, STAPLE PATTERN 'C' SHOULD BE UTILIZED. CHANNEL LININGS REQUIRED A 2.0' MINIMUM OVERLAP AT LONGITUDINAL JOINTS. SIDESLOPES SHALL REQUIRE A 6' MINIMUM OVERLAP. WHERE OVERLAPS OCCUR, THE UPSTREAM BLANKET SHALL OVERLAP THE DO"STREAM. IF OTHER THAN NORTH AMERICAN GREEN EROSION CONTROL BLANKETS ARE INTALLED FOLLOW THE INSTALLATION DIRECTIONS RECOMMENDED BY THAT PRODUCTS COMPANY, EROSION CONTROL BLANKET STAPLE PATTERN U N 11 LLJ N c .J_J N 1 _ I I 1 - -4 I 1'x1.5' R c p (NO SCALE) STABILIZATION PRACTICE JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. PERMANENT A • / / //I / / //• • /I/� SEEDING DORMANT SEEDNG TEMPORARY C SEEDING � ' / / //I / / / /•"'� '� SODDING F It • • / / / //I / / / //• �-� MULCHING G A - KENTUCKY BLUEGRASS 40 LBS /ACRE; CREEPING RED FESCUE 40 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADO ANNUAL RYEGRASS 20 LBS /ACRE B - KENTUCKY BLUEGRASS 60 LOS /ACRE; CREEPING RED FESCUE 60 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADO ANNUAL RYEGRASS 30 LBS /ACRE. C - SPRING OATS 3 BUSHEL /ACRE. D - WHEAT OR RYE 2 BUSHEL /ACRE E - ANNUAL RYEGRASS 40 LBS /ACRE. F - SOD G - STRAW MULCH 2 TONS /ACRE. .^ IRRIGATION NEEDED FOR 2 0 3 WEEKS AFTERD�L SEPTEMBER SEASONAL SOIL PROTECTION CHART (NO SCALE) PERMANENT VEGETATIV( STABLIZATION� MULCH MAY BE APPLIED ANY TIME CONDITIONS ARE SUITABLE FOR SPREADING /ANCHORING SUITABLE MULCH 94CLUDES: 1. AIR OR" MEAT, BARLEY, OAT, OR RYE STRAW (APPROXIMATELY TWO TONS PER ACRE) 2. EXCELSIOR BLANKET, JUTE NETTING. PAPER FABRIC OR SIMUAA SYSTEM APPLIED PER MANUFACURERS SPECOXAT045 3. w0pp CELLULOSE FIBER MIXED WITH WATER AND APPLIED WITH A HYDRO- SEEDER TO FORM A DENSE MAT AFTER DRYING. IT K BEST SUITED TO SITES MAMNG SLOPES LESS THAN 31E IN GRADE. WOOD CELLULOSE FIBER SHOULD NOT CONTAIN GROWTH OR GERMINATION INHIBITING FACTORS AND SHOULD BE DYED GREEN FOR METERING AND APPLIED AT A RATE OF 1200] PER ACRE. STRAW MULCH SHOULD BE ANCHORED BY PRESSING STRAW INTO THE SOIL A DEPTH OF Two INCHES WITH THE USE OF A MULCH ANCHORING TOOL LEGEND MIEROSION CONTROL SEEDING AREA EROSION CONTROL A TEMPORARY SEEDING MIXTURE IN THE AREAS WHERE STRIPPING OR FILL HAVE BEEN GRADED SMALL BE SEEDED FOR SILT EROSION PROTECTION. AFTER GRADING, ALL CONSTRUCTION AREAS ARE TO BE SEEDED AS FOLLOWS A_ SWALE SEEDING: SEED AND FERTILIZE WITHIN CONSTRUCTION LIMITS WITH S /ACRE 'REDTOP GRASS ". 20/ /ACRE 'RYE r77 GRASS'. 20/ /ACRE -BLUEGRASS', 25/ /ACRE 'FESCUE' AND 600/ /ACRE 12 -12 -12 FERTILIZER. B CUT/FILL SEEDING (ALONG PAVED AREASY SEED AND FERTILIZE WITH 25// ACRE "FESCUE'. 20/ /ACRE 'RYE GRASS -. IS/ /ACRE 'BLUEGRASS' AND 600# /ACRE 12 -12 -12 FERTILIZER. C. SEEDED AREAS SMALL HAVE A SUITABLE MULCH APPLIED FOR EROSION AND SILT CONTROL MULCH MAY BE STRAW. SHREDOCD HARDWOOD OR EROSION CONTROL MAT D. DEVELOPERS OPTION: CONSTRUCTION AREAS RECUWM EROSION CONTROL MAY BE MYDROSEEDED IN ACCORDANCE WITH ABOVE SEED AND FERTILIZER SPECIFICATIONS CONTROL SEEDING LIMITS V AM F VARIR APL F EROSION CONTROL SEEDING LIMITS VARIABLE VARIABLE -GRADE AS SHOWN DRAINAGE S WA L E SECTION (NO SCALE) file: SWALE.DWG PREPARED FOR: MIKE KEEN 330 NORTH RANGELINE ROAD CARMEL, IN 46032 TELE: (317) 844 -9999 PREPARED BY: EROSION CONTROL BLANKET WEIHE ENGINEERS, INC. 10505 N. COLLEGE AVE. O STRAW BALE PLACEMENT for Erosion Control #1 INDIANAPOLIS, IN 46 280 TELE: (317) 846 -6611 SILT FENCE ---WILSON VILLAGE r ,r,' n__.4 nk /FPO AP LL! 0 Q J _J Z 0 if i I 15q Rcp SOILS MAP 0 15 30 60 PLAN VIEW II II lm-ffl STRAW BALES BURIED 3" STORM BEEHIVE 3' -N4 REBAR STAKE 2'X6" SILT TRAP TYPICAL SLOTTED RISER (CAN BE USED INSTEAD OF STRAW BALES) TYPICAL SLOTTED RISER (CAN BE USED INSTEAD OF STRAW BALES) - STORM BEEHIVE f ' REBAR STAKE BALES BURIED 3" 2'X6" SILT TRAP r"-- SECTION VIEW STRAW BALE PL A CEMEN T FOR EROSION CONTROL (NO SCALE) MAINTENANCE: 1. INSPECT STRAW BALE DAMS WEEKLY AND AFTER EACH STORM EVENT. 2. REMOVE ANY SEDIMENT DEPOSITS PROMPTLY TAKING CARE NOT TO UNDERMINE ENTRENCHED BALES. 1,0' 3. INSPECT WEEKLY FOR DETERIORATION OR DAMAGE BY CONSTRUCTION Deed ACTIVITIES ANF REPAIR IMMEDIATELY. 4 AFTER DRAINAGE AREA AHS BEEN STABILIZED, REMOVE BALES AND OVERLAP SEDIMENT, BRING DISTURBED AREA TO GRADE AND STABILIZE IT. POST ;., ?AOs" STEEL 10 MAX. SPACING 14 GAC(MIHFI "_1r _;�N FILTER FABRIi LENGTH SZO JpN O�N)G I n j STAPLE OR WIRE TO FENCEM in 4'XE4' TRENCH TO AND C CCIM�ACTED I 3 I I I SILT FENCE SECTION (NO SCALE) MAINTENANCE: 1. INSPECT WEEKLY AND AFTER EACH STORM EVENT. 2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY. 3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF THE FENCE OR IS CAUSING FABRIC TO BULGE. 4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC. 5. AFTER DRAINAGE AREA IS STABILIZED. REMOVE FENCE AND SEDIMENT. BRING DISTURBED AREA TO GRADE AND STABILIZE IT. EROSION CONTROL STATEMENT' I. IrTt SCOPE OF THE WORK 15 TO REESTABLISH VEGETATIVE COVER BY SEEDING. EITHER PERMANENT \TEMPORARY. OR ER05ION CONTROL TYPES. AS SHOWN ON THE PLAN. AFTER FINISH GRADING. ALL CONSTRUCTION AREAS ARE TO BE SEEDED. 2. PERMANENT AND TEMPORARY SEEDING SHALL BE IN ACCORDANCE WITH THE DETAILS SPECIFICATIONS SHOWN. 3. EROSION CONTROL SEEDING' AN INTERIM SEEDING TO BE APPLIED TO ALL DISTURBED AREAS AS SOON AS FINAL GRADING IS ESTABLISHED. MIX AND APPLY AS SHOWN IN THE SPECIFICATIONS. CIF THIS SEEDING 15 APPLIED IMMEDIATELY UPON FINISH GRADING. IT CAN SAVE SOME OF THE FURTHER SEEDING AND LENGTHEN THE DURATION BETWEEN THE MAINTENANCE OF THE SILTATION TRAPS AND BARRIERS.) 4. IF GRADING OCCURS DURING DECEMBER. JANUARY OR FEBRUARY. DORMANT SEEDING PROCEDURES SHALL BE USED. IT IS IMPERATIVE THAT ALL SEDIMENT FILTERS AND TRAPS ARE IN PLACE PRIOR TO BULK EARTHMOVING OR CLEARING OPERATIONS COMMENCE. 5. DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING' OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND /OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. G. IF DURING THE CONSTRUCTION PROCESS. THE CONTRACTOR 15 ABLE TO MAINTAIN A 25' MINIMUM WIDTH OF VEGETATIVE COVER AROUND THE PERIMETER OF THE CONSTRUCTION ACTIVITY. THI5 WILL GREATLY REDUCE OR IN SOME CASES ELIMINATE THE NEED FOR SOME SILTATION BARRIERS. 7. THE IMPLEMENTATION AND MAINTENANCE OF THIS EROSION CONTROL PLAN 15 THE 50LE RESPONSIBILITY OF THE CONTRACTOR AND /OR OWNER. 8. IT SHALL BE THE CONTRACTORS AND /OR OWNERS RESPONSIBILITY TO MINIMIZE SEDIMENTATION CFROM ON -SITE CONSTRUCTION ACTIVITY) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS /DITCHES IN STRICT COMPLIANCE WITH 'RULE 5' C327 IAC 15 -5. CONSTRUCTION ACTIVITY STORMWATER RUNOFF CONTROL. IT SHALL AL50 BE THE CONTRACTORS OR OWNERS RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT. INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY. E?0510N AND SEDIMENT CONTROL MEASURES 1. *CONSTRUCTION ENTRANCE 15 TO BE INSTALLED PRIOR TO ANY CONSTRUCTION ON SITE. 2. IF SEDIMENT IS TO RISE ABOVE ONE THIRD THE HEIGHT OF ANY EROSION CONTROL STRUCTURE. THE STRUCTURE SHOULD BE CLEARED OF ALL SEDIMENTATION. 3. EROSION CONTROL IS TO BE MAINTAINED THROUGH THE TOTAL COMPLETION OF THE CONSTRUCTION PROCESS. 4. ALL INLETS AND EROSION CONTROL STRUCTURES ARE TO BE CHECKED ONCE A WEEK AND AFTER EACH RAINFALL TO INSURE PROPER PROTECTION FROM SEDIMENTATION. 5. ALL EXISTING STORM STRUCTURES THAT DRAIN UNDER COUNTY ROADS OR TOWARD ADJACENT PROPERTIES SHALL BE PROTECTED AS SHOWN ON THE EROSION CONTROL PLAN. 6. IF 501L IS TO BE STOCKPILED, IT SHALL BE SURROUNDED WITH A SILT FENCE TO PREVENT EROSION. 7. SILT TRAPS ARE TO PROTECT ALL EARTH DITCH INLETS. 8, PRIOR TO EARTH WORK, MEASURES SHOULD BE TAKEN TO PREVENT EROSION INTO EXISTING WATERSHEDS. AND PREVENT SILTATION ON ADJACENT PROPERTIES. PERMANENT VEGETATIVE STABILIZATION MULUM MAY BE APPLIED ANY TIME CONDITIONS ARE SUITABLE FOR SPREADING ANCHORING REGARDLESS OF VEGETATIVE COVER. SOME EXAMPLES OF SUITABLE MULCH INCLUDE' 1. AIR DRIED WHEAT. BARLEY, OAT. OR RYE STRAW. FREE FROM NOXIOUS WEEDS AND OTHER FOREIGN MATTER. IT SHOULD BE SPREAD UNIFORMLY SO 807. OF THE SURFACE 15 COVERED FIVE OR SIX STRAWS THICK CTWO BALES PER 1000 50. FT. OR APPROXIMATELY TWO TONS PER ACRE). 2. EXCELSIOR BLANKET. JUTE NETTING. PAPER FABRIC. OR A SIMILAR SYSTEM APPLIED ACCORDING TO MANUFACTURERS' SPECIFICATIONS. 2. WOOD CELLULOSE FIBER MIXED WITH WATER AND APPLIED WITH A HYDRO- SEEDER TO FORM A DENSE MAT AFTER DRYING. IT IS BEST SUITED TO SITES HAVING SLOPES LESS THAN 37. IN GRADE AND LE55 THAN 150 FEET IN LENGTH. WOOD CELLULOSE FIBER ' SHOULD NOT CONTAIN GROWTH OR GERMINATION INHIBITING FACTORS AND SHOULD BE DYED GREEN FOR METERING. IT SHOULD BE APPLIED IN A UNIFORM MANNER AT A RATE OF 1.200 POUNDS PER ACRE. MIXING AND APPLICATION SHOULD BE PERFORMED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS. STRAW MULCH SHOULD BE ANCHORED BY PRESSING STRAW INTO THE 501L A DEPTH OF TWO INCHES WITH THE USE OF A MULCH ANCHORING TOOL. OR SECURING WITH TWINE OR HEAVY STRING AROUND PEGS OR STAPLES. ALL MULCH INSTALLATION TECHNIQUES ARE TO CONFORM WITH THE URBAN DEVELOPMENT PLANNING GUIDE. FOURTH EDITION, JUNE 1990. W `j O 6W pa W X Ag V .3 a xQ .3 11" Z cn �w > a w W W d z B' 0 z ra Wrao ra 00 z d 04 Lu 3q ur�� A 0) Im u K. II- m W z�Do o ul) azn O 1 t� 610 0 as w w z z w a U Q- EET NO. 4 OF 5 OL 0 0 Z Z Q ii J Z0 W DC LLJ v, O . v LL_ Z �a 0w J LL-1 EET NO. 4 OF 5